Process Design of Flare and Blowdown
Uploaded by
BAHich
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download now
Download
Save Process Design of Flare and Blowdown For Later
Download
Save
Save Process Design of Flare and Blowdown For Later
0%
0% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
0 ratings
0% found this document useful (0 votes)
148 views
Process Design of Flare and Blowdown
Uploaded by
BAHich
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download now
Download
Save Process Design of Flare and Blowdown For Later
Carousel Previous
Carousel Next
Download
Save
Save Process Design of Flare and Blowdown For Later
0%
0% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
Download now
Download
You are on page 1
/ 37
Search
Fullscreen
IPS-E-PR-460 ENGINEERING STANDARD FOR PROCESS DESIGN OF FLARE AND BLOWDOWN SYSTEMS ORIGINAL EDITION JULY 1994 This standard specification is reviewed and updated by the relevant technical committee on June 1999. The approved modifications are included in the present issue of IPS. This Standard is the property of Iranian Ministry of Petroleum. All rights are reserved to the owner. Neither whole nor any part of this document may be disclosed to any third party, reproduced, stored in any retrieval system or transmitted in any form or by any means without the prior written consent of the Iranian Ministry of Petroleum.IRS oe IPS-E-PR-460 CONTENTS 0. INTRODUCTION. 1. SCOPE 2. REFERENCES 3. DEFINITIONS & TERMINOLOGY 4, SYMBOLS AND ABBREVIATIONS 5. UNITS, 6. SELECTION OF BLOWDOWN SYSTEMS 6.1 General 6.2 Blowdown System for Vapor Relief Stream 6.3 Blowdown System for Liquid Relief Stream. 7. DESIGN OF DISPOSAL SYSTEM COMPONENTS 7.4 Piping 7.2 Sizing a Knock-out Drum 7.3 Quench Drum 7.4 Sizing a Seal Drum. 7.5 Flares. 7.6 Burning Pits. TABLES TABLE 1 TYPICAL Kf VALUES FOR PIPE FITTINGS TABLE 2 TYPICAL FRICTION FACTORS AND CONVERSION FACTORS FOR CLEAN STEEL PIPE. TABLE 4 RADIATION FROM GASEOUS DIFFUSION FLAMES PAGE No, 10 15 15 18 18 25 " n 19 TABLE § RECOMMENDED DESIGN FLARE RADIATION LEVELS EXCLUDING SOLAR RADIATION. 21 TABLE 6 EXPOSURE TIMES NECESSARY TO REACH THE PAIN THRESHOLD. 21 TABLE 3. OPTIMIZING THE SIZE OF HORIZONTAL KNOCK-OUT DRUM (SI UNITS) 31 FIGURES FIGURE 1 DRAIN POT 13 FIGURE 2 DETERMINATION OF DRAG COEFFICIENT. 18 FIGURE 3 FLARE KNOCK-OUT DRUM 16 FIGURE 4 QUENCH DRUM 7 FIGURE § HEAT RELEASE, 22 WATTS FLAME LENGTH VERSUS HEAT RELEASE: 22IPS uly 1084 IPS-E-PR-460 INDUSTRIAL SIZE AND RELEASES FIGURE 6 APPROXIMATE FLAME DISTORTION DUE TO LATERAL WIND ON JET VELOCITY FROM FLARE STACKS. FIGURE 7 FLARE STACK SEAL DRUM FIGURE 8 TYPICAL BURNING PIT. FIGURE 9 DIMENSINONAL REFERENCES FOR SIZING A FLARE STACK APPENDICES : APPENDIX A VAPOR RELIEF HEADER SIZING APPENDIX 8 SIZING A KNOCK.OUT DRUM APPENDIX C DETERMINATION OF LIQUID LEVEL IN A HORIZONTAL VESSEL ‘APPENDIX D_ SAMPLE CALCULATION FOR SIZING A FLARE STACK 22 23 24 6 36 28 29 33 34IPS July 1994 IPS-E-PR-460 0. INTRODUCTION “Process Design of Safeguarding Systems for Oil, Gas and Petrochemical (OGP) Processes” are broad and contain variable subjects of paramount importance. Therefore a group of process engineering standards are prepared to cover the subject. This group includes the following Standards: STANDARD CODE STANDARD TITLE IPS-E-PR-450 "Process Design of Pressure Relieving Systems Inclusive Safety Relief Valves” IPS-£.PR-460 “Process Design of Flare and Blowdown Systems” IPs. R470 "Process Design of Emergency Measures’ ‘This Standard covers: “PROCESS DESIGN OF FLARE AND BLOWDOWN SYSTEMS” In designing safeguarding systems for process plants, facilities should be provided for handling, directing and ultimately disposal of voluntary and involuntary gases and liquids. There are several