09 2022 - OM - Tutorial - 1
09 2022 - OM - Tutorial - 1
Session 1 (Section B)
• What is bottleneck? What is process capacity? What is flow rate? What is cycle time?
• What is average labour content? Labour utilization? Cost of direct labour?
1
Capacity Analysis - Multiple Product Scenario (A, B &
C)
Consider a process consisting of five steps that are operated 8 hours per day. Each worker handles
one unit at a time at a particular step. The process works on three different products A, B and C:
Demand for A is 40 units per day, B is 50 units per day, and C is 60 units per day.
• If the system cannot meet demand then where will you increase capacity?
• How many new skiers are arriving—on average—in LaVilla every day?
∗ ∗ ∗ End of Tutorial 1 ∗ ∗ ∗