Open navigation menu
Close suggestions
Search
Search
en
Change Language
Upload
Sign in
Sign in
Download free for days
0 ratings
0% found this document useful (0 votes)
89 views
3.0 Calculation API Separator Sludge Pump 04P1003 AS
SLUDGE PUMP
Uploaded by
TesisAyF Proyecto
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download now
Download
Save 3.0 Calculation API Separator Sludge Pump 04P1003 ... For Later
Download
Save
Save 3.0 Calculation API Separator Sludge Pump 04P1003 ... For Later
0%
0% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
0 ratings
0% found this document useful (0 votes)
89 views
3.0 Calculation API Separator Sludge Pump 04P1003 AS
SLUDGE PUMP
Uploaded by
TesisAyF Proyecto
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download now
Download
Save 3.0 Calculation API Separator Sludge Pump 04P1003 ... For Later
Carousel Previous
Carousel Next
Save
Save 3.0 Calculation API Separator Sludge Pump 04P1003 ... For Later
0%
0% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
Download now
Download
You are on page 1
/ 17
Search
Fullscreen
. = [Asunto: 4? ” Sludge Pum |Elaboro: Fecha: 47/031 inelectra IOrAPI Segacatoc Sludge Pump 7108144 04-10-05 415 Des® al Hoja: Cl Revisor eledleula hidedulico de la bom ba 04-0-40-03A15_en \ase_o eatzeqada, fateh seadledor.. ~ Referencias 24 Hore, cle derlos de le bom Joa_04: 0-10. zi en Qoc_e) vende: Wirt Indusieica) i 1.9. EFO # $70-44- 03-0204 23. Gileulo anlerwe reali me fee 6 se Balas) eee den id shuta eat deO mn haal We 054+ 140014 Bx ACOGuL-eS-35 15137 OE) Bununa vedbue ven {@ Bombas FTC de Venezuela Fae ee INELECTRA 9 July 1989 Inquiry No: RQ 870-90-M4-1105-3 Attn: ETHEL MARTINEZ, Proposal No: 22154 {tem No : 04-P ae AIS 2s pt MODEL: 3196 Size: 1.5x3-13 MTX QTY: 2 Operating conditions SERVICE EFFLUENT WATER udu SLUGE CAPACITY N/R 27.0 27.0 M3/HR (39 Deg C. 1.100 SP.GR 55.00 ep Viscosity j HEAD 129m Performance at 1200 RPM PUBLISHED EFFY 4.0% (CDS) [ Prices in Use a] RATED EFFY 48.0% with contract seal | Pump Unit RATED KW 2.7 incl Mechanical seal drag 0.11) Max ar run ou 34 | Testing NPSHR (im) (1.6 (available NPSH is 8.8) Driver DISCH PRESSURE ‘141.0 kPa (174.4 @so) (Based on 2.0 kPa Suc.press} Box. 1 PERF.CURVE 4998-1 (Rotation CW viewed from coupling end) Total Unit 5.586 SHUT OFF HEAD 16,07 Tor. 2Un. peace MIN FLOW 2S Mune ShOMON: wwntetoowte Materials CASING DUCTILE IRON mas. cexing pres. vated temperature 1717 &Pa ‘ST.BOX COVER DUCTILE IRON IMPELLER CD4MCU -Open-Overhung. (283 rated {min} , max=330 min = 229) SHAFT SAE 4140 SHAFT SLEEVE Jiess ee ait LUBRICATION PURE o1t MIST BEARINGS SKE 6308 (Radiali SKF $309 A/C3 {Coupling end) 7 COUPLING THOMAS DBZ C WSS DISCS-126 a COUPLING GAO NON SPARKING (ALUMINUM) BASE PLATE FEATURE FAB STEEL. TO ANSI B73.1M 1991 DO67I4A Additional Pump Features ‘BASEPLATE DRILLING FOR [EC MOTOR SET OF SHIMS (MOTOR SIDE; (CASING DRAIN. 