Eltex Textile and Garment Factorry Quality Cost
Eltex Textile and Garment Factorry Quality Cost
1 Workers on payroll :
Sub-department
Department Manager Supervisor Ass. Sup. Helper Workers Total
1 Merchandising Department 1 1 2
2 Stores 1 2 15 18
3 Cutting Department 1 1 59
4 Sewing Department 1 14 35 269 319
5 Finishing and Packing Department 1 1 2 35 39
6 Accounts & Finance Department 51
7 HR & Admin Department 40
8 Miscellaneous 42
570
2 Number of Sewing Machines
Operational : 245
Idle : 109
Part I. Salary, Wages and Other Benefits to Workers, Staffs and Officers Part II. Factory Overhead
Total Production Variable
Month No. of Working Day Total SAM Factory Wages & Overtime postion Allowances Employee Pension Canteen Total Workers Admin Staff Salaries Canteen Overtime Prodn Incentive Transport Pension Total Admin Staff Total Part I Utility Misc Excise etc Sewing service Total Depreciation
Kids produced Salaries Allow Benefits Allow Service Benefit Machinery
Short T-shirt Complete Polo shirt Hoody Jacket VEST Pant Skirt SHIRT Total
NOV 23 23,160 135,672 19,752 35,004 168 12,840 3,012 3,012 232,643 1,741,032 997,757.48 32,743.73 115,200.00 - - 1,145,701.21 414,638.39 - 34,479.35 77,660.00 71,866.51 449,117.73 1,594,818.94 129,396.36 24,290.71 153,687.07
DEC 25 30,888 95,058 28,932 11,436 60 52,200 6,890 9,748 14,562 249,774 1,768,188 982,319.42 30,381.93 115,200.00 - 1,127,901.35 418,119.24 - 44,086.03 91,345.00 71,866.51 - 462,205.27 1,590,106.62 129,396.36 119,021.06 248,417.42
Jan 23 18,900 66,972 45,012 36,156 936 71,227 5,666 1,269 3,775 249,913 1,937,628 983,347.39 13,970.81 115,200.00 - - 1,112,518.21 374,408.93 - 35,575.89 87,995.00 71,866.51 409,984.83 1,522,503.03 129,396.36 28,367.71 157,764.07
FEB 23 15,552 74,560 36,453 71,148 1,444 14,256 1,776 12,578 6,080 233,847 2,093,854 985,790.27 33,676.94 115,200.00 1,134,667.21 415,699.77 50,513.15 88,220.00 71,866.51 466,212.92 1,605,838.21 129,396.36 47,395.03 176,791.39
MAR 24 32,456 72,874 24,563 59,450 436 22,343 2,456 12,343 1,080 228,001 1,775,626 974,443.76 29783.24 114700.00 1,118,927.00 428,818.30 - 42,352.70 79,825.00 71,866.51 471,171.00 1,590,098.00 129,396.36 461.12 129,857.48
Total 24 120,956 445,136 154,712 213,194 3,044 172,866 19,800 35,938 28,509 1,194,178 9,316,328 3,949,214.56 110,773.42 575,500.00 - - 4,520,787.98 1,622,866.33 - 164,654.42 425,045.00 359,332.57 - 2,258,691.75 7,903,364.81 646,981.82 219,535.63 - - 866,517.45 24,806.88
Short 5
T-shirt 6
Kids Complete 14
Polo shirt 12
Hoody Jacket 18
SHIRT 20
VEST 4
Pant 32
USD 31.99 ETB
Cost per piece Cost per piece Cost per SAM Cost per SAM Shipment
in dollars Produced in Produced in
Total Floor Cost / Floor Cost / ETB Dollars
Total Part II Month Day
Input Process Manpower Cost Consumables Calibration Cost External Services / Training / Projects
Average Cost, Per Person Cost of
