MRB Sect0c
MRB Sect0c
53 Fuselage
Prev Page
121
122
Sequence Number
ATA Subchapter
ATA Chapter
Inspection Interval
Type - (DET, GVI, RST, SDI, VCK) See Appendix
SECTION C
Initial - Task shall be accomplished by this time
Next Page
Repeat - Task shall be repeated by this time
Figure 1
Zone(s)
Zone(s) in which task is applicable
* = Peel back or remove lining / insulation, as required. Prepared by: Maintainability Engineering
TOC
** = Refer to Structural Program Rules, Paragraph 4. Revision: 0
*** = ED / AD inspections satisfy FD detection.
EXAMPLE
TIL-003890B
Submit PCR
Title Page
Inspection Interval
Item / A
Task L Description Repeat Zone(s) ZIP Rev
Number I Type Initial
AD ED FD
27 Rudder
Prev Page
27.21.00 Torque Tube
01 Detailed Inspection of rudder torque tube DET 96 ** 96 311 N 7
installation months months 324
52 Doors
Next Page
SECTION C
NOTE: Transferred to Zonal Inspection
Program.
• 53-200-01 Zonal Inspection
external upper fuselage, FS 44
- FS 596 (view from ground)
• 53-200-02 Zonal Inspection
external upper fuselage, FS 44
- FS 596 (view from platform)
02 Detailed Inspection of internal main entrance DET* 72 ** 72 811 N 0
door months months
TOC
Submit PCR
April 30/22
Page 1
C2
* = Peel back or remove lining / insulation as required. Prepared by: Maintainability Engineering
** = Refer to Structure Program Rules, Paragraph 4. Revision: 16
*** = ED / AD inspections satisfy FD detection.
Title Page
April 30/22
Page 2
C2 Item / A
Inspection Interval
Task L Description Repeat Zone(s) ZIP Rev
Number I Type Initial
AD ED FD
52.21.00 Baggage Door ***
01 General Visual Inspection of external baggage GVI Zonal ** Zonal 220 Y 0
Prev Page
door surface 810
NOTE: Transferred to Zonal Inspection
Program.
SECTION C
Next Page
02 Detailed Inspection of internal baggage door DET* 192 ** 144 816 N 0
months months
03 Detailed Inspection of baggage door external DET 2250 2250 816 N 0
radius coaming assembly Flight hours
hours
TOC
Submit PCR
* = Peel back or remove lining / insulation as required. Prepared by: Maintainability Engineering
** = Refer to Structure Program Rules, Paragraph 4. Revision: 16
*** = ED / AD inspections satisfy FD detection.
Title Page
Inspection Interval
Item / A
Task L Description Repeat Zone(s) ZIP Rev
Number I Type Initial
AD ED FD
52.31.00 Cargo Door (ASC 213 and / or ASC 354) 8
Prev Page
NOTE: Applies to Aircraft 1000 thru Aircraft
1499 having ASC 213 and / or ASC
354.
01 General Visual Inspection of external cargo GVI Zonal ** Zonal 180 Y 0
Next Page
- FS 596 (view from ground)
SECTION C
• 53-200-02 Zonal Inspection
external upper fuselage, FS 44
- FS 596 (view from platform)
02 Y Detailed Inspection of internal cargo door DET* 192 ** 144 819 N 13
NOTE: This task satisfies PSE 53-00-017 months months
at 192 months initial / 150 months
recurring.
03 Y Detailed Inspection of cargo door hinges DET 144 ** 96 819 N 13
NOTE: This task satisfies PSE 53-00-015 months months
TOC
at 192 months initial / 150 months
recurring.
Submit PCR
April 30/22
Page 3
C2
* = Peel back or remove lining / insulation as required. Prepared by: Maintainability Engineering
** = Refer to Structure Program Rules, Paragraph 4. Revision: 16
*** = ED / AD inspections satisfy FD detection.
Title Page
April 30/22
Page 4
C2 Item / A
Inspection Interval
Task L Description Repeat Zone(s) ZIP Rev
Number I Type Initial
AD ED FD
53 Fuselage
53.15.00 Nose Wheel Well Surround Structure, FS 44.5 ***
Prev Page
- FS 119
01 General Visual Inspection of nose wheel well GVI Zonal ** Zonal 113 Y 0
surround structure
SECTION C
Next Page
ground)
• 53-100-03 Zonal Inspection
internal nose gear wheel well,
FS 44 - FS 119
02 Detailed Inspection of nose gear attach DET Note ** Note 113 N 0
fittings
NOTE: At nose landing gear removal.
