Change Form

This change request form details a proposed change to a project, including a description of the type of change requested, its priority level, estimated duration and costs, potential impacts and risks, and alternatives considered. If approved, it would alter the project's scope, schedule, or procedures. The requester provides key details for management to review and make a decision on its status.

Uploaded by

Nigel Phipps
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
91 views

Change Form

This change request form details a proposed change to a project, including a description of the type of change requested, its priority level, estimated duration and costs, potential impacts and risks, and alternatives considered. If approved, it would alter the project's scope, schedule, or procedures. The requester provides key details for management to review and make a decision on its status.

Uploaded by

Nigel Phipps
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Change Request Approval Form

CHANGE REQUEST FORM

Project: Date of Request:

Requester:(Name and Title) Change Request ID:

Type of the Change:


☒ Scope   ☐ Human Resources ☐ Procedure/ Process ☒ Schedule
☐ Others: Please specify _________________
Description of the Change:

Priority
☒ Critical (I can’t move forward until this change is made)
☐ High (The situation is fine right now, however, the change has to be made as soon as possible, otherwise I can’t  move forward.)
☐ Medium (It’s not urgent, but the change will have to be made in the near future)
☐ Low (This change is not affecting my ability to move forward with the project.
Change Duration: Proposed  Start Date:

Proposed  End Date:

Reasons for the change:

Impact of the change: ☒ Variation ☐ Over-run


☐ Other, State__________________________________________________________________________________________________
Provide any additional information:

Alternatives to the Change:

Description of the possible risks:

Estimated costs and resources required to implement the change:

Outcomes of the project:


_____________________________________________________
Requester Signature

Position: ______________________________________________
Date:

FOR OFFICIAL USE ONLY

Change Request Status:


      ⃞  Request approved         ⃞  Request rejected             ⃞  Delayed

Comments on the status:

Approving party:

_____________________________________________________
Signature

Name:

Position: Project Manager


Date:

Managing Director

_____________________________________________________
Signature

Date: