BOSTCO
BOSTCO
or
Oil Companies International Marine Forum
ep
lr
MTIS Programme
cia
fi
Berth TPQ
of
an
Berth TPQ: Barge Dock 1
ot
ReportName 213feb15-571b-44f5-9226-ec2ffd3f2ee7
n
Galveston
Country: United States
Q
TP
1 Berth General
t.
or
1.4 Has a structural or conditional survey of the berth been undertaken, including
its underwater structure?
ep
1 Yes
2 If 'Yes', state date of last survey 01 October 2013
lr
1.5 Has an engineering analysis of berth been undertaken to ascertain maximum
cia
and minimum vessel size limitation?
1 Yes
fi
2 If 'Yes', state date of last analysis 01 October 2013
of
2 Berth Approaches
Ship Channel.
2 Specify other UKC criterion where applicable Terminal enforces a maximum draft
restriction, but does not enforce an Under
Th
2/4
TPQ , BOSTCO, Barge Dock 1
1 Applicable No restrictions
2 Maximum 0.00
t.
or
4.4 Length over all (LOA)
1 Applicable Applicable
ep
2 Minimum 0.00 Feet
lr
3 Maximum 300.00 Feet
cia
1 Applicable Not applicable
fi
2 Maximum 0.00
of
4.6 Beam
1 Applicable Applicable
2 Minimum
an 0.00 Feet
3 Maximum 54.00 Feet
ot
2 0.00 Feet
2 0.00 Feet
TP
2 0.00 Feet
ra
4.12 Freeboard
1 Applicable Not applicable
2 Minimum 0.00 Feet
3 Maximum 0.00 Feet
3/4
TPQ , BOSTCO, Barge Dock 1
1 Applicable No restrictions
2 0.00
5 Cargo/Vapour Manifolds
t.
1 Applicable Not applicable
or
2 Minimum 0.00 Feet
ep
3 Maximum 0.00 Feet
lr
1 Applicable Applicable
cia
2 Minimum 5.00 Feet
3 Maximum 20.00 Feet
fi
of
5.4 Centre of manifold above working platform
1 Applicable Applicable
2 Minimum an 12.00 Inches
3 Maximum 0.00 Inches
ot
5.5 Manifold spacing
1 Applicable Applicable
n
6 SBM/SPM
Q
TP
ft
ra
ad
is
is
Th
4/4