1/2 in NPT-WITH VALVE AND 1S0FFH FLANGE THREADED C. STEEL CONNECTIONS: "IM PELLER-BALANCE HOLES: ” VARIQUS-FLANGE PROTECTION « VARIOUS-LONG TERM STORAGE SURFACE PREPARATION AND PAINTING ACCORDING TO GOULDS STANDARD GOULDS BLUE FINAL. COLOR Sealing Method DESCRIPTION JOHN CRANE TYPE S6UIQ BSTFP X 058 1 058 1 Flush Plan : CPL PLAN 7332-STEEL, PIPE (CPI PLAN 7361 - (NO PIPING FURNISHED BY GOULDS)Guuses (8139 08+ BONBAS YEULUS vZLA Gu Docs..aentation muenes 2070 MKT ORSIS Page Na 2 NOCUMENTATION DATABOOK ACCORDING TO VENDORS DATA REQUIREMENTS CMTRS FOR CASING / IMPELLER 7 SHAFT -~ Testiny NON WI -CASING HYDROSTATIC TEST ‘NON WITNESSED-RUNNING PERFORMANCE TEST Driver ELECTRIC MOTOR Manufacturer: ABB OR SIMILAR FURNISHED BY — GOULDS MOUNTED BY GOULDS RATING 44 KW 5.9 HP) ENCLOSURE P55 EX-N ZONE 2113 T3 PHASE/HZ/VOLTS 3/60/460 ‘SPEED INSULATIONSE. | F/1.0 FRAME SPACE HEATER NO ATO's Eau ne in our pctage tional Features Ht TAL MOTOR ALIGNMENT ADJUSTERS VERTICAL LEVELING SCREWS GAUGE CONNECTIONS-3/8 in NPT (SUCTION AND DISCHARGE) ‘PAINT. PUMP AND BASEPLATE-EPOXY / URETHANE SYSTEM SURFACE PREPARATION-SANDBLASTING-PUMP AND BASE SSPC-SP6 NON WITNESSED- VIBRATION TEST (NON WITNESSED- ENDURANCE TEST (3 HOURS) TESTING-SHAFT RUNOUT MEASUREMENT (NON- WITNESSED) YESTING-ADDER FOR 60 MINUTES HYDROSTATIC TEST (NON-WITNESSED) Weights and Measurements TOTAL NET UNIT WEIGHT 274 Kg 1200 RPM. 284132 NO REREREE aad 310JAsunto: Saul 4 Ace OS omnes " inelectra a Oisenas la tomba curtes asociadas. | 22 | Hoja _de dales de laa. ace as ectenia dedsico__ TRE idan coe clobocadea gored ast ou aay, aE ahs aaa il 9 754-74 relocdad minima én las lined ex de! se Fara LO maxines Feo Mien a anor -Te04-8-10-02 x 1 8 04-P-10.034, Hacia succion de 04 P-10-038, Tramo AB Tramo BC Long: 17.1m Long: 423.5 m Acc: Acc: ELL. 90° 15 ELL. 90° ATRECTAS 1 TRECTA 2TDURAS 1 VALVULA DE CHECK 4 VALV. DE BOLA 1 SALIDA DE BOQUILLA ah =-1.85 m 026 in (4" std) 1 VALVULA DE BOLA ah=4.976 m 026 in (4" std) 04-8-10-02 Pop = 10 mbarg Pakiseno= 40 mbarg [Nivel mdximo de liquide desde a fondo dela th Desc. de 04-P-10-038, NNN “ Grade | ga-r-t0.t1 ssa = 28700 kh 1100 kg/n* 1-55 oP Densidad ‘% de solidos = 1 (6 maximo)lo de'las ae 5. por el néloda ete = Sele mélode. 62 10 Gara ia gucci HA —loaailud de esta \inea fc L<50m ~ Ropiedaded del a 1G 0.JACy 924996 gles 2. ota bah Con estas apicdaaeh ap tuheiat che a gue APreceigo Se, 62_psi= 0,045 tat (uct ot vcs 4eo's Ce 'a Sig a 122 ce la. ln eleckotid 2 aelabieale edb ~ 8h dg at ides en el loda) SPlnccidas 4,540,62 = 2, 40.08 #4 AV2 bar i 624 624 Gilecla a oa eécdidas: oe ft Pues) ‘de lq it 23 mc i mi Se et eiaiaie. lee ce dale Qe = a2 vO uni ie 3_ 257441 = =0,87444 bar i —Temando ua facloc de seque, “ips 2 pepe ern aa ud)? la len — obi del atte en noel 482 08044 4 0,564 vag. —— — jog ta Apacer 0,742 bas 2 Aine Maher 485m) = — HPoMA. 