options available to the process design engineer as to the selection of disposal systems. Once a specific disposal system is selected detail design is then undertaken.Irs July 1994 IPS-E-PR-460 1. SCOPE ‘This Standard covers process design and evaluation and selection of relief systems for Oil, Gas and Petrochemical (OGP) process plants It includes network and related ancillary installations which are to handle and direct fluids discharged due to overpressure andlor operational requirements to a safe disposal system, This Standard is primarily concerned with selection of disposal system, sizing of relief headers, sizing of flare systems and burning pits. Note: This standard specification is reviewed and updated by the relevant technical committee on June 1999. The approved modifications by T.C. were sent to IPS users as amendment No. 4 by circular No. 82 on June 1999. These modifications are included in the present issue of IPs, 2. REFERENCES, Throughout this Standard the following dated and undated standardsicodes are referred to. These referenced documents shall, to the extent specified herein, form a part of this standard, For dated references, the edition cited applies. The applicabilty of changes in dated references that occur after the cited date shall be mutually agreed upon by the Company and the Vendor. For undated references, the latest edition of the referenced documents (including any supplements and amendments) applies. IPS (IRANIAN PETROLEUM STANDARDS) IPS-E-GN-100 “Units” IPS-E-PR-440 "Process Design of Piping Systems (Process Piping & Pipelines)", Pars 1-4 IPS-E-PR-725, "Process Design of Plant Waste Water Sewer Systems". API (AMERICAN PETROLEUM INSTITUTE) "API Manual on Disposal of Refinery Wastes, Volume on ‘Atmospheric Emissions" 3. DEFINITIONS & TERMINOLOGY For extensive description reference can be made to API RP 521 3.4 Atmospheric Discharge Is the release of vapors and gases from pressure-relieving and depressuring devices to the atmosphere. 3.2 Autorefrigeration Is the reduction in temperature as a result of pressure drop and subsequent flashing of light hydrocarbon liquids,Irs July 1994 IPS-E-PR-460 3.3 Back Pressure Is the pressure that exists at the outlet of a pressure relief device as a result of pressure in the discharge system 3.4 Balanced Safety/Relief Valve Is a safetyirelief vaive that incorporates means for minimizing the effect of back pressure on the performance characteristics- opening pressure, closing pressure, it, and relieving capacity 3.5 Built-up Back Pressure Is the pressure in the discharge header which develops as a result of flow after the safety-relief valve opens. 3.6 Closed Disposal System Is a disposal system that is capable of containing pressures different from atmospheric pressure without leakage. 3.7 Conventional Safety/Relief Valve Is a closed-bonnet pressure relief valve whose bonnet is vented to the discharge side of the valve The valves performance characteristics-opening pressure, closing pressure, lift, and relieving capacity are directly affected by changes of the back pressure on the valve, 3.8 Critical Pressure Ratio Is the result of the following relationship: 3.9 Flare Is a means of safe disposal of waste gases by combustion. With an elevated flare, the combustion is carried out at the top of a pipe or stack where the burner and igniter are located. A ground flare is, similarly equipped, except combustion is carried out at or near ground level. A burn pit differs from a flare in that itis primarily designed to handle liquids. 3.10 Flare Blow OffiFlame Lift-up Is the lifting of fame front from the flare tip. 3.11 Flare Blow Out |s the extinguishing of flare flame. 3.12 Mach Number Is the ratio of vapor velocity to sonic velocity in that vapor at flowing conditions. 