4a WSTR Government of India
— Ya Waray Ministry of Railways
ad atZ Railway Board)
AGM
No. 2020,CE-/USSORWEM PCE, CAYC, PPA, REM cini, dated 31.07.2023
DRMa *
To, ae
As per list attached
Sub: Addendum and Corrigendum Slip No.1 (ACS-1) to IRUSSOR - 2021
Ref: (i) Railway Board’s letter No. 2020/
(ii) RDSO’s letter No. CBS/H Beam s
/USSOR/W&M/I dated 05.07.2022
per dated 01.03.2023
RDSO vide letter under ref (ii) above has issued instructions, modit
thickness of Stainless Steel Chequered plates to minimum 6mm and speci
1S:691| and also increased the scope of providing the same to trolly refuge, man refuge,
ide path way and made corrections in Channel Sleeper Drawings and Open Web Steel
girder drawi
2. In view of above, Ministry of Railway
195042, 195043 & 195044 of Indian Railways Unified Standard Schedule of Ra
2021 (IRUSSOR-2021) amended as shown in the enclosed Addendum & Cor
1).
Slip No.1 (AC!
3. Accord
Zonal Railways are requested to ban existing description of item
no. 195040, 195041, 195042, 195043 & 195044 in their respective Railway SOR. Zonal
Railways, if required, may use amended nomenclature of items 195040, 195041, 195042,
195043 & 195044 as new items of Zonal Railways SOR.
4 This issues with the approval of Board (MI).
DA: As above, — as
wy 4
tray
Prdwa / Rafter gAPraheh) / ad aE
[Phone : Rly: 030-47598, MTNL:01 1-23047598,
e-mail address: [email protected]]
04 AUS 22
iffty sons,
|
a Jy,|. CME, IROAF,
STRIBUTION (No.2020/CE-VUSSOR/W& MIT New Delhi, dated 31.07.2023)
agers, All Indian Railways & Production Units
General Manager (Con), N-F. Railway, Guwabati
General Manager ‘CORE, Allahabsd
Chief Administrative Oficers (Con), All Indian Railways (Exeept N.F. Railway)
Principal Chief Engineers, All Indian Railways
CAO, COFMOW. Tilak Bridge, New Delhi
Principal CAO, Diesel Loco Modemization Works. Patiala (Punjab)
CAO (Workshop Projects), Chamber Bhawan, Judge's Court Road, Anta Ghat, Patna-800001, Bihar
Director General, RDSO, Manak Nagar, Lucknow
Director General, NAIR, Vadodara
Director, IRICEN, Pune ~ 411 001 (Maharashtra)
Director, IRIEEN, PB No-233, Nasik Road-422 101 (Maharasht
Director, IRISET, Ta Naka Road, Lalla Guda, Secunderabad-S00017
Director, IRIMEE, Jamalpur Dist-Jamalpur, PIN-811214 (Bihar)
Director. IRITM, Sarswati Residential Estate, IRITM Campus, Manak Nagar, Lucknow
MD, CONCOR. Concor Bhawan, C-3, Mathura Road, Opp. Apollo Hospital, New Delhi- 110076
IRCON international Limited, C-1, Distriet Centre, Saket. New Delhi« 110017
MD, RITES L.td., RITES Bhawan, Plot No.1, Sector-29, Gurgaon
CMD, RVNL, August Kranti Bhawan Plot No.25, 1" Floor, Bhikaji Cama Place, New Delhi
MD, MRVC Litd,,. Churchgate Station Bldg, Mumbai- 400020
CMD, KONKAN Railway Corporation L1d, Rail Bhawan, New Dethi-110001
MD, DFCCIL, 3” Floor, Pragati Maidan Metro Station Building Complex, New Dethi-1 10001
MD. RLDA, Near Safdarjung Railway Station, Moti Bagh, Phase-1, New Delhi- 110021
MD, CRIS, Chanakyapar, New Delhi
CMD, RailTe! Corporation of India Ltd. Plot No. 143, Institutional Area, Sector-44, Gurgaon ~ 122003,
12" Floor, Core-1, Scope Minar, Distt. Centre, Laxmi Nagar, Delhi- 110092
