The document is a 4-page fit-up inspection report for the fabrication and erection of a tank and installation of piping at a dispenser. It details inspections of pipe joints like pipes to tees and tees to pipes, recording material types, dimensions, joint numbers, and inspection results. The report was prepared by the contractor's supervisor and reviewed by two other parties on July 21, 2023.

Uploaded by

rizky youlanda
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
11 views

21 July Report Fit Up

The document is a 4-page fit-up inspection report for the fabrication and erection of a tank and installation of piping at a dispenser. It details inspections of pipe joints like pipes to tees and tees to pipes, recording material types, dimensions, joint numbers, and inspection results. The report was prepared by the contractor's supervisor and reviewed by two other parties on July 21, 2023.

Uploaded by

rizky youlanda
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

FIT - UP INSPECTION REPORT

PROJECT : Fabrication Erection Tank and Install Piping For DETAIL : ISOMETRIC 100-1102-FO-50-CIB-16
Dispenser Qc 8 REPORT NO : 001/FU/ITJ/2023
CLIENT : PT. Riau Andalan Pulp and Paper DATE : 21 July 2023
CONTRACTOR : PT. Indoteknik Tjandra Utama PAGE : 001
ITP NO. : ITJ-QC-ITP-001 AREA : 100 - GENERAL ( PTSI )
DRAWING NO : ITJ-ENG-ISO-P-1001
NO PAGE DWG : 03
THICKNESS JOINT TYPE OF JOINT RESULT
NO SECTION/PART DN MATERIAL REMARK
(MM) NO BW FW ACC/REJ

1 PIPE TO TEE 50 A106 - A234 3.91 56 V ACC


2 TEE TO PIPE 50 A234 - A106 3.91 57 V ACC
3 PIPE TO FLANGE 50 A106 - A105 3.91 63 V ACC

PREPARED BY CONTRACTOR REVIEWED BY APRIL REVIEWED BY APRIL


NAME : RIZKY YOULANDA NAME : HERY MULYONO NAME : POLTAK NAPITU
DESIGNATION : SUPERVISOR/QC INSPECTOR DESIGNATION : SUPERVISOR DESIGNATION : QC INSPECTOR

SIGNATURE : SIGNATURE : SIGNATURE :

DATE : 21 JULY 2023 DATE : 21 JULY 2023 DATE : 21 JULY 2023


FIT - UP INSPECTION REPORT

PROJECT : Fabrication Erection Tank and Install Piping For DETAIL : ISOMETRIC 100-1102-FO-50-CIB-16
Dispenser Qc 8 REPORT NO : 002/FU/ITJ/2023
CLIENT : PT. Riau Andalan Pulp and Paper DATE : 21 July 2023
CONTRACTOR : PT. Indoteknik Tjandra Utama PAGE : 002
ITP NO. : ITJ-QC-ITP-001 AREA : 100 - GENERAL ( PTSI )
DRAWING NO : ITJ-ENG-ISO-P-1002
NO PAGE DWG : 03
THICKNESS JOINT TYPE OF JOINT RESULT
NO SECTION/PART DN MATERIAL REMARK
(MM) NO BW FW ACC/REJ

1 PIPE TO TEE 50 A106 - A234 3.91 56 V ACC


2 TEE TO PIPE 50 A234 - A106 3.91 57 V ACC
3 PIPE TO FLANGE 50 A106 - A105 3.91 63 V ACC

PREPARED BY CONTRACTOR REVIEWED BY APRIL REVIEWED BY APRIL


NAME : RIZKY YOULANDA NAME : HERY MULYONO NAME : POLTAK NAPITU
DESIGNATION : SUPERVISOR/QC INSPECTOR DESIGNATION : SUPERVISOR DESIGNATION : QC INSPECTOR

SIGNATURE : SIGNATURE : SIGNATURE :

DATE : 21 JULY 2023 DATE : 21 JULY 2023 DATE : 21 JULY 2023


FIT - UP INSPECTION REPORT

PROJECT : Fabrication Erection Tank and Install Piping For DETAIL : ISOMETRIC 100-1102-FO-50-CIB-16
Dispenser Qc 8 REPORT NO : 003/FU/ITJ/2023
CLIENT : PT. Riau Andalan Pulp and Paper DATE : 21 July 2023
CONTRACTOR : PT. Indoteknik Tjandra Utama PAGE : 003
ITP NO. : ITJ-QC-ITP-001 AREA : 100 - GENERAL ( PTSI )
DRAWING NO : ITJ-ENG-ISO-P-1003
NO PAGE DWG : 03
THICKNESS JOINT TYPE OF JOINT RESULT
NO SECTION/PART DN MATERIAL REMARK
(MM) NO BW FW ACC/REJ

1 PIPE TO TEE 50 A106 - A234 3.91 56 V ACC


2 TEE TO PIPE 50 A234 - A106 3.91 57 V ACC
3 PIPE TO FLANGE 50 A106 - A105 3.91 63 V ACC

PREPARED BY CONTRACTOR REVIEWED BY APRIL REVIEWED BY APRIL


NAME : RIZKY YOULANDA NAME : HERY MULYONO NAME : POLTAK NAPITU
DESIGNATION : SUPERVISOR/QC INSPECTOR DESIGNATION : SUPERVISOR DESIGNATION : QC INSPECTOR

SIGNATURE : SIGNATURE : SIGNATURE :

DATE : 21 JULY 2023 DATE : 21 JULY 2023 DATE : 21 JULY 2023


FIT - UP INSPECTION REPORT

PROJECT : Fabrication Erection Tank and Install Piping For DETAIL : ISOMETRIC 100-1102-FO-50-CIB-16
Dispenser Qc 8 REPORT NO : 004/FU/ITJ/2023
CLIENT : PT. Riau Andalan Pulp and Paper DATE : 21 July 2023
CONTRACTOR : PT. Indoteknik Tjandra Utama PAGE : 004
ITP NO. : ITJ-QC-ITP-001 AREA : 100 - GENERAL ( PTSI )
DRAWING NO : ITJ-ENG-ISO-P-1004
NO PAGE DWG : 03
THICKNESS JOINT TYPE OF JOINT RESULT
NO SECTION/PART DN MATERIAL REMARK
(MM) NO BW FW ACC/REJ

1 PIPE TO TEE 50 A106 - A234 3.91 56 V ACC


2 TEE TO PIPE 50 A234 - A106 3.91 57 V ACC
3 PIPE TO FLANGE 50 A106 - A105 3.91 53 V ACC

PREPARED BY CONTRACTOR REVIEWED BY APRIL REVIEWED BY APRIL


NAME : RIZKY YOULANDA NAME : HERY MULYONO NAME : POLTAK NAPITU
DESIGNATION : SUPERVISOR/QC INSPECTOR DESIGNATION : SUPERVISOR DESIGNATION : QC INSPECTOR

SIGNATURE : SIGNATURE : SIGNATURE :

DATE : 21 JULY 2023 DATE : 21 JULY 2023 DATE : 21 JULY 2023

You might also like