Contractor :-
Client:-
Consultant:-
Location:-
Super Structure
TAKEOFF SHEET
T LHD S Description
B super structure
1. concret work
ground floor
elevation column
0.25
0.25 C1&c2
20
2.73
3.41
0.25
0.25 First floor
20
2.73 elevation column
3.41
0.25
0.3 Intermidate beam
4
9.7 on axis 1 & 3
2.91
0.25 on axis 2
0.30
2
10
1.50
0.25
0.3 on axis 2'
2
5.000
0.75
0.25
0.300
2 0n axis A
9
1.35
0.25
0.30
4 On axis B&C
10
3.00
0.25
0.3 Top beam
4
9.7 on axis 1 & 3
2.91
T LHD S Description
1.100 Stair work
L=√(a²)+(b²) L
3.06
4 stair sofit
0.12
b=2.7m
1.62
0.34 0.30
1.1 v=1/2b*h*w
0.15
36
Stair step
4
0.16
0.3
1.08
1.000
2.2
2 Stair Landing
0.15 H=1.4m
0.66
0.25
0.30
2 Stair Beam
2.2
0.33
0.25
0.25
8 Column for water tanker house
2.74
1.37
0.250
0.3 Beam for water tanker house
4
4.00 B/N axis A&B & 2-3
1.20
0.25
0.3
4 B/N axis 2-3 & A&B
5
1.50
4.00
5
2 B/N axis 2-3 & A&B
0.15
6.00
2.73
Formwork
20 1.1 Ground floor Elevation column
60.06 (0.25*0.25)+2(0.25+(0.025*2))=1.1
2.73
20 1.1 First floor Elevation column
60.06 (0.25*0.25)+2(0.25+(0.025*2))=1.1
4 .3
0
6.1
Stair Landing
2 0.30
P=2.2+2.2+1.05+1.05=6.1
3.66
0.15
2 2.2 Stair Beam
0.66
0.25
Column for water tanker house
8 2.74
(0.25*0.25)+2(0.25+(0.025*2))=1.1
5.48
0.3 Beam for water tanker house
4 3.80 B/N axis A&B & 2-3
4.56 External
0.15 Beam for water tanker house
4 3.80 B/N axis A&B & 2-3
2.28 Bottom
0.25 Beam for water tanker house
4 3.80 B/N axis A&B & 2-3
3.8 Bottom
T LHD S Description
Axis 2 (Internal HCB work(20))
W=7.5 H=2.4
2 7.5 Door Area=2(0.8*2.4)=3.84
1Hcb =0.425*0.225=0.095(mortal adition)
2.4 M²
32.16 Total number of block
338.5263
Axis 2' (Internal HCB work(20))
1.8 W=1.8 H=2.4
2.4 1Hcb =0.425*0.225=0.095(mortal adition)
2 M²
8.64 Total number of block
90.94737
HCB work First floor
Axis c (Front elevation)
W=10 H=2.4
Window and Door
Area=2(0.9*1.5+0.8*1.5+2.75*2.4)=18.3
10 1Hcb =0.425*0.225=0.095(mortal adition)
2.4 M²
2
29.7 Total number of block
312.6316
HCB for balcony (15)
5.9 W=5.9 H=0.9
0.9 1Hcb =0.425*0.225=0.095(mortal adition)
2 M²
10.62 Total number of block
111.7895
Axis A b/n 1-2' (Rear elevation)
W=5.9 H=2.4
5.9 Door Area=4(1.2*1.5)+2(1.3*0.6)=8.76
1Hcb =0.425*0.225=0.095(mortal adition)
2.4 M²
2
19.56 Total number of block
205.8947
Axis A b/n 2'-3 (Rear elevation)
W=2.5 H=2.9
2.5 Door Area=4(2.3*0.6)=5.52
1Hcb =0.425*0.225=0.095(mortal adition)
2.9 M²
2
8.98 Total number of block