0, aie ina aa Hx Lueh | pa ‘ sei tw howe teak Ta ri ia I L I Hialtdea ed Gh # is s IoREPORTES DE CALCULOS) MEMORIA DE CALCULOS DE PERDIDA DE PRESION DIVISION DE PROCESOS INELECTRA / OKARA DP’ Proyecto: Sear DS Planta: WT Nama: 870 Unidad: 4100 ‘ete: Conn Cheat: 042300208 Por Mc [geet cree Jeena |g apt Jose or oct x nar eon sn rcen rnc ca Elaborado por INELECTRA S.A, Departamento de Procesos. Realizado por RV, version 2.0 Pagina 1 de2 sues 4P03.x5, 04-P-10-03 prop agua en succionSpReaeereaeereaEES DPI reson cee Kesscpraccea feo es soene larnonse ft esc om ls ett owed wre Jnea te sae coe JPwomaocue rae competes asc coc ct anc race sarase rac neat [2 pmaes ico area arn a Fj! win ce het ‘Etaborado por INELECTRA S.A., Departamento de Procesos Realizado por RV, version 2.a MEMORIA DE CALCULOS DE PERDIDA DE PRESION Localization Sicor DS Pagina 2 de 2 Cheat: 04° 10.030 “4P03.xs (08-P-10-03 prop agua en suctionISOMETRICOS 04-P-10-03 A/SDAA ER 4 AAA YAVAYAVAVAVAVAVAYAY AVAVAWA: \Ya¥a AVAVAVAV: Va¥, VAVAY PAAR AAA AAR AAAI RR ERR AVAVAVAY AVAVAVAY AVAVAVAVAVAVAS < VAVANAVANAVAVAVAVAV,TAVAVAVAVAVAYL® SYAVAVAVAVAS AAA AHN SAAR SAM SR BOO OOOO OOOO OTRO GODOT ICO RE KAA AAA AAA AAAS KAA AAA A¥a¥AYAYAYAYAYAVAVAYAYAN; 7AVAVAVAVAYAVAVAVAVA? AVAVAVAVA” -VAVAVAVA' AVA VAVA AVAVAVAVAVAVAVAVAVAVAYAVAVAYAVAVAVAVAVAVAV AVAVAVAY AV AVAVAVAVAVAVAVAVAVAVA WAY AVAVAVAVAVAVAVAVAVAYAY, YAVAYAYAVAVAYAYAVAYAVAVAVAYAVAVAY AVAVAVAVAVAVAVA'-_7AYAVAVAVAVAVAVAVAVAVAVAV1 VAVAVAVAVAVAVAVAVAYAYA\ RAVAN AAA RAAT POA LAA AAA AAA AAASeee ey Q EAA SR DA AR OC inelectra AANA AA ROY oA OS TANAY STAY ATATANAVAVAY AVAVAVAVAVAVAVAVAV,VA AVAVAVAVAVAY. /AVAY AVAYAVAVAVAVAYATAVAVAVAVAVAYAVANAV FAV AVAWAVAVAYAVAV \/AYAY AVAVAYAVAYAVAVAYAYAVAVAVAVAVAVAVAVAYAVAN GAY YAVAVAVAVAVAVAYAY AVAVAVAVAVAVAVAVAVAVAYAVAVAVAVAY.7,VAVAVAVAYAVAVAVAVAVAY PAVAVAVAVAYAVAY AVAVAVAVAVAVAVAVAVAYAVAVAVAVAVVAVA“AVAVAVAWAVAVAVAVAVAVAVAYAYAYAYAY AAAAA RAAT IOV AAA AAA AAA AAA AAA AAA AAA TAVAVAYA YA VAVAVAYAYAVAVAVAVAVAVAVAVAVAVAVAVAVAVAVAVAVAVAVAVAVAVAVAV AVAVAVAVAVAVAVAYAVAVAYAY AAA AAA AAA AAA AAA AAA SBN AAA AAA AAA AR AAAI AAA AA AAA AVAVAVAVAVAVAVAYAVAYAYAYAYAYAVAVA' TAVAVAVAVAVAVAVAVAVAVATAVAYAYAYAY/ DAV AAKS *AVAVa VAVAVAVAVAVAVAVAVAVAVAVAVAVAVAVAVAVAVAVAYAVAVAVAVAVA AAA ARAVA AA AAA AAA KAA, ZA AAR ea VAAL AA AAA AAA AANA AAA RAIA AAA AA AA AAA AY AAA IAA AAA AAA AAA AYAVANAVAVAVAVAVAVAVAVAVAVAVAVAVAVAWAVAVAVAVAVAVAVAVAVAVAVAVAVAVAVAVAVAVAVAVAVAVAW,VAVAVAVAVAVAVAY4 BARA AAT AVAVAVAVAVAVAYAVAVAVAVAVANAVAVAVAYAVA™ YANANAVAVAVAVAVAVAVAVAVAVANA | DRAKA AAA AAA AA AVAVAVAYAVAVAVAVAVAVAVAYAVAVAVAVAVA™: AV, VAVAVAVAVAYAVAVAYAVAYAVAY AAA AAA