Open navigation menu
Close suggestions
Search
Search
en
Change Language
Upload
Sign in
Sign in
Download free for days
0 ratings
0% found this document useful (0 votes)
542 views
Piping Notes Part II
Uploaded by
vishalsathe
Copyright
© © All Rights Reserved
Available Formats
Download as PDF or read online on Scribd
Download now
Download
Save Piping Notes Part II For Later
Download
Save
Save Piping Notes Part II For Later
0%
0% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
0 ratings
0% found this document useful (0 votes)
542 views
Piping Notes Part II
Uploaded by
vishalsathe
Copyright
© © All Rights Reserved
Available Formats
Download as PDF or read online on Scribd
Download now
Download
Save Piping Notes Part II For Later
Carousel Previous
Carousel Next
Save
Save Piping Notes Part II For Later
0%
0% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
Download now
Download
You are on page 1
/ 116
Search
Fullscreen
7 eS Tempavaluwe Measurement “emparatire = Thermal state ct a substance ie totness/eld Class Weation — A] Expansion thermometers 4) solid Expansion theromesten cbe~ Fa Bimetalle theromeler 2) Ugucd Expansion thermemeten eq: Hg thermometer. 3) das Fxpansien thermometer. g = Nihogen /Helium - thermometer. BI Fined system thermometer 1) Gas. tiled thermomete~ 2) Liqued > Wospour press — 1) Radiahdn temp Sensars (Pyrmeters) Ny Radiasion pyrometers 2) opticat pyrometers Temp: seehe. = Define wort Dtixed pt Tce pout Dee starts melt 2 pts te. 2) steam pt wotew Steds beiliiag ze pee TE is the Hemp of Ulich ice -aivwater is od equillihrun whompt i= femp ar Wl Stemn- aivfwaler IS of equilibniinnSteam pt iwc aie s4s2 | CaF feo \ | ree pt |e ae faaag oat 1° a oe . as oe Reaumor ee UB x CeS2 Ke te + 27345 thos fe + a5TT Solid Expansion thermometers 7 Bimetatue thermemeter ‘pinciple !- Every metal expands on nse in temp & contacts nq drop in tOUp. coetlicient & thermal Expansion Boepansion of unit lengin per unit change tn tes conshuckon High Expansion mera Fixed End Fee Cad dee deflection jx menture as Mange in teup,DD spite dimctal thewmometer: — greta used in thermomelee /- Twar 4). Fe 4367 Ni Bio —me Alley 2) Helin Bimetod thermometer (rap enue 74 “IBS te 840%. MOTT Liquid. Expansion “Thermometer :- Pineiple == Expansion of figutd vr = final wolune ob 1 Taihal volume = Ve T= Tnal-doup Vr = Vo (4 t+ prée yi) Welumelve Expansion liquid OF Temp. Hig Thermomnetews- ante te 258") ans thermomele can be used above B58"e uphy S50% by putting shert ges tn thenmemetet; 05 ther” gas elevaled poiting pF ct mercury: Gas_Exqonsion Wrermometew:- rinciple :- chete's law. (Pressure measurement) Molume const. POT we canmovky used. ) Gas billed “thermometew ey bay epics Ae evvtdea toe yEse al Fil 4 System Thermeneter: Vapour Ailled ~ Volatile Liquéd cassie, mélunal fas Billed tuquid ied - Bechtel kemp measivivg Inshrame RTD Resistance temp detector Be RCH OET ath atte.) Re -Resistouce at emp Ue Ro - Resisiace at temp ote Ws, Oe, ay ~ constants Rensterce (clus) Brdiccternrce(os OOREES/Cm) 5 fee PM ~ cenductiuce is alert zerp Gensuchon .- Sensing etemet (primary element) Resistance bulb — enduching metet RISA Gs Plestinum (ey Gengictnance Slur be very Lule. PT wo Sensor Lad Flaine Paiewce ot mente wo St Sam CH seunowe ie cope Resiste St soe. Reridtonce Con be menure b. f glmnovmelens, Recmeccareeecerstees Thermal well (55 5160) nemant 40 Proket wesicterce bulbheat stone Bridge circle mers Resi f Temp 2) Thermsters & principle Ter Resvetaice (ehan) sersiag clewenrts are sendiconductoy Qaristamce of s/c decreases 0+ kup Incvenses g tye TH temp cost at Resistorice Teme P fer al yesislouce Hye Tee Temp coeft Temp P resi) consbuchon C=, washes Beod Type ‘pe Dise Type“Thermocouple Principle -- Seeback effect eo Gam) v4 Themien Pelton re Th emt Te —e —,| TRI. ~ Temp Dittevercce 2 Hoh meld pelt os Pome, juschions & tere is Ree ailtewewee tre ede motive free 18 qeveredcl Type live wire | Feewire | Temp range. a | once B | MAR/as| PEA /ene| 0 tw B60 | | [ Ho | constour | “Ite te BOC lememet | lume | =t90 eo sTI% 1) Exposed Type 5 Seochion, Dest cutest wih oaae flaca 2) Vagmunded type 5) Gnounclecl Type Reoceed wes, Radiation Temp. Measiremenk (Pyromely) pay henfew Heroughs eehomgrehe waves Ue matt, eeeaetrey ee tao ie ~ OA pan + Geltzmann - tek ; ‘ ae mie ont Woes fax de sar xi? engs/secrear® deg? ayeropile 7 Green tos) vot boty WZAZZZ 7 ers Opticot Rrometry principle ~ Spechad tadianl’ intensity cb certain sence danagin oTBe pica Temp >tamp Aaj ee Supply ch ep to akee Wrage mull ie feet fae Met Fee. Os yew Sapely de Current 13 Caliomted in te, alt cmp,Wd Materiat hdl 4" sch 40 20m EYb0 get at Elbow ast 4 anes TEE Une me a alee” yates EOE CON. yay t Alar FING E KIN. ISDE a os nurs & Bors 2 Lee |Rajendea mw phavdle (CFO & mona 9 Diveth~) concept? Clearante cmapang, Pet Utd 18/6, Bandar complex, Nea PMT Depot, Rand Read, Pune +38 conhecl Maroguet Terms y ace Gergrat condihons of cowha ck 27 SCC ts Speciak cor dives A Comtena Am - Eactleas Mone Deponit Bidding Procedure -- Technica Procedures . > Features ot aids /propesale/Tenders © Reqd Decuments => ebmmentiat ‘Terms 3) ware mettods 4) Equiprunts & organizahonet pepltyrents 77 GA: poss, planing Komcrod Sy Cc wed, 6) Overnil schedule chart) 4) Engineering dnformaben Flew Schedule 8) Derek tectensynre speciheaher. 