Summary of Works: Contract Amount % Amount (RM) Workdone Description Item
Summary of Works: Contract Amount % Amount (RM) Workdone Description Item
Proposed 2-Storey Academic Block At Zon 2, Universiti Teknologi Mara Perak, Kampus Seri Iskandar, Perak Darul
Ridzuan.
Contract No.:
AP/APR 2010/QSD389/359
SUMMARY OF WORKS
CONTRACT WORKDONE
ITEM DESCRIPTION
TOTAL $ 1,143,114.61
Project Title:
Proposed 2-Storey Academic Block At Zon 2, Universiti Teknologi Mara Perak, Kampus Seri Iskandar, Perak Darul Ridzuan.
Contract No.:
AP/APR 2010/QSD389/359
A - PRELIMINARIES
RECURRING
ITEM DESCRIPTION AMOUNT INITIAL COST FINAL COST
COST
Contract No.:
AP/APR 2010/QSD389/359
A - PRELIMINARIES
= $ 54,700.00 + $ 32,453.51 + $ -
= $ 87,153.51
= $ 882,904.90 X 100%
$ 964,425.00
= 92%
= 92% X $ 35,450.00
= $ 32,453.51
Project Title:
Proposed 2-Storey Academic Block At Zon 2, Universiti Teknologi Mara Perak, Kampus Seri Iskandar, Perak
Darul Ridzuan.
Contract No.:
AP/APR 2010/QSD389/359
C - BUILDING WORKS
% OF
ITEM DESCRIPTION AMOUNT AMOUNT (RM)
WORKDONE
Contract No.:
AP/APR 2010/QSD389/359
D - EXTERNAL WORKS
% OF
ITEM DESCRIPTION AMOUNT AMOUNT (RM)
WORKDONE
Contract No.:
AP/APR 2010/QSD389/359
% OF
ITEM DESCRIPTION AMOUNT AMOUNT (RM)
WORKDONE
Contract No.:
AP/APR 2010/QSD389/359
Contract No.:
AP/APR 2010/QSD389/359
G - MATERIALS ON SITE
SUB-TOTAL $ 5,166.00
As per Clause 30.2 PAM 2018 (With Quantities) stated 'including the percentage of the value
of materials and goods stated in the Appendix up to the date of the Contractor's payment
application…'
As per Appendix (page 45) PAM 2018 (With Quantities) stated ' Percentage of the value of
materials and goods included in the Certificate [if none stated is 100%] ' 100%
TOTAL $ 5,166.00