Managing Director, IRFC Limited, UG Floor, FastTower, NBCC Place, Bhisham Pitamah Marg,
LodhiRoad, Pragati Vibar, New Delhi
CMD, IRCTC Lid, B-148, 11th Floor, Statesman House, Barakhamba Road, New Delhi 1 10001
CMD, Braithwaite & Co, limited, 5 Hide Road Kotkata 700043,
(By
Thy
General Secretary. IRCA, DRM Ottice, New Delhi
General Secretary, AIRF, Rail Bhawan, New Delhi
General Secretary, NFIR, Rail Bhawan, New Delhi
General Secretary. IRPOF. Rail Bhawan, New Delht
General Secretary, FROA, Rail Bhawan, New Delhi
rneral Secretary, AIRPA, Rail Bhawan, New Delhi
eral Secretary, AISC & STREA, Rail Bhawan, New Delhi
The Secretary, RBSS, Group (A) Oltices Association, Rail Bhawan
‘The Secretary, RBSS, Group (B) Offices Association, Rail Bhawan
General Secretary, RBSSS Association, Rail Bhawan
The Secretary, RBMSA, Rail Bhawan
retary, Railway, Group (1D) Employees Associa
G
Rail Bhawan
‘Concerned PSO for kind information of Chairman eum CEO, M/Infra, M/T&RS M/O&BD, MiFinance,
Railway Board
Ady MR, EDPG MR, OSD/MR, OSR(Co-ord)MR.
Chief Vigilance Officers. All Indian Railways
DGIRHS), DGIRPF), AM(CE), AM(Works), AM(B). AM(
AMICKIS, AMSig.. AM(Plg.), PED(B&S), PED
EDCEG), EDTK(M&MC), EDCE(B&S). EDAX), EDGS(Civill), ED'GS(CiviF-I}), ED/GSEle
EDGSSKT), EDGSSD. EDWiPig), ED(LRA), ED(PSU), EDVE, ED(Safety), ED(Sig. Dev.) EDC
cle), EDRS(G), EDFE(G), EDFE, EDE(N), ED(Accounts), ED/T&MPP, EDME(Ch.), EDME(Fr.),
ED Pl., JS(conf), JS(P), JS(G), JS(D), Vigilance-IIl, Vig(Conf) of Railway Board.
‘s\'
AM(RS), AM(ME), AM/Tele,
igilance), PEDCE(P), PED Safety, PED/Gati Shakti,Addendum and Corrigendum Slip No.1 (ACS-1) to Indian Railways Unified
Standard Schedule of Rates - 2021 (IRUSSOR-2021)
Tem ‘As Existing To be read as
No. Deseription Unit Deseription Unit
195040] Supplying & fixing Gang Supplying & fixing of Anti-Skid MS
pathway of MS/Stainless Steel / Stainless Steel chequered plates on
chequered plates between guard un- pallasted deck bridge as per
rails on un-ballasted deck bri approved drawings, with matching
for gang pathway. overlapping grade stainless steel fasteners as
at regular intervals of 2m to directed by Engineer-in- Charge, on
2.5m with bolts duly drilling new bridge or replacement of
holes in chequered ‘plate, as existing chequered plates on old
directed on new bridge or bridge including removal of old
replacement of existing chequered plates and stacking near
gangway on old bridge approaches of bridge, clear from all
including removal of old infringement
chequered plates and. stacking Note: Joints of chequered plates shall
near approaches of bridge clear not fall in between sleepers.
from all infringemen
Note: Overlapping of chequered
plates shall not fall in between
sleepers
195041 | MS chequered plates 6 to 8mm | Kg | MS chequered plates 6 to Smm thick | Kg
thick on new bridge on new bridge
195042 | MS chequered plates 6 to 8mm [ Kg | MS chequered plates 6 to 8mm thick | Kg
thick including removal of including removal of existing
existing chequered plates on chequered plates on Bridges
Bridges Note: Payment shall be made only as
Note: Payment shall be made per weight of new Chequered Plate
only as per weight of new fixed.