TOC
Submit PCR
* = Peel back or remove lining / insulation as required. Prepared by: Maintainability Engineering
** = Refer to Structure Program Rules, Paragraph 4. Revision: 16
*** = ED / AD inspections satisfy FD detection.
Title Page
Inspection Interval
Item / A
Task L Description Repeat Zone(s) ZIP Rev
Number I Type Initial
AD ED FD
53.17.00 Panel Assemblies and Window Structure ***
Fuselage, Nose Section, FS 44 - FS 133
Prev Page
01 General Visual Inspection of nose section GVI Zonal ** Zonal 110 Y 0
window structure and panel assemblies 210
NOTE: Transferred to Zonal Inspection
Next Page
SECTION C
• 53-200-01 Zonal Inspection
external upper fuselage, FS 44
- FS 596 (view from ground)
• 53-200-02 Zonal Inspection
external upper fuselage, FS 44
- FS 596 (view from platform)
02 Detailed Inspection of Left Hand windshield DET* Note ** Note 210 N 16
structures and their intersections with
adjacent structure
NOTE: Accomplish at windshield removal
TOC
or 192 months (16C) initial
threshold and 144 months (12C)
repeat interval, whichever occurs
first.
Windshield and interior covering (if
applicable) removed.
03 Detailed Inspection of internal skin / DET* 192 ** 144 211 N 0
Submit PCR
April 30/22
* = Peel back or remove lining / insulation as required. Prepared by: Maintainability Engineering
** = Refer to Structure Program Rules, Paragraph 4. Revision: 16
*** = ED / AD inspections satisfy FD detection.
Title Page
April 30/22
Page 6
C2 Item / A
Inspection Interval
Task L Description Repeat Zone(s) ZIP Rev
Number I Type Initial
AD ED FD
04 Detailed Inspection of Right Hand windshield DET* Note ** Note 221 N 16
structures, and their intersections with
adjacent structures
Prev Page
NOTE: Accomplish at windshield removal
or 192 months (16C) initial
threshold and 144 months (12C)
SECTION C
Next Page
NOTE: Accomplish at side window removal
or 192 months (16C) initial
threshold and 144 months (12C)
repeat interval, whichever occurs
first. Side window and interior
covering (if applicable) removed.
06 Detailed Inspection of Right Hand side DET* Note ** Note 221 N 16
window structures and their intersections with
adjacent structures
NOTE: Accomplish at side window removal
or 192 months (16C) initial
TOC
threshold and 144 months (12C)
repeat interval, whichever occurs
first. Side window and interior
covering (if applicable) removed.
Submit PCR
* = Peel back or remove lining / insulation as required. Prepared by: Maintainability Engineering
** = Refer to Structure Program Rules, Paragraph 4. Revision: 16
*** = ED / AD inspections satisfy FD detection.
Title Page
Inspection Interval
Item / A
Task L Description Repeat Zone(s) ZIP Rev
Number I Type Initial
AD ED FD
53.21.00 Cabin Above Floor, FS 133 - FS 596 Panel ***
Assemblies
Prev Page
01 General Visual Inspection of the external skin GVI Zonal ** Zonal 220 Y 0
and window frames
NOTE: Transferred to Zonal Inspection
Next Page
external upper fuselage, FS 44
SECTION C
- FS 596 (view from platform)
02 Detailed Inspection of all upper antenna DET* 144 ** 144 221 N 0
substructure months months
NOTE: Headliner removed
03 Detailed Inspection of emergency exit window DET* 96 ** 96 221 N 0
interior skin / substructure months months
04 Detailed Inspection of baggage door surround DET* 144 ** 96 221 N 0
skin / substructure months months
TOC
Submit PCR
April 30/22
Page 7
C2
* = Peel back or remove lining / insulation as required. Prepared by: Maintainability Engineering
