Pilot Project Manager Scripts Updated 220822
Pilot Project Manager Scripts Updated 220822
For the purposes of the Pilot documentation, TR refers to Solution Architects and Consultants
Contents
Pre Pilot activities ......................................................................................................................................... 3
Initial RM Queue setup (Resource Manager) ............................................................................................ 3
0 PM Preparation - Resources already assigned in Click (PROJECT MANAGER) ....................................... 3
3 Create New Resource Request (PROJECT MANAGER)........................................................................ 3
Resource Request Staffing (RESOURCE MANAGER) ............................................................................13
2 Assign Resource(s) to Project Task (PROJECT MANAGER)................................................................13
2A. Updating Assignment names (Project Manager) ..........................................................................30
2B. If resource is needed for non-standard working hours (I.E.; COMPANY HOLIDAYS/WEEKEND)
(Project Manager) ................................................................................................................................34
TR Preparation (Solution Architect and Consultant) ...............................................................................36
Process to remove TR’s from Click ..........................................................................................................36
New Project Process....................................................................................................................................36
PM Assignment Process (INTAKE)............................................................................................................36
TR Resource Request Creation (Standard Projects only) - (INTAKE) .......................................................36
1 Refinement of Resource Requests (PROJECT MANAGER) ....................................................................36
Check RR's for TR assignments (PROJECT MANAGER).........................................................................36
Refine and submit RR's with no assignments to RM. (PROJECT MANAGER) ......................................38
Resource Request Staffing (RESOURCE MANAGER) ................................................................................42
2 Assign Resource(s) to Project Task (PROJECT MANAGER)..................................................................42
2A Updating Assignment names (Project Manager) ...........................................................................58
2B If resource is needed for non-standard working hours (I.E.; COMPANY HOLIDAYS/WEEKEND)
(Project Manager) ................................................................................................................................62
3 Request a new TR – used to request the TR to perform configuration work, when assigned TR has a
skill miss-match, a TR has a lack of availability, or when additional scope has been identified.............64
3 Create New Resource Request (PROJECT MANAGER) ........................................................................64
2 Assign Resource(s) to Project Task (PROJECT MANAGER)..................................................................74
2A Updating Assignment names (Project Manager) ...........................................................................91
If you have resources that were previously assigned in Click (Work Order/Service Appointment process)
prior to the Click cutover to FF, aka Pilot Go Live, and you have additional work for that resource beyond
the current assignment – YOU NEED TO SUBMIT 1 NEW RESOURCE REQUEST PER RESOURCE ONE WEEK
PRIOR TO GO LIVE WITH A START DATE THE DAY FOLLOWING THE END OF THE CLICK ASSIGNMENT AND
AN END DATE OF WHEN YOU EXPECT THE RESOURCE TO COMPLETE THE TASK.
* FOR US AND CANADA PROJECTS ONLY – Use a Resource Request to request PDP planning resources.
Use a Work Order to request PD planning resources, and configuration resources. Note: Sometime in
June PD Resources will join the Pilot and ALL PD resources (Planning and Configuration) must be
requested via Resource Requests.
* FOR NON US AND CANADA PROJECTS ONLY – After a region goes live for the Staffing Pilot, all planning
resources (PD and PDP), and all configuration resources are requested via a Resource Request.
From the project page, Details tab, note the Practice and Region fields Contents (Figure 44)
Figure 44
Figure 46
Scroll down to Resource Request Name, and enter a name that is unique and identifiable (Figure 47)
Figure 48
Using the dropdown for Resource Role, select Solution Architecture Engineer 1. This role will be updated
once a resource has been assigned. (Figure 49)
Populate the Region field by clicking in the Region field, start typing the name (from the notes you took
in the first step), then clicking on the Region. (Figure 50)
Figure 50
Populate the Practice field by clicking in the Practice field, start typing the name (from the notes you
took in the first step), then clicking on the correct Practice. (Figure 50)
Update the Request Priority if needed, and enter the number of hours the resources is expected to need
over the life of this assignment. (Figure 52)
Figure 52
Figure 53
Figure 54 (Deleted)
Figure 55
Saving will bring you back to the Resource Request Screen. Click on the Resource Request hyperlink to
open the Resource Request. (Figure 57)
Figure 57
Scroll to the bottom and click NEW for Resource Skill Requests. (Figure 58)
Figure 58
Figure 59
Click dropdown for minimum rating, click desired minimum rating, and click to Uncheck Primary. (Figure
60)
10
Click Save & New if you have more skillsets to load, or if not then click Save. (Figure 61)
11
After saving, scroll up to the top and click on the pencil for status. (Figure 62)
Figure 62
Click the dropdown for status, click Ready to Staff, click Save. (Figure 63)
12
Done
For every new resource on the project, use the following steps:
From the project home screen select the dropdown, then click Project Task Gant (Figure 1)
13
If you find you do not have all the tasks you need, create new ones (Figures 2-4)
You need a separate task for each product/SA, and site. If you happen have more than one SA working
on the same task/product then its ok to have both on the same task. We need enable the SA’s to
update the status of their own task effort. i.e. the Data Domain task may be completed while the Unity
effort has only started.
