A Case Study in Project Management Based On PMP Approach
A Case Study in Project Management Based On PMP Approach
Project Management
Case Study
Based on PMP Approach
DR . AHMED EL SENOSY
Dr. Ahmed Al Senosy | www.linkedin.com/in/alsenosy
for purchase the full book please visit
http://store.professionalengineers.us/ar/
2
Dr. Ahmed Al Senosy | www.linkedin.com/in/alsenosy
TABLE OF CONTENT
Project Description 1
Project Initiating 2
Project Planning 7
Project Executing 31
Project Closing 43
1. Project Description
2. Project Initiating
3. Project Planning
4. Project Executing
6. Project Closing
1. Project Description
2. Project Initiating
The real estate and development unit of TPE organization are considered the project
sponsor, represented by the general manager Hany Mahmoud.
The project manager has been assigned from the engineering and the construction unit,
his name is Sameh Ahmed; he has been working as a project manager in the same
organization for more than ten years, and he had successfully completed three similar
projects considering the defined project objectives.
It was agreed that the project would be executed in two phases; phase 1 has been planned
to include 50 villas to be completed after 20 months of the project start (which has been
planned to be on March, 1st 2015); while phase 2 has been planned to include 70 villas to
be completed by the project finish date, which is February, 28th 2018. The project budget
has been expected to be $120 Million.
As there are some special works related to the electromechanical system, these works
have been agreed to be awarded to a nominated subcontractor MEV.
The project charter has been developed showing the high-level project information as
shown in Figure 1, which includes:
High-level risks
Project Information
Project Objectives
1. Achieve the required profit, which equals to or greater than $11 Million.
2. Improve the marketplace of TPE organization to be the leading organization in this
field.
Project Scope
Key Milestones
High-Level Risks
Expected Budget
$120 Million.
Signoff
Project Sponsor: Hany Mahmoud (TPE real estate and development unit)
Project
Sameh Ahmed Project Manager [email protected] Internal
Manager
CEO of MEV
Mazen Ibrahim [email protected] External
subcontractor
Subject Matter
Ahmed Samir [email protected] External
Expert
General manager in
Kamal Fadel [email protected] External
municipality
Customer (previous
Fareed Sami 0005859348 External
project)
Osama QA / QC
Auditor [email protected] Internal
Mohamed Manager
The project manager leads the process of developing project management plan. The
project management plan comprises subsidiary management plans and baselines. The
project management plan is initially developed with the available information then it is
progressively updated throughout the project.
Units of Measure
The project schedule should be updated Monthly (end of each calendar month).
Control Thresholds
If Schedule Performance Index (SPI) is less than 0.7, then the schedule needs to be
adjusted to consider the current progress status and plan how to recover the delays.
Cost: Dollars $.
Level of Precision: Round up to the nearest integer ($1566.678 round to $1567)
Process Description
Control Thresholds
If Cost Performance Index (CPI) is less than 0.88, then the budget should be re -
evaluated, and more control actions should be applied on site.
• The schedule is developed and maintained following the approaches defined in the
schedule management plan.
• Meetings are conducted to develop and periodically review the project schedule.
• Actions recorded in schedule review meetings are documented and tracked.
• Changes to the project schedule are following a structured approach as defined in
the change management plan.
Required Training
• Engaging project stakeholders and project team should identify risks effectively in
order to obtain a comprehensive risk register.
• Risks should be prioritized by using qualitative approaches considering the
probability and impact of risks.
• Quantitative analysis should only be performed if needed.
• Risk response planning should be conducted.
• Unconditional responses should be updated in the project management plan.
• Trigger conditions should be defined for conditional responses.
• Responses should be implemented as planned.
• Risks should be monitored, assessed for validity, and new risks should be
identified and analyzed.
Nominated Subcontractors
Contract Type
Providing the required works for the following systems for 120 villas:
o Fire alarm system;
o Telephone and data system; and
o CCTV system.
The subcontractor is responsible for:
o Providing shop drawings for approval;
o Providing samples for materials to be used for approval;
o Delivering required materials;
o Installing first fix (conduits);
o Installing second fix (wires and cables);
o Installing third fix (final system fixture);
o Testing the systems;
o Handing over the system; and
o Providing one-year warranty for fixing systems’ failures.
• Sponsor:
o Current Level: Supportive.
o Desired Level: Supportive.
o Actions to recover gap: no action needed.
Residents nearby site:
o Current level: Resistant.
o Desired level: Neutral or supportive.
o Actions to cover gap: informal meetings; discussing the effect of the project on
the market value of the whole district; and conducting friendly activities and
events with them.
Business Requirements
• The project has been taken to achieve a specific profit (greater than or equals to
$11 Million)
• The project has also been taken to improve the marketplace of the organization.
Project Requirements
• The required permits should be obtained from relevant authorities before starting
construction works.
• A time-buffer should be considered between the delivery of materials and starting
installation to allow proper testing and recording of all materials.
Stakeholder
Large green satisfaction More profit
REQ Will be
landscape leading to the as marketing Considered
001 considered
area. better will be easier
marketplace
Stakeholder
satisfaction More profit
REQ Sports centers Will be Will be
leading to the as marketing
003 and courts. considered considered
better will be easier
marketplace
Stakeholder
satisfaction More profit
REQ Will be Will be
Kids’ area. leading to the as marketing
004 considered considered
better will be easier
marketplace
Complete
REQ Obtaining project on
Considered Considered
005 building permit time and
within budget
Project Description
The project the development of residential compound project by TPE organization. The project
comprises 120 villas and the related infrastructure networks and landscape. The electromechanical
systems should be executed by a nominated subcontractor MEV. More details are presented in design
drawings (Appendix 4), and Bill of Quantities (Appendix B).
