TPDDL - Net - Metering - Declaration - Form

1) The document is a declaration form submitted as part of an application to install a renewable energy system and connect to the electricity grid. 2) It confirms the applicant owns or has permission to use the premises where the system will be installed and provides documentation of ownership or permission. 3) The applicant agrees to submit additional documents and pay fees within 30 days if the application is approved to complete the registration process for connection to the grid.

Uploaded by

hemant
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
305 views

TPDDL - Net - Metering - Declaration - Form

1) The document is a declaration form submitted as part of an application to install a renewable energy system and connect to the electricity grid. 2) It confirms the applicant owns or has permission to use the premises where the system will be installed and provides documentation of ownership or permission. 3) The applicant agrees to submit additional documents and pay fees within 30 days if the application is approved to complete the registration process for connection to the grid.

Uploaded by

hemant
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

DECLARATION/UNDERTAKING

Application Form Number

(On Rs.10/- non judicial stamp paper, duly attested by Notary public)

I, we
son / daughter / wife of
having electricity connection CA No
at
(address of premises as
per TPDDL record) do hereby solemnly affirm and declare as under:

1. That I/We am/are the owner of / co-owner of / legal heir of and have permission to
use aforesaid premises (Herein after referred to as the “Premises”).

2. I/We have submitted the application to install the renewable Energy system at above
mentioned premises. NOC from the other co–owner is enclosed / Will or Succession certificate
in proof of legal heirship is enclosed. (Please delete if not applicable).

3. I/We understand that once this application is approved, the same is valid for 30 days, within
which I/we shall submit the Registration form alongwith requisite fee, SLD charges, meter cost
and all other documents to be required by TPDDL for assessment of feasibility of my application.

4. I/We agree to pay the application fee Rs. 500/-(Rupee five Hundred) alogwith this
application, as per the Delhi Electricity Regulatory Commission (Net Metering for Renewable
Energy) Regulations, 2014.

5. I/We agree that TPDDL has permission to access the Renewable energy system installed at
my/our premises for assessment of connection requirement to TPDDL Distribution System
during anytime of Project life.

6. I/We agree that I/We shall provide requisite space to TPDDL for installation of Net Meter
and Solar Meter as per their requirement and TPDDL will have permission to access these
meters installed at my/our premises failing which electricity supply to my premises can be
disconnected.

7. I/We undertake that ownership of the roof/land where solar PV system is installed is with
me.

8. I/We undertake that the Renewable energy system installed at my/our premises will be
technically suitable for synchronization with TPDDL supply voltage level at my premises (1-
Phase/ 3-Phase) and rated Frequency (50 hz +-5%), in compliance to Delhi Electricity Regulatory
Commission (Net Metering for Renewable Energy) Regulations, 2014.

9. I/We have clearly understand that if any of the above statement is found to be false or
incorrect or on receipt of any objection from the concerned competent land owing/Law
enforcing agency or co-owner of the premises, the Net metering system can be disconnected
and the meter/service line can be removed by TPDDL without any further notice to me.

Certified by Notary