14
15
16
Ensure the tasks are unique, all the dates align, and the estimated hours are what you believe are
reasonably correct. (Figure 5)
Figure 5
17
Figure 6
18
19
20
Note: You will normally get the below screen with (Figure 10)
21
But if you get the following (as in the following screenshot below in Figure 12), this
means your resource has been assigned to this project with multiple resource requests, and you will
need to click on this link and choose which assignment to apply. Unfortunately will not be able to tell
which assignment to use without updating the assignment name - If you have this situation please refer
to Updating Assignment Names (after figure 18).
22
Should you need to add another resource to the same task, follow the steps in Figures 12-18.
23
Ensure the Assigned to this project is still checked as seen in Figure 14.
24
25
Note: You will normally get the below screen with (Figure 15)
26
But if you get the following (as in the following screenshot below in Figure 17), this
means your resource has been assigned to this project with multiple resource requests, and you will
need to click on this link and choose which assignment to apply. Unfortunately will not be able to tell
which assignment to use without updating the assignment name - If you have this situation please refer
to Updating Assignment Names (after figure 18).
27
28
Figure 18
29
Figure 19
Figure 20
30
Figure 21
Add start and end dated to the BEGINNING of the assignment name then click save (Figure 22)
31
Go back to the Project Gant Chart, and follow the process again to assign your resource to the task. This
time when you click you get the following where you can identify the correct
assignment to select. Select the correct assignment. (Figure 23)
32
Note the status now shows assigned. Click Apply Changes. (Figure 24)
33
2B. If resource is needed for non-standard working hours (I.E.; COMPANY HOLIDAYS/WEEKEND)
(Project Manager)
Figure 25
34
Figure 26
Click on the dropdown in the upper right and click Edit Schedule as shown in Figure 27
Figure 27
Update the start and end dates that cover the exception.
Only enter the hours you need to ADD to the existing schedule.
35
You have now refined the resource schedule for the desired work day(s).
Notify TR of assignment
36
Note: Depending on screen size – you may need to use the dropdown to select Resource Requests
Next, look at the Resource Requests and ensure all have a name associated:
37
For all Resource Requests that do not have a name assigned, the PM will need to open the Resource
Request by clicking on the Resource Request hyperlink on the left.
38
41
For every new resource on the project, use the following steps:
From the project home screen select the dropdown, then click Project Task Gant (Figure 1)
Figure 1
If you find you do not have all the tasks you need, create new ones (Figures 2-4)
You need a separate task for each product/SA, and site. If you happen have more than one SA working
on the same task/product then its ok to have both on the same task. We need enable the SA’s to
update the status of their own task effort. i.e. the Data Domain task may be completed while the Unity
effort has only started.
42
43
44
Ensure the tasks are unique, all the dates align, and the estimated hours are what you believe are
reasonably correct. (Figure 5)
Figure 5
45
Figure 6
46
47
48
Note: You will normally get the below screen with (Figure 10)
49
But if you get the following (as in the following screenshot below in Figure 12), this
means your resource has been assigned to this project with multiple resource requests, and you will
need to click on this link and choose which assignment to apply. Unfortunately will not be able to tell
which assignment to use without updating the assignment name - If you have this situation please refer
to Updating Assignment Names (after figure 18).
50
Should you need to add another resource to the same task, follow the steps in Figures 12-18.
51
Ensure the Assigned to this project is still checked as seen in Figure 14.
52
53
Note: You will normally get the below screen with (Figure 15)
54
But if you get the following (as in the following screenshot below in Figure 17), this
means your resource has been assigned to this project with multiple resource requests, and you will
need to click on this link and choose which assignment to apply. Unfortunately will not be able to tell
which assignment to use without updating the assignment name - If you have this situation please refer
to Updating Assignment Names (after figure 18).
55
56
Figure 18
57
Figure 19
Figure 20
58
Figure 21
Add start and end dated to the BEGINNING of the assignment name then click save (Figure 22)
59
Go back to the Project Gant Chart, and follow the process again to assign your resource to the task. This
time when you click you get the following where you can identify the correct
assignment to select. Select the correct assignment. (Figure 23)
60
Note the status now shows assigned. Click Apply Changes. (Figure 24)
61
Figure 25
62
Figure 26
Click on the dropdown in the upper right and click Edit Schedule as shown in Figure 27
Figure 27
Update the start and end dates that cover the exception.
Only enter the hours you need to ADD to the existing schedule.
63
You have now refined the resource schedule for the desired work day(s).
Notify TR of assignment
3 Request a new TR – used to request the TR to perform configuration work, when assigned TR
has a skill miss-match, a TR has a lack of availability, or when additional scope has been identified.
