4.01 Complete Mechanical design of the Ammonia Storage Tank shall be as per the
API 620 including Appendix-R (latest edition). Strict compliance with the
requirements of codes, tank specification sheets and any other referred
documents enclosed with this tender shall be ensured.
4.02 The tank shall be double wall double integrity type with dome roof having
suspended deck and shall be designed in accordance with API 620 (including
Appendix-R, latest version).
4.03 The inner tank roof shall be suspended deck type and shall be designed as per
frame membrane analogy.
4.04 The anchorage of inner & outer tank shall be adequately designed.
4.05 Design of the pipe between inner and outer tank shall be checked for adequate
expansion/ contraction. If required, expansion bellow to be suitably designed &
provided. Design calculations shall be submitted.
4.06 Detailed design calculations for adequacy of strength of all individual parts along
with fabrication drawings & other related documents as per documents Design
Basis attached at Annexure-2 and other documents enclosed with ITB shall be
prepared by contractor and shall submit the same to GNFC for comment &
approval. After approval of design & fabrication drawings, fabrication activity to
be taken up. Any change / comment made on design calculations and drawing to
satisfy the requirement of code & enquiry documents to make the Ammonia
Storage Tank perfectly fit for smooth operation shall have to be incorporated by
Contractor without any delivery / commercial implications.
4.07 Design conditions for the ammonia storage tank shall be as per Ammonia
Storage Tank datasheet & Technical Specification enclosed with the enquiry.
Minimum required thicknesses of various components shall be calculated based
on design parameters considering different types of loadings conditions including
effect of wind pressure, force of moment owing to connected piping & other
attachments as platform etc. Ammonia Storage Tank shall also be designed for
hydrostatic condition. Final thickness of tank shall be decided giving due
consideration for corrosion allowance & thinning allowance.
4.08 Wind analysis shall be performed as per IS-875 (Latest Edition). Wind velocity of
158.4 Km/Hr shall be considered in design. Contractor shall also refer Project
Design Basis of site.
08_Tech_Spec_LSTK_D1003AM1_Annexure-4 Page 11 of 26