0% found this document useful (0 votes)
46 views37 pages

Menilik Teknologi Geothermal Di Indonesia - Apa Istimewanya

PT Pertamina Geothermal Energy (PGE) plays a key role in Indonesia's geothermal industry. PGE manages 14 geothermal working areas across Indonesia with a total installed capacity of 672 MW from its own operations and 1,205 MW from joint operations. PGE has 5 subsidiaries and holds participating shares in 10 other geothermal companies. It aims to maximize the utilization of geothermal energy in Indonesia.

Uploaded by

Adven Brilian
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
46 views37 pages

Menilik Teknologi Geothermal Di Indonesia - Apa Istimewanya

PT Pertamina Geothermal Energy (PGE) plays a key role in Indonesia's geothermal industry. PGE manages 14 geothermal working areas across Indonesia with a total installed capacity of 672 MW from its own operations and 1,205 MW from joint operations. PGE has 5 subsidiaries and holds participating shares in 10 other geothermal companies. It aims to maximize the utilization of geothermal energy in Indonesia.

Uploaded by

Adven Brilian
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 37

MENILIK TEKNOLOGI

GEOTERMAL DI INDONESIA,
APA ISTIMEWANYA ?
TABLE OF CONTENT

• Profil Perusahaan dan Peran PT Pertamina Geothermal Energy


Dalam Industri Geotermal Di Indonesia
• Bagaimana Proses Pengolahan Energi Geotermal Menjadi
Pembangkit Tenaga Listrik
• Teknologi Dan Peralatan Yang digunakan Pada Sistem Geotermal
• Pengembangan Teknologi Yang Digunakan Selama Ini
• Rencana Pemanfaatan Energi Geotermal Agar Lebih Maksimal
Profil Perusahaan
dan
Peran PT Pertamina Geothermal Energy
Dalam Industri Geotermal Di Indonesia
PROFILE BRIEF
6 Geothermal Areas Installed Capacity
3 Development Project
3 Exploration Inititaion
WORKING
Line of Business
Geothermal Exploitation 5 Joint Operation 672 MW 1205 MW AREA
Contract (JOC) (Own Operations) (JOC) a. 12 Geothermal Working Areas :

• Gunung Sibuali-Buali
Shareholder
• Gunung Sibayak-Sinabung
• Sungai Penuh (Kerinci)
( 91,09%) Portfolio • Hululais
• Lumut Balai dan Margabayur

2
• Way Panas
( 8,91 %)
Head Subsidiaries • Kamojang – Darajat
- PGE Lawu • Karaha Cakrabuana
Office - Geothermal Energi • Pangalengan
Seulawah • Cibeureum-Parabakti
Menara Cakrawala lantai 15 • Tabanan
Legal • Lahendong
Jalan MH Thamrin No. 9

23
Establishment Jakarta 10340 Participating Stock
Phone: (62-21) 398 33 222 Companies under b. 2 Geothermal Licenses
Deed of Establishment Fax: (62-21) 398 33 230 PT Pertamina • Gunung Lawu
No.10 dated 12 Desember 2006 (Persero) Group • Seulawah
Email: [email protected]
BOARD OF COMMISIONER

Sarman Simanjorang
President Commisioner

Ida Nuryatin Finahari


Commisioner Ibnu Chouldum
Commisioner
BOARD OF DIRECTOR

VACANT
Chief Executive Officer

Tafif Azimudin Eko Agung Bramantyo Demsi Aswan


Exploration & Development Operational Director Finance Director
Director
WORLD GEOTHERMAL INSTALLED CAPACITY 14.602 MW