** = Refer to Structure Program Rules, Paragraph 4. Revision: 16
*** = ED / AD inspections satisfy FD detection.
Title Page
April 30/22
Page 8
C2 Item / A
Inspection Interval
Task L Description Repeat Zone(s) ZIP Rev
Number I Type Initial
AD ED FD
53.22.00 Cabin Below Floor, FS 133 - FS 596 Panel ***
Assemblies
Prev Page
01 General Visual Inspection of external panel GVI Zonal ** Zonal 120 Y 16
assemblies from FS 133 to FS 321.5 and 180
from FS 498 to FS 596
SECTION C
Next Page
02 Y Detailed Inspection of internal side of DET* 96 ** 96 121 N 16
fuselage, below stringer 19 Left Hand / Right months months 122
Hand , from FS 133 to FS 321.5 and from FS 181
498 to FS 596 182
NOTE: This task satisfies PSE 53-33-306
at 360 months initial / 96 months
recurring
TOC
Submit PCR
* = Peel back or remove lining / insulation as required. Prepared by: Maintainability Engineering
** = Refer to Structure Program Rules, Paragraph 4. Revision: 16
*** = ED / AD inspections satisfy FD detection.
Title Page
Inspection Interval
Item / A
Task L Description Repeat Zone(s) ZIP Rev
Number I Type Initial
AD ED FD
03 General Visual Inspection of internal panel GVI Zonal ** Zonal 121 Y 16
assemblies from Stringer 19 Left / Right 122
Prev Page
upward to floor level, between FS 133 to FS 181
321.5 and from FS 498 to FS 596 182
NOTE: Transferred to Zonal Inspection
Next Page
SECTION C
FS 498 - FS 539
• 53-100-11 Zonal Inspection
internal baggage compartment
below floor, FS 539 - FS 596
• 53-100-12 Zonal Inspection
internal cabin below floor, FS
133 - FS 193
53.25.00 Floor Structure FS 133 - FS 596 ***
01 Detailed Inspection of floor beam / floorboards DET* 96 ** 96 121 N 0
beneath lavatory / galley wet areas as viewed months months 122
TOC
from bottom 141
143
144
181
182
Submit PCR
April 30/22
Page 9
C2
* = Peel back or remove lining / insulation as required. Prepared by: Maintainability Engineering
** = Refer to Structure Program Rules, Paragraph 4. Revision: 16
*** = ED / AD inspections satisfy FD detection.
Title Page
April 30/22
Page 10
C2 Item / A
Inspection Interval
Task L Description Repeat Zone(s) ZIP Rev
Number I Type Initial
AD ED FD
02 Detailed Inspection of floor beam / floorboards DET* 192 ** 144 121 N 0
not under lavatory / galley dry areas as months months 122
viewed from bottom 141
Prev Page
143
144
181
SECTION C
Next Page
months months 140
180
53.26.00 Avionics Bay, Shelves and Under Floor ***
Mountings FS 133 - FS 193
01 General Visual Inspection of EER racks and GVI Zonal ** Zonal 121 Y 0
below floor mounting provisions 223
NOTE: Transferred to Zonal Inspection 224
Program.
• 53-100-12 Zonal Inspection
internal cabin below floor, FS
TOC
133 - FS 193
• 53-200-06 Zonal Inspection
internal left radio rack, FS 165 -
FS 193B
• 53-200-07 Zonal Inspection
internal right radio rack, FS 133
- FS 181
Submit PCR
* = Peel back or remove lining / insulation as required. Prepared by: Maintainability Engineering
** = Refer to Structure Program Rules, Paragraph 4. Revision: 16
*** = ED / AD inspections satisfy FD detection.
Title Page
Inspection Interval
Item / A
Task L Description Repeat Zone(s) ZIP Rev
Number I Type Initial
AD ED FD
53.34.00 Fuselage to Wing Interface Structure ***
Prev Page
01 General Visual Inspection of drag beam GVI Zonal ** Zonal 151 Y 0
installation 161
NOTE: Transferred to Zonal Inspection
Program.
