0% found this document useful (0 votes)
79 views

What Is Material Test Report (MTR) - Mill Test Report

Uploaded by

Sh.nasirpur
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
79 views

What Is Material Test Report (MTR) - Mill Test Report

Uploaded by

Sh.nasirpur
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 9

Inspection 4

Industry LLC

Home
General
Third Party Inspection
Vendor Inspection
Factory Acceptance Test
Inspection and Test Plan
Commodity Inspection
Industrial Inspection
Quality Control
Plant Inspection
Coating Inspection
Pre-Shipment Inspection
Vendor List
Fix Equipment
Pressure Vessel
Heat Exchanger
Piping System
Industrial Valve
Steam Boiler
Storage Tank
Process Heater
Rotary Equipment
Centrifugal Pump
Centrifugal Compressor
Reciprocating Compressor
Gas Turbine
Steam Turbine
Fan & Blower
E & I Equipment
Electric Generator
Electric Motor
Power Transformer
Control Panel
Switchgear
Power Cable
I4I Academy
I4I Academy Courses
Aramco API Classroom
API CPD Hours
API SIFE Training
API 510 Training
API 570 Training
API 653 Training
API 571 Training
ASME Training Course
ASME IX Training
Quality Control Training
CWI Endorsement Training
I4I Academy Contact
Get in Touch
About Us
Contact Us
Blog
Privacy Policy

Did you find this


article useful? Click
What is Material Test Report
Search this
on below Like (MTR)/ Mill Test Report?
button! Site! More than 600
YouTube 8K Articles!

Like 2.2K
Material test report or Mill test report
certifies that the chemical analysis and
Home mechanical properties are in conformance
with the specified specification. 

GENERAL An MTR certifies a material’s compliance


with the standard specification such as
Third Party ASME Section II Part A and B or ASTM. The
Inspection MTR is supplied from the material
Vendor manufacturer such as plate manufacturer,
Inspection casting manufacturer, forging manufacturer,
etc.  
Factory
Acceptance Test

Inspection and
Heat Number
Test Plan
The MTR document contains heat number
Commodity which is also known as “melt number” and
Inspection is similar to lot or batch number. When the
steel plate is in its molten condition, a
Industrial
sample is drawn out from the batch for
Inspection
analysis of its chemical composition. This
Quality Control plate is given a particular identification
Plant Inspection number known as heat number.

Coating The heat number provides a way to trace


Inspection back the steel plates to its production units
Pre-Shipment and process conditions. During the
Inspection inspection of the material the heat number
mentioned on the MTR must match with one
Vendor List on engraved/printed on the plate.

Several plates might have identical heat


FIX number, and this is normal since that
EQUIPMENT indicates both plates made from the same
batch of melted material.   
Pressure Vessel

Heat Exchanger
Contents of Material Test
Piping System
Report
Industrial Valve
An MTR certificate contains following
Steam Boiler
information in general.
Storage Tank Basic information such as name of the
material manufacturer, material size,
Process Heater
weight, material identification and
grade i.e. SA 516 Gr. 70, ASTM A106
ROTARY Gr 60
Material Heat Number
EQUIPMENT Chemical composition analysis test
result 
Centrifugal Pump
Mechanical test result 
Centrifugal
Compressor
How to review an MTR?
Reciprocating
Compressor Assume you have assigned for inspection of
Gas Turbine pressure vessel plate material at the
pressure vessel manufacture shop. The
Steam Turbine vessel manufacturer provides you with MTR
Fan & Blower for purchased plate material from his
supplier. 

E&I You look at the pressure vessel drawing and


find out the vessel plate should be SA240
EQUIPMENT
TP 316 L (Low Carbon Stainless Steel).
Electric
Generator Following MTR provided to you. This is just
for example; the MTR header has been
Electric Motor removed. 
Power
Transformer

Control Panel

Switchgear

Power Cable

I4I Step 1
ACADEMY You will walk on the shop floor and make a
visual inspection. You should see the
I4I Academy
stenciled heat number on the plate surface
Courses
Aramco API which in this MTR is “N1J0”. With this
Classroom checking, you make sure your MTR is the
one generated for this plate. (Based on the
API CPD Hours
project requirement, you might also run a
API SIFE Training visual inspection on plate edges, plate
surface and also make dimensional
API 510 Training
inspection especially thickness
API 570 Training measurement)

API 653 Training

API 571 Training Step 2 


ASME Training You will open the ASME Section II Part A
Course and find SA 240 TP 316 L material
ASME IX Training specification. Locate the chemical
composition table and compare the
Quality Control
percentage values in the MTR with the
Training
acceptance range in the table e.g. Carbon
CWI (C), Chromium (Cr), Cupper(Cu), Manganese
Endorsement (Mn), Molybdenum(Mo), Nitrogen (N),
Training Nickel(Ni), phosphor(P), Sulphur(S) and
silicon(Si). 
I4I Academy
Contact
Step 3 
GET IN Locate the mechanical property table in the
TOUCH same specification. It generally comes after
chemical composition table. Similarly,
About Us compare the measured value in the MTR
Contact Us with the acceptance range in the
mechanical properties table.
Blog

Privacy Policy For this example, you need to check yield


strength, tensile strength, elongation,
reduction in area and hardness  
We will be updating
and growing this
site with more and If the result of all verification on all these 3
more of industrial steps were satisfactory, then the result of
inspection related MTR review will be satisfactory. The
articles.
Please subscribe to material test report review in most of ITP’s
my monthly is the “Review” point. 
newsletter so you
don't miss a thing.
MTR based on EN 10204
Email Standard
When you review the project specification
even the inspection and test plan
Enter Your First
occasionally you might see that project
Name (optional)
requires the material test report being
provided either in conformance with EN
10204 3.1 or EN 10204 3.2
I am at least 16
years of age. EN 10204 3.1

I have read and The material certificate is provided and


accept the privacy certified by the material manufacturer. So
policy.
when you review the MTR with this
requirement, you only see the material
I understand
manufacturer stamp/signature
that you will use
my information to
send me a EN 10204 3.2
newsletter.

Besides, material manufacturer an


Subscribe independent inspection agency also shall
authenticate the MTR. You typically need to
see two stamps and signatures, one from
the material manufacturer and the second
one from inspection agency.

The inspection agencies usually assign an


inspector to witness the chemical
composition analysis test and mechanical
testing. The third party inspector verifies
test result with acceptance criteria and also
checks heat numbers and test specimens. If
all items met the requirements, the
inspector would sign off the MTR.
Return to Industrial Inspection

Did you find this article useful? Click on


below Like button!

Like 2.2K

New! Comments
Have your say about what you just read!
Leave me a comment in the box below.
13 comments

Add a comment...

James Timoteo
great overview.w
Like · Reply · Mark as spam · 1 · 6y

Salman Ahmed
Facebook Twitter

inspection-for-industry.com
Copyright © 2012-2013 Inspection-for-Industry.Com

You might also like