This document contains a takeoff sheet for the super structure of a mixed use building project. It lists various building elements including concrete work, columns, beams, stair work, formwork, and hollow concrete block work. Dimensions and quantities are provided for each element. The total quantities calculated include 60.06 cubic meters of formwork for ground floor elevation columns, 338.53 square meters of hollow concrete blocks for internal walls on axis 2, and 547.37 square meters of hollow concrete blocks for the parapet wall.

Uploaded by

Riyaad Mandisa
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
37 views

Holostic My

This document contains a takeoff sheet for the super structure of a mixed use building project. It lists various building elements including concrete work, columns, beams, stair work, formwork, and hollow concrete block work. Dimensions and quantities are provided for each element. The total quantities calculated include 60.06 cubic meters of formwork for ground floor elevation columns, 338.53 square meters of hollow concrete blocks for internal walls on axis 2, and 547.37 square meters of hollow concrete blocks for the parapet wall.

Uploaded by

Riyaad Mandisa
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 30

Project :- MIXED USE BUILDING

Contractor :-
Client:-
Consultant:-
Location:-
Super Structure
TAKEOFF SHEET
T LHD S Description
B super structure
1. concret work
ground floor
elevation column
0.25
0.25 C1&c2
20
2.73
3.41
0.25
0.25 First floor
20
2.73 elevation column
3.41
0.25
0.3 Intermidate beam
4
9.7 on axis 1 & 3
2.91
0.25 on axis 2
0.30
2
10
1.50
0.25
0.3 on axis 2'
2
5.000
0.75
0.25
0.300
2 0n axis A
9
1.35
0.25
0.30
4 On axis B&C
10
3.00
0.25
0.3 Top beam
4
9.7 on axis 1 & 3
2.91

T LHD S Description
1.100 Stair work
L=√(a²)+(b²) L
3.06
4 stair sofit
0.12
b=2.7m
1.62
0.34 0.30

1.1 v=1/2b*h*w

0.15
36
Stair step

4
0.16

0.3
1.08
1.000
2.2
2 Stair Landing
0.15 H=1.4m
0.66
0.25
0.30
2 Stair Beam
2.2
0.33
0.25
0.25
8 Column for water tanker house
2.74
1.37
0.250
0.3 Beam for water tanker house
4
4.00 B/N axis A&B & 2-3
1.20
0.25
0.3
4 B/N axis 2-3 & A&B
5
1.50
4.00
5
2 B/N axis 2-3 & A&B
0.15
6.00
2.73
Formwork
20 1.1 Ground floor Elevation column
60.06 (0.25*0.25)+2(0.25+(0.025*2))=1.1

2.73
20 1.1 First floor Elevation column
60.06 (0.25*0.25)+2(0.25+(0.025*2))=1.1

0.3 Intermidate beam


4
9.7 on axis 1 & 3
11.64 External
0.15 Intermidate beam
4 9.7 on axis 1 & 3
5.82 Internal
T LHD S Description
0.15 on axis 2'
4 4.700
2.82
0.25 on axis 2'
4 4.7 Bottom
4.7
0.300
0n axis A
4 9
external
10.8
0.15
0n axis A
4 8
internal
4.8
0.25
0n axis A
4 8
Bottom
8
0.15
4 9.25 On axis B&C
5.55
0.25
On axis B&C
9.25
Bottom
4
3.06 Stair work
L=√(a²)+(b²) L
4 0.30
3.672 stair sofit
b=2.7m
36 1.1
0.16 0.30
v=1/2b*h*w
6.336
Stair step
0.15