Next Page
02 Y Detailed Inspection of torque box, main DET 96 ** 96 141 N 13
SECTION C
landing gear door support fittings, wing attach months months 143
fittings 144
NOTE: This task satisfies PSE 53-34-300 151
and 53-34-400 at 360 months initial 161
/ 120 months recurring, and PSE
53-34-600 at 360 months initial / 96
months repeat.
53.36.00 Bulkheads ***
01 Detailed Inspection of pressure bulkhead DET* 96 ** 96 182 N 0
TOC
structure below floor, FS 596 months months 311
02 Detailed Inspection of aft engine mounts DET* 96 ** 72 313 N 0
NOTE: Aircraft 1000 thru Aircraft 1179. months months
Submit PCR
April 30/22
* = Peel back or remove lining / insulation as required. Prepared by: Maintainability Engineering
** = Refer to Structure Program Rules, Paragraph 4. Revision: 16
*** = ED / AD inspections satisfy FD detection.
Title Page
April 30/22
Page 12
C2 Item / A
Inspection Interval
Task L Description Repeat Zone(s) ZIP Rev
Number I Type Initial
AD ED FD
05 Detailed Inspection of pressure bulkhead DET* 192 ** 144 221 N 13
composite panels and beams, FS 596 months months
Prev Page
06 Detailed Inspection of secondary bulkhead DET* 96 ** 96 181 N 0
structure below floor, FS 539 months months 182
07 Detailed Inspection of secondary bulkhead DET* 96 ** 96 221 N 0
SECTION C
Next Page
10 Special detail inspection (Tap Test) of the FS SDI* 72 ** 72 221 N 13
596 flat pressure bulkhead forward face and months months 311
aft face (accessible portions), above floor, for
environmental deterioration (disbonding).
TOC
Submit PCR
* = Peel back or remove lining / insulation as required. Prepared by: Maintainability Engineering
** = Refer to Structure Program Rules, Paragraph 4. Revision: 16
*** = ED / AD inspections satisfy FD detection.
Title Page
Inspection Interval
Item / A
Task L Description Repeat Zone(s) ZIP Rev
Number I Type Initial
AD ED FD
53.40.00 Aft Fuselage Installation, FS 576 - FS 812 ***
Prev Page
01 General Visual Inspection of external aft GVI Zonal ** Zonal 310 Y 0
fuselage
NOTE: Transferred to Zonal Inspection
Program.
Next Page
- FS 596 (view from platform)
SECTION C
• 53-300-01 Zonal Inspection
external aft fuselage and
empennage, FS 596 - FS 864
(view from ground)
• 53-300-02 Zonal Inspection
external aft fuselage and
empennage, FS 596 - FS 864
(view from platform)
02 General Visual Inspection of internal tail GVI Zonal ** Zonal 311 Y 0
compartment 313
TOC
NOTE: Transferred to Zonal Inspection
Program.
• 53-300-03 Zonal Inspection
internal aft fuselage, above
floor, FS 596 - FS 826
Submit PCR
April 30/22
Page 13
C2
* = Peel back or remove lining / insulation as required. Prepared by: Maintainability Engineering
** = Refer to Structure Program Rules, Paragraph 4. Revision: 16
*** = ED / AD inspections satisfy FD detection.
Title Page
April 30/22
Page 14
C2 Item / A
Inspection Interval
Task L Description Repeat Zone(s) ZIP Rev
Number I Type Initial
AD ED FD
53.44.00 APU Enclosure ***
01 General Visual Inspection of internal APU GVI Zonal ** Zonal 312 Y 0
Prev Page
enclosure
NOTE: Transferred to Zonal Inspection
Program.
SECTION C
Next Page
01 General Visual Inspection of internal surfaces GVI Zonal ** Zonal 431 Y 0
and pylon structure 441
NOTE: Transferred to Zonal Inspection
Program.
• 71-400-09 Zonal Inspection
external left and right pylons
02 General Visual Inspection of precooler GVI Zonal ** Zonal 430 Y 0
exhaust 440
NOTE: Transferred to Zonal Inspection
Program.