United States 3639

Indonesia 2005 2nd

Philippines 1868
Iceland
Turkey 1347 Turkey

New Zealand 1005 Mexico


Philippines
Mexico 951
Italy
Italy 944
Indonesia
Iceland 755

Kenya 676

Japan 542 Japan


Others 925
United States

Indonesia is the 2nd largest country


with geothermal installed capacity in New Zealand
the world*
Kenya

*www. thinkgeoenergy.com - 2019


GEOTHERMAL WORKING AREAS
PGE manages 14 Geothermal Working Areas.
Total installed capacity Own Operation 672 MW and Joint Operation Contract 1.205 MW
Gn.Lawu
Sibayak (12 MW) Sungai Penuh Central & Lahendong Unit 1-6 (120 MW)
North Sumatera (1x55 MW) East Java North Sulawesi
Jambi JOC Wayang Windu
(227 MW) West Java

Seulawah Lumut Balai Unit 1 (55MW)


Aceh Lumut Balai Unit 2 (55 MW)
South Sumatera OPERATION
JOC Gn.Salak
JOC Sarulla (377MW) DEVELOPMENT
(330 MW) West Java
North Sumatera
EXPLORATION

JOC
JOC Bedugul
Bali
32% PGE - JOC
JOC Darajat ( 271 MW)
West Java 12%
Kamojang unit 1-5 (235 MW) Others
672 MW West Java
INSTALLED Karaha unit 1 (30 MW)
CAPACITY Hululais Hululais Ext. Ulubelu Unit 1-4 (220MW) West Java
(2x55 MW) (Bukit Daun) Lampung
Bengkulu Bengkulu 56% PGE

88% of geothermal installed capacity in


Indonesia is within PGE GWAs
COMPANY STRUCTURE &
PORTFOLIO
Shareholders Subsidiaries Participating Stock (1%)

1. PT PHE Corridor
2. PT PHE Donggala
3. PT PHE Gebang North
PGE 99% Sumatera
9/5/16
PHE 1% 4. PT PHE Jabung
5. PT PHE Jambi Merang
Mount Lawu 6. PT PHE Kakap
Exploration Phase 7. PT PHE Karama
8. PT PHE Makassar Strait
91,09 % 9. PT PHE Ogan Komering
10. PT PHE Pasiriaman/NSO
PT Pertamina (Persero)
11. PT PHE Raja Tempirai
12. PT PHE Coastal Plains
Pekanbaru
100 % 13. PT PHE Salawati Basin
PT Pertamina Geothermal Energy
14. PT PHE Salawati
15. PT PHE Simenggaris
16. PT PHE South Jambi B
8,91 % 17. PT PHE Tengah K
18. PT PHE Tomori Sulawesi
PT Pertamina Pedeve Indonesia 19. PT PHE Tuban East Java
PGE 75 %
31/07/17 20. PT PHE West Madura Offshore
PDPA 25%
21. PT PHE Sakakemang
Seulawah Agam 22. PT PHE Kampar
23. PT PHE Ambalat Timur
Exploration Phase
Bagaimana Proses Pengolahan Energi Geotermal
Menjadi Pembangkit Tenaga Listrik
KEISTIMEWAAN RESOURCE DAN TEKNOLOGI PEMANFAATAN ENERGI
GEOTERMAL DI INDONESIA

• Berdasarkan resource geothermal, Indonesia memiliki tipe reservoir yang lengkap


termasuk reservoir water dominated (a.l Ulubelu, Lahendong, Lumut Balai) dan steam
dominated (Kamojang, Darajat) untuk sistem hidrotermal bertemperatur tinggi
• Resource berupa reservoir steam dominated ini sangat langka di dunia dan hanya sekitar
5% dari total sistem hidrotermal di dunia dengan temperatur lebih tinggi dari 200°C
(DiPippo, 2005)
• Perbedaan tipe reservoir tersebut akan mempengaruhi pemilihan teknologi pemanfaatan
konversi energi geothermal menjadi energi listrik