4 .3
0

6.1
Stair Landing
2 0.30
P=2.2+2.2+1.05+1.05=6.1
3.66
0.15
2 2.2 Stair Beam
0.66
0.25
Column for water tanker house
8 2.74
(0.25*0.25)+2(0.25+(0.025*2))=1.1
5.48
0.3 Beam for water tanker house
4 3.80 B/N axis A&B & 2-3
4.56 External
0.15 Beam for water tanker house
4 3.80 B/N axis A&B & 2-3
2.28 Bottom
0.25 Beam for water tanker house
4 3.80 B/N axis A&B & 2-3
3.8 Bottom
T LHD S Description
Axis 2 (Internal HCB work(20))
W=7.5 H=2.4
2 7.5 Door Area=2(0.8*2.4)=3.84
1Hcb =0.425*0.225=0.095(mortal adition)
2.4 M²
32.16 Total number of block
338.5263
Axis 2' (Internal HCB work(20))
1.8 W=1.8 H=2.4
2.4 1Hcb =0.425*0.225=0.095(mortal adition)
2 M²
8.64 Total number of block
90.94737
HCB work First floor
Axis c (Front elevation)
W=10 H=2.4
Window and Door
Area=2(0.9*1.5+0.8*1.5+2.75*2.4)=18.3
10 1Hcb =0.425*0.225=0.095(mortal adition)
2.4 M²
2
29.7 Total number of block
312.6316
HCB for balcony (15)
5.9 W=5.9 H=0.9
0.9 1Hcb =0.425*0.225=0.095(mortal adition)
2 M²
10.62 Total number of block
111.7895
Axis A b/n 1-2' (Rear elevation)
W=5.9 H=2.4
5.9 Door Area=4(1.2*1.5)+2(1.3*0.6)=8.76
1Hcb =0.425*0.225=0.095(mortal adition)
2.4 M²
2
19.56 Total number of block
205.8947
Axis A b/n 2'-3 (Rear elevation)
W=2.5 H=2.9
2.5 Door Area=4(2.3*0.6)=5.52
1Hcb =0.425*0.225=0.095(mortal adition)
2.9 M²
2
8.98 Total number of block
94.52632
Axis 1(Left elevation)
9.25 W=9.25 H=2.4
2.5 1Hcb =0.425*0.225=0.095(mortal adition)
2 M²
46.25 Total number of block
486.8421
Axis 3 b/n A&B (Right elevation)
W=3.5 H=2.4
2 Door Area=4(0.6*0.60)=1.4
1Hcb =0.425*0.225=0.095(mortal adition)

Total number of block
Axis 3 b/n A&B (Right elevation)
W=3.5 H=2.4
2 3.5 Door Area=4(0.6*0.60)=1.4
1Hcb =0.425*0.225=0.095(mortal adition)
2.4 M²
15.4 Total number of block
162.1053
1.3 HCB work for parapet wall
4 10
52 M²
Total number of block
547.3684
1.3 HCB work for parapet wall
4 10
26 M²
Total number of block
273.6842
8 Plastering for Ground floor
2 2.4 Axis c (Front elevation)
7.2 M²
4.6
2 2.4 Axis A b/n 1-2 (Rear elevation)
14.88 M²
2.5
2 4.4 Axis A b/n 2'-3 (Rear elevation)
16.48 M²
9.25
2 2.5 Axis 1(Left elevation)
46.25 M²
4.5
2 2.4 Axis 3 b/n B&C (Right elevation)
17.4 M²
3.5
2 2.4 Axis 3 b/n A&B (Right elevation)
15.4 M²
3.7
2 2.4 Axis B (Internal HCB work(20))
13.92 M²
4.69
2 2.4 Axis B (Internal HCB work(15))
18.672 M²
7.5
2 2.4 Axis 2 (Internal HCB work(20))
32.16 M²
1.8
2 2.4 Axis 2' (Internal HCB work(20))
8.64 M²
10
2 2.4 First coat plastering First floor
29.7 M²
5.9
2 0.9 HCB for balcony (15)
10.62 M²
5.9
2 2.4 Axis A b/n 1-2' (Rear elevation)