• 71-400-07 Zonal Inspection
TOC
external left and right pylons
(view from ground)
03 Detailed Inspection of pylon boards DET 48 ** 48 430 N 0
months months 440
Submit PCR
* = Peel back or remove lining / insulation as required. Prepared by: Maintainability Engineering
** = Refer to Structure Program Rules, Paragraph 4. Revision: 16
*** = ED / AD inspections satisfy FD detection.
Title Page
Inspection Interval
Item / A
Task L Description Repeat Zone(s) ZIP Rev
Number I Type Initial
AD ED FD
55 Stabilizers
Prev Page
55.11.00 Horizontal Stabilizer (Box Structure) ***
01 General Visual Inspection of external GVI Zonal ** Zonal 330 Y 0
horizontal stab surfaces 340
Next Page
SECTION C
• 53-300-02 Zonal Inspection
external aft fuselage and
empennage, FS 596 - FS 864
(view from platform)
02 Detailed Inspection of internal horizontal stab DET 96 ** 96 332 N 0
(panels removed) months months 342
03 Detailed Inspection of horizontal stab front DET 192 ** 144 331 N 0
beam months months 341
NOTE: Leading edge removed.
TOC
55.12.00 Horizontal Stabilizer (Attachments, Actuator ***
and Hinge Fittings)
01 Detailed Inspection of horizontal stabilizer to DET 192 ** 144 333 N 0
elevator hinges months months
02 Detailed Inspection of attach pivot fittings DET 192 ** 144 310 N 0
NOTE: Stabilizer installed. months months
Submit PCR
April 30/22
Page 15
C2
* = Peel back or remove lining / insulation as required. Prepared by: Maintainability Engineering
** = Refer to Structure Program Rules, Paragraph 4. Revision: 16
*** = ED / AD inspections satisfy FD detection.
Title Page
April 30/22
Page 16
C2 Item / A
Inspection Interval
Task L Description Repeat Zone(s) ZIP Rev
Number I Type Initial
AD ED FD
55.21.00 Elevator Assemblies (Box Structure) ***
01 Detailed Inspection of internal elevator DET 192 ** 144 333 N 0
Prev Page
assemblies months months 343
02 General Visual Inspection of external elevator GVI Zonal ** Zonal 330 Y 0
structure 340
SECTION C
Next Page
• 53-300-02 Zonal Inspection
external aft fuselage and
empennage, FS 596 - FS 864
(view from platform)
03 Detailed Inspection of ballast weights DET 144 ** 96 333 N 0
NOTE: Aircraft 1234 and subsequent or months months 343
ASC 263 installed.
04 Detailed Inspection of ballast weights DET 72 ** 72 333 N 0
NOTE: Aircraft 1000 thru Aircraft 1233 not months months 343
having ASC 263 installed.
TOC
55.22.00 Elevator to Horizontal Stabilizer Attachments, ***
(Hinge Assemblies)
01 Detailed Inspection of elevator to stabilizer DET 192 ** 144 333 N 0
hinges months months 343
NOTE: Elevator installed.
Submit PCR
* = Peel back or remove lining / insulation as required. Prepared by: Maintainability Engineering
** = Refer to Structure Program Rules, Paragraph 4. Revision: 16
*** = ED / AD inspections satisfy FD detection.
Title Page
Inspection Interval
Item / A
Task L Description Repeat Zone(s) ZIP Rev
Number I Type Initial
AD ED FD
55.31.00 Vertical Stabilizer (Box Structure) ***
Prev Page
01 General Visual Inspection of external vertical GVI Zonal ** Zonal 320 Y 0
stab skin surfaces
NOTE: Transferred to Zonal Inspection
Program.
Next Page
external aft fuselage and
SECTION C
empennage, FS 596 - FS 864
(view from platform)
02 General Visual Inspection of external surface GVI Zonal ** Zonal 324 Y 0
of rear beam
NOTE: Transferred to Zonal Inspection
Program.