Input 1 Input 2 Input 3 Input 4 Designation No of People Hrs Spent Per Day No of Days Hrs Utilised Cost(ETB) Name of Reports / Records Consumption Per Month Cost Per Month Name of EquiProduction Headent Name of Consumable Average Cost Consumption Per Month Cost Per Month Name of EquiProduction Headent External Maintenance Frequency Cost Per Year Name of Programme Cost of Programme Frequency Training Type
Per Hour Programme
Sampling Indent Received for Proto Techpack / Base Pattern Risk Analysis Raw Material and Trims Proto Made
Proto Sample Proto Inspection / Risk Analysis General Manager 1 184 1 3 3.00 552.10 P 41407.65865
Marketing Manager 1 135 1 3 3.00 403.85 P 30288.46154
Production Head 1 71 1 3 3.00 212.02 P 15901.44231
Quality Head 1 35 1 3 3.00 106.28 P 7971.274038
PPC 1 36 1 3 3.00 108.17 P 8112.980769
Sampling In charge 1 27 1 3 3.00 80.90 P 6067.427885
Merchndiser 2 48 1 3 6.00 285.49 P 10705.88942
Repair and Correct Gold Seal Sample Sampling In charge 1 27 5 5 25.00 674.16
Sample Maker 2 13 5 5 50.00 635.10
Inspected Proto Sample Buyer Comments Re-Inspect Proto Sample Sampling In charge 1 27 1 5 5.00 134.83 A
Line supervisor 1 24 1 5 5.00 119.38 A
Quality checker 2 6 1 5 10.00 57.69 A
Indent for Fit / SMS Spec Sheet / Comments Fit / SMS made 0 0.00
Fit / SMS made Inspect Fit / Proto Sample Line supervisor 3 24 1 3 9.00 214.88 A
Quality checker 1 6 1 3 3.00 17.31 A
Repair and Correct Gold Seal Sample Sampling In charge 1 27 1 3 3.00 80.90
Sample Maker 2 13 2 5 20.00 254.04
Inspected Fit / SMS Sample Buyer Comments Re-Inspect Fit / Proto Show Sample Sampling In charge 1 27 2 5 10.00 269.66 A
E
Line supervisor 3 24 1 3 9.00 214.88 A
Quality checker 1 6 2 4 8.00 46.15 A
0 0.00
0 0.00
Indent PP Sample Spec Sheet / Comments PP sample made 0 0.00
PP Sample made Inspect PP Sample Line supervisor 1 24 2 3 6.00 143.25 A
Quality checker 1 6 2 4 8.00 46.15 A
0 0.00 A
Repair and Correct Gold Seal Sample Sampling In charge 1 27 2 3 6.00 161.80
Sample Maker 2 13 4 5 40.00 508.08
0 0.00
Inspected PP Sample Buyer Comments Re-Inspect PP Sample Sampling In charge 1 27 1 3 3.00 80.90 A
Line supervisor 2 24 1 3 6.00 143.25 A
Quality checker 2 6 1 3 6.00 34.62 A
0 0.00
Pilot Run Buyer Comments Shrinkage Analysis Pilot Pieces Ready 0 0.00
Pilot Run Ready Inspect Pilot Run Line supervisor 2 24 1 2 4.00 95.50 A
Quality checker 2 6 1 2 4.00 23.08 A
Report & Records
Style analysis/ OB/ Layouts Material in ward Batch setting I.E 0 0 0.00
OB Buyer coomment Machine /attachments allocation PPC 1 36 3 26 78 2812.50 p
Pass Inspection Material Manpower allocation PPC 1 36 2 26 52 1875.00 A
Report
Planning DCDS sheet Cutttingplanning PPC 1 36 2 5 10 360.58 P
Sewing planning PPC 1 36 3 26 78 2812.50 A
GRN Finishing plan PPC 1 36 2 26 52 1875.00 A
Fail Inspection Report & Findings WIP Report PPC 1 36 2 3 6 216.35
Invoice Material in ward Inspection Report , Shrinkage Report , CSV Report Cutting Supervisor 1 27 1 26 26 696.38 A
Quality Checker 2 6 0.5 26 13 75.00 A
GRN Pass Inspection Report Material Material Inventory, if Inspection Pass 0