2
19.56 M²
4.5
2 2.4 Axis 3 b/n B&C (Right elevation)
17.4 M²
3.5
2 2.4 Axis 3 b/n A&B (Right elevation)
15.4 M²
3.7
2 2.4 Axis B (Internal HCB work(20))
13.92 M²
4.69
2 2.4 Axis B (Internal HCB work(15))
18.672 M²
7.5
2 2.4 Axis 2 (Internal HCB work(20))
32.16 M²
1.8
2 2.4 Axis 2' (Internal HCB work(20))
8.64 M²
10
2 2.4 second coat for First floor
29.7 M²
5.9
2 0.9 HCB for balcony (15)
10.62 M²
5.9
2 2.4 Axis A b/n 1-2' (Rear elevation)
19.56 M²
4.6
2 2.4 Axis A b/n 1-2 (Rear elevation)
14.88 M²
2.5
2 4.4 Axis A b/n 2'-3 (Rear elevation)
16.48 M²
9.25
2 2.5 Axis 1(Left elevation)
46.25 M²
4.5
2 2.4 Axis 3 b/n B&C (Right elevation)
17.4 M²
3.5
2 2.4 Axis 3 b/n A&B (Right elevation)
15.4 M²
3.7
2 2.4 Axis B (Internal HCB work(20))
13.92 M²
4.69
2 Axis B (Internal HCB work(15))

2 2.4 Axis B (Internal HCB work(15))
18.672 M²
5.9
2 0.9 HCB for balcony (15)
10.62 M²
5.9
2 2.4 Axis A b/n 1-2' (Rear elevation)
19.56 M²
4.6
2 2.4 Axis A b/n 1-2 (Rear elevation)
14.88 M²
2.5
2 4.4 Axis A b/n 2'-3 (Rear elevation)
16.48 M²
9.25
2 2.5 Axis 1(Left elevation)
46.25 M²
4.5
2 2.4 Axis 3 b/n B&C (Right elevation)
17.4 M²
3.5
2 2.4 Axis 3 b/n A&B (Right elevation)
15.4 M²
3.7
2 2.4 Axis B (Internal HCB work(20))
13.92 M²
4.69
2 2.4 Axis B (Internal HCB work(15))
18.672 M²
7.5
2 2.4 Axis 2 (Internal HCB work(20))
32.16 M²
1.8
2 2.4 Axis 2' (Internal HCB work(20))
8.64 M²
3.5 HCB work Water tanker house
4 2.4 Axis A&B B/N 2-3
33.6 M²
3.5
2 2.4 Axis 3
15.4 M²
3.5
2 2.4 Axis 2
16.8 M²
4.5
6.5 A2
2 58.5 M²
148.5 Total roof cover
82.5 total numbre of roof cover

FLOOR FINISH
Ground floor
50 cm thick cement secreeding with
mortal of ratio 1:3
shop 1
2 14.5 29 M²
Shop 2
2 25.5 51 M²
store
2 13.83 27.66 M²
corridoor
2 5.04 10.08 M²
corridoor 2
2 1.54 3.08 M²
corridoor walkway
2 10 20 M²
Wc
2 3.13 6.26 M²
stair case
2 4.29 8.58 M²
155.66 M² Total sement secreede

FLOOR FINISH
Ground floor
shop 1 terrazzo
2 14.5 29 M²
Shop 2 terrazzo
2 25.5 51 M²
store terrazzo
2 13.83 27.66 M²
corridoor terrazzo
2 5.04 10.08 M²
corridoor 2 terrazzo
2 1.54 3.08 M²
corridoor walkway terrazzo
2 10 20 M²
Wc ceramic
2 3.13 6.26 M²
stair case marble
2 4.29 8.58 M²

