Procedure - Testing and Calibration of Metering Equipment

The document outlines the procedure for testing and calibrating kilowatt-hour meters and current transformers (CTs). It involves: [1] inspecting the metering equipment to ensure it complies with standards, [2] connecting the equipment to a meter site analyzer or phantom loader to test accuracy, [3] recording test results and sealing passed equipment for installation, and [4] programming meters as needed. Personnel should use personal protective equipment like gloves and safety shoes when handling the equipment. The goal is to ensure metering equipment is accurate before acceptance and use.

Uploaded by

Metering Section
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
164 views

Procedure - Testing and Calibration of Metering Equipment

The document outlines the procedure for testing and calibrating kilowatt-hour meters and current transformers (CTs). It involves: [1] inspecting the metering equipment to ensure it complies with standards, [2] connecting the equipment to a meter site analyzer or phantom loader to test accuracy, [3] recording test results and sealing passed equipment for installation, and [4] programming meters as needed. Personnel should use personal protective equipment like gloves and safety shoes when handling the equipment. The goal is to ensure metering equipment is accurate before acceptance and use.

Uploaded by

Metering Section
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 10

PROCESS PROCEDURE WORK INSTRUCTION TOOLS/MATERIALS/ PERSONNEL PPE

EQUIPMENT INVOLVED

Testing and I. Testing and Calibration of - Meter Site Analyzer - Metering - Working
Kilowatt-hour Meter - PWS with Phantom Specialist/ Gloves
Calibration of
Loader (alternative) Metering Officer - Safety
Metering - Pliers Shoes
Equipment - Screw drivers
- Connecting wires
- Alligator clips
- ORMECO Seal
● Purpose - Ballpen
– To ensure that - Test Report Form
metering i. Secure Transformer If Consumer owned:
equipments are Recommendation Sheet and
Meter Testing Fee  Secure Transformer
compliant with the
Recommendation Sheet
standard set by the and Meter Testing Fee
cooperative and If Coop owned:
ERC, before
acceptance,  Secure ERC Test Report
installation, and from the Supplier and
energization Certificate of Acceptance
ii. Inspection of meter  Receive the kwh meter
from Warehouse / walk-in
consumer.
● Scope  Verify and inspect if there’s
- All type of nothing suspicious, it
meters and should have ERC seal
instrument and/or sticker
transformers  Endorsed meter should
comply with recommended
as indicated in the
Transformer
Recommendation Sheet
a. If Compliant:
Proceed to testing
b. If non-compliant:
return to the
supplier/ consumer
subject for
replacement (not
accepted)
iii. Testing of kwh meter  Check the connections and
the set-up of test
equipment from the power
source. Engage the meter
to the test equipment but
make sure that no
load/ampere is applied by
the phantom loader to
prevent possible
burns/accident.
 Make sure to make proper
connections to the Load
Side and Line side of the
kWh meter.
 Switch on the Phantom
Loader and the test
equipment.
 Install and align the
impulse sensor to the
LED/impulse indicator of
the meter, then set the
proper configuration
(impulse per kWh) in the
test equipment to be able
to get accurate test results.
 Shut down the Phantom
loader and the test
equipment. Gently remove
the connections of the
terminal of the meter from
the Phantom Loader. Put
back the terminal cover
with the screw
iv. Recording of data and secure  Record the percent error
test report that appears from the test
equipment.
 Observe the meter for
other remarks and
findings.
 Jot down information and
test result to the Metering
Equipment Log Book.
a. If Passed: Meter shall
be sealed and approved
for installation; to be
programmed if needed
b. If Failed: Meter shall be
rendered to the
supplier/ consumer
subject for replacement,
together with signed
test report
v. Programming of the meter  Meter shall be
programmed by the
Metering Officer/ SE
Section Head depending
on the data/parameters
needed.
 A copy of program shall be
printed and filed for future
reference.
vi. End of procedure

II. Testing of Current - Meter Site - Metering - Working


Transformer Analyzer Specialist/ Gloves
- PWS with Metering - Safety
Phantom Loader
Officer Shoes
(alternative)
- Pliers
- Screw drivers
- Connecting wires
- Alligator clips
- ORMECO Seal
- Ballpen
- Test Report
Form
i. Secure Transformer If Consumer owned:
Recommendation Sheet and
Meter Testing Fee  Secure Transformer
Recommendation Sheet
and Meter Testing Fee
If Coop owned:

 Secure ERC Test Report


from the Supplier and
Certificate of Acceptance

ii. Inspection of CT  Receive the CT from


Warehouse / walk-in
consumer.
 Verify and inspect the
CT if there’s nothing
suspicious. It should
have ERC sticker and
name plate having the
information of the CT
 It shall comply with
issued Transformer
Recommendation
Sheet.
a. If Compliant:
Proceed to testing
b. If non-compliant:
return to the
supplier/ consumer
subject for
replacement/ not
accepted
iii. Testing of CT  Remove the terminal
cover.
 Engage the CT to the
Phantom Loader and Test
Equipment. Make proper
connections on the H1 and
H2 of the CT to the
Phantom loader. Clamp
the Ammeter to the H1 of
the CT.
 Plug in the test equipment
to the power source.
Switch on the Phantom
loader. Adjust the input
current depending on the
test ampere for the CT.
 Repeat for different ratio of
the CT.
 Turn off the test equipment
and put back the terminal
cover with the screw.
iv. Recording of data and  Record the percent error
securing test report  Jot down information and
test result to the Metering
Equipment Log Book.
a. If Passed: CT shall be
approved for installation
b. If Failed: CT shall be
rendered to the
supplier/ consumer
subject for replacement,
together with signed
test report
v. End of procedure

III. Testing of Potential - Multi-tester/ Metering Specialist/ Working


Transformer/ Voltage voltmeter Metering Officer Gloves
Transformer - Screw drivers
- Pliers
- Connecting wires
- Alligator clips
- Ballpen
- Test Report
Form

i. Secure Transformer If Consumer owned:


Recommendation Sheet and  Secure Transformer
Meter Testing Fee Recommendation Sheet
and Meter Testing Fee
If Coop owned:

 Secure ERC Test Report


from the Supplier and
Certificate of Acceptance

ii. Inspection of PT  Receive the PT from


Warehouse / walk-in
consumer.
 Verify and inspect the PT if
there’s nothing suspicious.
It should have ERC sticker
and name plate having the
information of the PT
 It shall comply with issued
Transformer
Recommendation Sheet.
a. If Compliant:
Proceed to testing
b. If non-compliant:
return to the
supplier/ consumer
subject for
replacement/ not
accepted
iii. Testing of Potential/ Voltage  Remove the terminal
Transformer cover.
 Check the power source
and mark the "live" and
"ground" portions. Connect
the alligator clips to the
terminals of the PT:
positive/red to H1 and
negative/black to H2. Make
sure it is not interchanged.
Plug the wire connected
from the PT to the power
source, H1 connected to
the "live" and H2
connected to the "ground"
 Measure the Primary
Voltage using the multi-
tester. Tap the tip of the
positive probe to H1 and
negative probe to H2
.Make sure not to touch
bare conductor part of any
of the tools used to prevent
electric shock.
 Measure the Secondary
Voltage using the multi-
tester. Tap the tip of the
probes to secondary
terminals with X1 and X2
markings. Make sure not to
touch bare conductor part
of any of the tools used to
prevent electric shock.
 Remove the plug from the
power source and put back
the terminal cover with the
screw
iv. Recording of data and  Record the percent error
securing test report  Jot down information and
test result to the Metering
Equipment Log Book.
a. If Passed: PT shall be
approved for installation
b. If Failed: PT shall be
rendered to the
supplier/ consumer
subject for replacement,
together with signed
test report
v. End of Procedure

IV. Preparation of Metering - Laptop - Metering


Equipment Test Report - Ballpen Officer
- Log Book - SE Section
Head
- SESS
Division
Supervisor
- TSD
Manager
i. Gather data Secure detailed report
from person involved in
testing of metering
equipment written in
Metering equipment
logbook
ii. Prepare detailed test report Fill out necessary details,
include remarks and
findings. Test report and/or
Checklist must be signed
and copy shall be
furnished to consumer and
DSLI Section.