AAA KAA AIA AAA AAA AAT AAA AAA AAA AAT POA AR DOO OO OSI O OT OOO AIA A KARA AANA AAAOTROS SOPORTESFOSTER WHEELER USA LOCATION. TEM NO SERVICE, COMMON SPARE seamen of Pes REND crenirws one 0 . tor omen crenata sane owe intwant ‘earengn +70 T PROCESS AEGUREWENTS PER FUME orchaTwa Case emo ‘ano | mow case tau ETS meee 1 Fann ee wonun—e aa i wrists wou 20: menert nated tang 10 GeecreD wy 2 110 7 ‘aognonestune 6 ae 208 wscosirv et ae Sse cower @ pT. ago ne zr noma amin 2 = decane seestuncneadaeo — ean-a Tae 7 suction pnessune: —neauReo ean-6 [021 7 ix. fossiecn ean O82 ‘Deereneiera Paetaune: oan 208i OFFERENTIAL HEAD (CENTRE PUMPS OMA uw —_| 7945; 1 PSH AVAILABLE r me ste 7 cORAOSION / nOTON Fr con = t i een oetans 1 Hew contnaueD oy E Tavgn owOrF OreRATOW, oes MANUAL — Oniven sTeAe per cane notes: — QS Fafa ean conten v3 0 6 wr low senpenaed one 4 2D Avene Recommtioen | om Inrenanta . TPERRYVILLE CORPORATE FOSTER WHEELER ee LUNTON, NJ 08899-1000 SUMP CALCULATION SHEET custowen succor contact Powe senwce 7 T Cotati case —— r Wout pues scuogeT eee wscosiy 0 Duss __s cincur capacity OISCHARGE PRESSURE __MIN NORMAL ESIGN NORMAL KGS (D292) VESSEL PRESSURE. Sarg 2 om ome om Mame nt 732 PLO TewreRATURE + 0'¢ arn rave nes. a smwnaua sareTy FaeTon au xiosene? ons ons _@ of ston Arey o0cTOR PATON ORF Ea Sesion wanna, aoe SUCTION PRESSURE 38 SLUG Teurenatune = 39° 309 “ionn vesseLpetss bag 338 Sus arate WeAD Bu p= 08 sosexooun suk 086 308 Sonos ene vost. tw COMTROLVALVE aF 308 sinan ote costes. once se a8 sev suet PRessune ba ewe co ts NETOESKNOCH (Cog tee Thee NET POSITIVE SUCTION HEAD DOIEFERENTIAL PRESSURE Due cTON Pes SURE D201 cesawoscrance messURE. tog 1 “noon eeessune @ 29% So Sinus Svion PRESSURE Ou g ae eee = nerorrenscne be 3a “it ener ou xs0/1 1059 weno werens © ae SoSH neanAOL es SAE FACTOR sue ceurenune tevaronfa “eure veseet ABOVE GagunO. HYDRAULIC HORSEPOWER SHUTOFE PRESSURE (@MAX SG)__NORM _MAK “or = SUCTONRRESEUME 8g ax Qos FAUs 10% oF DIFERENTA PRESSURE, ur 5. “| ast SHUTOFF messune Brg at $e BRAKE HORSEROWE! | — POWER ‘OPERATING RW = O.74ex32 ‘STEAM ORIVEN PUMPS WATERRATE. KGSMHOMA, STEAMRATE. KOSH «__WALK__ oweFOSTER WHEELER [SA CORPORATION PROCESS SPECIFICATION CUSTOMER: _SINCUR DOWNSTREAM PROJECT JOB NUMBER: 13-4464.01 Locarion: Jose. Fenezuela SHEET 3 OF 3 IiEwNO: —_ oeppoons [seem SERVICE: API S@parator Sludge Pump. > © ony ser: oben. +> rn gaan aS a OA-T- 10-11 uCG = TOM SFER Ths FN: 08 1003.D0C
You might also like
Sulsim Integration
PDF
No ratings yet
Sulsim Integration
23 pages
ASME Filtro
PDF
No ratings yet
ASME Filtro
11 pages
Siemens Flender 05 Bipex
PDF
No ratings yet
Siemens Flender 05 Bipex
8 pages
Cyclone
PDF
No ratings yet
Cyclone
10 pages
Agitator Details PDF
PDF
No ratings yet
Agitator Details PDF
4 pages