• 55-300-11 Zonal Inspection
internal vertical stabilizer rear
beam aft face
TOC
03 Detailed Inspection of internal vertical stab DET 192 ** 144 323 N 0
NOTE: Panels removed. months months
Submit PCR
April 30/22
Page 17
C2
* = Peel back or remove lining / insulation as required. Prepared by: Maintainability Engineering
** = Refer to Structure Program Rules, Paragraph 4. Revision: 16
*** = ED / AD inspections satisfy FD detection.
Title Page
April 30/22
Page 18
C2 Item / A
Inspection Interval
Task L Description Repeat Zone(s) ZIP Rev
Number I Type Initial
AD ED FD
55.32.00 Vertical Stabilizer to Fuselage (Boomerang ***
Horizontal Stabilizer Pivot and Actuator Attach
Fittings)
Prev Page
01 Detailed Inspection of stabilizer pivot fitting DET 192 ** 144 310 N 0
NOTE: Stabilizer installed. months months
SECTION C
Next Page
section including boomerang
fitting panel
03 General Visual Inspection of boomerang fitting GVI 96 ** 96 323 N 0
NOTE: Aircraft 1000 thru Aircraft 1171, months months
chrome moly steel.
04 General Visual Inspection of boomerang fitting GVI 192 ** 144 323 N 0
NOTE: Aircraft 1172 and subsequent, months months
stainless steel.
TOC
Submit PCR
* = Peel back or remove lining / insulation as required. Prepared by: Maintainability Engineering
** = Refer to Structure Program Rules, Paragraph 4. Revision: 16
*** = ED / AD inspections satisfy FD detection.
Title Page
Inspection Interval
Item / A
Task L Description Repeat Zone(s) ZIP Rev
Number I Type Initial
AD ED FD
55.41.00 Rudder Assembly (Installation) ***
Prev Page
01 General Visual Inspection of external rudder GVI Zonal ** Zonal 320 Y 0
surfaces
NOTE: Transferred to Zonal Inspection
Program.
Next Page
external aft fuselage and
SECTION C
empennage, FS 596 - FS 864
(view from platform)
02 Detailed Inspection of internal rudder DET 144 ** 144 323 N 0
assembly months months
03 Detailed Inspection of ballast weight DET 96 ** 96 320 N 0
NOTE: Rudder installed. months months
TOC
01 Detailed Inspection of upper, mid, lower hinge DET 192 ** 144 324 N 0
assemblies months months
NOTE: Rudder installed.
Submit PCR
April 30/22
Page 19
C2
* = Peel back or remove lining / insulation as required. Prepared by: Maintainability Engineering
** = Refer to Structure Program Rules, Paragraph 4. Revision: 16
*** = ED / AD inspections satisfy FD detection.
Title Page
April 30/22
Page 20
C2 Item / A
Inspection Interval
Task L Description Repeat Zone(s) ZIP Rev
Number I Type Initial
AD ED FD
57 Wings
57.02.00 Wing Box Assembly ***
Prev Page
01 General Visual Inspection of external lower GVI Zonal ** Zonal 520 Y 0
skins and aft spar 530
NOTE: Transferred to Zonal Inspection 531
SECTION C
Next Page
external lower left wing surface
• 57-500-09 Zonal Inspection
internal left wing rear beam,
including attachments for flap,
aileron and spoilers
• 57-600-01 Zonal Inspection
external right wing leading
edge, RBL 35.80 - RBL 433
(inboard of navigation light
assembly)
• 57-600-04 Zonal Inspection
TOC
external lower right wing
surface
• 57-600-09 Zonal Inspection
internal right wing rear beam,
including attachments for flap,
aileron and spoilers
Submit PCR
* = Peel back or remove lining / insulation as required. Prepared by: Maintainability Engineering
** = Refer to Structure Program Rules, Paragraph 4. Revision: 16
*** = ED / AD inspections satisfy FD detection.
Title Page
Inspection Interval
Item / A
Task L Description Repeat Zone(s) ZIP Rev
Number I Type Initial
AD ED FD
02 General Visual Inspection of external upper GVI Zonal ** Zonal 520 Y 0
skins 620
Prev Page
NOTE: Transferred to Zonal Inspection
Program.