TAKEOFF SHEET
T D S Description
0.25 on axis 2
0.30
2
10
1.50
0.25
0.3 on axis 2'
2
5.000
0.75
0.25
0.300
2 0n axis A
9
1.35
0.25
4 0.30 On axis B&C
10
3.00
4.5
10.00 Slab work
2
0.15 A,1=B/N axis1-2 & A-C
13.50
4.60
4
2
0.15 A,2=B/N axis2-3 & B-C
5.52
0.800
5
2 A,3= Balcony
0.15
1.20
1
5.00
A,4=B/N axis2-2' & A-B
0.15
2 1.50
2.24
2 1.2 A,5=B/N axis2'-3 & B-B'
0.15
0.81
T D S Description
0.25 Intermidate beam
on axis 1 & 3
4 9.7 bottom
9.7
0.15
4 9.35 on axis 2
5.61
0.25
on axis 2
9.35
bottom
4
0.15 on axis 2'
H=1.4m 4 4.700
2.82
0.25 on axis 2'
4 4.7 Bottom
4.7
0.300
0n axis A
4 9
external
10.8
0.15
0n axis A
4 8
internal
4.8
0.25
0n axis A
4 8
Bottom
8
0.15
4 9.25 On axis B&C
5.55
0.25
On axis B&C
9.25
Bottom
4 9.25
0.3 Top beam
4
9.7 on axis 1 & 3
11.64 External
0.15 Top beam
4 9.7 on axis 1 & 3
5.82 Internal
0.25 Intermidate beam
on axis 1 & 3
4 9.7 bottom
9.7
0.15
4 9.35 on axis 2
5.61
0.25
on axis 2
9.35
bottom
4
T D S Description
HCB work Ground floor
Axis c (Front elevation)
W=8*2.4=19.2 H=2.4
Door Area=2(3.74*2.4+2.75*2.4)=31.2
8 1Hcb =0.425*0.225=0.095(mortal adition)
2.4 M²
2
7.2 Total number of block
75.78947
Axis A b/n 1-2 (Rear elevation)
W=4.6 H=2.4
4.6 Door Area=4(1.2*1.5)=7.2
1Hcb =0.425*0.225=0.095(mortal adition)
2.4 M²
2
14.88 Total number of block
156.6316
Axis A b/n 2'-3 (Rear elevation)
W=2.5 H=4.4
2.5 Door Area=4(2.3*0.6)=5.52
1Hcb =0.425*0.225=0.095(mortal adition)
4.4 M²
2
16.48 Total number of block
173.4737
Axis 1(Left elevation)
9.25 W=9.25 H=2.4
2.5 1Hcb =0.425*0.225=0.095(mortal adition)
2 M²
46.25 Total number of block
486.8421
Axis 3 b/n B&C (Right elevation)
W=4.5 H=2.4
2 4.5 Door Area=2(3.5*0.60)=4.2
1Hcb =0.425*0.225=0.095(mortal adition)
2.4 M²
17.4 Total number of block
183.1579
Axis 3 b/n A&B (Right elevation)
W=3.5 H=2.4
2 3.5 Door Area=4(0.6*0.60)=1.4
1Hcb =0.425*0.225=0.095(mortal adition)
2.4 M²
15.4 Total number of block
162.1053
Axis B (Internal HCB work(20))
W=3.7 H=2.4
2 3.7 Door Area=2(0.8*2.4)=3.84
1Hcb =0.425*0.225=0.095(mortal adition)
2.4 M²
13.92 Total number of block
146.5263
Axis B (Internal HCB work(15))
W=4.69 H=2.4
2 4.69 Door Area=2(0.8*2.4)=3.84
1Hcb =0.425*0.225=0.095(mortal adition)
2.4 M²
Total number of block
Axis B (Internal HCB work(15))
W=4.69 H=2.4
Door Area=2(0.8*2.4)=3.84
1Hcb =0.425*0.225=0.095(mortal adition)

