LB 2027 JLT Id Add 1003 30th Floor All Day Dining Furniture Layout 1002
LB 2027 JLT Id Add 1003 30th Floor All Day Dining Furniture Layout 1002
DOOR
GLASS
FF-14 AcDbWipeout (WipeOut)
FF-15
AcDbWipeout (WipeOut)
DOOR
GLASS
FF-14
(WipeOut)
AcDbWipeout
(WipeOut)
AcDbWipeout
(WipeOut)
AcDbWipeout
ST1
(WipeOut)
AcDbWipeout
STEP-
(WipeOut)
AcDbWipeout
LT-06
(WipeOut)
AcDbWipeout
0
Ø127
(WipeOut)
AcDbWipeout
(WipeOut)
AcDbWipeout
JF-07 KEY PLAN
ECE PTION E
1" (3.2%
)
R -01 RAMP 12 SHEET NOTES:
tural
Sculp k
FP CORRIDOR
r t w or l Trim
A Meta · This drawing is for design intent purposes only and is not to
UP A
JF-09
be scaled.
FF-14 · All dimensions shown are in millimeters and are set out
from the applied finish surface.
· All dimensions are to be verified on site by the contractor
FF-15 prior to creation of shop drawings, manufacture and installation.
· Any omissions or discrepancies found shall be reported to
FF-14 the ID consultant / Engineer immediately for clarification.
Art wo
rk
VEST. · This drawing is to be read in conjunction with the relevant
JF-06
rk
section of the specifications, schedules and drawings referenced
Art wo
· All necessary structural supports to all items including
ceiling hung, wall hung, built-in units or cantilevered items shall be
TRASH of adequate strength to ensure stability and shall be considered by
FP-01 the contractor.
NTER
10 20
JF-09
· The contractor shall submit full shop / setting out drawings
OU
for approval (based on site verified dimensions) prior to
BAR C
commencement of any site works, placing any orders or
manufacture of any fittings, fixtures and components shown.
LT-08 Sculp
tural A
r t work · All work must conform to municipality regulations, national
and international building code and all regulations by governing
LT-08 authorities.
· The contractor must ensure all coordination between his
work, his subcontractors and the ID Consultant's design.
LT-16 1 · All interior finishes must have a flame-spread rating and
SFT-0 smoke density rating to meet or exceed local code requirements.
· All MEP design shown on the ID drawings is MEP design
requirements only. All MEP Design is to be verified by the MEP
JF-08 Consultant.
door
flip up FF-10
FF-13
a FF-11 FF-12
FF-09b
FF-15 a
FF-09 00
a
FF-09 FF-10
FF-13 FF-11
Ø9
OUT SCOPE
FF-12
Ø750
50
Ø7
LT-07 STORE 1 24.05.2023 IFC SUBMISSION SPS
750
FF-12
1 28.03.2023 DD PACKAGE REVISED SUBMISSION-01 SPS
FF-10
FF-14 0 30.11.2022 DD PACKAGE SUBMISSION SPS
1495
FF-09 FF-09b
FF-15 580
FF-12 870
FF-10
FF-14 515
870
JF-08
ISSUE FOR CONSTRUCTION
FF-12
FF-09
FF-09 FF-11 LT-07 PASS THROUGH
FF-12 FF-12
FF-13
FF-09
FF-15 FF-12 PROJECT
FF-12 800
FF-13
FF-09 JUMEIRAH LIVING TOWER
BUFFET COUNTER
FF-12
Fridge
(Kitchen equipment CLIENT
FF-11
1880
FF-14 JF-08 by kitchen consultant)
FF-09 b
FF-09
FF-11
FF-15
a FF-10
1
SFT-0
Waite OS
Ø750
FF-14 JF-10
+ P
r
n
waite
Statio
900
INTERIOR CONSULTANT
r sta
FF-12
FF-13 FF-12 JF-08a AV RACK
tion
a 450
a FF-09
00
FF-09 FF-09b
FF-15
Ø9 100 FF-11
1000 100
FF-12 FF-10
FF-12
Ø750 1200
FF-13
1800
a JF-10 FF-09a.1
JF-10 Al-Nahda First, Office 104 Saheel 2 Building Dubai, United Arab Emirates
270 Direct +971 50 3002975
Ø1
FF-09
Station+POS
FF-09
a
FF-09 FF-12
FF-09
00
a Ø9
FF-15 FF-11 Ø900 a
Ø 750
FF-12 FF-11 FF-09 FF-11
FF-14 FF-12 FF-11
1 SFT-01
SFT-0
PROJECT MANAGEMENT
13 13
FF- 15 FF- 15
FF- 13 FF- 13
FF- FF-
SHEET NAME
14
FF- 09 30TH FLOOR - ALL DAY DINING
FF- 14 FURNITURE LAYOUT
FF-
LB-2027-JLT-ID-ADD-1003 0