0% found this document useful (0 votes)
164 views

Free Work Method Statement Queensland

This document is a template for creating safe work method statements (SWMS) with sections for project details, personal protective equipment, emergency procedures, risk assessment, and step-by-step work instructions. The template includes contact information, qualifications required, relevant legislation, emergency procedures, hazards identified, and risk assessment matrix. It is to be used to document the process for completing work safely and managing risks.

Uploaded by

Paul Roberts
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
164 views

Free Work Method Statement Queensland

This document is a template for creating safe work method statements (SWMS) with sections for project details, personal protective equipment, emergency procedures, risk assessment, and step-by-step work instructions. The template includes contact information, qualifications required, relevant legislation, emergency procedures, hazards identified, and risk assessment matrix. It is to be used to document the process for completing work safely and managing risks.

Uploaded by

Paul Roberts
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 10

Work Safety QLD

Safe Work Method Statement Template


www.worksafetyqld.com
Email: [email protected]
Phone: 0432 631 964
A template to use when creating Safe Work Method Statements in your workplace
ABN: 28 911 810 228

Project Details

Job Description & Location:

Contacts: Qualifications & Training: Relevant Legislation & Information:


Contact 1 - 888 888 888 General site induction Work Health & Safety Act 2011
Contact 2 - 888 888 888 Daily toolbox meeting Work Health & Safety Legislation 2011
Contact 3 - 888 888 888 Competent and trained workers Insert other relevant legislation or codes of practice here
Person responsible for implementing, reviewing and monitoring General Construction Induction Card (Blue or White)
this SWMS: Contact 4 - 888 888 888

PPE / Safety Equipment / Signage / Tags: Plant & Equipment: Relevant Parties

● Steel cap safety boots Insert Plant & Equipment used on the task here (Make sure to attach a Person Conducting Business or Undertaking Name:
● Safety glasses plant hazard risk assessment for each item of plant or equipment used) ABN: 888 888 888 88 Address: 123 Address st, QLD 4109 Phone: 888
● Safety gloves 888 888
● Long sleeve, high visibility clothing Principal Contractor:
● Other PPE for specific tasks will be identified in controls ABN: 888 888 888 88 Address: 123 Address st, QLD 4109 Phone: 888
888 888

Emergency Planning & Rescue Procedures: High Risk Work Activities: Safety Data Sheets:

Insert relevant emergency plan and rescue procedures here Identify which high risk work activities are part of this task Insert any Safety Data Sheets required for the job here (make sure to
attach copies)
In the event of an incident or emergency, work must stop
immediately and the <Your Company Name> Incident Management
and Emergency Management Policy and Procedure must be
followed. This SWMS must be reviewed and amended before work
recommences to ensure that the incident cannot occur again.

Printed Copies Are Uncontrolled | Document: SWMS Template | Rev: A | Last Revision Date: 30/11/2021 | Job Description: <Insert Job Description Here> | Page: 1 of 10
Work Safety QLD

Safe Work Method Statement Template


www.worksafetyqld.com
Email: [email protected]
Phone: 0432 631 964
A template to use when creating Safe Work Method Statements in your workplace
ABN: 28 911 810 228

Risk Assessment

Consequences:

5 - Catastrophic 4 - Major 3 - Moderate 2 - Minor 1 - Insignificant


No injuries, slight damage to
Death or disablement, significant Extensive injuries with lost time, Medical treatment, damage to First aid treatment, minor damage
equipment, very minor non-
damage to equipment, significant major damage to equipment, plant and equipment, moderate to equipment, minor financial cost,
existent financial cost, very minor
financial cost, significant long term major financial cost, major short financial cost, major short term minor short term environmental
or non-existent environmental
Likelihood environmental damage term environmental damage environmental damage damage
damage

5 - Almost Certain 25 20 15 10 5

4 - Likely 20 16 12 8 4

3 - Possible 15 12 9 6 3

2 - Unlikely 10 8 6 4 2

1 - Rare 5 4 3 2 1

Printed Copies Are Uncontrolled | Document: SWMS Template | Rev: A | Last Revision Date: 30/11/2021 | Job Description: <Insert Job Description Here> | Page: 2 of 10
Work Safety QLD

Safe Work Method Statement Template


www.worksafetyqld.com
Email: [email protected]
Phone: 0432 631 964
A template to use when creating Safe Work Method Statements in your workplace
ABN: 28 911 810 228

Risk Rating Actions Required

High Risk – Work must be stopped immediately. Control measures must be put in place immediately by a competent person, following the hierarchy of controls
16 - 25

Substantial Risk – Stop work if there is an immediate risk. Additional control measures must be put in place immediately by a competent person, following the hierarchy of
10 - 15 controls

Low Risk – Work may commence. All current control measures must be maintained. Monitored and reviewed and further controls implemented if possible
5-9

Very low risk – Work may commence. All current control measures must be maintained, monitored and reviewed
1-4

Hierarchy of Controls

Eliminate the hazard altogether e.g. remove a hazardous machine from use
Elimination

Substitution Substitute a safer option e.g. replace a hazardous machine with a safer one

Isolation Isolate a hazard from anyone who could be harmed

Engineering Use engineering controls to reduce the risk

Administrative Utilise training and signage

PPE Utilise personal protective equipment

Printed Copies Are Uncontrolled | Document: SWMS Template | Rev: A | Last Revision Date: 30/11/2021 | Job Description: <Insert Job Description Here> | Page: 3 of 10
Work Safety QLD