Fail Inspection Report & Findings Raise FRA, if Inspection Fail Quality Line supervisor 3 0 1 26 26 0.00 A
Fail Inspection Report & Findings Packing ListFRA Review & Reject Comments Raise FDR , if reject 0
Invoice Inspection Report , Shrinkage Report , CSV Report Store In charge 1 11 1 26 26 284.10 A
Quality Checker 2 6 0.5 26 13 75.00 A
GRN Material Inventory, if Inspection Pass 0
Fail Inspection Report & Findings Raise FRA, if Inspection Fail Store In charge 1 11 1 26 26 284.10 A
Input Process Manpower Cost Consumables Calibration Cost External Services / Training / Projects Consumables Calibration Cost External Services / Training / Projects
Average Cost, Per Person Cost of Consumption Name of Name of Average Consumption Cost Per Name of External Cost Per Cost of Cost of Training
Input 1 Input 2 Input 3 Input 4 Designation No of People Hrs Spent Per Day No of Days Hrs Utilised Cost(ETB) Name of Reports / Records Consumption Per Month Cost Per Month Name of EquiProduction Headent Name of Consumable Average Cost Consumption Per Month Cost Per Month Name of EquiProduction Headent External Maintenance Frequency Cost Per Year Name of Programme Cost of Programme Frequency Training Name of Reports / Records Average Cost Cost Per Month EquiProduction Maintena Frequency Year Name of Programme Frequency Total Type
Per Hour Programme Per Month Equipment Consumable Cost Per Month Month Headent nce Programme Programme
machine lubricating mechanic 31 0 0.00 200 Liter 18000 Machine OIL 90 1 1800 2,500.00 5000 9300.00 Six SiGeneral Managera Training 0 P
machiine cleaning operator 290 10 8 26 208 2127.82 2127.82 Auto Cutter and 0 P
pattern plotter
0 0
Breakdown Maintenance Maintenance Head 1 43 1 26 24.765 1069.63 1069.63 A
Incharge 0 0 0.00 0 A
Breakdown Alert Consumables Mechanic 6 31 8 26 198.12 6045.90 6045.8985 A
CUTTING
Input 1 Input 2 Input 3 Input 4 ck Designation No of People Average Cost, Per Person Hrs Spent Per Day No of Days Hrs Utilised Cost(ETB) Name of Reports / Records Consumption Per Month Cost Per Month Name of EquiProduction Headent Name of Consumable Average Cost Consumption Per Month Cost Per Month Name of Reports / Records Consumption Avg Cost Cost Per Month Total Type
Per Hour Per Month
Techpack, Specification Confirmations Control Sheet Preparation 0 0 0.00
Work Order Sheet Cut Plan Making 0 0 0.00
Box test Marker Marker Plotter Calibration 0 0 0.00
Cut Plan Approved Sample Marker Making 0 0 0.00
Marker Marker Plotting 0 0 0.00
Marker Checking Report Marker Marker Checking Quality checker 2 6 1 26 26 150.00 Marker Inspection report 104 150 printer papper 150 104 150 Marker Inspection report 104 1 150 150.00 A
Work Order Sheet Material Requisition Marker Issuance Issue Raw Material & Trims to Cutting 0 0 0.00 0.00
Buyer Comments Pattern Comments Cutting PP Meeting cutting supervisor 2 27 1 6 6 160.70 500 660.70 P
Quality head 35 1 6 6 212.57 212.57 P
Quality checker 6 1 6 6 34.62 34.62 P
Issued Raw Material Spread 0 0 0.00 0.00
0 0 0.00 0.00
Spread Lays, Cut 0 0 0.00 0.00
