This weekly labour report from Hotchkiss Ltd provides attendance information for operatives working on Project 2169 over the past week. It lists the names of operatives from multiple subcontracting companies, their attendance codes for each day of the week (Saturday to Friday), and notes requirements for directly employed staff to submit absence forms.

Uploaded by

Valentina Rey
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
25 views

Blank Labour Report

This weekly labour report from Hotchkiss Ltd provides attendance information for operatives working on Project 2169 over the past week. It lists the names of operatives from multiple subcontracting companies, their attendance codes for each day of the week (Saturday to Friday), and notes requirements for directly employed staff to submit absence forms.

Uploaded by

Valentina Rey
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 2

WEEKLY LABOUR REPORT

Week Ending Date : Supervisor Name: Sheet 1 of 1


Attendance Code:
Daily Working Hours: From: AM 07:30 To: PM 4:30:00 PM W = Worked
A = Absent
Weekend Working Hours: From: AM To: PM S = Sick
H = Holiday
Project Name: Project No: 2169 C = College
L = Late
M = Moved Site

Operatives Name Company Grade Saturday Sunday Monday Tuesday Wednesday Thursday

H/Ltd = Hotchkiss Ltd A.K.L = Airways Kent Limited P.D.S = Premier Ductwork
D.G.P = D.G.Palmer UKD = UK Ductwork S.P. = Steve Pursey
Company Abbreviations
D.S = Ductwork Services BG = B.G.Ductwork APP = Apollo
D&D = Dave Carter ACB = ACB Ltd B.D.S = Brightduct

N.B .This form is to completed weekly and returned to:- [email protected] by midday each Friday.

NOTES FOR HOTCHKISS LTD DIRECTLY EMPLOYED OPERATIVES:


1.Prior to taking Holiday it is a requirement that the operative completes a "HOLIDAY REQUEST FORM" a copy of which must be attached to this report.
2.All employed operatives must complete a short term abscense form in the event of unbooked time off due to sickness, a copy of which must be attached to this report

HL-QF-165 24.03.17
KLY LABOUR REPORT

Friday

= Premier Ductwork
= Steve Pursey

urned to:- [email protected] by midday each Friday.

es a "HOLIDAY REQUEST FORM" a copy of which must be attached to this report.


in the event of unbooked time off due to sickness, a copy of which must be attached to this report