15
3 4 BHE-XX-XX-DR-S-3002
BHE-XX-XX-DR-S-3001 BHE-XX-XX-DR-S-3001
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2
wheel of fire tender
BHE-XX-XX-DR-S-3000 BHE-XX-XX-DR-S-3000
4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 600
A
PLANTING REFER TO SOFTSCAPE PLAN
RAISED PLANTER
2
1575 14900
210
6600
L2-006A
1400
1100
PA
1350
C1 C2 C3 C4 C5 C6 C7
(400 x 800) (600 x 800) (600 x 800) (600 x 800) (600 x 800) (800 x 800) (450 x 800)
300
B
45
1500
PLANTING REFER TO
SOFTSCAP PLAN
70
2850 x 550 2850 x 650
00
10200
400 x 1300
11800
14075
9750
dispersion distance
MOUNTABLE KERB 3 =210+270
3000 x 550 L5-003 3000 x 650
2
C8 C9 C10 C11 C12
1 3
C13 C14 C15
=480 mm
(400 x 800) (400 x 1000) (500 x 700) (500 x 700) L2-006B
(500 x 700) L2-006B L2-008B
(500 x 700) (500 x 700) (400 x 800)
C
HOTEL DROP-OFF 5870 3325 Typical section for the dispersion through slab
1200
PA FL +5.425 m
C16 C17 C18 C19 C20 C21 C22
PA PA C23
7500
(400 x 600) (400 x 600) (500 x 500) (450 x 450) 500 x 800 (500 x 500) 500 x 800 (500 x 500) 500 x 800 (500 x 500) 500 x 800
C15A (400 x 600)
HH
8250
(400 x 800)
250 THK R.C. SLAB
400 x 1300
300 x 800
1V
400 x 800
250 THK R.C. SLAB
400 x 700
300 x 600
C28 HOTEL DRO
6000 1200 (500 x 500)
D C25 WALL
300 x 800
300 x 800
0 x 1300
0 x 800
0 x 700
0 x 800
Fire Tender Load Consideration for slab Load intensity to consider by this method
1 2
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2
wheel of fire tender
BHE-XX-XX-DR-S-3000 BHE-XX-XX-DR-S-3000
4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 600
A
PLANTING REFER TO SOFTSCAPE PLAN
RAISED PLANTER
2
1575 14900
210
6600
L2-006A
1400
1100
PA
1350
C1 C2 C3 C4 C5 C6 C7
(400 x 800) (600 x 800) (600 x 800) (600 x 800) (600 x 800) (800 x 800) (450 x 800)
300
B
45
1500
PLANTING REFER TO
SOFTSCAP PLAN
70
2850 x 550 2850 x 650
00
10200
400 x 1300
11800
14075
9750
dispersion distance
MOUNTABLE KERB 3 =210+270
3000 x 550 L5-003 3000 x 650
2
C8 C9 C10 C11 C12
1 3
C13 C14 C15
=480 mm
(400 x 800) (400 x 1000) (500 x 700) (500 x 700) L2-006B
(500 x 700) L2-006B L2-008B
(500 x 700) (500 x 700) (400 x 800)
C
HOTEL DROP-OFF 5870 3325 Typical section for the dispersion through slab
1200
PA FL +5.425 m
C16 C17 C18 C19 C20 C21 C22
PA PA C23
7500
(400 x 600) (400 x 600) (500 x 500) (450 x 450) 500 x 800 (500 x 500) 500 x 800 (500 x 500) 500 x 800 (500 x 500) 500 x 800
C15A (400 x 600)
HH
8250
(400 x 800)
250 THK R.C. SLAB
400 x 1300
300 x 800
1V
400 x 800
250 THK R.C. SLAB
400 x 700
300 x 600
C28 HOTEL DRO
6000 1200 (500 x 500)
D C25 WALL
300 x 800
300 x 800
0 x 1300
0 x 800
0 x 700
0 x 800
Load intensity to consider by this method
Fire Tender Load Consideration for slab
Effective area of the the
region under fire tender
wheels
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 2
wheel of fire tender
BHE-XX-XX-DR-S-3000 BHE-XX-XX-DR-S-3000
4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 600
Length is 11.4 m.
Maximum two fire
A Maximum 527 kN load tender, partly can
on each column PLANTING REFER TO SOFTSCAPE PLAN stay in a bay of
because of one fire 9mX9m. RAISED PLANTER
tender in a bay 2
1575 14900
210
6600
L2-006A
1400
1100
PA
1350
C1 C2 C3 C4 C5 C6 C7
(400 x 800) (600 x 800) (600 x 800) (600 x 800) (600 x 800) (800 x 800) (450 x 800)
300
B
45
1500
PLANTING REFER TO
SOFTSCAP PLAN
70
2850 x 550 2850 x 650
00
10200
400 x 1300
11800
14075
9750
dispersion distance
MOUNTABLE KERB 3 =210+270
3000 x 550 L5-003 3000 x 650
2
C8 C9 C10 C11 C12
1 3
C13 C14 C15
=480 mm
(400 x 800) (400 x 1000) (500 x 700) (500 x 700) L2-006B
(500 x 700) L2-006B L2-008B
(500 x 700) (500 x 700) (400 x 800)
C
HOTEL DROP-OFF 5870 3325 Typical section for the dispersion through slab
1200
PA FL +5.425 m
C16 C17 C18 C19 C20 C21 C22
PA PA C23
7500
(400 x 600) (400 x 600) (500 x 500) (450 x 450) 500 x 800 (500 x 500) 500 x 800 (500 x 500) 500 x 800 (500 x 500) 500 x 800
C15A (400 x 600)
HH
8250
(400 x 800)
250 THK R.C. SLAB
400 x 1300
300 x 800
1V
400 x 800
250 THK R.C. SLAB
400 x 700
300 x 600
C28 HOTEL DRO
6000 1200 (500 x 500)
D C25 WALL
300 x 800
300 x 800
0 x 1300
0 x 800
0 x 700
0 x 800
Fire Tender Load Consideration for Punching in Column
Total length of one fire fighting vehicle is 11.4 m so assuming worst case of two fire tender in a bay of (9mX9m).
Load Intensity of two fire tenders in 9X9 m grid= Total load of two fire tenders
Total effective area of 1 bay
= 900
9X9
=11.11 kN/m2
Fire Tender path: Load Consideration at Function drop off: Ground level
285
350
45
dispersion distance
=285+320
=605 mm
1 2
285
350
45
dispersion distance
=285+320
=605 mm
310
350
45
dispersion distance
=310+320
=630 mm
310
350
45
dispersion distance
=310+320
=630 mm