2) Pregress xepaneg. | Gnerdvebtu wate de we) commenting & Teumntent Dewiahins NJ original Biddieq BorwmentS Atanspe a € stgved Pawns) Mier Panning Macro Mannie, vo Conbrarts & Project Management, 40/04 Jos é& Con factig Common De ticienese T Incorrect: contact Srategy & Bocumers ~ Anccewvate cost Fshinacte — Inadequate Made Powsion — Inacucale speccheahm- 5 ¢ Dawigs. — Mentralized statements abtching aualdly & cost = Unidended Role F Third party, wunsuttans ek, ~ wridehned Bete tommuntation Rote & Repabig, ~ Ne contingeucy Prov: ~ Theoupetent ‘coubertors: — Unreaushe gd Time schedule £ Pehys +> ReScusce, Eup leg tr’ daabillly te Superw se hen; for € Crete t Coubuck Couema's Silen, Sr Turneey — Eatire responsibilty of porjes tists Coches rnkey project LATE — -Lumsump Turney pro Procurement , coustachin, EPC ~ Coginceriney ne SPEPTC ~ Eughice sug, Procurement nex 2) Propels 4 Projects Mant. @ 9? Project is a specie plan prsested fy considevahio. b) Project is prepesal for co Ineeshmerd © Doject is a visevete package cb Snvestneut dp prsjeck hes defined SlorWug & Cadiug Petes Project Management ) projetr mgart is Plannig, sche dbeug £ Biehl a of project actives achuities te accompli the desived cbjechves bp preject wager io te wale the mash efferent £ Etfeciwe use of Resources~ Manpower, money, materials £ Tehnoleg 4 Features of Projec ) abjedive, Lite spar, siegle ently, Team wets. ike cyche uniquentes, change made te dev, wrchy in diversehy Sab Contracting, Risk G uncertaaahy » parameter. frie , Phase ct project WBS - were Breakdaun shudure ®) Problem Iddawheabon 27 vebairg es FINBS~ Feed Werte Rretdorn shuchvre,Te = (Tet tin + tp) é te) ophnctshe Te - opkimush'c Time. (Shatest pessible ‘ty wnieg Te = eine toes Gate se Tae stung Th - pessiovene Time. -Cmae dave rOqd » O35un ues everyttuic. el lee: Ty > mtest Likely Tne 3+ specie M~ meesuneble A Accountebte Re Rahored A - Tans parent. (CTowor widow ) WIR WIN Si huedy er you a loose. wove, loose we tote loose wren01/05 oy se- 11g lay-steer = T1G Alloy. ste G carbor sted - In somve cuseTLG vs used > Longest cwss-couny pipedine ABT 2a" 36" Teo Kus Nazivo Bijepar gadslapur duak = MP-UP > Euigmed claserhed stds Ratomy ose Piss p = thermak Powe- pant BScs Sd capacity ob guavars Thee wrok pore No ey 210 mur 50D My WISER ie ~ 2" 800 4 2x 509 merp_~ bxgio J Types ob piping > Typed Mal BHF tates? seas / allay walics AS3S Pa ee Pu ke ABS wErUpIO bow 0% Cement ied pipe — under Ostunel wed Cemest Lined aed sit Dia ct pire ADP pre ¢ ofee. - (Blacle. )Meoinuns Ak pipe eee ee ovaileds le (2-97) ae eee ae oveutable its pare Bie}, —> Upto y” Fething £ ove Fnged Gbnre i, FHkg ave fabwiceded. at sie 3 > Raiding ee eee Piminvy Cobk > ved extde leFe Cock — l 7 Epsryle, Coe Serle J 9 Insulabou Hot — Reckwok. CID - poly urether fans, > NDT Pedr (ee oe ‘Peph. an — ety "phy, cobalt Go TSarce. — yp agi (Oper eomdirs a) FO 60 cre, Beside condition Cunct) cosity[ABS Work Break Down struchioe Veit A. equt pment wr 2. Shrechtve, mr Lt mpaiting, a* As Insulohow mt 5 Teshugdcendi — man bys / Days TRB F497 6 /4oins/ maT s as 35 im inch or gt” se) ame HoraeDratot ig xtm = atm = ip eee] bstat ine Bxsm= 30m 64 Shae ety 6" RAMs Ay Bh eyo mT = BM “34 leo" = [6o"™ 20° = 40"pSch 6c — 40" gy 6 A0'g Sch igo ~ ac'# xs 1a 120% Shwo- 41782 ww wY re" 260"g CS person) A Welder Gang gweS about 50 te co"? Productivity af rprefabicahon in shop / Pay. Leider — 2579 productivity alr site / pay. Falmication co fitfings wate is calculate ings wate iS always calewlated iy A tonnes ‘ terms Ulbasonte is is dene at citteel, cases Radiepaphy is cherged per fila — pew inch Pasting per Sore meter /toat Irsutohor pee me Dp per wt Testu, cotisianiig Jer hs TMG RULES ee Bree Tquipmeat= 40 men Ors JA Cy heuwrg em 16 hiker) Retory Pumps — TS ments /our Compressor — Wo wren hea/ eer Shuctwe fabicahon —Igo manhys/T (te dian stuchive, Evechou wit) Platforms & Graig — 6O mar bes] T Faieting, — 05 mawhvs /3q- meter /coat Sand Blashe = 2 man hrs / sq: meter Finsulahou Ket 2°5 manhys/3q:-wedev C25 marie) cold — 6 mains / Sq neterepig: (wtp) coronstect = 25 maunhrs /"¢ Staintess steel 2-3-5 arn bes / Alloy steet oH man hve J"B Crt) shes yeleuing pect Golowise tren :- 4 mas he s/ "meter pve [HDPE t- OS wan Wes / mater Pipe Seprovt Clight):+ 300 Mou furs /toun, "wt "B Rabo © 4 unit piping, ~ 45 we @ chtser piging ura pipg— 3% 4 © under Grounet Co @ ewss cwunhy piping — jo abe $12" — 12m teagth gipe is available,M/S Tindal femilizers Stajapar Oem has equ from ee Cowhaciprs ane tenders based on Fhowivog. BOQ & sta Redes. calcaleke tat pipe AISS contact hes tern (Of. TS cour qe 1 viscous OH ‘Btal prize Hence cobculate tre Buck amoury tebe muated. Seo Tew unib Sry nate Aurounk 4 2 7 & 9 ‘ CS Piper Socks'y 100 &s/up Choceod ”m) Alloy stee 1o,ax0"'gs 250 Rs /"p (26. c00"" my Steaiiless Boos’ ss 300 bs /¥g (2000"m) Pigs vert see 8s /p (Fab Lerectiony 2067 Radicqaphy 10 7 20 ks Shress Rlisvog sy too Bs Fainting too, 40 es Snsulabun Sox oe done Cheawec ee 12 10 vw? (Bed te os) Booo &s (Hes oF Hen), eS Supperd Area = 20 5qe Ar. HH you inwe give de Ym Ly convert : Goncerstion my pat Rb Sqn crea "Mx od = mw2) ve piesa — eat poesanct ax high 4 fabled, po ik Lown A pent ey bd: oes 100 = {ers nto = 14 —Ta= Sut ly Aupeieated atten a used ko alsive teafou > Press Plow Diag : 4 Sterstecne fo tmp - Max ofr Line Designswwiw-codfools- com te fou poi, tu th messed sith therm wet bulb, —2n_aummer, wet-bulb temp mow, —etin_undar AC, thy bb \ pie. given Janke Sat she : ir etal eas 2) ad, eee %. ie ae Foes null feed wrreren aller. ©PFD + Preeess Flow Diagram, e2foes "a Tank Data sheet aust p55 ) Tape & storage er Po 2 moc Cae aes Gage" Nseta » Ste eege wilt ae [eenro) min allowance = Vig" Finetrsed Ze UR Hydrocarbon handtiig ~ COOE - shred at 9 Pot plan 6) Une ust 2) Equrpment Joyout % specification of pipiog 4) Pipitag layout 5) Review & PAID. : # Muap shut off head Bip Rrra meter ont i coogtnae Haid Waid Vis move tlie Belo SCV Peet oe en PCensh! pévse. ~ ceachyet prog dr int a y rk ‘een spar iraecanted puss acum cauge or | bo Tor = % mmty | eo erat ae cent ect —————— skears femsity Us favess- 2am Hg mont vel. com years i 20 wm + 25 m/sec Phomkec Pre PO ylems? a Po= 2KG/em* le ao 20m w Aug velocity Révoutage Eco ia eper Syston Meisctess. process Que A taal) Polyrer wind wisccsiny= amo opfa FIL Flo Diagaat € its usefulness 10 pipius, Eugineer ema a aa Sone rete oe - ‘Nitrogen ~ chilled wate - BELL @ciler feed woote~) ce ee we ‘er _ ee Set pl of Relief valve = So psig — habove comes under TER. Paes sey = 25! ta lety Wate Row votes — Potable watey oe oe beter ted wate) ed cate- Der water fee fom cofanes & tousaa canbvifigeal compresses, used fr generation. ad aiv . iv © used af Freq fem (ae — Back preuiere = Be a Be peers 5B plot voit FLD PO gta tee fy RSS > AN pacistve to be vensove Bowe aly foicirg came db dived: iShowenst ©] seconmbje cb ay ak ofc. find AMP av ak joctc £ 65 Fgfemtg, fave = aps : 103 x B00 2 5 Cee a ane is m/se oe 2134100 i [we seeze Amy} aay ae ee 4" T0.13 m/sec Thx y oe Fe msec sts = rH aaa mise F amisa ny whed Win ba © osee Is eapseaos 4 utility Flew Diagram 3) usitthy PLT digream. Super heabed Shea Sensi hay ston, ce iias oe m= 2-2 Tp Pao 28 fae Th = 352'¢ t Me = 25 Tp Pa ~ 25 Bare ete 4 only supehacded teas is To Bad Lullatpyict mM Rng i turbive as not {apechected “pli Loon cowuilete ou St hebine Dade os Hf can make Dlades Unhatawce hoe 2801 “bai Ry Hy = Mp xb 22200 © 3189S 4 404x125 = 25ecox 2801 ne ka, Keg : > KSe-ks, = Me hie oe a = 2880 as 10? 