0% found this document useful (0 votes)
34 views

Earthing and Netmetering

Uploaded by

Umar Hamid
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
34 views

Earthing and Netmetering

Uploaded by

Umar Hamid
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 6

Proposal for Earthing of Solar System

Client Name: Ubaid Sahab Date:


Address: Muzaffatgarh Quotation No.

Contact No: Designed By:

Sr. No. Product Description Qty

1 Solar PV Panel JA/Jinko 550/555 Grade A Tier 1 555


2 Solar Inverter Nitrox 3kw
3 14 Guage Customized Structure 14 Guage L2 Structure 14 G
4 DC Cable 6mm
5 AC Breaker Schneider
6 DC Breaker Schneider
7 AC SPD Schneider
8 DC SPD Schneider
9 Distribution Box PVC
10 Bare Conductor 10 mm 2
11 Copper Rods 2
12 Earthing Bags 4
13 Earthing Cable 1
14 Bidirectional Green Meters Transfopower
15 Net Metering
4x Daewoo Deep Cycle Battery,
16 Batteries 4x Osaka 230A
Battery Cables, Thimbles
17 Battery Cables 1 Job
18 Battery Thimbles
19 Bores 2
20 Concrete Pads 1 Job 1
21 Transportation 1 Job 1
22 Installation Fee 1 Job 1
23 MC4 Connectors
24 Flexible pipe Adam G
25 PVC Pipe Adam G
26 Duct Patti simple 40x40
27 Cable Ties 1 Job
28 Screw for Duct 1 inch
29 J Bolts
30 Rawal Bolts
31 Insulation Tapes

Grand Total
g of Solar System
07/12/2023
335
Engr. Umar Hamid

Unit Rate
Earthing
(Rs.)

87 0 0
275,000 0 0
7,000 0 0
25,000 0
4,000 0
4,000 0
0
5,000 0
5,000 0
10,000 0
12,000 24,000
600 1200
32,000
300 1200
4,000 5600
27,000 0
0
70,000 70000

0
47,000
0
3,000 0
500
7,000
10000
10,000 10,000
1,500 1,500 1,500
0 1,500 1,500
500
2,300 0
1,500 0
1,500 0
350 0 0
250 0

1,274,950 45,000
Proposal for Earthing of Solar System
Client Name: Mr. Date: 12-Jul-23
Address Multan Quotation No. 335
Contact No: Designed By: Engr. Umar Hamid

Type: Earthing
Unit Rate Total Price
Sr. No. Product Description Qty (Rs.) (Rs.)

Copper Rope,
1 Earthing Equipment - - 32,000
Copper Rods, Earthing Bags

NOC,
2 Net Metering Green Meters, Netmetering - - 0
File, File Processing

2 x Bores for Earthing (50' -


3 Civil Work - - 10,000
60')

All Item from Wareshouse to


4 Transportation - - 1,500
Site

Installation, Comissioning
5 Site Services - - 1,500
and Testing Services

MC4 Connectors, Flexible


Pipe, PVC Pipe, Duct Patti,
6 Miscellaneous Cable Ties, Screws, J Bolts, - - 0
Rawal/Anchor Bolts,
Insulation Tapes etc.

Grand Total 45,000


*Rs. 70,000 will be charged additonal as Cost of PV Elevated
mounting structure as per site requirement
** Quotation is valid for 3 Days

Term and Conditions


1)      Inclusion of
a)       Electrical work :
• Installation and connection of PV panels
• Installation of Inverter and battery system
• Connection of circuit breakers and surge protection devices
• Complete services from WAPDA input to main distribution box.
• Net metering File + File Processing + Speed Money
b)      Civil work:
• A minimum 60 feet bore for AC Earthing
• A minimum 60 feet bore for DC Earthing
• To concrete structure’s base for support
2)     Protection
Inclusionfeatures
of
Sr. # Features Protection
1 Input-side disconnection device Yes
2 Anti-islanding protection Yes
3 AC over-current protection Yes
4 AC short-circuit protection Yes
5 AC over-voltage protection Yes
6 DC reverse-polarity protection Yes
7 DC surge protection Yes
8 AC surge protection Yes
9 Residual current monitoring unit Yes
10 Arc fault protection Yes
11 Ripple receiver control Yes

3)      Standard Exclusions:


i) Any cost or activity associated with up-gradation of customer's existing electrical service/panel or
building
ii)  electrical
Any cost grounding
or activity system.
associated with covering the risk of damage, loss or theft of solar system and its

components after delivery to the customer site.


iii) Any cost or activity associated with repair of damage caused by fluctuation in grid (DISCO).
iv)  Any cost or activity associated with working on any live electricity system that comes under the
purview of local DISCO or Authority.
v)  Demand Notice for 3phase connection, extension of load, change of name and extension of conductor.
4)      Installation Period
i)  Commissioning of solar PV system will be done within 15 days after submission of 70% project cost
by the customer to the Company.
ii)  100% payment at the time of order is mandatory
iii) The acquisition of the relevant net metering approval, generation license and installation of

bi-directional/net meter can be a lengthyprocess as it involves multiple Government departments/agencies.


