0% found this document useful (0 votes)
41 views1 page

Door Window Schedule - W14

This document appears to be a floor plan and elevation for a 7-story building. The floor plan shows room dimensions and locations of windows and doors on each level. The elevation depicts the building's southern facade and notes window sizes and locations across the 7 floors. Key dimensions shown include overall building width of 5300mm and balcony depth of 170mm.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
41 views1 page

Door Window Schedule - W14

This document appears to be a floor plan and elevation for a 7-story building. The floor plan shows room dimensions and locations of windows and doors on each level. The elevation depicts the building's southern facade and notes window sizes and locations across the 7 floors. Key dimensions shown include overall building width of 5300mm and balcony depth of 170mm.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

1765

duct 5300

5 balcony
170 0
235
0 259 279
0

110Ø Rain water

OVERALL PLAN
DW-22 1:100 SECOND TO SEVENTH FLOOR

STRUCTURAL GLAZING
60X120X2.8 MM
130 90 265 135 540 85 570
1025 2350 955 1705 1010 1525 1450 2590 5300 700 1765 1225 1555 2840
seventh floor
WINDOW SCHEDULE 14 lvl +25850

60
1540
3200

60
940
sixth floor
60 60

480
lvl +22650
1600
3200

60
940

fifth floor
60 60

480

lvl +19450
1600
3200
16200

60
940

fourth floor
60 60

lvl +16250
480
2000
3600

60
940

third floor
60 60

lvl +12650
480
2000
3600

60
880

second floor
60

lvl +9050
600

STRETCH SOUTH ELEVATION


DW-22 1:100 SECOND TO SEVENTH FLOOR

REVISIONS:
DO NOT SCALE PROJECT TITLE: DRAWING TITLE: SCALE: AS SHOWN DRAWN BY: SM

111
COMMERCIAL COMPLEX WITH S NO DATE
CONTRACTOR TO VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCING WORK
A. 4TH FEB. 2022
WINDOW SCHEDULE DATE: JUNE 2019
ANY DISCREPANCIES ARE TO BE REPORTED TO ARCHITECT WHO SHALL CONFERENCE HALL, SERVICE APPROVED BY: SS
DECIDE ON ADJUSTMENTS B. 28TH APRIL 2022 SOUTH STRETCH ELEVATION
COPYRIGHT OUTRÉ DESIGN APARTMENTS, RETAIL & BASEMENT
C. 20TH OCT 2022
@ JHAMSIKHEL JOB NO.: C-06-19 DRWG NO.: DW-22