18.672 Total number of block
196.5474
T D S Description
Axis 3 b/n A&B (Right elevation)
W=3.5 H=2.4
2 3.5 Door Area=4(0.6*0.60)=1.4
1Hcb =0.425*0.225=0.095(mortal adition)
2.4 M²
15.4 Total number of block
162.1053
Axis B (Internal HCB work(20))
W=3.7 H=2.4
2 3.7 Door Area=2(0.8*2.4)=3.84
1Hcb =0.425*0.225=0.095(mortal adition)
2.4 M²
13.92 Total number of block
146.5263
Axis B (Internal HCB work(20))
W=4.69 H=2.4
2 4.69 Door Area=2(0.8*2.4)=3.84
1Hcb =0.425*0.225=0.095(mortal adition)
2.4 M²
18.672 Total number of block
196.5474
Axis 2 (Internal HCB work(20))
W=7.5 H=2.4
2 7.5 1Hcb =0.425*0.225=0.095(mortal adition)
2.4 M²
36 Total number of block
378.9474
Axis 2' (Internal HCB work(20))
1.8 W=1.8 H=2.4
2.4 1Hcb =0.425*0.225=0.095(mortal adition)
2 M²
8.64 Total number of block
90.94737
HCB work Water tanker house
Axis A-B & 2-3
3.5 W=3.5 H=2.4
1Hcb =0.425*0.225=0.095(mortal adition)
2.4 M²
2
13 Total number of block
136.8421
Axis 3
3.5 W=3.5 H=2.4
2.4 1Hcb =0.425*0.225=0.095(mortal adition)
4 M²
29.76 Total number of block
313.2632
Axis 2
3.5 W=3.5 H=2.4
2.4 1Hcb =0.425*0.225=0.095(mortal adition)
4 M²
Total number of block
Axis 2
W=3.5 H=2.4
1Hcb =0.425*0.225=0.095(mortal adition)
4 M²
32.2 Total number of block
338.9474
4.6
2 2.4 Axis A b/n 1-2 (Rear elevation)
14.88 M²
2.5
2 4.4 Axis A b/n 2'-3 (Rear elevation)
16.48 M²
9.25
2 2.5 Axis 1(Left elevation)
46.25 M²
4.5
2 2.4 Axis 3 b/n B&C (Right elevation)
17.4 M²
3.5
2 2.4 Axis 3 b/n A&B (Right elevation)
15.4 M²
3.7
2 2.4 Axis B (Internal HCB work(20))
13.92 M²
4.69
2 2.4 Axis B (Internal HCB work(15))
18.672 M²
7.5
2 2.4 Axis 2 (Internal HCB work(20))
32.16 M²
1.8
2 2.4 Axis 2' (Internal HCB work(20))
8.64 M²
3.5 HCB work Water tanker house
4 2.4 Axis A&B B/N 2-3
33.6 M²
3.5
2 2.4 Axis 3
15.4 M²
3.5
2 2.4 Axis 2
16.8 M²
8 Plastering second coat Ground floor
2 2.4 Axis c (Front elevation)
7.2 M²
4.6
2 2.4 Axis A b/n 1-2 (Rear elevation)
14.88 M²
2.5
2 4.4 Axis A b/n 2'-3 (Rear elevation)
16.48 M²
9.25
2 Axis 1(Left elevation)

2 2.5 Axis 1(Left elevation)
46.25 M²
7.5
2 2.4 Axis 2 (Internal HCB work(20))
32.16 M²
1.8
2 2.4 Axis 2' (Internal HCB work(20))
8.64 M²
3.5 HCB work Water tanker house
4 2.4 Axis A&B B/N 2-3
33.6 M²
3.5
2 2.4 Axis 3
15.4 M²
3.5
2 2.4 Axis 2
16.8 M²
8 Painting Ground floor
2 2.4 Axis c (Front elevation)
7.2 M²
4.6
2 2.4 Axis A b/n 1-2 (Rear elevation)
14.88 M²
2.5
2 4.4 Axis A b/n 2'-3 (Rear elevation)
16.48 M²
9.25
2 2.5 Axis 1(Left elevation)
46.25 M²
4.5
2 2.4 Axis 3 b/n B&C (Right elevation)
17.4 M²
3.5
2 2.4 Axis 3 b/n A&B (Right elevation)
15.4 M²
3.7
2 2.4 Axis B (Internal HCB work(20))
13.92 M²
4.69
2 2.4 Axis B (Internal HCB work(15))
18.672 M²
7.5
2 2.4 Axis 2 (Internal HCB work(20))
32.16 M²
1.8
2 2.4 Axis 2' (Internal HCB work(20))
8.64 M²
10
2 Painting for First floor

2 2.4 Painting for First floor
29.7 M²
ROOF WORK
1.3 king post
10 13 M
Queen
post 1 q1 q2 q3
16 0.92
M
14.72

