Earthing and Netmetering
Earthing and Netmetering
Grand Total
g of Solar System
07/12/2023
335
Engr. Umar Hamid
Unit Rate
Earthing
(Rs.)
87 0 0
275,000 0 0
7,000 0 0
25,000 0
4,000 0
4,000 0
0
5,000 0
5,000 0
10,000 0
12,000 24,000
600 1200
32,000
300 1200
4,000 5600
27,000 0
0
70,000 70000
0
47,000
0
3,000 0
500
7,000
10000
10,000 10,000
1,500 1,500 1,500
0 1,500 1,500
500
2,300 0
1,500 0
1,500 0
350 0 0
250 0
1,274,950 45,000
Proposal for Earthing of Solar System
Client Name: Mr. Date: 12-Jul-23
Address Multan Quotation No. 335
Contact No: Designed By: Engr. Umar Hamid
Type: Earthing
Unit Rate Total Price
Sr. No. Product Description Qty (Rs.) (Rs.)
Copper Rope,
1 Earthing Equipment - - 32,000
Copper Rods, Earthing Bags
NOC,
2 Net Metering Green Meters, Netmetering - - 0
File, File Processing
Installation, Comissioning
5 Site Services - - 1,500
and Testing Services
Total Cost =
Advance =
Balance =
Type: Earthing
4
PV Mounting Structure*
Protection Equipment
14 Guage L2 Structure
DC Cables, AC Breakers,
DC Breakers, AC SPDs,
0
As per System
1
& System Accessries Requirement
DC SPDs, DB Box
Copper Rope,
5 Earthing Equipment Copper Rods, Earthing Bags, Nill
J
Earthing Cable
NOC,
6 Net Metering Green Meters, Netmetering Nill
File, File Processing
O
2xOsaka TallTubler 145AH,
7 Backup Equipment Nill
Battery Cables, Thimbles
B
8 Civil Work
Concrete Pads Requirement
Total Cost =
Advance =
Balance =