Consecrations
• October, 31% 2016: Completing phase 1 of the project (50 villas) with related networks and
services.
• February, 28" 2018: Completing phase 2 (70 villas) with related networks and services. Limited
budget of $120 Million.
Project Deliveries
• $120 high luxury villas (turnkey). Landscape comprising external pools. Services and amenities
including shopping mall, GYM, tennis courts, and football court.
Project Exclusion
• $120 high luxury villas (turnkey). Landscape comprising external pools. Services and amenities
including shopping mall, GYM, tennis courts, and football court.
3.15 After creating the WBS, the next step is defining the project
activities. Each work package of the created WBS has been
decomposed into activities which represent the required efforts and
actions to complete this work package; this produces a complete
activity list. Figure 17 shows a portion of the defined activity list in a
scheduling tool/software.
Date of Contract
Contract Parties
Contract Background
Contract Price
$22 Million
Contract Duration
Order of precedence
1. Contract Agreement.
2. Contract Particular Conditions.
3. Contract General Conditions.
4. Design Drawings.
5. Bill of Quantities.
6. Specifications.
Quality has been managed via manage quality process by ensuring that all the work
performed is executed as per specific procedures, standards, and guidelines; for example,
before delivering and pouring concrete, the project manager ensures that the following
processes have been defined and considered:
• Standards and specifications for concrete mix design have been defined;
• The concrete batch plant is complied with standards and specifications;
• Concrete has been checked via slump test before pouring; and
• Workforce experienced with concrete pouring are available.
Manage project knowledge has been achieved by the project manager by reviewing the
lessons learned of previous similar projects; the main item that has been considered is
the importance of continuously involve stakeholders throughout the project phases to
increase the chance of final acceptance and for achieving stakeholders satisfaction, and
thus, achieve project objectives.
Manage stakeholder engagement has been performed as follows:
4.7 Throughout the project, manage team process has been applied effectively
by the project manager; a major conflict has occurred between the technical
office manager and the construction manager regarding a connection detail that
was ambiguous in the shop drawings, the construction manager claimed that
this details should have been more clear while the technical office manager
stated that the current level of detail is enough for experienced construction
manager to deduce any minor missing details; the project manager applied
collaborative/problem solving technique by conducting a separate meeting with
each of the conflict parties and emphasising the importance and the value of
each of them in the project; he conducted them a meeting including both parties
and stated that they are all one team and he proposed a procedure for
clarifying such ambiguous issues in the future so that no conflicts will occur;
both parties were very satisfied with the project manager action.
Very Very
Item Low Medium High
Low High
5.6 Risks have been monitored to check their validity and the adequacy of contingency
reserves, and to identify any new risks that could impact the project. The project
manager continuously ensured that the risk management processes had been done as
defined in the risk management plan. A new major risk has been identified during
performing the construction works, which is “the main supplier responsible for
5.9 One of the challenges that faced the project manager was dealing with
changes and performing integrated change control; by involving the
customers/end user throughout the project, a new requirement has evolved,
where many customers are preferring to have an indoor basketball court
while keeping only one open tennis court instead of having two tennis courts.
The project manager has raised a change request to the change control board
(CCB) which contains the project sponsor and other subject matter experts;
the CCB evaluated the impact of the change request and approved it. The
approved change has been updated in the change log and communicated to the
project team for updating project plans and baselines, and to be considered
for implementation. Figure 33 shows a portion of the submitted change
request.
Subject: Adding one basketball court and omitting one tennis court.
Date: October 15th, 2015.
Requester: Sameh Ahmed.
Requester Role: Project Manager.
By involving the customers/end users, it was observed that most of them prefer to
have one basketball court while keeping one tennis court instead of having two tennis
courts. Complying with their expectations and requirements is essential for achieving
the marketing objectives.
Impact on Project
• There will be no impact on the project schedule finish date as the activities related
to implement the change request are not critical activities (analysis attached in
Appendix A).
• There will be an extra cost of $60,000 (analysis attached in Appendix B).
Approved
Required Updates
• Change log.
• Project management plan.
Communicate to
5. Project Closing
The project manager performed close project or phase process twice; once after
completing phase 1, and the other after finalizing phase 2 and all remaining works. The
project manager has performed the following tasks:
• Ensured that the lessons learned are collected and archived to be used in future
projects.
• Ensured that all issues have been resolved.
• All payments and issues related to the nominated subcontractor MEV have been
finalized and settled and no open claims.
• Completed and ensured the transition of the final product (the villas in addition to
related landscape and networks) to the organization and the customers.
• The prepared final report that presents the project objectives and how they have
been met.
• Released the project resources.
• Objective 1: Achieve the required profit, which equals to or greater than $11 Million.
• Performance: This objective has been achieved.
• Objective 2: Improve the marketplace of TPE organization to be the leading
organization in this field.
• Performance: The marketplace of TPE organization has been improved, but still it
is not the sole leading organization in the field; more projects are required to
achieve this strategic objective.
Milestones Performance
Phase 1 has been completed before the required date; while phase 2 has been
completed exactly on the required time.
Lessons Learned