Sist Expert PT Managementul Calitatii Si Mentenantei Serviciilor Ultima Varianta in Engleza
Sist Expert PT Managementul Calitatii Si Mentenantei Serviciilor Ultima Varianta in Engleza
Abstract. Quality and satisfying the clients represent subjects of great interest,
the quality standards offering an answer to this acknowledgement and having as
purpose the encouragement of companies and other organizations in managing
the quality of their performed services more efficiently. Creating and
maintaining quality within organizations depend on the manager’s and
employers’ vision of quality management for the purpose of guaranteeing the
understanding and the accomplishment of the clients’ demands [1]
1. Introduction
Having established the roles within the project team clearly, the
consultant can use a series of instruments helpful during the implementation,
which help him to strictly plan the implementation steps and to establish the
responsibilities of each team member. The consultant can use the application
Microsoft Project or any other software which can help him monitor the time
and the degree of carrying out the activities.
By accomplishing the diagnosis analysis, he identifies the major problems
in the organisation, and then, he establishes, through a report, the period of time
of each step of the project. Microsoft Project places at user’s disposal the
necessary instruments in order to realize such a programming, and, in this way,
the project’s architecture can be shown as in figure 1.
DANIEL CIUREA and RĂZVAN RUSEI
Fig. 1.- Time distribution within the project depending on the importance of the activities
For the study case, we took into consideration the time allocated at the
beginning of the collaboration between the client organisation and the consultant
in order not to exceed this period. We know from the beginning that the used
resources are distributed depending on the activities over allocation. This fact is
well illustrated through figure 2.
Fig. 2.- Resources distribution within the project depending on the importance of the
activities
of view.
Quality assuring system refers to the way that the quality management
system was conceived, researched, planned and implemented. The correct
interpretation of this stage represents a key point for the action’s success. There
is an adequate commercial software dedicated to elaborating qualitative
documentation, to conceiving inspections and verifications for the product,
service or personal level. Through this software, each employee connected to a
computer has the possibility of visualising the work instructions of the process
in which he is involved. Each employee is permanently connected to a modulus
of the program only and he can access work instructions and many other process
information just through a click.
Projection control (design) refers to the strategy of establishing and
perfecting control procedures and projection verification in order to obtain the
proposed results and has the following components: planning the products and
design development; organizational interfacing, initiating the design operation;
results capitalization; results verification; re-evaluating the projection
possibilities; concept validation and modification. A distinct projection for
packages, specifications and service is made in trade companies. Of a great
interest to BLC products is the design introduction of data resulted from the
defective analysis that came from the justified customer complaints about the
technical parameters or product liability.
Documentation control refers to the organization’s manner of elaborating,
issuing, approving, correcting and/or annulling the documentation referring to
quality assurance. This is the step when the competent structures, the
responsible persons and the independent supervisor structure are defined for
each mentioned step and the place of the respective documentations are named.
Product supply and control to different providers. Generally, any
company must make sure that the ordered products/services amount to the
requested quality level. With that end in view the company draws up an
evaluation and control methodology for their direct or indirect suppliers and
specifies the current quality data of the received products. When drawing up the
quality pursuing documentation for different suppliers, we use specialized
software, capable of indicting the suppliers list, the covered audit operations,
and the suppliers’ quality parameters.
Own products identification (and source recognition). This procedure
looks like a known fact within production or sale but in fact it is not simple at
all. The company must be in any moment capable of identifying the product
precisely, the technological course or the sales course before putting into
operation (including installation, guarantee or post guarantee revision) and so
on.
Processes control. This is a stage when limits must be established
because the technical process control can influence quality directly, involving
BUL. INST. POLIT. IAŞI, TOMUL L (LIV), FASC. 5
5. Conclusions
REFERENCES
1. Grigoruţă Maria Viorica, Quality and non quality management within service organizations
2. Gabriel Spiţă TÜV Rheinland Romania business manager, www.gff.ro
3. http://www.qpr.com/romanian/qprscorecard.html
4. Suciu Petre, Implementing and certificating quality management systems in conformity with
SR EN ISO 9001:2001 for organizations and with SR EN ISO/CEI 17025:2001 for testing
laboratories
5. Melinda Macho, Quality assurance in accordance with ISO 9001
6. Andreea Fortuna Schiopu, Staff motivation in the context of total quality management
7. Everett E Adam Jr, Ronald J Ebert “Production and Operation management”, Ed.Teora
2001
8. Emil Maxim, Quality management – synthesis, Iaşi 2005
9. International Organization for Standardisation, ISO 9001:2000, Quality management
systems - Requirements. 2000, International Organization for Standardisation: Geneva,
Switzerland
10. http://www.qpr.com/Brochures/QPRScoreCardBrochure.pdf
The present work details the importance of implementing a quality management system
within an organization with the help of computational instruments and an external consultant.
Implementing and monitoring the management system happens by following each developed
process and by monitoring the activity with the help of adequate software.