Chequered Plate fixed.
195043] Anti skid Stainless steel | Kg | Anti-Skid Stainless Steel chequered | Kg
chequered plate of 409M Grade plate conforming to latest 1S:691 1,
as per Specification ASTM ISS Symbol 409M with flat bottom
A240 SS and Pattern and top pattem conforming to IS:
conforming to BIS 3502 with 3502, 1A with bead height of
average, ‘thickness. of S:Stani minimum 0.8mm - on New Bridges.
bead height of 0.8mm min
thick - on New Bridges
195044 | Fixing Anti skid Stainless steel | Kg [Vining An-Skid Stainless Steel | Ke
chequered plate of Grade 409M
and average thickness of 3.5mm
with bead height of 0.8mm min.
thick including removal of
existing chequered plates on
Bridges
Note: Payment shall be made
only as per weight of
Chequered Plate fixed
new
chequered plate conforming to latest
18:6911, ISS Symbol 409M with flat
bottom and top pattern conforming
to IS: 3502, 1A with bead height of
imum 0.8mm including removal
existing chequered plates on
existing Bridges.
Note: Payment shall be made only as
per weight of new Chequered Plate
of
fixed,Ux ‘ae BWSR Government of India Wx
Veg @a Fare Ministry of Railways Sg
orate (?a@ ate Railway Board) Azadi ka
Amrit Mahotsav
No. 2020/CE-/USSORW&M/L New Delhi, Date: 05.07.2022
“To,
As per list attached
Sub:‘Indian Railways Unified Standard Schedule of Rates’ IRUSSOR-2021), Basic
Rate Sheet-2021 and ‘Analysis of Rate-2021', for execution of Bridges works,
Formation works and P. Way works
Ref: Railway Board letter No. 2019/CE-VUSSOR/W&M/1, dated 26.11.2019
Railway Board vide letter under reference had issued ‘Indian Railways Unified
Standard Schedule of Rates’ (IRUSSOR-2019) and ‘Indian Railways Unified
Standard Specification (IRUSS-2019), for execution of Bridge works, Formation
works and P.Way works. :
2. Ithas been decided to have next updated version of IRUSSOR-2019.
3. Now, Board (MI, MF) has approved the Indian Railways Unified Standard
Schedule of Rates-2021 (IRUSSOR-2021), Basic Rate Sheet-2021 and Analysis
of Rate-2021 (AOR-2021) for execution of Formation Works, Bridge Work and
P.Way Works. The salient features of the IRUSSOR-2021 are as under:
a. New version of IRUSSOR-2021 have included of certain New Items and
deleted redundant items from the previous version.
b. The IRUSSOR-2021 for execution of Bridge works, Formation works and
P.Way works consists of 21 chapters. The Excel Sheet of IRUSSOR-2021
including Basic Data Input, Analysis of Rate & Schedule of Rates has been
prepared in file named “IR USSOR-2021.xIsx" and uploaded on Civil
Engineering Directorate webpage of Railway Board for preparing &
publishing zonal SOR by Zonal Railways. Link of Excel Sheet is as under:
huips://indianrailways.gov.in/railwayboard>> About Indian Railways>>
Railway Board Directorates>> Civil Engineering>> 4, Schedule of Rates,
AOR and specifications>> Schedule_Rates Analysis of Rates and
Specifications
c. The Badic Rates reflected in IRUSSOR-2021 xlsx’ are representative rates
of different components to confirm consistency in ‘Analysis of Rates (AOR).
Zonal Railways shall prepare their SOR by updating the rates of all
components in ‘Basic Rates’ sheet of IRUSSOR-2021 xlsx file. The basic
rat reparation of Zonal SOR shall be exclusive of GS’
Zonal Railways shall update the ‘Basic Rates’ sheet with concurrence of
4h 3 seassociate finance, at least once in two years to have duly updated USSOR of
each Zonal Railway every two year
d. Zonal Railways are not authorised to make any change in the Item No.,
Description of Item, and Unit of Item. In case any Railway finds any
ambiguity in these fields of any item during development of their SOR, they
shall refer the same to Reilway Board for issuing suitable modification
uniformly across TR
€. Production Units & other Organizations can adopt the SOR of nearby Zone.