2-48 TPH Refrmer - allecl hear & penercile steaws Deartaler i Remoue oxygen fw Stone Belov water ed 4 ceartahr:vtthy = yg oF meuery De-creator Dei = (ie ae cern Ide " oe A hg bunchow Pe-areatrn FA" 8254 = th6 mm Hg Tore Tre heed water WOR EET = (apts pee OH espe Flee gasit woted it converts to Sulphur aced. 2% Fem Prawn poly RE gy at » PM wale te generile denen feed in be-areate~ al Beg pets at HS. pmpit ty ccononstte 9 vecver heat Excpocder chouge & place guine evualent onset heat fro Liquid Te xapren.v a Genevatvon Disthbuion, cookieg were oe S a - } elie steam condenser oe @: Any ED) her = mb ne x s6c0 Fee 10 = A x15 x 3600 ens ther . pene é- [S74 Lee =n Tsx asco” /T So by = OOHR m snp 5-R— 4" 6-0-6" to tera" $-ge-6" 9 ae 8" Flow ot header = Aad of ot few rate = 450 “Yaw fad headlepyg Size = add east pipe™ & the sy-mwhWek pple = 32 35% oe temp an hehce } heat pranster only #7 OC aber are Pave Ba Wen > Molealer ut cb ate o 2g Mer te Dregs Ue ae ee fee a ace ones Ze, WVelume ae mee = 2g 78D = 9396 kent ws wt = 34%6 J Water ax 200'F through 4 sch vo steel pipe ak rate A AIS. gpm - (gellar dew) S = Goslot Abs /fe Agen = oases HP wate = GE IeISe 3329632 ftw3 os fio4. 7 fy: fateardnan. ; ‘STEAM ae id STEAM —_ VW82E30EN Gonouliant) Steam — tow temp oil = High temp Prescure inexeases — tne Boiling pt increases storkeg pt Re piping fa utilily Stock Process. sam [pit Be 4] Water —P Silers — Produces steam [px ) Paging Je rig washing € @ demineredl : : [ requive : Cleat © Fitter 2) Casileys 4 Nib eee : ee fe ee 8) corti vquende 3) Oxygen 5) Inshac AH chilled water 4) Steon piping it) hess Anabysis ww) Romeval ot eondensote—s acitved by Taps. iv) Romevot Ai fermected te pipe Twps one of 2 yp es: 1) Thetmodyramsic. - Ya" te 344) 1) ducker — for large sumount of com deutete . Taps fe be provided at lowest pt of Steam pipe bine fr vemawet of condensate2 Cemmeriice tldle~ plart Remevek of calcium sulphate Cu So, —+ 1504 Ae cation/Ancin — Dishiatted conte utility Bleck @ Boilev House G pm. pate ® chimney @ water stmoge tak © B-F pumps © dosing systeus @ conteod parret @® dAY Tank fr water © day tare fr fuet @ weiter House tayour /D Ee Verical strage tau Desiga as per IS B03 ‘Dosing Sistem — Atkinne.® Steam is water Vapovy uses ef steam an fades Steam is used fur heat ¢ pawev “Jo process plank Steam is used Br heabivty the cthor Substance _w 50 pauer plank steam rs used 12 te Ihe Turbine Zt tum the wier of an obtematiy £ used te Prrduce cledeveity Ulky Slean ic used at has a very Weigh heat courteut St gues up TS Weak at conctout temp. at is podice fom idler which “s cheap Tt te edeertess & -tastless te to henk com be used over £ over agar dt cow bee used fw pouer generate 4 then Ry heabinn St is wodily dembuted ¢ coudrolled . qomeit Sacks 1) Vopour pressure ~The press: of winch the escape et molecule from Baud te the overlayilg press. © calted Yopour pree® qs » oo = ue porate feimp of wLs'ch motectes hon te quia just batamces Te overdagiing peas is cated a polling 9 2) Hak ct reduced pressure -- IF we oecte vaccum in He Nese codeluing ugquid: The liq molecules escape wine aBily bo THE foilig pk decreases, 4) Salneded stawn:- wher vapay is ob a TAP ameipg fo tre Lqwid buitiag pt - appropriate fo iis pressure th is sard t pe sctiraled -9 steam classiheabian 5> POMPS Compressor piping sysku 2) Condensate recovery ©) Yee PPM /piPw soc BD DVistllstten syste, 7) ccoe AI coollieg Cacter syste 5) Fire Pibing Sustens 4) Bom premiary dntermudoted kuat 6) suppats Hows Steam Acts steam is simply a conveyer ot hea is Initially contuved ih et Be Ue cool wre, gas ledmciny Good oil or nade wep. Recommaded Mow of Stears—» jon f/sec Rensonable velocity lov diy sdumbed steam ave qt 26 m/sec Buk HeXS is mem muge abe these velo. noise C erein will fake place The above WU. ae geod ah main header Gul fa branches where He pipe sire weduced wel of ISim/se would be Leume preutl cot -Fitieg on velsathy takes po aor account of Reeugih of towel and theefire it eau produce @ Very Uneven pretaet drop. sue oe ckarutcal pit Keep ot Nealiug wedi can be simperfaot Ko fy satan steaus pressure.‘Technical De 1) Type = Roreontat Werient Smoke tube /icater be 2) Megat Nom suupplien ty give O” ypu Cam specify Ate ifrrmation t ypu lave 2) Capacity fom Wore | 20 Ky Jae, 4) wing press kg /cu™ §) Steam cudifion + WBT/ saturated /siperlected. 6) Steaw ten at ca 47 fact ethumey. Tobe om bSHS/romace oil/irm a S) thermret CMs Te be Specified by ak AD Fleddwical power available 240 [440 17 fel @usumphon ") pesiqn code 2- 150/15 PP Mechauicot Poe Tora /tmphy wt wokiog wt Overa dimension, SS RE Re Be Fate Sot sin Fuel imlet sive a eee et Shell sureke bee foadetle 14) Boilev Read Taushe Arca U5) shat holding enpacity |e steam space mt 5) Fuel gas Acap at Boiler pt . : i ot Kult Lonel cor in Cael /S01) Teed wolem arrarqemonl 8) Fuel prep ‘Type - Gear Capacity © LTR/y Yess-in (Burner) oto veciben $ Pre Leate~ .- 1) Pratt equipment FD Fan Tee = canbe fgat make capacity «> Lani /ay SILC press 2 Motor rahe: 20) wate requirement Ay neg Te requirement /hy in kg Elective qutat lead + Pops + Blue a Sanday SI) Feed wate~ quotthy 22 Reqd Boiler feed Late~ qBality 23) TRR Approreat 24) Inshunets 25) Pees2pifo4 3) Eleddeat Detail Bugg 9) dostuument Shady (©) In coxporahien Tho. in Pro 1) Release of ofl hypes obdayouts 12) Tendevs. 