Modco Closures: Operation, Maintenance & Welding Instructions
PDF
No ratings yet
Modco Closures: Operation, Maintenance & Welding Instructions
7 pages
To Increase The Research Octane Number of Gasoline Through Iso-Merization by Panex Technology
PDF
No ratings yet
To Increase The Research Octane Number of Gasoline Through Iso-Merization by Panex Technology
75 pages
Ammonia Simulation Paper
PDF
No ratings yet
Ammonia Simulation Paper
11 pages
5-Acceleration Head Calculation Sheet
PDF
0% (1)
5-Acceleration Head Calculation Sheet
2 pages
Quick Opening Closures
PDF
No ratings yet
Quick Opening Closures
4 pages
PFI ES-02 - 2019 - Dimensioning Piping Assemblies
PDF
100% (1)
PFI ES-02 - 2019 - Dimensioning Piping Assemblies
3 pages
How To Arrange The Plot Plan For Process Plants
PDF
No ratings yet
How To Arrange The Plot Plan For Process Plants
6 pages
Gun Barrel Rev A1
PDF
No ratings yet
Gun Barrel Rev A1
14 pages
Data Sheet: 25 Frame Plunger Pumps
PDF
No ratings yet
Data Sheet: 25 Frame Plunger Pumps
4 pages
Avances
PDF
100% (1)
Avances
2 pages
PV Elite
PDF
No ratings yet
PV Elite
4 pages
ETBE Technical Sheet
PDF
100% (1)
ETBE Technical Sheet
28 pages
Dump Valves: DVU Series
PDF
No ratings yet
Dump Valves: DVU Series
2 pages
Stack Sizing-Sh 6115
PDF
No ratings yet
Stack Sizing-Sh 6115
8 pages
Descripción Del Equipamiento para SLOP OIL
PDF
No ratings yet
Descripción Del Equipamiento para SLOP OIL
25 pages
Ecopetrol Coatings Specification - Rev 8
PDF
No ratings yet
Ecopetrol Coatings Specification - Rev 8
28 pages
EXXI 4001-00-00 VD MAN 0091 - AAX Instrucciones Equipos Auxiliares Sello Gas
PDF
No ratings yet
EXXI 4001-00-00 VD MAN 0091 - AAX Instrucciones Equipos Auxiliares Sello Gas
21 pages
Lecture 8f
PDF
No ratings yet
Lecture 8f
38 pages
LPG Trap Tank Vapour
PDF
No ratings yet
LPG Trap Tank Vapour
5 pages
Oil Skimers
PDF
No ratings yet
Oil Skimers
139 pages
Recycling and Re use of Waste Rubber 2nd Edition Martin J. Forrest - The latest updated ebook version is ready for download
PDF
100% (3)
Recycling and Re use of Waste Rubber 2nd Edition Martin J. Forrest - The latest updated ebook version is ready for download
47 pages
Optimized Conditions For The Design and Operation of A Vacuum Distillation Column
PDF
No ratings yet
Optimized Conditions For The Design and Operation of A Vacuum Distillation Column
18 pages
ALPEMA Standards Rev1
PDF
No ratings yet
ALPEMA Standards Rev1
8 pages
2017 - Waters and Harrison
PDF
No ratings yet
2017 - Waters and Harrison
11 pages
Heat Exchanger (Fluid Allocation)
PDF
No ratings yet
Heat Exchanger (Fluid Allocation)
6 pages
Design of Onshore Multi-Pipe Slug Catcher
PDF
No ratings yet
Design of Onshore Multi-Pipe Slug Catcher
28 pages
Apovac en
PDF
No ratings yet
Apovac en
8 pages
Gas Distributor Design
PDF
No ratings yet