94.52632
Axis 1(Left elevation)
9.25 W=9.25 H=2.4
2.5 1Hcb =0.425*0.225=0.095(mortal adition)
2 M²
46.25 Total number of block
486.8421
Axis 3 b/n A&B (Right elevation)
W=3.5 H=2.4
2 Door Area=4(0.6*0.60)=1.4
1Hcb =0.425*0.225=0.095(mortal adition)
M²
Total number of block
Axis 3 b/n A&B (Right elevation)
W=3.5 H=2.4
2 3.5 Door Area=4(0.6*0.60)=1.4
1Hcb =0.425*0.225=0.095(mortal adition)
2.4 M²
15.4 Total number of block
162.1053
1.3 HCB work for parapet wall
4 10
52 M²
Total number of block
547.3684
1.3 HCB work for parapet wall
4 10
26 M²
Total number of block
273.6842
8 Plastering for Ground floor
2 2.4 Axis c (Front elevation)
7.2 M²
4.6
2 2.4 Axis A b/n 1-2 (Rear elevation)
14.88 M²
2.5
2 4.4 Axis A b/n 2'-3 (Rear elevation)
16.48 M²
9.25
2 2.5 Axis 1(Left elevation)
46.25 M²
4.5
2 2.4 Axis 3 b/n B&C (Right elevation)
17.4 M²
3.5
2 2.4 Axis 3 b/n A&B (Right elevation)
15.4 M²
3.7
2 2.4 Axis B (Internal HCB work(20))
13.92 M²
4.69
2 2.4 Axis B (Internal HCB work(15))
18.672 M²
7.5
2 2.4 Axis 2 (Internal HCB work(20))
32.16 M²
1.8
2 2.4 Axis 2' (Internal HCB work(20))
8.64 M²
10
2 2.4 First coat plastering First floor
29.7 M²
5.9
2 0.9 HCB for balcony (15)
10.62 M²
5.9
2 2.4 Axis A b/n 1-2' (Rear elevation)
M²
2
19.56 M²
4.5
2 2.4 Axis 3 b/n B&C (Right elevation)
17.4 M²
3.5
2 2.4 Axis 3 b/n A&B (Right elevation)
15.4 M²
3.7
2 2.4 Axis B (Internal HCB work(20))
13.92 M²
4.69
2 2.4 Axis B (Internal HCB work(15))
18.672 M²
7.5
2 2.4 Axis 2 (Internal HCB work(20))
32.16 M²
1.8
2 2.4 Axis 2' (Internal HCB work(20))
8.64 M²
10
2 2.4 second coat for First floor
29.7 M²
5.9
2 0.9 HCB for balcony (15)
10.62 M²
5.9
2 2.4 Axis A b/n 1-2' (Rear elevation)
19.56 M²
4.6
2 2.4 Axis A b/n 1-2 (Rear elevation)
14.88 M²
2.5
2 4.4 Axis A b/n 2'-3 (Rear elevation)
16.48 M²
9.25
2 2.5 Axis 1(Left elevation)
46.25 M²
4.5
2 2.4 Axis 3 b/n B&C (Right elevation)
17.4 M²
3.5
2 2.4 Axis 3 b/n A&B (Right elevation)
15.4 M²
3.7
2 2.4 Axis B (Internal HCB work(20))
13.92 M²
4.69
2 Axis B (Internal HCB work(15))
M²
2 2.4 Axis B (Internal HCB work(15))
18.672 M²
5.9
2 0.9 HCB for balcony (15)
10.62 M²
5.9
2 2.4 Axis A b/n 1-2' (Rear elevation)
19.56 M²
4.6
2 2.4 Axis A b/n 1-2 (Rear elevation)
14.88 M²
2.5
2 4.4 Axis A b/n 2'-3 (Rear elevation)
16.48 M²
9.25
2 2.5 Axis 1(Left elevation)
46.25 M²
4.5
2 2.4 Axis 3 b/n B&C (Right elevation)
17.4 M²
3.5