1) Equipment layour 2) piping, specifienkion 3) PAID update 4) Equip speciheation sp Rack study 6) ceil foundation design § spec 4) chil design Peto nits of process planar aii Reacher Fumaces, Distillabion compressor Filteration. Sols eT hestion \ an Rack piping 25) space should proviite hor kiture space’ on each asks.WEleclical cable hays 2) Anshumedtehon cable hays > Space br coating reegin | tee 5 # Gerenlty tlechieat cable are pehced wp a the reek 4 minisiem salir. distance he wack should be Oe Moa! 4 tility pipes on 2p of seek ped eee OP ee DUE types of Racks t kame 2m, oF 4 [ i “T K p<] APiping... SUPPOPTS. + Smpovtaoce 6} Suppor — 4)io_ 2 voto fre aust enti esng — “bd To dake expansion lead a 2) ‘Te take. tind trad — AD Te take. easthquate- dead. — urduces 10" vertical tpad ise 2) Te abseab an peg connedted te setatig mper > ea es pins in pple syst (a BO presenta een ps ed ete) ah __-9)Ta —uppont—-oye during — stat jana standby — + To, 2uppeat— mnaliance “ t oe 1). Genero — Actas D_ tonsbourbion—cetaile 2 _jynvkibo aa ia fpadiont: ic daw cote eapgeoas— aay a Ss fs vpn Leia .-2A2= = ae Senta it hn. acta eeCetetion ap ripe valule app 4006". 0.005", 1, very gtd -ancthen agate 3 Based on. ee AD Bixed “Poin Suppest est4 Tatamniion et Rien will weaker #ne pmect pipe duetn HE: : C tue teintowenont past iz _wephcle cae = To Wales elder —Suppente {ney matt egtee ophon im Comer, Flange weigh, ee a0 Cee Medes ast leads ane calenlied ak cath jn nang in Ai deta nede nes tobe ain,ay lope pate “fob Tepic > SnsTuemenlationa Bot, (New) Piping + IGA Aduntitictions :— : ental ey yaw * tig tots should bein capeek Letter 9 we ALB, -- oS WD Maximum ne- -ch “Uantityiny dattod should bee 3, WH) pet tote “boat ed Aw Baik alphabet Ake fo Kemp ~ deen ti Garo tape (TE) » oe ie fre dart fe len NO ” Aumbel- Lent font eaten 7 92S... pov.flan_dy = met 28 Hg aynisl) — soning dead Mines [Peppa i Jeeta2 Beaxd Mout Cage svete) 3 Aecal Mounged Caoubte decevtea), I e 4 Beaxd MowitéA (double Jewice) Gl + 2 Trani »- ee pom one Aneakeen, 4D otter ! 7) deat mounted {Bean onountza ~ | | | 2 Guana A tench valve 2 ! : Dy fot = iD Hufsatic, | —— fanaraite ey ce, | ae foinuou—potpla—canat anual ney |Prana, np ateatip maxima at Belli & min at: top, 3K LON. MEASUREMENT: ~ {eon suanbatg muttiods DPatt of Y few: i) Jott ee 1 fptagiven, [amet aka gin fi agineh 2 Gea ee theca a :2 Veriiivimelsse Biot fee 4 how nea (r= Navan | gaa ace 0 ae we ae Clube: Sk pe aectonelin, L Se oma E) Fouitiwe ener pate a =n Aa a Veted: S et ae ¢ ty ren % Prcpetlex vr DH Paine ot Head pow oiler Prunect 3 ts ee —— Qe Ae Ay 2 GisBeas a OPIFICEMETE R | - enh Comtencta OFIFICE PLATE ee AP= Pim DTabewan or- i- m= b Sg] (SS) Nolunctie. {ow Fat A= _ (ho | \-pt 76(- Dp | J Manone. AE p= Patio oh. aia of ouipia &. Ain. eb pe Sin cpa = 4 G= (ip fe flow 2a F oifiomits an be WGA fps only pafely Boiron pp eo (2 Was _pr-dacp. vstiich vecover Kamae Stead nan gym = detain gop gut pots fee ae pics etdPeombGan ake = Dune & = SK ppe aia UpsBiaun side ‘ pA p= 04 aa aaa Pipe dia So deen p> Ae 9X pipe din @ “Ee bm Oy HA = 9% pipe da. + Caluulation tox dont Once bak Hun BH AAyiuten ef eu! moncmilir to ke Aone 8-4 6" N= 0-98, Stk 8-0. 2 ae “ Hayy Lil wid Prisco. : eae soot - x Rich pram dese Feel. A cant deal conc veace % | | | |fess ppt revs plow, venkasimdle Show ps dap, Pxesure veiove ted ot Dupdi— Maly. utp oe § yg np ft a Q- few, Had ee rN "Ges Spee th aman” ak wall, mas ace fhe es Aoti< Dey Ino pe Ane ae Rugs op tata ble deg 1) Ersuse Anat eid 1) — tua Ait oust Jbe_dlean gut pee ue ep ors = {" towne musk be. sith 2" aud “4 tee rm\ BO. iy) Ghe conecing Auad ines should. not bemere than Ceppet len Y) Je omecing tates must Loe omaunbiened ak a bet 9-400, ~) Aeverdangf! clenunts must Le cerweattd. below the lve 4 paray ole He NARNBLE AREA METERS »~ rivers + chang Incase. tech Mu pus lf unt 1) _Potumutiie -— CALIBRATED, £0AL. runt — * Polat show. de vestheal, lat alunnys a Lette ABE Deis Garnet Le-“ustd pot seven skate! o& CHUNDER _& PRION TYPE FLOW METER- 7 RLECTEOMGNETIC. _FLON METER. = FEINCIPLE ' vada: tow sats flak whe a cucu a condnitor. enovei 40. sexton’ a old. tun EME es sian Ae tnd Heserge. would be He Ain of pipe anad Ditap:-V)Un be used vonduttive. see de ued errata pipeline D tony be wid tp ma peta aa fy edu 3 TOTAL How METERS > Pewee! Poiikive Ait platonunk pr s- (Feupsaig pomp <= - Nea Volume. iia Siglertes intel volume ausplou =the phectprocekig poten type Lowmelx + = = amt cay ee “ge Pieonab we poco Xdeve lobed unpeller fjswmilbc!— fo handle diy Nicos fluids Jake kare, ete 1" lost doze} |Lesexio'n' 25 blot. | toto ttn hy EZ toes [poxit tts 205%. |t0"tos sane Sh lol th] IOS x saic nt tost los bgome fheSTRESS AS- 3 1 REQUIRMENTSOF ASME HSL. (PROCESS FING CODE) IN INTRODUCTION TO STRESS. ATIONSHIL‘Sires on fc Yea pe Seca Mee FET bit Pres! at cere eee “STRESS -STRAIN CURVE: Wi eae nr erates pla apt gion eas Ke eon presen ees isda popeont nin it Ako propeional fom Spent ac tuna engin wD i ener an ep rh ei teste elongonor ig fhe mati whoo ny eoexpng ea | Pome ss abit sgh fate ome theses ile abwoasrapere en WHAT IS STRESS ANALYSIS? Fea ree alps ir tem apld 10 clues, which lies te sate and dynamic fading Fe nates of ravi, mpeatere chang, eal and extra pressures changes Testing fo lee ntiy. Codes and standards establish dhe miimom requirements of res analy ‘PURPOSE OF FIPING STRESS ANALYSIS urpos of piping sss analysis sto enue Safer of ping ad piping component “Safety of comes eqipent and supporting sui “> iping dfetions are within the iisILURES} HOW PIPIN “ar me var fae mds, wc col pag mse Te spn enna a provi pnt git one Foe ie mas y perry esse sre ppg cae FAILURE BY GERNRAL YIELDING: Faiheis due excessive pac defrmstion, 2 Yielding at Sub Elevated temperature: Pody undergoes plastic deformation unde lip setion of ans. 2 Yielding at Elevated temperature: After slippage, matrial recqystlies and hence yielding ‘Finis witht eresing lob. This phenomenon is known a rep. > FAILURE BY FRACTURE: Body fils without undergoing yielding ‘2 Brittle fracture: Occurs intitle materi. ‘a Fatigue: Due to silting initally a smal cack develped which grows after cach cycle and results in sen fare WHEN PING AND COMPONENTS FAIL CTHEORI OF FAILURE) Various theories of falure have buen proposed, their purpose belng to establish the point at vahich failure will occur unde