Source : PGE website


KEISTIMEWAAN RESOURCE DAN TEKNOLOGI PEMANFAATAN ENERGI
GEOTERMAL DI INDONESIA

• Teknologi surface facility yang digunakan di sistem geothermal steam dominated lebih
sederhana karena fluida geothermal sudah dalam fasa uap semenjak keluar dari sumur
produksi sehingga tidak membutuhkan fasilitas brine handling
• Sedangkan untuk sistem water dominated mempunyai surface facility lebih kompleks
karena ada brine handling system yang signifikan dalam porsi asset termasuk dalam
kegiatan operasi dan maintenance nya
• Peluang memanfaatkan hot brine sebagai side product PLTP single flash dengan
bottoming unit
• Pemanfaatan resource geothermal dari jenis low dan medium temperature baik untuk
indirect use (listrik) maupun direct use (non listrik)

Source : PGE website


PEMANFAATAN TIDAK LANGSUNG ENERGI GEOTERMAL:
PEMBANGKIT LISTRIK

Source : PGE website


Teknologi Dan Peralatan Yang digunakan Pada Sistem Geotermal
TEKNOLOGI SIKLUS TERMODINAMIKA PLTP

 Steam dominated reservoir  Water dominated reservoir  Water dominated reservoir;


 Fluida satu fasa (uap) dari sumur  Fluida dua fasa (uap dan cair) steam dominated reservoir
 Tidak memerlukan separator di dari sumur  Fluida kerja kedua berupa fluida
fasilitas produksi  Memerlukan separator di non water dengan titik didih yang
 PLTP dry steam fasilitas produksi lebih rendah(refrigerant, organic
• Kamojang  Tipe: Single, double, triple flash fluid/hidrokarbon)
• Darajat  PLTP flash steam  PLTP binary cycle
• Lahendong • Sorik marapi (binary)
• Ulubelu • Sarulla (combined cycle;
• Lumut Balai flash&binary)
Picture Source : https://www.britannica.com/science/geothermal-energy
PERALATAN UTAMA PLTP
(Flash Type)
 PRODUCTION WELL
 REINJECTION WELL
 FLUID COLLECTION AND REINJECTION SYSTEM
• Separator
• Cross country Steam Supply Pipeline
• Cross country Brine Reinjection Pipeline
• Rock muffler
• Etc.
 GEOTHERMAL POWER PLANT
• Steam turbine
• Condenser
• Generator
• Transformer
• Gas Extraction System
• Main Cooling Water System
• Auxiliary Cooling Water System
• Switchyard
• Balance of Plant (Instrument&Service Air, Water treatment, etc.)
LAYOUT PLTP
Power House
(Turbine, Generator, Condenser)

Cooling tower

Crosscountry
Switchyard
steam pipeline

Power House
(Turbine, Generator, Condenser)
Main Transformer

Source : PGE website


PLTP KAMOJANG UNIT 4&5
• Single Flash Condensing Turbine
• Steam Dominated Reservoir
LAYOUT PLTP

Cooling tower
Power House
(Turbine, Generator, Condenser)

Switchyard Production Well

Steam pipeline

Main Transformer

Separator

PLTP LAHENDONG UNIT 5&6


Source : PGE website • Single Flash Condensing Turbine
• Water Dominated Reservoir
TYPICAL LAYOUT KLUSTER PRODUKSI

Separator

pipeline

Production Well

*www. thinkgeoenergy.com - 2019


GEOTHERMAL STEAM TURBINE

Source : Toshiba website

PLTP Lumut Balai Unit 1 menggunakan turbin Toshiba

Source : Fuji website

PLTP Kamojang Unit 4&5, Ulubelu Unit 3&4, Lahendong


Unit 5&6 menggunakan turbin Fuji
GEOTHERMAL TURBINE MANUFACTURER

Source : Geothermal Power Plant in The World 2010-2014 Update Report, WGC Bertani, 2014
Pengembangan Teknologi Yang Digunakan Selama Ini
PENGEMBANGAN TEKNOLOGI DI DALAM PEMANFAATAN TIDAK
LANGSUNG ENERGI GEOTERMAL UNTUK PEMBANGKIT LISTRIK