* FOR US AND CANADA PROJECTS ONLY – Use a Resource Request to request PDP planning resources.
Use a Work Order to request PD planning resources, and configuration resources. Note: Sometime in
June PD Resources will join the Pilot and ALL PD resources (Planning and Configuration) must be
requested via Resource Requests.
* FOR NON US AND CANADA PROJECTS ONLY – After a region goes live for the Staffing Pilot, all planning
resources (PD and PDP), and all configuration resources are requested via a Resource Request.
From the project page, Details tab, note the Practice and Region fields Contents (Figure 44)
64
Figure 45
65
Scroll down to Resource Request Name, and enter a name that is unique and identifiable (Figure 47)
Figure 47
Figure 48
Using the dropdown for Resource Role, select Solution Architecture Engineer 1. This role will be updated
once a resource has been assigned. (Figure 49)
66
Populate the Region field by clicking in the Region field, start typing the name (from the notes you took
in the first step), then clicking on the Region. (Figure 50)
Figure 50
Populate the Practice field by clicking in the Practice field, start typing the name (from the notes you
took in the first step), then clicking on the correct Practice. (Figure 50)
67
Update the Request Priority if needed, and enter the number of hours the resources is expected to need
over the life of this assignment. (Figure 52)
Figure 52
68
Figure 53
Figure 54 (Deleted)
Figure 55
69
Saving will bring you back to the Resource Request Screen. Click on the Resource Request hyperlink to
open the Resource Request. (Figure 57)
Figure 57
Scroll to the bottom and click NEW for Resource Skill Requests. (Figure 58)
Figure 58
70
Figure 59
Click dropdown for minimum rating, click desired minimum rating, and click to Uncheck Primary. (Figure
60)
71
Click Save & New if you have more skillsets to load, or if not then click Save. (Figure 61)
72
After saving, scroll up to the top and click on the pencil for status. (Figure 62)
Figure 62
Click the dropdown for status, click Ready to Staff, click Save. (Figure 63)
73
Done
For every new resource on the project, use the following steps:
From the project home screen select the dropdown, then click Project Task Gant (Figure 1)
74
If you find you do not have all the tasks you need, create new ones (Figures 2-4)
You need a separate task for each product/SA, and site. If you happen have more than one SA working
on the same task/product then its ok to have both on the same task. We need enable the SA’s to
update the status of their own task effort. i.e. the Data Domain task may be completed while the Unity
effort has only started.
75
76
77
Ensure the tasks are unique, all the dates align, and the estimated hours are what you believe are
reasonably correct. (Figure 5)
Figure 5
78
Figure 6
79
80
81
Note: You will normally get the below screen with (Figure 10)
82
But if you get the following (as in the following screenshot below in Figure 12), this
means your resource has been assigned to this project with multiple resource requests, and you will
need to click on this link and choose which assignment to apply. Unfortunately will not be able to tell
which assignment to use without updating the assignment name - If you have this situation please refer
to Updating Assignment Names (after figure 18).
83
Should you need to add another resource to the same task, follow the steps in Figures 12-18.
84
Ensure the Assigned to this project is still checked as seen in Figure 14.
85
86
Note: You will normally get the below screen with (Figure 15)
87
But if you get the following (as in the following screenshot below in Figure 17), this
means your resource has been assigned to this project with multiple resource requests, and you will
need to click on this link and choose which assignment to apply. Unfortunately will not be able to tell
which assignment to use without updating the assignment name - If you have this situation please refer
to Updating Assignment Names (after figure 18).
88
89
Figure 18
90
Figure 19
Figure 20
91
Figure 21
Add start and end dated to the BEGINNING of the assignment name then click save (Figure 22)
92
Go back to the Project Gant Chart, and follow the process again to assign your resource to the task. This
time when you click you get the following where you can identify the correct
assignment to select. Select the correct assignment. (Figure 23)
93
Note the status now shows assigned. Click Apply Changes. (Figure 24)
94
Figure 25
95
Figure 26
Click on the dropdown in the upper right and click Edit Schedule as shown in Figure 27
Figure 27
Update the start and end dates that cover the exception.
Only enter the hours you need to ADD to the existing schedule.
96
You have now refined the resource schedule for the desired work day(s).
Notify TR of assignment
Figure 32
97
Figure 33
Click the dropdown in the upper right and click Edit Schedule as seen in Figure 34
Figure 34
To adjust the total hours for the assignment (Figures 35 and 36)
98
Enter the TOTAL Hours to be allocated for the duration of the assignment.
Click Update
Click Save
Figure 35
Figure 36
99
Click Update
Click Save
Figure 37
From the Project page scroll down the Details page to Activity, then click Chatter.
100
To view the statuses of the Tasks, from the project page Click Tasks (Figure 39)
Figure 39
101
Figure 40
Until the statuses can be renamed, we will need to use a translation table (Figure 41)
Figure 41
102
Once opened, you can see the status there (Figure 43)
103
104