any fy of combsned lonaing “Te falure theories most commen used in describing the strength of siging systems are: > Maximum principal stress theory This theory states tat yielding in Piping Component accurs when the magnitude of any ofthe tive mutual perpenciuar principle stresses exceeds the ile point strength ofthe material,1 Mexinauen shear stress theory Sonate that fare of 2 piping component oecurs when the may ga he she sass at the vied prt st ‘vials 3 So yielding 1) the comporenis oecurs urs shear stess inthe tense test, a 72, 8 when Maxum Shoat stess *nac2Sy-So! 2Sy (2 1 princi stress theot (a ss forniing systems goveme by Note: maximum or rininum normal sts called principal srs STRESS CATEGORIES SE pesos categories ae primary, So ory om peak PRIMARY STRESSES: UDA developed hy the impose! lenin and itral frees ang moments oth pip ar ncesary to satis the eqplibinm between extemal geyser, Primary stresses are no selling, < -CONDARY STRESSES: + CON Te consi Sapsconens of ster. These dsplassmen’ an be caused a es nor cur imposed estat an anchor point movers, Seevedary Cosas are setting PEAK STRESSES: CEA STR ESTon of secondary sess which cate dsoron, peak sess cause no signicant one fading corse the highs ese inthe region ur consideration an are responsible for using five fil CLASSCIFICATION OF LOADS > Primary loads: ot vided into two categories based on the duration of loadin, 5 Sustained loads sae ene expected tbe presen rough out plat opeain. eg presse and weight 5 Occasional lords rasional 12d gent infrequent ileal ring plan open ez cahauck wind et > Expansion lozds: aera uct csplacements of piping. © themal expansion sisi anchor moverens, and paling setleren+h QUTRMENTS OF ASME B31.3 (PROCESS PIPING CODE) “he code gore al piping win the prope ina acts ena nh resins or hans Tess sores har elate pode Exares ae» chemi plant, peso refine acing _ sing plant, ul lan corpounding plot a tank frm as promt Dnsidred ste resume, weight (ive and dead lows) impact, win, se ee a foes, viraon diachage resins, themal expansion and consiaton, \eciperture gates, arsor movements ‘he governing equtionsare as flows ‘Strnaes de tu sestained loa SSS 5. = (pian +55 LBs alowable sess at maximam real empeatre So = Bae ene dod in calling Shall be te nominal tihness mins mechani Coytesion and reson aflowance 2, Stresses ductn occasional oats, era Toads depress © ight and ober susained ons and of stresses produced cont ods suck ascahgue or wi. lino exceed 1255h Stress range due to expansion loads, ce diplassment sreserange Se sal ot exceed Sx we ere | TE Mi inplane bending moment, in niplane bending moment ib a a ie aren ineication itor caine fram appendix of B31. 3 ee te ses ntensifeton factor baie fom appendix of B33 mraz) Me = Torsion momar, i 6 = Allowable digpheement stress range (allowable stess a= tallomable sess)" Sr =(2/3) = Sie Br. 6m),«y= ie poi ses d SS TAG poi sressat hn emer Atlosablesress=5. 526 StS) 15 (S450) TSAR Bad after chiding with FOS pat allowable ses = [(1.25(8¢ $0)°SH) SoS shane lovable sess a minimum meal SoS 5 ee aeration factor rm wl 3022 50 S12 utr: Siva ate, Jinoie ENGINEER PINS arp, tn jmoore FEM FEROZIUR ROAD rome PASTAS AMOR Fras SIM en I cmp hence ‘inCreat Procem ne - Kee ena ow the Basics in Vaives Know fe i.usics in Valves Reviewing dosigtt aac applicatic the selection process ee recuse mint ann 6 ase anes Sertowpest sow nu aap nose, sueaeenhrttt tae St Seren en eemoretnscantbetco aE tee pane ua ner si tae ogc sed a te he nay ening amd a vie 0" She pecan achor aia exes fl om ‘reponering decent son beta pei oF be won Aiea icone deus apes or PP ta wee pin of i ow conten dk a opr ety yori te own Gory waves cna be od rane Sing arc Se tet Geom tone sarang pce ee eet congne ay ony marten ary ave Sita ere ecko oar oe Imo Secansay ogres tne bet ves, beaty ves ae nena atl an an, epg on Baetebyette ees ne carne of try tency, a eer ch maar ees eel acon eee ak ng nh vm Sesame cen aphoam aes BERNSR Sn tm by cing» tala stag down int asa They ae eee te fontton tons ho and hand hash ae Sy cave Rofomeciaw cone ‘heya say marine mary tgs, va poston iene hence ao Wieden esi vate Dactegn vive got uri ase ness andany weet oi Ma a st pre marie steno tae ana wh uN ices in ove ese it pcre mais «reumty ated dapragm a, rece cathe ‘mares mans: ate Spar tated auton renee o ashore Net adres araaaiopce eel he SS ae Ne eae stan am esa ve TE a cessing.com/web_firsticp.nstiContents/8625688C005A249786... 5/20/2004owt Seaton Valves Tee CCLSteRty eons Metentreaue ane ayeia Vs pea case bicmodysemg eons nace epenangen hemes est sok ake I he DeCateeaelnice sna Send bg ewer abe eupenenin compte sexi pr sna ae panna. Pe ele piinnrinrentatmrmeaan ns Bem ceeeur gear nme ne err wre ara ae SELES er pepmo namcn snag neo cn el Sine tet evtar igri cimwter yee oa Sande Soe eee ens eer atte nha cease eae nee SESS aitieeaas ac nan ‘eSgraa'n reve a fog toc oie stn vee vee fow) Rete Set reas meta gene petra ae eee he Bierpre se Sc yeaa thin anoc anaes ve Fh characte and emily ‘hetatetaren nocd overs as ype ue i mprant charac ‘ns tne ne eget, ‘pean on arthe ‘Sitar ht abs nye Sppraowos mara vave eco ae, prec reece a SNS Sa sorenendte steers Sire ate eerie SCRE SESESS ne Atco monsmnatotmaan et ncaa acento, ne pau an ener becnse rae wha oer (Soa ante ain et ens Seis ea ‘ent fact saer ove en eng roses cod? Be peso eh ute Siedler btetn werent nh psa eo he ows pee tp green cen nt. raze teil ot ‘ined erence hun ek os ne anos reg ave. To ‘Sistpnenze swe anh lpn boca clench canst} be ae ‘hos sta osee posure cron sale woes 2 he vab Tm lowing SER eR SERGE Sache scmenton mgr vac i £ agut it Footless Sooke gauy coche ners - Stes + ee torommbeeduapen rect cén : SADIE restart octet ctoea st , Sep ie Sstenarete reser sage me restae S12 ppt ole mn pean oo ft Ca Pr edomarenymnveiyee) hupa/snww.chemicaprocesing comveb frst mtu ave eet Mary rin a uence we na sci or osha ons gen Mae "Satan SGN 6 O-aGTEN pokes asa sr0n004TABLE D1_RATING CEILING VALUES ao m | ae ‘mo | vss | dim | sem |S 00 m | me eo | wo [ans | aso | saan ‘0 mo | ws | ttn | oe | ae | Sean tee ve | Ste ts | im | ise | ame | Sten 1200 = | fe