Gas Distributor Design
9 pages
Lo Cat H2S Removal
PDF
No ratings yet
Lo Cat H2S Removal
33 pages
Autopipe Vessel Manual Pages 10-15
PDF
No ratings yet
Autopipe Vessel Manual Pages 10-15
5 pages
HVLR Monitor: Technical Data Sheet
PDF
No ratings yet
HVLR Monitor: Technical Data Sheet
2 pages
Jigs Batac
PDF
No ratings yet
Jigs Batac
28 pages
Jump Start To Crushing and Milling in AspenPlus v8 - DownLoadLy - Ir
PDF
No ratings yet
Jump Start To Crushing and Milling in AspenPlus v8 - DownLoadLy - Ir
14 pages
Duplex Inline Filters
PDF
100% (1)
Duplex Inline Filters
7 pages
Standard Specification: UOP Engineering Department Date Status SPNSR Apvd
PDF
No ratings yet
Standard Specification: UOP Engineering Department Date Status SPNSR Apvd
5 pages
S/N Desiccant Shape Bulk Density Particle Size Bulk Density (KG/M) (Ibm/f)
PDF
No ratings yet
S/N Desiccant Shape Bulk Density Particle Size Bulk Density (KG/M) (Ibm/f)
16 pages
FAME Analysis by FT IR
PDF
No ratings yet
FAME Analysis by FT IR
3 pages
Pro II Simulation
PDF
No ratings yet
Pro II Simulation
5 pages
Ognition PSV Sizing For Fire Spreadsheet
PDF
100% (1)
Ognition PSV Sizing For Fire Spreadsheet
2 pages
Thermal Production of Phosphoric Acid
PDF
No ratings yet
Thermal Production of Phosphoric Acid
4 pages
Advanced Technologies For Ammonia Plants - CASALE GROUP
PDF
No ratings yet
Advanced Technologies For Ammonia Plants - CASALE GROUP
83 pages
1966 Tridiagonal Matrix For Distillation
PDF
No ratings yet
1966 Tridiagonal Matrix For Distillation
9 pages
Demister (Vapor)
PDF
No ratings yet
Demister (Vapor)
6 pages
G Me 150 PDF
PDF
No ratings yet
G Me 150 PDF
102 pages
Alfa Laval M15: Gasketed Plate Heat Exchanger For A Wide Range of Applications
PDF
No ratings yet
Alfa Laval M15: Gasketed Plate Heat Exchanger For A Wide Range of Applications
3 pages
Apic2015 Zhao Na
PDF
No ratings yet
Apic2015 Zhao Na
24 pages
ThuDauMot, Vietman Submittal
PDF
No ratings yet
ThuDauMot, Vietman Submittal
53 pages
Selecting Evaporators For Process Applications
PDF
No ratings yet
Selecting Evaporators For Process Applications
8 pages
VGS Vane Separators Are Recommended For
PDF
No ratings yet
VGS Vane Separators Are Recommended For
1 page
APS Dosing New Facility1
PDF
No ratings yet
APS Dosing New Facility1
8 pages
Catalysts: Oxidative Desulfurization of Heavy Oils With High Sulfur Content: A Review
PDF
No ratings yet
Catalysts: Oxidative Desulfurization of Heavy Oils With High Sulfur Content: A Review
26 pages
Turbine Flowmeter Datasheet
PDF
No ratings yet
Turbine Flowmeter Datasheet
6 pages
Client Location 1/2 Unit: Doc. Nr. Rev
PDF
No ratings yet
Client Location 1/2 Unit: Doc. Nr. Rev
5 pages
5.14tohkemy Pump-CMY
PDF
No ratings yet
5.14tohkemy Pump-CMY
28 pages
VRU Manual PDF
PDF
No ratings yet
VRU Manual PDF
108 pages