4. The downloadable pdf copy of Basic Rate Sheet-2021, IRUSSOR-2021 and
Analysis of Rate-2021 with sample rate are available on Civil Engineering
Directorate webpage of Railway Board for guidance purpose only.
5. Zonal Railways shall use only IRUSSOR for Formation Works, Bridge Works & P.
Way Works and CPWD DSR for Building works, Road works & Horticulture
Works etc. Separate Tender Schedule shall be prepared for CPWD DSR and
IRUSSOR in case a tender is having both CPWD DSR and IRUSSOR items
6. Zonal Railways are required to prepare and publish Zonal USSOR NOT LATER
THAN 30-SEP-2022 for execution of Railway Formation Works, Bridge Works
and P.Way Works. PCE of Zonal Railway shall ensure the target date above.
adie Fw
Sea FARA)
: arto Prewe fates aie ars
{Phone: 030-44803: Rly: 011-23383379:MTNL]
e-mail address : [email protected]
No. 2020/CE-/USSORW&M/1 New Delhi, Date: 05.07.2022
Copy forwarded for information to:
1, The PFAs, All Indian Railways.
2. Dy. Comptroller and Auditor General of India (Railways), Room No. 224, Rail
Bhawan, New Delhi
For Member Financescence oe
squatter steiner A
msaarenstent we!
covet of wat Rao ‘a SE me
Research Designs & Standards Organization
marae gar, cin 228001
: CBS/H Beam sleeper ‘Reni: 01.03.2023,
GM Con! NER.
Principal Chief Engineer (All Zonal Railways).
Chief Administrative Officer (Con) (Alt Zonal Raibways).
fax: Issuing of Alteration drawings regarding Chequered Plate.
‘Ateration has been done in drawings of Channel Sleeper (BA-1636/R2, BA-1636/1/R2,
BA-1636/2, RDSOVB-1636/7, ROSO/B-1636/10, ROSO/B-1739/R, ROSOIB-1745). H-Beam
sleeper (ROSOIB.1636/5, RDSOIB-1636/4/R, ROSO/B-1626'9) and pathway for open web
Girder (CBS-0046), Total 1ines.) as below~
‘Antisskid Chequered Plates for gangway, trolly rofuge, man refuge, side pathway
‘etc, shall be conforming to latest IS 6911, ISS Symbol 409M, minimum mm thick
(excluding bead height) with flat bottom and top pattern conforming to 1S 3502, 1A.For
coastalicorrosive areas, thickness may be suitably increased depending upon severity of
Appropriate matching stainless steel grade fasteners as recommended by
‘manufacturer shall be used.
The same may be used for other similar applications also wherever required.
Drawings with alterations have been issued and uploaded on ROSO Railnet website
(hnp710 109.2 4/drawina/irmLink asp)
This ie for your information and necessary action please.
Director/B&S-4
faa:
EDCEIBSS, Raay boar for knd information
{ihe Managing Discoe, RITES LTO, RITES Bnavan, Pot No.1, Sect28, Gurgaon
(Haryana) toot
Thelen Brees, RCON, aa Bavan, Sect, RK. Puram, New De -
4, The Ghaiman & Managing Dect Konkan Raltay Corporation Lia, Blapur Brava,
Pai Se: BD Bear nun 0064
5, The Managing Orector, Rai Vikas Nigam, it floor, August Kran Bhawan, Bika
Coma Pace ates Ross RK Puram New Osh 110016" oe
6 The Managing DrectorOFCCIL. sth Floor, Frags Makan, Hetro Staton Bulging
Comeioc New be = 10001
7, The General Manager Debi Met Rel Coporaton Ltd, NBCC Pace, Shshma
Paamaniarg, Praga Vir, New Dai 110008
Chairman & Managing Director, Mumbai Railway Vikas Corporation Ltd., 2" Floor,
Chorengate Staton Burg, Churchgate, Maral 400 620,