ms | wom | jem | de v0 ww as xs os oo | ss ia ° ES s rH zs teSTAINLESS STEEL NOMINAL BOARD PIPE MES Se eee el oe TOWNAL Wall THIORNESS FOR Sas none a a Soto" s0" foots 100 tao 40 sen 4st Se Pn ame 902 ee os a Pa sense eee ee ye tes at eT a8 - 478 rar mer tes om an - Bar ast 554 102 + pedo 165 277 27 998 455 = 635 909 ty ans 165 277 277-888 AS - + 6a 870 1 4028 165, 277 277 - aca sos 74 106 2 se 165 277 77 as ssh en nor Se ae a 952 1402 aes 211 305 805 sao 762 = 9 1624 3, 10168 21-305 805 sm 908 16.5 ee ee 139 redo 1712 ae 141.90 277 340 340 655 952 - 1270 - 15.87 19.05, ee rn ter 1427 ye24 2195 g-m1907 277 76 - «695 704 B18 1270 1508 1824 2062 2501 2222 jo zra0s 340 410-635 780 927 1270 18At 2142 2640 2857 2540 {2 seas 390 457 - 65 890 982 1270 P141 2980 2857 sAsP 2540 te a5580 396 476 635 792 952 = - 2880 2775 S175 3571 te 40540 430 «476 695 792 952 - - 2819 9094 9859 404B te 45720 439 «476 635 790 (1112- - —-29.98 9482 ORT 4524 zo 10000 476 S54 83 952 em - «SBE BBO. 44454900 no ssa 476 «452 635 952 1270- wase 4127 4796 S297 zh eumgo 554 035 605 952 a7 = RED 2 een4o ey ae oe ayy. JM, & Coy 147/149, Ka soe, Gs, Mumba - 400 08, prone gab 702 345 0888 Fax | 347 1626 E-mall:
[email protected]
. 11Nema Outside Pipe sie, Dia ininches tom 137 4% Te %, 28 2867 1 sa40 1, 4216 1, 48.28 2 cose ay, 7302 3 8890 3% 10168 4 11430 14130 6 seazr a 21907 10 273.08 12 32885 14 355.60 16 405.40 18 487.20 508.00 58880 24 609.60 26 66040 Furs STAINLESS STEEL NOMINAL BOARD PIPES eh ‘sah Se 1010 168 165 165 165 1.65. 165 amt an an am 2qT am 340 3.98 3.96 419 419 470 478 654 24 1.85 165 am aq7 am 3.05 3.05 305 3.08 340 3.40 376 419 aa 476 476 452 635. ait ar a7 ar a7r 3.05 3.08 305 308 3.40 6.35 635 635 635 638 792 JM, & 00 ‘as ae / 345 0858 Fax [NOMINAL WALL THICKNESS FOR een 2 635 635 038 792 792 792 ost ose 982 1270 17 1149, Kika set, Gulalnas, Mumbai 47 1026 E-all ca 2 708 720 ey 952 952 2 Sa 403 473 228 231 ar 287 928 358 368 aet 516 5.49 602 858 am 218 927 ase 1270 1427 eh 08, zat 302 320 373 3a 455 485 5.08 554 701 8.08 ass 952 1097 1270 1270 12.70 100 15.08 1826 ait 23.80 26.19 20.38 sage 38.89 Sh x0 113 1270 saa 1824 21a 23.80 ar76 20.84 3492 ato 27 2082 25.40 2887 3175 3653 3067 404s 4764 400 os. ‘iainies@bomivecknetin 11 ‘ase eta Ba Srong 478 447 554 182 835 909 635 370 714 10.18 en 97 952 1408 1113-1528 16.18 1349.17.12 1887 19.05 19.28 21.95 2301 2222 2857 25.40 3332 2540 3571 40.46 45.28 4990 5387Pras beech ‘SHRI PARIINAN PRATISHTHAN INSTITUTE OF APPLIED TECHNOLOGY ost Graduate Diploma in Pping and Project Engineering SUB:- ISOMETRICS & BILL OF MATERIALS. aie: 1802/2005 Max. Marks = 28 Qt Why B.O. Ms requred fo give for every isometric separately? © 2 Wrle weather Following toms ae 1 be considered asa piing component in B.O.M. (5) 1) Pressure Indicator 2) Control vive ~ 3) Safety valve 4) Flow ofice 5) Reducor 3. Wite the B. 0. M. forthe isometric enclosed herewith on right side ofthe sheet, (17)yoSHRI PARISWAN PRATISHTHAN INSTITUTE OF APPLIED TECHNOLOGY ost Graduate Diploma in Piping and Project Engnesing, 2008 EXAMINATION SUB: ON LINE INSTRUMENTS & PIPING, rr Answer any ive questions 1) With elp of table sketches show installation of folowing instruments (anf) Rarer on th sketch the components and deni end connectons for each. Ao seit an i shetch scope change line between piping and strumentation o 1) Bimesal ype dia thermometer mounted on pipeline with suitable dhermorvell by Pressure gauge with pigtail (Siphon) mourted on steam Kine }_ inpinagm wpe pressure gauge mounted on 2 pipeline FS I bol fr folowing sre (a eu) ® 4) Tempindctionss pa of LC stem iy Orie pte iy Rotana S)Tharmonel ans Tepid 1) Totsiver pe Now meter Gate requirements of right rans of pipe (wpstream an dows seam) Lo following ) Orifameer iy Rovareter & working of thermocouple used fr temperaire ‘serie the pincinle of construction "8 5) How wl you measure absolute pressure and gauge presse wth te help of hauid eau _ Jib sven ppt baw ons eter cn Be used to measure Nowraie 2) When you itl empl differenti pressure melo for level mexsuremeut desu wworing @ _ Pitre bac temp ae tiods over other metus? aa8 sive eens 7 _3y-Comvert temper of 180° into 2) Kevinseae 1 Folrenet ele _2p fine surg of instrament 2yWith suitable example tetvetn dct & indirect measrent ‘bint between he weight of Now & ttl Now of fi 3B fie clbetion of instr 6) Lio ou eve measurement methods, which are commonly wed fr sais & bas ate relation berseen [py Aol pressure & Gauge posure 5b) Gauge pressure & VaccumSHRI PARLINAN PRATISHTHAN'S INSTITUTE OF APPLIED TECHNOLOGY ost Graduate Diploma in Piping and Project Engineering 21005 EXAMINATION ‘SUB: THERMAL INSULATION OF PIPINS Time = 90 Mins = 2 Mas Masks = 2 1) smal centage saving et los iF IN, ec pipe (ODO = 9078 mm) eng Aerie hid a 200 es sled with 2) 2m thick insulation 1) Sm tik nation a 12) Eimate opera of uti srfceofsulation when 100NB (ODD = 114/102) {Pann bre t-10 Seis insulted sth 4) 2mm thik insulation 1) erm ik insulation Py 3) Anger any ofthe folong o 1. Thema conductivity of copper 2 Typlet het gun bare surfaze for temperature difference 0f20 7 Regommended insulation mate for pipeline downstream offer cote or sompresed at ‘With setrence o optim thickness oF insulation, explo the following i brief 1 Tou anol eaviabe cost 2 Total annual fed cost 5) _A.Fillin the Blanks cera tine for optimum isan dikes i= at Toss ater insulation tobe Senera beeline rent of heat os om base surface het oso be between ia @ '. Withreference to PCRA revommendations give recommended insulation thishness fo Falowing conditions °) suragetemp, Pipe NB i 100 fe SONB, 10 "e oo NB {00 fe 2SNBSHIRI PARITNAN PRATISHTHAN INSTITUTE OF APPLIED TECHNOLOGY ost Graduate Diplo in Piping and Project Engineering 3005 EXAMINATION [PING MATETIALS — SELECTION & SPECIFICATIONS et Time L308, Max, Macks 28 Instruction 1 Adtempt any 3 questions 2. Q11 caries 9 marks and all other carries 8 marks each, 43. This section must be written on separate answer book. 977») Explin bie folowing terms, (73) 8 1” Pipe schedule number 2) Killed steal BYERW pipes 4) Creep strength 5 Seamless pipes Compare ments and demens of an hee of the following pis Oy JY, Weldabl iting ws Flanged fing, _DY Concent edcrs ws Eocene reducers, Slip-on anges vis Weld-neck Mange. XZy Long radius elbows vs Short rads elbows 5) Fat face Manges vis Raised face Manges. 