Dimensional Inspektion Report

This dimensional inspection report documents measurements of a shell (P-5) part for the Manyar Smelter Project. Measurements were taken at various marking points (#1 through #7) on the part, with the dimensions, tolerances, and actual measurements recorded. The part was measured according to the provided drawing and sketch, with the results needing witnessed and approved review and an overall judgment made on acceptance.

Uploaded by

didi sudi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
571 views6 pages

Dimensional Inspektion Report

This dimensional inspection report documents measurements of a shell (P-5) part for the Manyar Smelter Project. Measurements were taken at various marking points (#1 through #7) on the part, with the dimensions, tolerances, and actual measurements recorded. The part was measured according to the provided drawing and sketch, with the results needing witnessed and approved review and an overall judgment made on acceptance.

Uploaded by

didi sudi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 6

QHSE-FM-QCA02-07, Rev.

02
Page :

DIMENSIONAL INSPECTION REPORT

Project Name : MANYAR SMELTER PROJECT Report No. : MEASUREMENT RESULT


Part Name : SHELL (P-5) Drawing No. : MS-DD-KMY01-MEC-GA-0002 DIMENSION TOLERANCE ACTUAL
NO. MARKING JUDGMENT
Client : PT KOTA MINYAK INTERNUSA Date : (mm) (mm) (mm)

#1 B

DRAWING / SKETCH MEASUREMENT RESULT


SHELL STAGE 1 DIMENSION TOLERANCE ACTUAL
NO. MARKING JUDGMENT
(mm) (mm) (mm)

#2 B

MEASUREMENT RESULT
A
C DIMENSION TOLERANCE ACTUAL
NO. MARKING JUDGMENT
(mm) (mm) (mm)

#3 B

MEASUREMENT RESULT
DIMENSION TOLERANCE ACTUAL
NO. MARKING JUDGMENT
(mm) (mm) (mm)
B
A

#4 B

MEASUREMENT RESULT
DIMENSION TOLERANCE ACTUAL
NO. MARKING JUDGMENT
(mm) (mm) (mm)

#5 B

Prepared by : Wittnessed / Reviewed / Approved by : C

JUDGMENT CODE :

ACC : ACCEPTED

SACC : SPECIAL ACCEPTED WITH COMMENT

Date : Date : NACC : NOT ACCEPTED


QHSE-FM-QCA02-07, Rev.02
Page :

DIMENSIONAL INSPECTION REPORT

Project Name : MANYAR SMELTER PROJECT Report No. : MEASUREMENT RESULT


Part Name : SHELL (P-5) Drawing No. : MS-DD-KMY01-MEC-GA-0002 DIMENSION TOLERANCE ACTUAL
NO. MARKING JUDGMENT
Client : PT KOTA MINYAK INTERNUSA Date : (mm) (mm) (mm)

#6 B

DRAWING / SKETCH MEASUREMENT RESULT


SHELL STAGE 2 DIMENSION TOLERANCE ACTUAL
NO. MARKING JUDGMENT
(mm) (mm) (mm)

#7 B

MEASUREMENT RESULT
A
C DIMENSION TOLERANCE ACTUAL
NO. MARKING JUDGMENT
(mm) (mm) (mm)

#8 B

MEASUREMENT RESULT
DIMENSION TOLERANCE ACTUAL
NO. MARKING JUDGMENT
(mm) (mm) (mm)
B
A

#9 B

MEASUREMENT RESULT
DIMENSION TOLERANCE ACTUAL
NO. MARKING JUDGMENT
(mm) (mm) (mm)

#10 B

Prepared by : Wittnessed / Reviewed / Approved by : C

JUDGMENT CODE :

ACC : ACCEPTED

SACC : SPECIAL ACCEPTED WITH COMMENT

Date : Date : NACC : NOT ACCEPTED


QHSE-FM-QCA02-07, Rev.02
Page :

DIMENSIONAL INSPECTION REPORT

Project Name : MANYAR SMELTER PROJECT Report No. : MEASUREMENT RESULT


Part Name : SHELL (P-5) Drawing No. : MS-DD-KMY01-MEC-GA-0002 DIMENSION TOLERANCE ACTUAL
NO. MARKING JUDGMENT
Client : PT KOTA MINYAK INTERNUSA Job No. : (mm) (mm) (mm)

End User : Date : A

Contract No. : Page : of #11 B

DRAWING / SKETCH MEASUREMENT RESULT


SHELL STAGE 3 DIMENSION TOLERANCE ACTUAL
NO. MARKING JUDGMENT
(mm) (mm) (mm)

#12 B

MEASUREMENT RESULT
A
C DIMENSION TOLERANCE ACTUAL
NO. MARKING JUDGMENT
(mm) (mm) (mm)

#13 B

MEASUREMENT RESULT
DIMENSION TOLERANCE ACTUAL
NO. MARKING JUDGMENT
(mm) (mm) (mm)
B
A - - - -

#14 B - - - -

C - - - -

MEASUREMENT RESULT
DIMENSION TOLERANCE ACTUAL
NO. MARKING JUDGMENT
(mm) (mm) (mm)

A - - - -

#15 B - - - -

Prepared by : Wittnessed / Reviewed / Approved by : C - - - -

JUDGMENT CODE :