Pemanfaatan energi geothermal melibatkan banyak disiplin ilmu


Dalam perencanaan, konstruksi dan operasi&maintenance fasilitas permukaan termasuk
FCRS (Fluid Colection and Reinjection System) dan PLTP melibatkan bidang-bidang utama
sebagai berikut :
 Civil Work : cut&fill, foundation, building, slope protection, road
 Mechanical Work : main system process, process safety, mechanical equipment (static,
rotating)
 Electrical Work : high voltage equipment, motor control center, electrical distribution
system, switchyard, electrical protection
 Instrumentation & Control : data acquisition, process control, equipment trip protection,
Distributed Control System
PENGEMBANGAN TEKNOLOGI DI DALAM PEMANFAATAN TIDAK
LANGSUNG ENERGI GEOTERMAL UNTUK PEMBANGKIT LISTRIK

Pengembangan teknologi geothermal dalam bidang-bidang di atas termasuk riset dilakukan


oleh beberapa pihak antara lain :
 Equipment manufacturer, contoh: riset peralatan/teknologi material yang tahan
terhadap lingkungan korosif
 Kontraktor, contoh: inovasi project management dalam eksekusi proyek EPCC PLTP di
area geothermal dengan curah hujan tinggi dimana proyek harus diselesaikan dalam
waktu yag telah disepakati dengan owner
 Konsultan teknis, contoh: mendesain slope protection sepanjang jalur pipeline di area
geothermal Indonesia yang bergunung-gunung, curam dan rawan longsor
 Perguruan tinggi, contoh: mendesain sistem silica anti scaling dalam brine PLTP
 Lembaga penelitian, contoh: riset PLTP skala kecil dengan TKDN tinggi
 Perusahaan, contoh: riset H2S removal dan pemanfaatan CO2 di dalam NCG PLTP
Rencana Pemanfaatan Energi Geotermal Agar Lebih Maksimal
PEMANFAATAN TIDAK LANGSUNG ENERGI GEOTERMAL:
OPTIMASI ENERGI DI DALAM HOT BRINE UNTUK PEMBANGKIT LISTRIK

Source
*www.
: PGE
thinkgeoenergy.com
AECOM training material
- 2019
PEMANFAATAN TIDAK LANGSUNG ENERGI GEOTERMAL:
OPTIMASI ENERGI DI DALAM HOT BRINE UNTUK PEMBANGKIT LISTRIK

Pemanfaatan energi geothermal agar


lebih maksimal untuk pembangkit
listrik dengan memanfaatkan
Source : Geothermal Power Plant in The World 2010-2014 Update Report,
teknologi : WGC Bertani, 2014

• Double Flash Condensing


• Triple Flash Condensing
• Organic Rankine Cycle (Binary)
PEMANFAATAN TIDAK LANGSUNG ENERGI GEOTERMAL:
OPTIMASI ENERGI DI DALAM HOT BRINE UNTUK PEMBANGKIT LISTRIK

Optimasi
menggunakan
Triple Flash
Condensing Turbine
PEMANFAATAN TIDAK LANGSUNG ENERGI GEOTERMAL:
OPTIMASI ENERGI DI DALAM HOT BRINE UNTUK PEMBANGKIT LISTRIK

ORC : Organic Rankine Cycle

Typical ORC Binary Power Plant


Source : ESMAP Geothermal Handbook
ORC Market geographical breakdown
Current situation: applications and manufacturers of ORC
List of ORC Manufacturer, Number of Installed Units dan Total Instaled Capacity

32
Installed Binary Plant - ORMAT
Total Output Power : 100 MW
PEMANFAATAN LANGSUNG ENERGI GEOTERMAL :
MEMAKSIMALKAN UTILISASI ENERGI DI LUAR PEMBANGKITAN LISTRIK

Source : ESMAP Geothermal Handbook


PEMANFAATAN LANGSUNG ENERGI GEOTERMAL :
MEMAKSIMALKAN UTILISASI ENERGI DI LUAR PEMBANGKITAN LISTRIK

Source : ESMAP Geothermal Handbook


PEMANFAATAN LANGSUNG ENERGI GEOTERMAL :
PT PGE - AREA GEOTHERMAL LAHENDONG
TERIMA KASIH

You might also like