• 53-100-08 Zonal Inspection
Next Page
SECTION C
external upper right wing
surface
03 Detailed Inspection of forward spar exterior DET 96 96 96 511 N 0
NOTE: Through gap bands. months months months 611
TOC
internal left wing leading edge,
including wing front beam
• 57-600-03 Zonal Inspection
internal right wing leading edge,
including wing front beam
Submit PCR
April 30/22
Page 21
C2
* = Peel back or remove lining / insulation as required. Prepared by: Maintainability Engineering
** = Refer to Structure Program Rules, Paragraph 4. Revision: 16
*** = ED / AD inspections satisfy FD detection.
Title Page
April 30/22
Page 22
C2 Item / A
Inspection Interval
Task L Description Repeat Zone(s) ZIP Rev
Number I Type Initial
AD ED FD
05 Y Detailed Inspection of skins, stringers, spars DET 96 96 96 521 N 13
and ribs inside fuel tank months months months 621
NOTE: This task satisfies PSE 57-11-204
Prev Page
at 108 months initial / 108 months
recurring.
SECTION C
Next Page
NOTE: Limited access required, inboard 3
panels each wing.
09 Y Special Detailed Inspection (Microbiological SDI 6 ** 6 500 N 14
Growth Test) of the fuel tank months months 600
10 Task deleted per 2020 ISC. 15
11 Special Detailed Inspection (Borescope) of SDI 72 ** 72 143 N 16
the Left and Right area under the Wing months months 144
Wedge Panel / Inboard Trailing Edge Box
Panel Interface, from the wheel well
TOC
12 Special Detailed Inspection (Borescope / SDI 72 ** 72 531 N 16
Ultrasound) of the Left and Right Outboard months months 631
Trailing Edge Box Wing Rebate Flanges
(Upper / Lower)
Submit PCR
* = Peel back or remove lining / insulation as required. Prepared by: Maintainability Engineering
** = Refer to Structure Program Rules, Paragraph 4. Revision: 16
*** = ED / AD inspections satisfy FD detection.
Title Page
Inspection Interval
Item / A
Task L Description Repeat Zone(s) ZIP Rev
Number I Type Initial
AD ED FD
57.14.00 Main Landing Gear Attachment ***
Prev Page
01 General Visual Inspection of main landing GVI Zonal ** Zonal 143 Y 0
gear attachment 144
NOTE: Transferred to Zonal Inspection 710
Program. 720
Next Page
wheel wells, FS 452 - FS 496
SECTION C
(zone 141 viewed for wheel well
only)
02 Detailed Inspection of left and right trunnion DET Note ** Note 143 N 6
support ribs plus forward bearing and aft 144
bushing bores
NOTE: At landing gear restore.
03 Detailed Inspection of trunnion aft bushings DET Note ** Note 143 N 6
NOTE: At landing gear restore. 144
TOC
bearings 144
NOTE: ASC 190 configuration aircraft.
At landing gear restore.
Submit PCR
April 30/22
Page 23
C2
* = Peel back or remove lining / insulation as required. Prepared by: Maintainability Engineering
** = Refer to Structure Program Rules, Paragraph 4. Revision: 16
*** = ED / AD inspections satisfy FD detection.
Title Page
April 30/22
Page 24
C2 Item / A
Inspection Interval
Task L Description Repeat Zone(s) ZIP Rev
Number I Type Initial
AD ED FD
57.16.00 Attach Fittings Wing to Fuselage ***
01 Y Detailed Inspection of CRES and titanium DET 96 96 96 151 N 13
Prev Page
fittings months months months 161
NOTE: This task satisfies PSE 57-16-101A 520
at 360 months initial / 360 months 620
SECTION C
as required.
Next Page
TOC
Submit PCR
* = Peel back or remove lining / insulation as required. Prepared by: Maintainability Engineering
** = Refer to Structure Program Rules, Paragraph 4. Revision: 16
*** = ED / AD inspections satisfy FD detection.
Title Page
Inspection Interval
Item / A
Task L Description Repeat Zone(s) ZIP Rev
Number I Type Initial
AD ED FD
02 General Visual Inspection of external aileron, GVI Zonal ** Zonal 530 Y 0
spoiler & flap surfaces 630
Prev Page
NOTE: Transferred to Zonal Inspection
Program.