ACC : ACCEPTED

SACC : SPECIAL ACCEPTED WITH COMMENT

Date : Date : NACC : NOT ACCEPTED


Page : 1 of 3

DIMENSIONAL INSPECTION REPORT

Project Name : MANYAR SMELTER PROJECT ( 4821 ) Report No. : MEASUREMENT RESULT
Part Name : SHELL (P-5) Drawing No. : MS-DD-KMY01-MEC-GA-0002 DIMENSION TOLERANCE Reff to. STD-PRO-011.003.00 ACTUAL
NO. MARKING JUDGMENT
Client : PT KOTA MINYAK INTERNUSA Date : (mm) (mm) (mm)

A 5403

#1 B 2400

C 20

DRAWING / SKETCH MEASUREMENT RESULT


SHELL STAGE 1 DIMENSION TOLERANCE Reff to. STD-PRO-011.003.00 ACTUAL
NO. MARKING JUDGMENT
A (mm) (mm) (mm)
C
A 5403

#2 B 2400
C 20
MEASUREMENT RESULT
DIMENSION TOLERANCE Reff to. STD-PRO-011.003.00 ACTUAL
NO. MARKING JUDGMENT
(mm) (mm) (mm)
A 5403

B #3 B 2400
C 20
MEASUREMENT RESULT
DIMENSION TOLERANCE Reff to. STD-PRO-011.003.00 ACTUAL
NO. MARKING JUDGMENT
(mm) (mm) (mm)
A 5403

#4 B 2400
C 20

MEASUREMENT RESULT
DIMENSION TOLERANCE Reff to. STD-PRO-011.003.00 ACTUAL
NO. MARKING JUDGMENT
(mm) (mm) (mm)

A 5403

#5 B 2358

Note Prepared by : Wittnessed / Reviewed / Approved by : C 20

........................................................................................................ JUDGMENT CODE :

........................................................................................................ ACC : ACCEPTED

........................................................................................................ SACC : SPECIAL ACCEPTED WITH COMMENT

Date : Date : NACC : NOT ACCEPTED


Page : 2 of 3

DIMENSIONAL INSPECTION REPORT

Project Name : MANYAR SMELTER PROJECT ( 4821 ) Report No. : MEASUREMENT RESULT
Part Name : Shell Stack 4821 Drawing No. : MS-DD-KMY01-MEC-GA-0002 DIMENSION TOLERANCE Reff to. STD-PRO-011.003.00 ACTUAL
NO. MARKING JUDGMENT
Client : PT KOTA MINYAK INTERNUSA Date : (mm) (mm) (mm)

A 5403

#6 B 2400

C 20

DRAWING / SKETCH MEASUREMENT RESULT


SHELL STAGE 2 DIMENSION TOLERANCE Reff to. STD-PRO-011.003.00 ACTUAL
NO. MARKING JUDGMENT
(mm) (mm) (mm)
A 5403

#7 B 2400
A C
C 20
MEASUREMENT RESULT
DIMENSION TOLERANCE Reff to. STD-PRO-011.003.00 ACTUAL
NO. MARKING JUDGMENT
(mm) (mm) (mm)
A 5403

B 2400
#8
C 20
B
MEASUREMENT RESULT
DIMENSION TOLERANCE Reff to. STD-PRO-011.003.00 ACTUAL
NO. MARKING JUDGMENT
(mm) (mm) (mm)
A 5403

#9 B 2400
C 20

MEASUREMENT RESULT
DIMENSION TOLERANCE Reff to. STD-PRO-011.003.00 ACTUAL
NO. MARKING JUDGMENT
(mm) (mm) (mm)

A 5403

#10 B 2358

Note Prepared by : Wittnessed / Reviewed / Approved by : C 20

.................................................................................................................. JUDGMENT CODE :

.................................................................................................................. ACC : ACCEPTED

.................................................................................................................. SACC : SPECIAL ACCEPTED WITH COMMENT

Date : Date : NACC : NOT ACCEPTED


Page : 3 of 3

DIMENSIONAL INSPECTION REPORT

Project Name : MANYAR SMELTER PROJECT Report No. : MEASUREMENT RESULT


Part Name : Shell Stack 4821-STC-0001 Drawing No. : MS-DD-KMY01-MEC-GA-0002 DIMENSION TOLERANCE Reff to. STD-PRO-011.003.00 ACTUAL
NO. MARKING JUDGMENT
Client : PT KOTA MINYAK INTERNUSA Date : (mm) (mm) (mm)

A 5403

#11 B 2383

C 20

DRAWING / SKETCH MEASUREMENT RESULT


SHELL STAGE 3 DIMENSION TOLERANCE Reff to. STD-PRO-011.003.00 ACTUAL
NO. MARKING JUDGMENT
(mm) (mm) (mm)
A 5403
A C
#12 B 2400
C 20
MEASUREMENT RESULT
DIMENSION TOLERANCE Reff to. STD-PRO-011.003.00 ACTUAL
NO. MARKING JUDGMENT
(mm) (mm) (mm)
A 5403
#13 B 900
C 20
B MEASUREMENT RESULT
DIMENSION TOLERANCE ACTUAL
NO. MARKING JUDGMENT
(mm) (mm) (mm)
A - - - -

#14 B - - - -
C - - - -

MEASUREMENT RESULT
DIMENSION TOLERANCE Reff to. STD-PRO-011.003.00 ACTUAL
NO. MARKING JUDGMENT
(mm) (mm) (mm)

A - - - -

#15 B - - - -

Note Prepared by : Wittnessed / Reviewed / Approved by : C - - - -

................................................................................................... JUDGMENT CODE :

................................................................................................... ACC : ACCEPTED

................................................................................................... SACC : SPECIAL ACCEPTED WITH COMMENT

Date : Date : NACC : NOT ACCEPTED