0.7 Q2
16 11.2 M

0.36 Q3
16 5.76 M
31.68 M Queen post

Diagonal member b/n queen post

D1 D1 D2 D3 D4
1.25
16 20 M

1.38 D2
16 22.08 M

1.25 D3
16 20 M

1.34 D4
16 21.44 M
Truss 1
10 PURLIN
28 280 M
RAFTER
4.7 R²=(run²)+(riser²)
20 94 M

4.5 WOODEN BATTEN


16 72 M
Total length of Zigba
13 M Total king post
31.68 M Total queen post
280 M Purlin
63.52 M Diagonal
72 M Wooden butten
94 M Rafter
10
4.5 ROOF COVER
2 90 A1

FLOOR FINISH
First floor
50 cm thick cement secreeding with
mortal of ratio 1:3
Office 1
2 21.1 42.2 M²
Office 2
2 15.54 31.08 M²
Office 3
2 23.45 46.9 M²
Corridoor
2 6.54 13.08 M²
Wc
2 4.14 8.28 M²
Balcony
2 4.41 8.82 M²

FLOOR FINISH
First floor
Office 1 PVC
2 21.1 42.2 M²
Office 2 PVC
2 15.54 31.08 M²
Office 3 PVC
2 23.45 46.9 M²
Corridoor Terrazzo
2 6.54 13.08 M²
Wc ceramic
2 4.14 8.28 M²
Balcony Corridoor Terrazzo
2 4.41 8.82 M²
description work type shape diameter No of bar length

Ground floor column 20 6 7.8


Stirup 8 19 0.9
First floor column 20 4 7.8
Stirup 10 26 1.6
20 16 4.54
Stirup 10 21 1.24
Stirup 10 17 2.2
20 16 5.08
Stirup 10 17 2.2
Stirup 10 21 1.24
20 10 4.54
Stirup 10 26 1.6
Stirup 10 28 1.6
20 10 4.54
Stirup 10 26 1.6
20 16 4.54
Stirup 10 21 1.24
Stirup 10 17 2.2
20 10 4.54
Stirup 10 26 1.6
Stirup 10 28 1.6
20 10 4.54
10 26 1.6
20 10 4.54
10 26 1.6
Stirup 10 28 1.6
Stair 4
1 16 14 4.43
2 16 14 4.3
3 16 14 6.45
4 16 14 6
Sub Total
total length (m)
unit weight (Kg/m)
weight (Kg)

Project: Gojjam Cultural Center Auditrium Building


Contractor :- ANRS BWCE
Client:- East Gojjam Adminstration Office
Consultant:- AspireAecomArchitectural and engineers PLC
Location:- D/Markos
Block :2
Super Structure 1 st floor

description work type shape diameter No of bar length

B/n axis 97-98 &b/n axis 8 12 3.02


106"&106' 10 32 3.02
8 12 3.02
B/n axis 98-99 &b/n 106"&106' 10 32 3.02
8 12 3.02
B/n axis 99-100 & b/n 106"&106' 10 25 3.02
8 12 3.02
B/n axis 100-101 & b/n 106"&106' 10 32 3.02
8 12 3.02
B/n axis 101-102 &b/n 106"&106' 10 32 3.02
B/n axis 102-103&b/n 8 12 3.02
106"&106' 10 25 3.02
B/n axis 103-104 & b/n 8 12 3.02
106"&106' 10 32 3.02
8 5
B/n axis 97-98 & b/n 106'&106 10 32
8 5
B/n axis 98-99 &b/n 106'&106 10 32
8 5
B/n axis 99-100 & b/n 106'&106 10 25
B/n axis 100-101 & b/n 8 5
106'&106 10 32
B/n axis 101-102 & b/n 8 5
106'&106 10 32
B/n axis 102-103 & b/n 8 5
106'&106 10 25
B/n axis 103-104 & b/n 8 5
106'&106 10 32
8 6
B/n axis 97-98 & b/n 106 &105 10 32
8 6
B/n axis 98-99 & b/n 106 &105 10 32
8 6
B/n axis 99-100 & b/n 106 &105 10 25
B/n axis 100-101 & b/n 106 8 6
&105 10 32
B/n axis 101-102 & b/n 106 8 6
&105 10 32
B/n axis 102-103 & b/n 106 8 6
&105 10 25
B/n axis 103-104 & b/n 106 8 6
&105 10 32
8 6
B/n axis97-98 & b/n 104'& 105 10 32
8 6
B/n axis 98-99 & b/n 104'& 105 10 32
8 6
B/n axis 99-100 & b/n 104'& 105 10 25
B/n axis 100-101 & b/n 104'& 8 6
105 10 32
B/n axis 101-102 & b/n 104'& 8 6
105 10 32
B/n axis 102-103 & b/n 104'& 8 6
105 10 25
B/n axis 103-104 & b/n 104'& 8 6
105 10 32

