PM Program
PM Program
Record Readings
Visual inspection
Cleaning chiller
Check operation
condition
Check Solution Levels
Check
Job
Replace
Downtime
(days/order) -
Time
Maintenance Time
(Hours/order) 1
Manpower Tech.
Effort (Man-Hour) 1
Resources
Service Eq. -
PM Program/ Direct Fired Chiller
Monthly Semi-Annual
Record Readings Record Readings
Visual inspection Visual inspection
Cleaning chiller Cleaning chiller
Check operation Check operation
condition condition
Check Solution Levels Check Solution Levels
perform Vacuum Perform Vacuum
Check Vacuum Line Check Vacuum Line
Refine Refrigerant Refine Refrigerant
Check failures and Check failures and
alarms alarms
Check Noise Check Noise
Check pumps current Check pumps current
Leak test for gas Line Leak test for gas Line
check safety devices Check safety devices
Check A/F linkage operation Check A/F linkage operation
Check non condensable gases
Make solution analysis
Check pilot and Shut off Valve
Leakage
Check Combustion
Change Oil
Add inhibitor if required
Running Running
- -
3 5
Tool box +
Tool Box Exhaust analysis device
- -
Direct Fired Chiller
Shutdown Shutdown
3 4
30 36
- -
Six years
Record Readings
Visual inspection
Cleaning chiller
Check operation
condition
Check Solution Levels
Perform Vacuum
Check Vacuum Line
Refine Refrigerant
Check failures and
alarms
Check Noise
Check pumps current
Leak test for gas Line
Check safety devices
Check A/F linkage operation
Check non condensable gases
Make solution analysis
Check pilot and Shut off Valve
Leakage
Check Combustion
Meager Test
Check Relays
Solution Filterations
Change Oil
Add inhibitor if required
72
Engineer+ 4 Tech
360
Tool box +
Exhaust analysis device +
Brushing machine + Carsher +
Meager
Replace
Replace
Maintenance Time
(Hours/order) 1 2
Service Eq. - -
PM Program/ Air Handling units
Quarter Semi-Annual
Check operation Check operation
check And clean the coil check And clean the coil
2 3
2 3
2 Tech. 2 Tech.
4 6
- -
Annual Two years
Check operation Check operation
check And clean the coil check And clean the coil
7 9
7 9
2 Tech. 3 Tech
14 27
- -
PM Level Weekly Monthly
Check operation Check operation
Replace
Replace
Maintenance Time
(Hours/order) 1 2
Service Eq. - -
PM Program/ Fresh Air units
Quarter Semi-Annual
Check operation Check operation
2 3
2 3
2 Tech. 2 Tech.
4 6
- -
Annual Two years
Check operation Check operation
change filters
Shutdown Shutdown
7 9
7 9
2 Tech. 3 Tech
14 27
- -
PM P
Check
Job
Replace
Downtime
(hours/order) - 1
Time
Maintenance Time
(Hours/order) 1 1
Manpower Tech. Tech.
Effort (Man-Hour) 1 1
Resources
Tools/Special Tool Box Tool Box
Service Eq.
PM Program/ Chilled and Cooling water pumps
Quarter Semi-Annual
Cleaning Cleaning
Check operation Check operation
measure and record measure and record
current current
Shutdown Shutdown
1 2
1 2
Tech. Tech.
1 2
Check coupling
Check Shaft
Replace Coupling.
Shutdown Shutdown
8 8
9 9
2 Tech. 2 Tech.
18 18
PM Level Weekly
measure and record
current
Check
Job
Replace
Downtime
(hours/order) -
Time
Maintenance Time
(Hours/order) 1
Manpower Tech.
Effort (Man-Hour) 1
Resources
Check noise and vibration Check noise and vibration Check noise and vibration
18 18 18
19 19 19
Replace bearings
Shutdown Shutdown
18 24
19 25
3 Tech. 3 Tech.
57 75