2 2.4 Axis 3 b/n A&B (Right elevation)
15.4 M²
3.7
2 2.4 Axis B (Internal HCB work(20))
13.92 M²
4.69
2 2.4 Axis B (Internal HCB work(15))
18.672 M²
7.5
2 2.4 Axis 2 (Internal HCB work(20))
32.16 M²
1.8
2 2.4 Axis 2' (Internal HCB work(20))
8.64 M²
3.5 HCB work Water tanker house
4 2.4 Axis A&B B/N 2-3
33.6 M²
3.5
2 2.4 Axis 3
15.4 M²
3.5
2 2.4 Axis 2
16.8 M²
4.5
6.5 A2
2 58.5 M²
148.5 Total roof cover
82.5 total numbre of roof cover
FLOOR FINISH
Ground floor
50 cm thick cement secreeding with
mortal of ratio 1:3
shop 1
2 14.5 29 M²
Shop 2
2 25.5 51 M²
store
2 13.83 27.66 M²
corridoor
2 5.04 10.08 M²
corridoor 2
2 1.54 3.08 M²
corridoor walkway
2 10 20 M²
Wc
2 3.13 6.26 M²
stair case
2 4.29 8.58 M²
155.66 M² Total sement secreede
FLOOR FINISH
Ground floor
shop 1 terrazzo
2 14.5 29 M²
Shop 2 terrazzo
2 25.5 51 M²
store terrazzo
2 13.83 27.66 M²
corridoor terrazzo
2 5.04 10.08 M²
corridoor 2 terrazzo
2 1.54 3.08 M²
corridoor walkway terrazzo
2 10 20 M²
Wc ceramic
2 3.13 6.26 M²
stair case marble
2 4.29 8.58 M²
M²
TAKEOFF SHEET
T D S Description
0.25 on axis 2
0.30
2
10
1.50
0.25
0.3 on axis 2'
2
5.000
0.75
0.25
0.300
2 0n axis A
9
1.35
0.25
4 0.30 On axis B&C
10
3.00
4.5
10.00 Slab work
2
0.15 A,1=B/N axis1-2 & A-C
13.50
4.60
4
2
0.15 A,2=B/N axis2-3 & B-C
5.52
0.800
5
2 A,3= Balcony
0.15
1.20
1
5.00
A,4=B/N axis2-2' & A-B
0.15
2 1.50
2.24
2 1.2 A,5=B/N axis2'-3 & B-B'
0.15
0.81
T D S Description
0.25 Intermidate beam
on axis 1 & 3
4 9.7 bottom
9.7
0.15
4 9.35 on axis 2
5.61
0.25
on axis 2
9.35
bottom
4
0.15 on axis 2'
H=1.4m 4 4.700
2.82
0.25 on axis 2'
4 4.7 Bottom
4.7
0.300
0n axis A
4 9
external
10.8
0.15
0n axis A
4 8
internal
4.8
0.25
0n axis A
4 8
Bottom
8
0.15
4 9.25 On axis B&C
5.55
0.25
On axis B&C
9.25
Bottom
4 9.25
0.3 Top beam
4
9.7 on axis 1 & 3
11.64 External
0.15 Top beam
4 9.7 on axis 1 & 3
5.82 Internal
0.25 Intermidate beam
on axis 1 & 3
4 9.7 bottom
9.7
0.15
4 9.35 on axis 2
5.61
0.25
on axis 2
9.35
bottom
4
T D S Description
HCB work Ground floor
Axis c (Front elevation)
W=8*2.4=19.2 H=2.4
Door Area=2(3.74*2.4+2.75*2.4)=31.2
8 1Hcb =0.425*0.225=0.095(mortal adition)
2.4 M²
2
7.2 Total number of block
75.78947
Axis A b/n 1-2 (Rear elevation)
W=4.6 H=2.4
4.6 Door Area=4(1.2*1.5)=7.2
1Hcb =0.425*0.225=0.095(mortal adition)
2.4 M²
2
14.88 Total number of block
156.6316
Axis A b/n 2'-3 (Rear elevation)
W=2.5 H=4.4
2.5 Door Area=4(2.3*0.6)=5.52
