PE01 MMG Perú Las Bambas Mine

The job ticket is for work order number 200761094 at the Las Bambas Mine in Peru on June 8, 2023. The work involves replacing various hydraulic components for the PE01-10-25-16 hydraulic system. Five replacement parts are listed including 366 cm of hose, connectors, and adapters. The work is scheduled to take place on June 7, 2023 at the MDAU Maintenance Mechanical Auxiliary work center and involves zero hours of work.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
23 views

PE01 MMG Perú Las Bambas Mine

The job ticket is for work order number 200761094 at the Las Bambas Mine in Peru on June 8, 2023. The work involves replacing various hydraulic components for the PE01-10-25-16 hydraulic system. Five replacement parts are listed including 366 cm of hose, connectors, and adapters. The work is scheduled to take place on June 7, 2023 at the MDAU Maintenance Mechanical Auxiliary work center and involves zero hours of work.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

Jun 8, 2023 Job Ticket - with attachments ROCHACOR Original Page 1

PE01 MMG Perú Las Bambas Mine


WORK ORDER NUMBER : 200761094

Priority : On the Day Created By : ROCHACOR

Technical Object : PE01-10-25-16-DZTR011.HYSM Hydraulic System


Description : REPUESTOS WONG - VARIOS Start : Wednesday, 07/06/2023
Work Center : MDAU Maintenance Mechanical Auxiliary End : Wednesday, 07/06/2023
Sort field : DZ011
Process Area : PE01-10-25 Auxiliary Equip
Measuring Point :
Equipment :
Task Type :

Operations Overview
Duration
Operation Description Work Centre People
HRS
0020 REPUESTOS WONG - HIDRAULICO BANCO DE VAL MDAU-MEC 0 0

Overview of Materials
Store
Material Description Qty Unit Unloading Point
Locn
80003502 MANGUERA,1/4IN,SAE100R2AT,T24A,RYCO 366 CM 1001

80001139 CONEXION,1/4X1/4IN,45GR,T2810-0409,RYCO 1 EA 1001

80001951 CONECTOR,1/4X1/4IN,90GR,T2823-0409,RYCO 1 EA 1001

80001455 ADAPTADOR,20-16,2081-2016ST,STROBBE 1 EA 1001

80003758 ADAPTADOR,TAPON,H.12,FF9863-12ST,STROBBE 1 EA 1001

Work Summary
REPUESTOS WONG - VARIOS
08.06.2023 10:40:32 AUSVIC Roberto Carlos Rocha Cordova (ROCHACOR)
Job Description

REPUESTOS WONG - HIDRAULICO

Trade Type Hours / Duration

Materials Required

Permits / Special Considerations


Jun 8, 2023 Job Ticket - with attachments ROCHACOR Original Page 2
Jun 8, 2023 Job Ticket - with attachments ROCHACOR Original Page 3

Work Order Number : 200761094


Operation number : 0020

Order Type : PM02


OPERATIONS AND MATERIAL OVERVIEW

General Data
Description : REPUESTOS WONG - VARIOS Priority : On the Day
Required Start : Wednesday, 07/06/2023 8:06:22 PM
Technical Object : PE01-10-25-16-DZTR011.HYSM Hydraulic System
System Condition : Offline - PU
Sort field : DZ011
Process Area : PE01-10-25 Auxiliary Equip
Measuring Point :
Equipment :
Serial Number :
Task Type :

Operations Overview

Duration
Operation Description Work Center People
HRS
0020 REPUESTOS WONG - HIDRAULICO BANCO DE VAL MDAU-MEC 0 0

Overview of Materials
Store Item
Material Description Qty Unit Unloading Point Resv No
Locn no
80003502 MANGUERA,1/4IN,SAE100R2AT,T24A,RYCO 366 CM 1001 2453594 21

80001139 CONEXION,1/4X1/4IN,45GR,T2810-0409,RYCO 1 EA 1001 2453594 22

80001951 CONECTOR,1/4X1/4IN,90GR,T2823-0409,RYCO 1 EA 1001 2453594 23

80001455 ADAPTADOR,20-16,2081-2016ST,STROBBE 1 EA 1001 2453594 24

80003758 ADAPTADOR,TAPON,H.12,FF9863-12ST,STROBBE 1 EA 1001 2453594 25

Operation Completed By : Start Time: Finish Time:


Hours : Date :
CNF Yes/No

Operation Completed By : Start Time: Finish Time:


Hours : Date :
CNF Yes/No

Work Summary
Jun 8, 2023 Job Ticket - with attachments ROCHACOR Original Page 4

You might also like