0.2 State tue of false and broly justly your answer. (any) 8 ‘a) Carbon stels with approx 0 25% carbon, is most favoured see! fo pipes because, It kas ‘ghest tensile rength compared all ther carbon percentages. by Staness see 304 L shows more tendency fo curbide precipitation compared to SS 306 1) Castion Manges are generally alfa ype 3D Deonsulzed sels are likely to have more laminations compared lo non-deoxidized ste ©) Abstoiti stainless sets can be wed both as eyogenic materials as wells high tenperature materials 1) Useof CAF gaskets banned in sever! counties, 3 Answer briefly any 2 of following questions 6 Jat ae desirable propos of gasket materials 3) Pa let peony of serateaton of stile: By Bx bly one method for manure of ERW pipes 4g) ar rtlems do you come srs ar ung carbon sss above 450°, What along omens ar aed to counter these problems. «) Strclatve ments and demests of astomerc gaskets and sia wound gasket.Qe 7 os (]) Rewrite the following statements by choosing correct alternative out ofthe choizes Bien (attempt ans §) ©) A) Compared to tel, cast iron have chigha/lower) carbon content. &)) 100 NB Sch 40 and 100 NB Seh 80 pipes have same (LD0,0.) ©) Typical low temperature stool will ave (\iC1/Mo) as alloying clement {Usa mil elerance on pipe thickness s (1592. 394/10%) ©) Compared to carbon sees, lanes see welds are likely to show, (ughertowevsame)distorion 1) Use of (Slip-on /Weld-neck) Nanges is refered where lower pressure drop desired 12) For plan earbon sels, as percentage of carbon increases, ene strength (inoresssideerases). £2) Select mos suitable pipe material for following applirations from given choice cf mnnterial specifications @ (Coices given: ASTM A 53 gr, APIS I grB, ASTM A 106 grB, $$304, $8 304 L, Ayplcations- © ‘oo 1) Piping for superheated stcam at 360°C—— 2) Piping for long-distance wansporation of petroleum products 53)_Seamles pipes required for pressure compressed ai piping for conveying of dry Avemp! any 4 questions From follwing @ 4) Explain the terms “potlife” and “shelEfe as applied in parsing practice ‘) Distinguish between flowing two grades of san biting 3)5s b)Sa3 ) Explain the erms picking and parsivation {&) What do you understand by trm “DFT” of pint costing, What are units for DFT measurement in Metric and British systems, ) Explain the term “toughness”, What et is cared to know toughness of maietia? 1) xplin the use of pressure-iemporature rating cars for anges 2) Explain the term * Strinshacdening ange” wih respec 0 stessstean curve.SHRI PARUNAN PRATISHTHAN INSTITUTE OF APPLIED TECHNOLOGY Post Graduate Diploma in Piping and Project Engineering (0S EXAMINATION. SUB FABRICATION AND TESTING OF PIPING. “ins 2s a Mas. Mas =" QS) Note 2) Aterptany ve questions 2} guts on ah iat all ars Qt a) Draw nical ede preparation for but jon pipe sow he allowing 2 ) Rot sea. i) Bova angle 1) Groove ange in) Shand? of weld goose 1b) Givetypical valeas oF folowing TKelecicode diameter used for ot bass 2 1) Root gap in nm i) "Land? ofthe groose in nim 1) Groove angle degrees: @) 2) Wha is “Low ~ Hydrogen Blestode™ How doesit help ina ding "Under cracking o 02 ah Wha sthe purpose of procedure & perfomance quaications? What test ane cred wy ‘on weld est piece Fr the purpose of socedure guaicatinss ® by Exp 2G. 4G 866 positions wath hep of nea: sketches 2) Destite any two of the following welding processes with the help of neat sketches. sale the mehod of protective shielding (10 avoid oxidation} emploved in each af tne wo process you selected. Alo stat individual merit & demerit 189 pi Oa SMAW : “iy SAW Ai TIGIGTAN) h)MIGIGMAM) 4 Ste Toe Fae (Atempt om) o) 1) Barking of Low Hrdrogeneecrodes scared out pio to her 72) 6G quae ll weld postions for welder 3) “Sk inelson” is &mgjor problem in T1G weting 2) Welling ofS components eases much lower dionion compared 1 xrbon sock 13) Bhp oe Manges require mre chil fr selding~ nook Manges «let weds th st ofthe ile wed & the “oat” of the weld & te "roat af the wad are one & te Same £7) Pipe for LSOND sch 30 4 150NE\ sch 0 pipes wl be same 15) Far pipe ses NPS 15, & above te pipe “NPS” & pipe OD. ae sans 7) Lang falis elbow cause higher presuredop compared to shor ra bau 1 — op" & welling camp to1 List dow major advantages of weldablefitings ver the Ange fitings "QS a} State causes & remedies ito eauses & 180 rome) fr Follonang weld defects (aor any he) 1) Porosity 2) Slag inclusion 3) Incomplete penetration 4) Weld mal eracking 5) Tungsten inlsion, ©) Acerain carbon steal electrode is designated a: 7018 = What is significance of peli = What is siniticance of 1 wo digit “70 For what veldingposions th eleciroe can used Can this electrode be use for “TIG™ welding Q6 2)Draw welding symbols for following for Shop welding ae ‘iF above welds ae tobe performed at sie, how will the above symbols get meilid aw modified symbols Wie brief notes on any 140 1) Preservation of welding consumables, 2) Phenomenon of carbide ~presiptation in iainles tes 5) Essential variables & non-essential variables in WPSIPOR, Q7 a) Compare mest & demerit of folowing NDT method (40 1) Radiography Vis Uieasonic tasting, 2) Magnetic particle Vis Dye pemetant est vo demeris) 1) Explain hetero P = number as wed in ASME see. 1X. Q8 )How dosyou tackle the foloing 1) Welding of dsrlor material pipes (ay°C.S to S.) 2} Welding of dsm pips sedule (say seh AU a ssh 80) 1b) What do sou understand by teams 1) Tach—mter& 2) tinh dancer Explain wi suitable examples ©) Why Hydio-esting i profered over pneumatic testing of pipes. When is poeumati testing is pesmited instead of Hedro-tsting. © » @ a) > wo w @ vw)Pal ok SHR] PARUINAN PRATISHTHAN'S INSTITUTE OF APPLIED TECHNOLOGY si Graduate Diplam i Piping and Prec gineering EXAMINATION SU-eterconnesing piping ystems, Dein codes & Css county Times tte bas Marks = 10 SECTION =1 (Mia Maris 18) oe: Saya mak hw olan aera gH «q) Theses befor allot sero assent pean "SF" ah ‘ASME 313 Coe on 8) ASME BILL Code onl 1) Babhaods above 1) None of shove 92 Tapped inns oe No Bamps reson of faoleu prodocts 8 2) ASME ESL ® 13k. ©) ASMEB313, 4 ASMEDSIA 93 _ eon it Presents 2 NBO i Tan en Annan sie fader ie SAGE ie emfocesent aea eqe 73054 00 &) isotse=m ©) 30005000 00 ou Foray (nel 8 UTS) fr ASME B31 el ASMED 313 3) Sand rape. 1) Sforbs 2) and) spine Artem 8 Cole saying ore iin done er SS ASMEBSIT 3) ASME See VID ©) ASME SSIS. f) ASMESe~ anna seam su he sgh presi qs. Acro ASHE 3.1 rer i Brana ays sa dea psa SNe HE SSS ) stot steam dun nes eas aul nal res 19 IE