Safe Work Method Statement Template


www.worksafetyqld.com
Email: [email protected]
Phone: 0432 631 964
A template to use when creating Safe Work Method Statements in your workplace
ABN: 28 911 810 228

Safe Work Method Statement

Initial Risk Residual Risk


Job Step Potential Hazards Safety Control Measures Persons Responsible
L C S L C S

Example Step ● Slips Trips and Falls 4 3 12 ● Example safety controls 1 3 3 ● Example

Printed Copies Are Uncontrolled | Document: SWMS Template | Rev: A | Last Revision Date: 30/11/2021 | Job Description: <Insert Job Description Here> | Page: 4 of 10
Work Safety QLD

Safe Work Method Statement Template


www.worksafetyqld.com
Email: [email protected]
Phone: 0432 631 964
A template to use when creating Safe Work Method Statements in your workplace
ABN: 28 911 810 228

Safe Work Method Statement

Initial Risk Residual Risk


Job Step Potential Hazards Safety Control Measures Persons Responsible
L C S L C S

Printed Copies Are Uncontrolled | Document: SWMS Template | Rev: A | Last Revision Date: 30/11/2021 | Job Description: <Insert Job Description Here> | Page: 5 of 10
Work Safety QLD

Safe Work Method Statement Template


www.worksafetyqld.com
Email: [email protected]
Phone: 0432 631 964
A template to use when creating Safe Work Method Statements in your workplace
ABN: 28 911 810 228

Safe Work Method Statement

Initial Risk Residual Risk


Job Step Potential Hazards Safety Control Measures Persons Responsible
L C S L C S

Printed Copies Are Uncontrolled | Document: SWMS Template | Rev: A | Last Revision Date: 30/11/2021 | Job Description: <Insert Job Description Here> | Page: 6 of 10
Work Safety QLD

Safe Work Method Statement Template


www.worksafetyqld.com
Email: [email protected]
Phone: 0432 631 964
A template to use when creating Safe Work Method Statements in your workplace
ABN: 28 911 810 228

Monitoring, Review & Communication Process

Monitoring
<Your Company Name> management must monitor this SWMS continuously. Management and Supervisors must ensure that all control measures outlined in the Safe Work Method Statement
section above are being followed and put in place. This is achieved by:

Utilizing safety inspections

● Ensuring that competent supervisors monitor all work being conducted to make sure that all control measures are being followed
● Training supervisors to continuously monitor for and report potential hazards
● Training workers to continuously monitor for and report potential hazards
● Management continuously monitoring for potential hazards and implementing/communicating controls where possible when hazards are found or reported

Review
<Your Company Name> management must review this SWMS periodically to ensure it remains relevant. This is achieved by:

● Management reviewing this SWMS at least once every six (6) months to ensure that controls remain relevant and to ensure that any new hazards have been assessed
● Management inspecting the work being conducted to ensure that controls remain relevant
● Conducting pre-start meetings or “Toolbox talks” to discuss this SWMS, potential hazards and control measures with workers

In The Event Of An Incident or Emergency


In the event of an incident or emergency, work must stop immediately and the <Your Company Name> Incident Management and Emergency Management Policy and Procedure must be followed.
This SWMS must be reviewed and amended before work recommences to ensure that the incident cannot occur again.

Communication
This SWMS must be communicated at a pre-start meeting before work commences. Workers must be given the opportunity to discuss controls which are listed in this SWMS, and be allowed time to
discuss any further controls which they feel are necessary.

Finally, workers must sign below to state that they have been instructed in this SWMS, understand all hazards involved with the work and are comfortable with all of the control measures that must be
implemented and followed.

If any changes are made to this SWMS, they must be communicated to workers and the communication sheet below must be re-signed by all persons involved with the job.

Printed Copies Are Uncontrolled | Document: SWMS Template | Rev: A | Last Revision Date: 30/11/2021 | Job Description: <Insert Job Description Here> | Page: 7 of 10
Work Safety QLD

Safe Work Method Statement Template


www.worksafetyqld.com
Email: [email protected]
Phone: 0432 631 964
A template to use when creating Safe Work Method Statements in your workplace
ABN: 28 911 810 228

Additional Controls To Be Put In Place After Consultation With All Relevant Workers

Printed Copies Are Uncontrolled | Document: SWMS Template | Rev: A | Last Revision Date: 30/11/2021 | Job Description: <Insert Job Description Here> | Page: 8 of 10
Work Safety QLD

Safe Work Method Statement Template


www.worksafetyqld.com
Email: [email protected]
Phone: 0432 631 964
A template to use when creating Safe Work Method Statements in your workplace
ABN: 28 911 810 228

Revision History (This SWMS must be revised at least once every six months)

Revision Date Revised Description of Changes Revised By Signature Next Revision Date

A Document Creation (Include name of person who prepared this Immediately


SWMS)

A Document Review & Approval by Company Owner

A Initial Consultation with All Relevant Workers

Printed Copies Are Uncontrolled | Document: SWMS Template | Rev: A | Last Revision Date: 30/11/2021 | Job Description: <Insert Job Description Here> | Page: 9 of 10
Work Safety QLD

Safe Work Method Statement Template


www.worksafetyqld.com
Email: [email protected]
Phone: 0432 631 964
A template to use when creating Safe Work Method Statements in your workplace
ABN: 28 911 810 228

Communication / Acknowledgement Sheet

Name Signature Date Company Position Licence / Ticket Numbers

Printed Copies Are Uncontrolled | Document: SWMS Template | Rev: A | Last Revision Date: 30/11/2021 | Job Description: <Insert Job Description Here> | Page: 10 of 10

You might also like