Method Statement For Materials Shifting, Storage A

The document provides a method statement for unloading materials from a portacabin and storage container using a crane, shifting and storing the materials, and barricading the area with PVC barriers and warning tape at a laydown area site in Qatar.

Uploaded by

sharif khan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
47 views

Method Statement For Materials Shifting, Storage A

The document provides a method statement for unloading materials from a portacabin and storage container using a crane, shifting and storing the materials, and barricading the area with PVC barriers and warning tape at a laydown area site in Qatar.

Uploaded by

sharif khan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

Method of statement for

Materials Shifting, Storage and Barricading

Dicotech Qatar W.L.L

• Purpose

The purpose of this method of statement is unloading of portacabin using by crane, materials
shifting and storage, Barricading the area using by PVC barrier and warning tape.

• Scope

The scope of work includes porta cabin for offices and storage container unloading,
materials shifting and storage.
• Reference

• Qatar construction specification (QCS)

• Definitions

o Project : Build Lay Down area at MIC Land


o Contract No : 602020
o Client/company : DicoTech Qatar WLL

• Responsibilities

 Site supervisor
o Site Supervisor shall ensure that all activities are carried out in accordance with the JSA &
Method Statement.
o Site supervisor shall ensure that the work is covered with valid work permits and
necessary documents from MIC and all permit / safety requirements strictly followed.
o Conduct daily toolbox talk as and whenever is required and explain the risk associated
with the work and the precautions to be taken.

 The Site Engineer/Supervisor


Method of statement for
Materials Shifting, Storage and Barricading

Dicotech Qatar W.L.L

o The Site Engineer/Supervisor shall be responsible and fully aware of the daily work
program and shall ensure that he attends all inspection points in a timely manner and
records the results of his inspections correctly on the appropriate forms and to follow-up
appropriate corrective preventive actions (if applicable). He is also responsible for the co-
ordination with Client for the close-out of Report for inspection.

o The Supervisor/Engineer shall ensure that all activities that are required to be inspected.
Representative and approved.

 The safety officers


o All necessary PPE shall be provided and worn by Project personnel.
o The safety officer shall ensure that the work is covered with valid work permits from MIC
wherever applicable and all permits and safety requirements strictly followed.
o The Safety officer shall ensure that tool box meetings are carried at all work location as
per HSE plan to encourage the labor to work in safe environment.
o The safety officer shall ensure that work location is fully barricaded with installing safety
signs
o To stop any unsafe act or condition and report to HSE engineer and construction /site
supervisor.

• Work procedure

Materials Shifting, unloading, storage and Barricading

 Site Survey and mark the area as per co-ordinates given MIC
 Permit and all relevant documents should be at site prior to start the job
 Unloading of Porta cabin and steel storage container as per Lifting plan and permit
 Materials unloading and storage in proper way
 All chemical types materials MSDS should present at site
 Barricade the MIC approved land using by PVC barrier and warning tape
Method of statement for
Materials Shifting, Storage and Barricading

Dicotech Qatar W.L.L

 Chemical materials should be stored as per MSDS/


 All tools will be kept in proper manner inside storage container
 Unloading of concrete blocks and keep in proper manner
 All necessary precaution shall be taken by site supervisor
Waste Management

• All waste shall be disposed to approved designated dumping area.


• While Loading & unloading the waste material, Activity can generate amounts of
excess dust so this can be controlled by spraying the water.
• Safety

 Before starting any work, this checklist shall be followed by safety officer as per
requirement:
 Prior to commencement of any work on site, the site should be inspected and approved
by the Site Authorities or their representatives.
 All necessary PPE shall be provided and worn by working personnel
 Emergency Response Procedures shall be explained to the workers to make them aware
of the procedure when emergency situation arises.
 All access / exit points to work areas shall be maintained free from obstacles, materials
and equipment.
 Barricades with PVC Road Barrier, sign boards must be present at the work site.
 Contractor shall maintain good housekeeping at all the times.

• Equipment & Tools

 Crane
 Hand Tools
 PVC Barrier