1Hcb =0.425*0.225=0.095(mortal adition)
4.4 M²
2
16.48 Total number of block
173.4737
Axis 1(Left elevation)
9.25 W=9.25 H=2.4
2.5 1Hcb =0.425*0.225=0.095(mortal adition)
2 M²
46.25 Total number of block
486.8421
Axis 3 b/n B&C (Right elevation)
W=4.5 H=2.4
2 4.5 Door Area=2(3.5*0.60)=4.2
1Hcb =0.425*0.225=0.095(mortal adition)
2.4 M²
17.4 Total number of block
183.1579
Axis 3 b/n A&B (Right elevation)
W=3.5 H=2.4
2 3.5 Door Area=4(0.6*0.60)=1.4
1Hcb =0.425*0.225=0.095(mortal adition)
2.4 M²
15.4 Total number of block
162.1053
Axis B (Internal HCB work(20))
W=3.7 H=2.4
2 3.7 Door Area=2(0.8*2.4)=3.84
1Hcb =0.425*0.225=0.095(mortal adition)
2.4 M²
13.92 Total number of block
146.5263
Axis B (Internal HCB work(15))
W=4.69 H=2.4
2 4.69 Door Area=2(0.8*2.4)=3.84
1Hcb =0.425*0.225=0.095(mortal adition)
2.4 M²
Total number of block
Axis B (Internal HCB work(15))
W=4.69 H=2.4
Door Area=2(0.8*2.4)=3.84
1Hcb =0.425*0.225=0.095(mortal adition)
M²
18.672 Total number of block
196.5474
T D S Description
Axis 3 b/n A&B (Right elevation)
W=3.5 H=2.4
2 3.5 Door Area=4(0.6*0.60)=1.4
1Hcb =0.425*0.225=0.095(mortal adition)
2.4 M²
15.4 Total number of block
162.1053
Axis B (Internal HCB work(20))
W=3.7 H=2.4
2 3.7 Door Area=2(0.8*2.4)=3.84
1Hcb =0.425*0.225=0.095(mortal adition)
2.4 M²
13.92 Total number of block
146.5263
Axis B (Internal HCB work(20))
W=4.69 H=2.4
2 4.69 Door Area=2(0.8*2.4)=3.84
1Hcb =0.425*0.225=0.095(mortal adition)
2.4 M²
18.672 Total number of block
196.5474
Axis 2 (Internal HCB work(20))
W=7.5 H=2.4
2 7.5 1Hcb =0.425*0.225=0.095(mortal adition)
2.4 M²
36 Total number of block
378.9474
Axis 2' (Internal HCB work(20))
1.8 W=1.8 H=2.4
2.4 1Hcb =0.425*0.225=0.095(mortal adition)
2 M²
8.64 Total number of block
90.94737
HCB work Water tanker house
Axis A-B & 2-3
3.5 W=3.5 H=2.4
1Hcb =0.425*0.225=0.095(mortal adition)
2.4 M²
2
13 Total number of block
136.8421
Axis 3
3.5 W=3.5 H=2.4
2.4 1Hcb =0.425*0.225=0.095(mortal adition)
4 M²
29.76 Total number of block
313.2632
Axis 2
3.5 W=3.5 H=2.4
2.4 1Hcb =0.425*0.225=0.095(mortal adition)
4 M²
Total number of block
Axis 2
W=3.5 H=2.4
1Hcb =0.425*0.225=0.095(mortal adition)
4 M²
32.2 Total number of block
338.9474
4.6
2 2.4 Axis A b/n 1-2 (Rear elevation)
14.88 M²
2.5
2 4.4 Axis A b/n 2'-3 (Rear elevation)
16.48 M²
9.25
2 2.5 Axis 1(Left elevation)
46.25 M²
4.5
2 2.4 Axis 3 b/n B&C (Right elevation)