• 57-500-07 Zonal Inspection
Next Page
SECTION C
spoilers
• 57-600-07 Zonal Inspection
external lower right wing trailing
edge, including flap, aileron and
spoilers
• 57-600-08 Zonal Inspection
external upper right wing trailing
edge, including flap, aileron and
spoilers
03 General Visual Inspection of support / attach GVI 144 96 ** 531 N 9
TOC
fittings, track lugs, hinge fittings months months 631
NOTE: Flaps, spoilers, ailerons deployed
as required.
04 Detailed Inspection of aileron balance weights DET 96 ** 96 530 N 0
NOTE: Ailerons installed. months months 630
Submit PCR
April 30/22
Page 25
C2
* = Peel back or remove lining / insulation as required. Prepared by: Maintainability Engineering
** = Refer to Structure Program Rules, Paragraph 4. Revision: 16
*** = ED / AD inspections satisfy FD detection.
Title Page
April 30/22
Page 26
C2 Item / A
Inspection Interval
Task L Description Repeat Zone(s) ZIP Rev
Number I Type Initial
AD ED FD
06 General Visual Inspection of CRES attach GVI Zonal Zonal 531 Y 9
fittings, tracks, lugs for corrosion 631
NOTE: Transferred to Zonal Inspection
Prev Page
Program.
• 57-500-09 Zonal Inspection
internal left wing rear beam,
SECTION C
Next Page
57.60.00 Winglet and Attach Hardware *** 8
01 General Visual Inspection of winglet blade GVI Zonal ** Zonal 550 Y 8
NOTE: Transferred to Zonal Inspection 650
Program.
• 57-500-10 Zonal Inspection
external left winglet blade
• 57-600-10 Zonal Inspection
external right winglet blade
Viewed from ground.
TOC
Submit PCR
* = Peel back or remove lining / insulation as required. Prepared by: Maintainability Engineering
** = Refer to Structure Program Rules, Paragraph 4. Revision: 16
*** = ED / AD inspections satisfy FD detection.
Title Page
Inspection Interval
Item / A
Task L Description Repeat Zone(s) ZIP Rev
Number I Type Initial
AD ED FD
02 General Visual inspection of winglet blade GVI Zonal ** Zonal 550 Y 8
650
Prev Page
NOTE: Transferred to Zonal Inspection
Program.
• 57-500-11 Zonal Inspection
external left winglet blade
Next Page
SECTION C
NOTE: Applicable to aircraft not having
CRES hardware or ASC 403.
04 Detailed Inspection of winglet attach hardware DET 72 ** 72 550 N 9
(CRES) months months 650
NOTE: Applicable to aircraft having CRES
hardware or ASC 403.
71 Power Plants
71.20.00 Engine Mount and Support Links ***
01 Detailed Inspection of engine mount and DET Note Note Note 412 N 11
TOC
support links 422
NOTE: At engine removal unless 431
accomplished within the previous 441
12 months.
Submit PCR
April 30/22
Page 27
C2
* = Peel back or remove lining / insulation as required. Prepared by: Maintainability Engineering
** = Refer to Structure Program Rules, Paragraph 4. Revision: 16
*** = ED / AD inspections satisfy FD detection.
Title Page
April 30/22
Page 28
C2 Item / A
Inspection Interval
Task L Description Repeat Zone(s) ZIP Rev
Number I Type Initial
AD ED FD
02 Detailed Inspection of engine mount fittings DET Note ** Note 412 N 11
(steel and CRES) 422
NOTE: At engine removal unless 431
Prev Page
accomplished within the previous 441
12 months.
Next Page
TOC
Submit PCR
* = Peel back or remove lining / insulation as required. Prepared by: Maintainability Engineering
** = Refer to Structure Program Rules, Paragraph 4. Revision: 16
*** = ED / AD inspections satisfy FD detection.