0 0 0.00 0.00
0 0 0.00 0.00
Spread and Cut Lays Spreading & Cutting Quality Check Quality checker 2 6 2 26 52 300.00 Laying Report 200 printer papper 150 104 150 Laying Report 104 1 150 300.00 A
Numbering Sheet Cut Parts Numbering 0 0 0.00 0.00
Relaying 0 0 0.00 0.00
0 0 0.00 0.00
Defective Panel Material Requisition Slip Panel Replacement - Cutting Helper 6 5 3 26 78 404.70 Recutting Report Recutting Report 104 1 150 404.70 A
Defective Panel Material Requisition Slip Panel Replacement - Production 0 0 0.00 0.00
Inspected & Replaced Parts, Fusing Cut Part Fusing 0 0 0.00 0.00
Fusing Test Interlining Recommendation Fusing Bond Test / Glue Line Temperature Test 0 0 0.00 Fusing Report Fusing Report 104 1 150 0.00 A
Inspected & Replaced Parts, Fused Parts Bundling 0 0 0.00 0.00
Cut Parts Bundles Bundle Audit Quality checker 2 6 2 26 52 300.00 Bundle Audit Report Bundle Audit Report 104 1 150 300.00 A
Audited Bundles Numbering Sheet Issue to Sewing 0 0 0.00 0.00
Cut Parts, Trims Check Material Before Start 0 0 0.00 0.00
MIS 0 0 0.00 0.00
Defective Parts Rework and Repair, If defects / defectives 0 0 0.00 0.00
Reports 0 0.00 0.00
Consumables
Raw Material Cost Per Standard Allowance for Excess Value Loss Due to Q3, Scraps &
S. No Product Brand Meter Cost Per Product planned Consumption Meter Order Quantity Cut Qty Final Consumption % Excess Consumption Q1 Q2 Q3 Scarp Un Accounted Consumption Excess Process Loss Raw Material Loss Value Unaccounted Total Loss
- - - -
Short 110.00 23.00 3825.00 12750 13133 3952.50 3.33% 12650 152 331 4.00% 0.00% - 7,601.50 7,601.50
- - - -
T-shirt 120.00 28.00 3104.32 15580 16047 3131.58 0.88% 15642 212 193 4.00% 0.00% - 5,415.20 5,415.20
- - - -
Kids Complete 125.00 45.00 2308.24 9550 9837 2387.50 3.43% 9500 85 252 4.00% 0.00% - 11,317.50 11,317.50
- - -
Polo shirt 135.00 34.00 3375.27 13890 14307 3472.50 2.88% 13850 146 311 4.00% 0.00% - 10,563.80 10,563.80
- - - -
VEST 90.00 18.00 2670.89 14113 14536 2715.34 1.66% 14220 58 258 4.00% 0.00% - 4,651.02 4,651.02
- - -
Pant 115.00 44.00 5647.75 3.55% 11025 112 214 4.00% 0.00% - 9,398.40 9,398.40
11020 11351 5847.98
- - -
Date Product Brand Work Order Style Code Order Quantity Pack Qty Manhour for Re- Manhour for Manhour for Cost Per SAM Cost of Rescreen &
No screen Repair Reinspection Repair
0.00
0.00
0.00
0.00
0.00
0.94 0.00
0.00
0.94 0.00
0.94 0.00
0.00
0.00
0.94 0.00
0.00
0.94 0.00
0.00
0.00
0.00
0.00
0.00
0.94 0.00
0.00
0.94 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
] 0.00
0.00
Work Order Manhour for Re- Manhour for Manhour for Cost of Rescreen &
Date Product Brand No Style Code Order Qty Pack Qty screen in MIN Repair Reinspection Cost Per SAM Repair
Date Product Brand Work Order No Style Code Cost Per Piece No. of Pcs Returned Loss in ETB.
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
300,000.00
100.00%
250,000.00
80.00%
200,000.00
60.00%
150,000.00
40.00%
100,000.00
20.00%
50,000.00
- 0.00%
100.00%
80.00%
60.00%
40.00%
20.00%
0.00%