17.4 M²
3.5
2 2.4 Axis 3 b/n A&B (Right elevation)
15.4 M²
3.7
2 2.4 Axis B (Internal HCB work(20))
13.92 M²
4.69
2 2.4 Axis B (Internal HCB work(15))
18.672 M²
7.5
2 2.4 Axis 2 (Internal HCB work(20))
32.16 M²
1.8
2 2.4 Axis 2' (Internal HCB work(20))
8.64 M²
3.5 HCB work Water tanker house
4 2.4 Axis A&B B/N 2-3
33.6 M²
3.5
2 2.4 Axis 3
15.4 M²
3.5
2 2.4 Axis 2
16.8 M²
8 Plastering second coat Ground floor
2 2.4 Axis c (Front elevation)
7.2 M²
4.6
2 2.4 Axis A b/n 1-2 (Rear elevation)
14.88 M²
2.5
2 4.4 Axis A b/n 2'-3 (Rear elevation)
16.48 M²
9.25
2 Axis 1(Left elevation)
M²
2 2.5 Axis 1(Left elevation)
46.25 M²
7.5
2 2.4 Axis 2 (Internal HCB work(20))
32.16 M²
1.8
2 2.4 Axis 2' (Internal HCB work(20))
8.64 M²
3.5 HCB work Water tanker house
4 2.4 Axis A&B B/N 2-3
33.6 M²
3.5
2 2.4 Axis 3
15.4 M²
3.5
2 2.4 Axis 2
16.8 M²
8 Painting Ground floor
2 2.4 Axis c (Front elevation)
7.2 M²
4.6
2 2.4 Axis A b/n 1-2 (Rear elevation)
14.88 M²
2.5
2 4.4 Axis A b/n 2'-3 (Rear elevation)
16.48 M²
9.25
2 2.5 Axis 1(Left elevation)
46.25 M²
4.5
2 2.4 Axis 3 b/n B&C (Right elevation)
17.4 M²
3.5
2 2.4 Axis 3 b/n A&B (Right elevation)
15.4 M²
3.7
2 2.4 Axis B (Internal HCB work(20))
13.92 M²
4.69
2 2.4 Axis B (Internal HCB work(15))
18.672 M²
7.5
2 2.4 Axis 2 (Internal HCB work(20))
32.16 M²
1.8
2 2.4 Axis 2' (Internal HCB work(20))
8.64 M²
10
2 Painting for First floor
M²
2 2.4 Painting for First floor
29.7 M²
ROOF WORK
1.3 king post
10 13 M
Queen
post 1 q1 q2 q3
16 0.92
M
14.72
0.7 Q2
16 11.2 M
0.36 Q3
16 5.76 M
31.68 M Queen post
D1 D1 D2 D3 D4
1.25
16 20 M
1.38 D2
16 22.08 M
1.25 D3
16 20 M
1.34 D4
16 21.44 M
Truss 1
10 PURLIN
28 280 M
RAFTER
4.7 R²=(run²)+(riser²)
20 94 M
FLOOR FINISH
First floor
50 cm thick cement secreeding with
mortal of ratio 1:3
Office 1
2 21.1 42.2 M²
Office 2
2 15.54 31.08 M²
Office 3
2 23.45 46.9 M²
Corridoor
2 6.54 13.08 M²
Wc
2 4.14 8.28 M²
Balcony
2 4.41 8.82 M²
FLOOR FINISH
First floor
Office 1 PVC
2 21.1 42.2 M²
Office 2 PVC
2 15.54 31.08 M²
Office 3 PVC
2 23.45 46.9 M²
Corridoor Terrazzo
2 6.54 13.08 M²
Wc ceramic
2 4.14 8.28 M²
Balcony Corridoor Terrazzo
2 4.41 8.82 M²
description work type shape diameter No of bar length
Sub Total
total length (m)
unit weight (Kg/m)
weight (Kg)
total no
member of bar Total length
Ø8 Ø10 Ø12 Ø14 Ø16 Ø20 Ø24
0 0 0
253.7 634.2 0.0 0.0 0.0 0.0 0.0
0.40 0.666
100.2036 422.3772 0 0.000