Sub Total
total length (m)
unit weight (Kg/m)
weight (Kg)
total no
member of bar Total length
Ø8 Ø10 Ø12 Ø14 Ø16 Ø20 Ø24

20 120 #REF! #REF! #REF! #REF! #REF! #REF! #REF!


20 380 342 - - - - - -
20 80 - - - - - 624 -
10 260 - 416 - - - - -
10 160 - - - - - 726.4 -
10 210 - 260.4 - - - - -
10 170 - 374 - - - - -
10 160 - - - - - 812.8 -
10 170 - 374 - - - - -
11 231 - 286.44 - - - - -
10 100 - - - - - 454 -
10 260 - 416 - - - - -
10 280 - 448 - - - - -
10 100 - - - - - 454 -
10 260 - 416 - - - - -
10 160 - - - - - 726.4 -
10 210 - 260.4 - - - - -
10 170 - 374 - - - - -
10 100 - - - - - 454 -
10 260 - 416 - - - - -
10 280 - 448 - - - - -
10 100 - - - - - 454 -
10 260
10 100 - - - - - 454 -
10 260 - 416 - - - - -
10 280
0 - - - - - - -
4 56 - - - - 248.08 - -
4 56 - - - - 240.8 - -
4 56 - - - - 361.2 - -
4 56 - - - - 336 - -
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
0.39 0.617 0.888 1.209 1.579 2.467 3.552
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
total no
member of bar Total length
Ø8 Ø10 Ø12 Ø14 Ø16 Ø20 Ø24
1 12 36.24 - - - - - -
1 32 - 96.64 - - - - -
1 12 36.24 - - - - - -
1 32 - 96.64 - - - - -
1 12 36.24 - - - - - -
1 25 - 75.5 - - - - -
1 12 36.24 - - - - - -
1 32 - 96.64 - - - - -
1 12 36.24 - - - - - -
1 32 - 96.64 - - - - -
1 12 36.24 - - - - - -
1 25 - 75.5 - - - - -
1 12 36.24 - - - - - -
1 32 - 96.64 - - - - -
1 5 0 - - - - - -
1 32 - 0 - - - - -
1 5 0 - - - - - -
1 32 - 0 - - - - -
1 5 0 - - - - - -
1 25 - 0 - - - - -
1 5 0 - - - - - -
1 32 - 0 - - - - -
1 5 0 - - - - - -
1 32 - 0 - - - - -
1 5 0 - - - - - -
1 25 - 0 - - - - -
1 5 0 - - - - - -
1 32 - 0 - - - - -
1 6 0 - - - - - -
1 32 - 0 - - - - -
1 6 0 - - - - - -
1 32 - 0 - - - - -
1 6 0 - - - - - -
1 25 - 0 - - - - -
1 6 0 - - - - - -
1 32 - 0 - - - - -
1 6 0 - - - - - -
1 32 - 0 - - - - -
1 6 0 - - - - - -
1 25 - 0 - - - - -
1 6 0 - - - - - -
1 32 - 0 - - - - -
1 6 0 -
1 32 - 0
1 6 0 -
1 32 - 0
1 6 0 -
1 25 - 0
1 6 0 -
1 32 - 0
1 6 0 -
1 32 - 0
1 6 0 -
1 25 - 0
1 6 0 -
1 32 - 0 - - - - -

0 0 0
253.7 634.2 0.0 0.0 0.0 0.0 0.0
0.40 0.666
100.2036 422.3772 0 0.000