Method Statement For Materials Shifting, Storage A
Method Statement For Materials Shifting, Storage A
• Purpose
The purpose of this method of statement is unloading of portacabin using by crane, materials
shifting and storage, Barricading the area using by PVC barrier and warning tape.
• Scope
The scope of work includes porta cabin for offices and storage container unloading,
materials shifting and storage.
• Reference
• Definitions
• Responsibilities
Site supervisor
o Site Supervisor shall ensure that all activities are carried out in accordance with the JSA &
Method Statement.
o Site supervisor shall ensure that the work is covered with valid work permits and
necessary documents from MIC and all permit / safety requirements strictly followed.
o Conduct daily toolbox talk as and whenever is required and explain the risk associated
with the work and the precautions to be taken.
o The Site Engineer/Supervisor shall be responsible and fully aware of the daily work
program and shall ensure that he attends all inspection points in a timely manner and
records the results of his inspections correctly on the appropriate forms and to follow-up
appropriate corrective preventive actions (if applicable). He is also responsible for the co-
ordination with Client for the close-out of Report for inspection.
o The Supervisor/Engineer shall ensure that all activities that are required to be inspected.
Representative and approved.
• Work procedure
Site Survey and mark the area as per co-ordinates given MIC
Permit and all relevant documents should be at site prior to start the job
Unloading of Porta cabin and steel storage container as per Lifting plan and permit
Materials unloading and storage in proper way
All chemical types materials MSDS should present at site
Barricade the MIC approved land using by PVC barrier and warning tape
Method of statement for
Materials Shifting, Storage and Barricading
Before starting any work, this checklist shall be followed by safety officer as per
requirement:
Prior to commencement of any work on site, the site should be inspected and approved
by the Site Authorities or their representatives.
All necessary PPE shall be provided and worn by working personnel
Emergency Response Procedures shall be explained to the workers to make them aware
of the procedure when emergency situation arises.
All access / exit points to work areas shall be maintained free from obstacles, materials
and equipment.
Barricades with PVC Road Barrier, sign boards must be present at the work site.
Contractor shall maintain good housekeeping at all the times.
Crane
Hand Tools
PVC Barrier