You might also like
GSWC Standard Drawings 2016 (Final Version) - Part 1
PDF
No ratings yet
GSWC Standard Drawings 2016 (Final Version) - Part 1
77 pages
PRG - TP.JAK.1007 - Steam Jacketed Piping PDF
PDF
No ratings yet
PRG - TP.JAK.1007 - Steam Jacketed Piping PDF
21 pages
Piping Notes Part I
PDF
No ratings yet
Piping Notes Part I
112 pages
5 - A9a Specification
PDF
No ratings yet
5 - A9a Specification
4 pages
Process Piping Drafting - 1
PDF
100% (1)
Process Piping Drafting - 1
100 pages
Plot Plan Guidelines and Procedure
PDF
No ratings yet
Plot Plan Guidelines and Procedure
3 pages
Design & Construction of Piping Sys
PDF
100% (1)
Design & Construction of Piping Sys
114 pages
Ges
PDF
No ratings yet
Ges
59 pages
Valve Data Sheet: BCXS302T
PDF
No ratings yet
Valve Data Sheet: BCXS302T
1 page
Design Piping
PDF
No ratings yet
Design Piping
412 pages
Compressor Inlet Piping - Compressed Air Best Practices
PDF
No ratings yet
Compressor Inlet Piping - Compressed Air Best Practices
10 pages
Jacketed Ball Valves Leaflet
PDF
No ratings yet
Jacketed Ball Valves Leaflet
2 pages
KIL3012 - WEEK 3 - 24.9.19 (Student Copy)
PDF
No ratings yet
KIL3012 - WEEK 3 - 24.9.19 (Student Copy)
84 pages
Bestline Mining Supplies LTD - 2010 Edition
PDF
No ratings yet
Bestline Mining Supplies LTD - 2010 Edition
50 pages
Industrial Process Piping
PDF
No ratings yet
Industrial Process Piping
31 pages
Pi Ups 1003
PDF
No ratings yet
Pi Ups 1003
54 pages
Form A-1P Manufacturer'S Data Report For Plate Heat Exchangers As Required by The Provisions of The ASME Code Rules, Section VIII, Division 2
PDF
No ratings yet
Form A-1P Manufacturer'S Data Report For Plate Heat Exchangers As Required by The Provisions of The ASME Code Rules, Section VIII, Division 2
2 pages
Jpep 0 1360 T 4141 PDF
PDF
No ratings yet
Jpep 0 1360 T 4141 PDF
44 pages
Heat Exchanger Reference Theory
PDF
No ratings yet
Heat Exchanger Reference Theory
23 pages
Piping Material Spec MUBADALA PETROLEUM
PDF
No ratings yet
Piping Material Spec MUBADALA PETROLEUM
192 pages
Piping: Piping Sometimes Refers To Piping Design, The Detailed Specification of The
PDF
100% (1)
Piping: Piping Sometimes Refers To Piping Design, The Detailed Specification of The
5 pages
Piping Specification PDF
PDF
100% (1)
Piping Specification PDF
35 pages
Floating Head Heat Exchanger Maintenance
PDF
No ratings yet
Floating Head Heat Exchanger Maintenance
15 pages
Overview Part 1 PDF
PDF
No ratings yet
Overview Part 1 PDF
65 pages
C 10flanges
PDF
100% (1)
C 10flanges
11 pages
Piping and Piping Components (Iso 10628) : Date of Print: 11/30/2021
PDF
No ratings yet
Piping and Piping Components (Iso 10628) : Date of Print: 11/30/2021
12 pages
Fundamentals of Piping Technology
PDF
No ratings yet
Fundamentals of Piping Technology
33 pages
Piping Design L-002
PDF
100% (1)
Piping Design L-002
20 pages
Unit Plot Plan
PDF
No ratings yet
Unit Plot Plan
1 page
Final Deepak Fertilizers Petrochemicals LTD
PDF
No ratings yet
Final Deepak Fertilizers Petrochemicals LTD
9 pages
Tables of Piping Standards - Pittsburgh
PDF
No ratings yet
Tables of Piping Standards - Pittsburgh
166 pages
(Dd0eff91 8517 432e A0db D39ed010873e) - Data Sheet Id Fan
PDF
No ratings yet
(Dd0eff91 8517 432e A0db D39ed010873e) - Data Sheet Id Fan
16 pages
Pipe Supports
PDF
No ratings yet
Pipe Supports
28 pages
GP 03 05 01
PDF
No ratings yet
GP 03 05 01
10 pages
PIPING
PDF
No ratings yet
PIPING
6 pages
Brochure Steam and Condensate Manifolds
PDF
No ratings yet
Brochure Steam and Condensate Manifolds
8 pages
BSP12.STD.01.01 - Pipe Support
PDF
No ratings yet
BSP12.STD.01.01 - Pipe Support
40 pages
A0Y0Y7 - Appendix E1 - Engineering Piping Specifications
PDF
No ratings yet
A0Y0Y7 - Appendix E1 - Engineering Piping Specifications
40 pages
Fluor Piping TraingTOC
PDF
No ratings yet
Fluor Piping TraingTOC
1 page
8009 9210 KNMP 0000 000 Mec SPC 001002 en R3 PDF
PDF
No ratings yet
8009 9210 KNMP 0000 000 Mec SPC 001002 en R3 PDF
65 pages
Piping Material Engineer
PDF
No ratings yet
Piping Material Engineer
2 pages
Review of Reactor Piping Systems - R1 To R2 Piping Report PDF
PDF
50% (2)
Review of Reactor Piping Systems - R1 To R2 Piping Report PDF
37 pages
C-15 Valves
PDF
No ratings yet
C-15 Valves
49 pages
Piperack Design - Piping and Layouts
PDF
No ratings yet
Piperack Design - Piping and Layouts
1 page
Points Which Should Be Incorporated While Making Flexibility Specification
PDF
No ratings yet
Points Which Should Be Incorporated While Making Flexibility Specification
2 pages
Koc MP 019
PDF
100% (1)
Koc MP 019
19 pages
Offshore Plotplan-Guide Document
PDF
No ratings yet
Offshore Plotplan-Guide Document
118 pages
Valves in Piping Design
PDF
No ratings yet
Valves in Piping Design
5 pages
Piping Design Fabrication
PDF
No ratings yet
Piping Design Fabrication
142 pages
(PSE) - PSA Training
PDF
No ratings yet
(PSE) - PSA Training
67 pages
Piping
PDF
100% (1)
Piping
4 pages
Sit Book 1
PDF
No ratings yet
Sit Book 1
73 pages
Electric Heating
PDF
No ratings yet
Electric Heating
20 pages
Prestressed Cement Concrete
PDF
No ratings yet
Prestressed Cement Concrete
61 pages
تلخيص عمليات تصنيع جديد PDF
PDF
No ratings yet
تلخيص عمليات تصنيع جديد PDF
40 pages
Piping and Drafting Guide
PDF
No ratings yet
Piping and Drafting Guide
215 pages
Piping Guide
PDF
No ratings yet
Piping Guide
215 pages
The Piping Desing Guide
PDF
100% (2)
The Piping Desing Guide
215 pages
The Piping Guide PDF
PDF
No ratings yet
The Piping Guide PDF
215 pages
M-08) Piping Diagram in Engine Room
PDF
No ratings yet
M-08) Piping Diagram in Engine Room
39 pages