2. BACKGROUND
The major of this project is to analyze the current situation of the company, whether the company using
its manufacturing equipment’s in a proper way to get the competitive advantages? If not, figuring out the main
cause for that and look into the problem exists within the company i.e. lack of availability of resources or poor
quality or lack of performance efficiency,and how these problems influence the company in achieving its goals.
The company cannot compete in the competitive market unless it uses its resources and capabilities to
the maximum extent. The company must work to get rid of the problems to get the competitive advantages with
respect to cost, service, and quality and on time delivery. These issues do not allow the company to achieve its set
goals.
Problem Formulation
To investigate the current situation of the production of the company.
To pick up the weakening in the production system those do not allow the company to achieve its full
capacity and meet the set goals.
To suggest the ways to improve the situation.
3. OBJECTIVE OF THE PROJECT
In today’s scenario the automotive suppliers have a great concern over improving quality and delivery
and decreasing cost, which leads to improved system productivity. In order to remain competitive, waste from
the value stream must be identified and eliminated so to run system with maximum efficiencies.
A Production is to order and large numbers of different products are produced, each in relatively small
volume. A Production shop consists of number of machine centers, each with a fundamentally different activity.
5. VSM METHODOLOGY
To start improving productivity by identifying waste and then removing it by implementing lean
principle in the industry there is no other tool better than VSM. It helps to understand and streamline work
processes using the tools and techniques of Lean Manufacturing.
The goal of VSM is to identify, demonstrate and decrease waste in the process. Waste being any
activity that does not add value to the final product, often used to demonstrate and decrease the amount of
`waste' in a manufacturing system. VSM can thus serve as a blue print for Lean Manufacturing.
Generally VSM has four major steps as given by Rother and Shook (1996):
1. Product
2. Drawing current state
3. Drawing future state
4. Develop work plan for implementation of future state.
Product
Work Plan
REFERENCES
[1] O. Ram Mohan Rao 1*, Dr. K VenkataSubbaiah 2, Dr. K NarayanaRao 3, T SrinivasaRao ; Enhancing Productivity of
hot metal in Blast furnace -A case study in an Integrated Steel Plant; O. Ram Mohan Rao et al. / International Journal of
Engineering Science and Technology (IJEST) ISSN :
[2] Marcello BRAGLIA_, Gionata CARMIGNANI , Francesco ZAMMORI Dipartimento di IngegneriaMeccanica,
Nucleare e dellaProduzione, Università di Pisa, A NEW VALUE STREAM MAPPING APPROACH FOR COMPLEX
PRODUCTION SYSTEMS; International Journal of Production Research.
[3] S. P. Vendan *, K. Sakthidhasan; Reduction of Wastages in Motor Manufacturing Industry; Jordan Journal of
Mechanical and Industrial Engineering Pages 579 - 590 Volume 4, Number 5, November 2010
ISSN 1995-6665.
[4] D. Rajenthirakumar*, P.V. Mohanram, S.G. Harikarthik, Department of Mechanical Engineering,PSG College of
Technology, Coimbatore; Process Cycle Efficiency Improvement Through Lean: A Case Study; Issue 1 (June 2011
International Journal of Lean Thinking Volume 2,
[5] Yang-HuaLian, Hendrik Van Landeghem Department of Industrial Management Ghent University; an application of
simulation and value stream mapping in lean manufacturing; Proceedings 14th European Simulation Symposium A.
Verbraeck, W. Krug, eds. (c) SCS Europe BVBA, 2002. [7] LixiaChenSchool of Economics and Management,
Changchun University of Science and Technology; The Application of Value Stream Mapping Based Lean Production
System; International Journal of Business and Management Vol. 5, No. 6; June 2010
[6] William M. Goriwondo*, Samson Mhlanga, AlphonceMarecha National University of Science and Technolog
Department of Industrial and Manufacturing Engineering; use of the value stream mapping tool for waste reduction in
manufacturing. case study for bread manufacturing in zimbabwe; Proceedings of the 2011 International Conference on
Industrial Engineering and Operations Management Kuala Lumpur, Malaysia, January 22 – 24, 2011.
[7] Stephen L. Woehrle, Minnesota State University, Mankato LouayAbou-Shady, Minnesota State University,
Mankato; Using Dynamic Value Stream Mapping and Lean Accounting Box Scores to Support Lean Implementation;
2010 EABR & ETLC Conference Proceedings Dublin, Ireland.
[8] Jon H. Marvel1; Charles R. Standridge2 1Gettysburg College (USA); 2Grand Valley State University (USA); A
simulation-enhanced lean design process; doi:10.3926/jiem.2009.v2n1.p90-113 ©© JIEM, 2009– 2(1): 90-113 – ISSN:
2013-0953.
[9] Rother, M. & Shook, J. (1999), "Learning to See: Value Stream Mapping to Add Value and Eliminate Muda",
Brookline, MA: Lean Enterprise Institute (www.lean.org)
[10] Feld, W.M. (2000). Lean Manufacturing: Tools, Techniques, and How To Use Them. London: The St. Lucie
Press.
[11] Grewal, C.S. (2008). An initiative to implement lean manufacturing using value stream mapping.
IntJManufTechnolManag 15(3-4):404-417.
[12] Hines, P. and Rich, N. (1997). The seven value stream mapping tools. International Journal of Operations
&Production Management 17(1): 46-64.
[13] Hines, P., Rich, N. and Esain, A. (1999).Value stream mapping - a distribution industry application. Benchmarking
International JournaJ6(1): 60-77.