So it will take 30 to 40 days.
5)      Warranty
i) Inverter warranty 4 years (1 year parts + 3 Years’ service)
ii) Warranty of solar panel will be 12 years performance/ 25 Year power output.

Total Cost =

Advance =

Balance =

Signature of Company’s CEO Signature of Customer


Proposal for Earthing of Solar System
Client Name: Mr. M. Ayyaz Date: 12-Jul-23
Address Alipur Quotation No. 335
Contact No: Designed By: Engr. Umar Hamid

Type: Earthing

Sr. No. Product Description Qty

JA/Jinko 550/555 Grade A


1 Solar PV Panel 0
Tier 1

2 Solar Inverter Nitrox 3kw 0

4
PV Mounting Structure*

Protection Equipment
14 Guage L2 Structure

DC Cables, AC Breakers,
DC Breakers, AC SPDs,
0

As per System
1
& System Accessries Requirement
DC SPDs, DB Box

Copper Rope,
5 Earthing Equipment Copper Rods, Earthing Bags, Nill

J
Earthing Cable

NOC,
6 Net Metering Green Meters, Netmetering Nill
File, File Processing

O
2xOsaka TallTubler 145AH,
7 Backup Equipment Nill
Battery Cables, Thimbles

Bores for Earthing, As per System

B
8 Civil Work
Concrete Pads Requirement

All Item from Wareshouse to As per Site


9 Transportation
Site Requirement

Installation, Comissioning As per Site


10 Site Services
and Testing Services Requirement

MC4 Connectors, Flexible


Pipe, PVC Pipe, Duct Patti,
As per Site
11 Miscellaneous Cable Ties, Screws, J Bolts,
Requirement
Rawal/Anchor Bolts,
Insulation Tapes etc.

Grand Total 798,995


*Rs. 70,000 will be charged additonal as Cost of PV Elevated
mounting structure as per site requirement
** Quotation is valid for 3 days

Term and Conditions


1)      Inclusion of
a)       Electrical work :
• Installation and connection of PV panels
• Installation of Inverter and battery system
• Connection of circuit breakers and surge protection devices
• Complete services from WAPDA input to main distribution box.
• Net metering File + File Processing + Speed Money
b)      Civil work:
• A minimum 60 feet bore for AC Earthing
• A minimum 60 feet bore for DC Earthing
• To concrete structure’s base for support
2)     Protection
Inclusionfeatures
of
Sr. # Features Protection
1 Input-side disconnection device Yes
2 Anti-islanding protection Yes
3 AC over-current protection Yes
4 AC short-circuit protection Yes
5 AC over-voltage protection Yes
6 DC reverse-polarity protection Yes
7 DC surge protection Yes
8 AC surge protection Yes
9 Residual current monitoring unit Yes
10 Arc fault protection Yes
11 Ripple receiver control Yes

3)      Standard Exclusions:


i) Any cost or activity associated with up-gradation of customer's existing electrical service/panel or
building
ii)  electrical
Any cost grounding
or activity system.
associated with covering the risk of damage, loss or theft of solar system and its

components after delivery to the customer site.


iii) Any cost or activity associated with repair of damage caused by fluctuation in grid (DISCO).
iv)  Any cost or activity associated with working on any live electricity system that comes under the
purview of local DISCO or Authority.
v)  Demand Notice for 3phase connection, extension of load, change of name and extension of conductor.
4)      Installation Period
i)  100%
ii) advance payment
The acquisition at the time
of the relevant of order is
net metering mandatory.
approval, generation license and installation of

bi-directional/net meter can be a lengthyprocess as it involves multiple Government departments/agencies.


So it will take 30 to 40 days.
5)      Warranty
i) Inverter warranty 2 years (2 Years Part + Life Time service)
ii)  Warranty of solar panel will be 12 years performance/ 25 Year power output.

Total Cost =

Advance =

Balance =

Signature of Company’s CEO Signature of Customer