3.13 Open Disposal System Is a disposal system that discharges directly from the relieving device to the atmosphere with no containment other than a short tail pipe PeF AS a ecke aye” (Eq. po ent tH (Ea)IrS 3.14 Quenching Is the cooling of a hot vapor by mixing it with another fluid or by partially vaporizing another liquid uly 1994 IPS-E-PR-460 3.18 Super Imposed Back Pressure Is the static pressure that exists at the outlet of a pressure relief device at the time the device is required to operate. Itis the result of pressure in the discharge system coming from other sources and may be constant or variable. 3.16 Vent Stack Is the elevated vertical termination of a disposal system that discharges vapors into the atmosphere without combustion or conversion of the relieved fluid 4, SYMBOLS AND ABBREVIATIONS A Au Au Cross-sectional area, in (m*) ‘Vessel segment area occupied by slops and drain, in (m”), ‘Vessel segment area occupied by condensed liquid, in (m°), Pit area required to vaporize and burn liquid, in (m2). Total vessel cross-sectional area, in (m’) \Vessel cross-section area available for vapor flow, in (m’) Drag coetficient Diameter ofthe inlet gas pipe, in (m) Inside diameter of the line, in (m). Particle diameter, in (m) Moody Friction Factor, f=f Friction Factor ‘Acceleration due to gravity, in (9.8 mis”) Design mass flow, in (kg/s. m’). Critical mass flow, in (kgis.m'. Depth (maximum distance, thatthe inlet pipe is submerged), in (m). Flare stack height. in (). Vessel depth occupied by stops and drain, in (m) Vessel depth occupied by condensed liquid, in (m) Vertical space for vapor flow, in (em) Ralio of specific heats, C,/C, forthe vapor being relieved Dimensional constant equal to 0.078 men/min. Unit conversion factor equal to 60,000 forte, fe -anning Friction Factor, f D=Darcy Factor representing tctional resistance fo fow. (dimensionless). Equivalent length of line, in (m). Flare knock-out drum length, in (rm), Flame length, in (m). Flare knockout drum minimum length required, in (m)uy 0% IPS-E-PR-460 Pe Py Poo Por = pL (rho) pv(rho) p (muy (Gama) atmosphere © (phiy Y (psi) @ (theta) 7 (pi) Molecular mass (weight) of the vapor or gas. Line resistance factor, (dimensionless). Polytropic exponent. Upstream pressure, in (kPa absolute) Pressure in the pipe at the exit or at any point or distance | downstream from the source, in (kPa absolute) Pressure in reservoir into which pipe discharges, in (101 kPa (absolute) with atmospheric discharge}. Critical-flow pressure, in (kPa absolute). Pressure of the vapor just inside the flare tip, in (kPa absolute) Rate of vaporization and burning of liquid, in (kg/s) (selected as equal to the rate of lashed liquid entering the pit) ‘Steam flow rate, in (kg/s). Vapor relief rate, in (kg/s). Heat required to vaporize liquid, in (ki/kg) Radius. ‘Surface distance from the center of flare stack to the object under consideration, in (m), Relative humidity, in (percent) Minimum distance from the midpoint of the flame to the object under consideration, in (m), Linear regression rate of liquid surface in (mmimin) Upstream temperature, in (K) Temperature of the vapor just inside the flare tip in (K). Particle dropout velocity, in (mv). Exit gas velocity, in (ris). Vapor velocity, in (rvs) Lateral wind velocity, in (mis) Greek Letters = Density of liquid at operating conditions, in (kgim*) = Density of vapor at operating conditions, in (kgim*) = Viscosity of gas, in (¢P=1m Pa. s); = Fraction of heat intensity transmitted through the = Heat release (LHV), in (kW). = Allowable radiation level, in (kWim?) Liquid particle dropout time, in (s). Constant figure equal to 3.1416.Irs ily 1984, IPS-E-PR-460 5. UNITS This standard is based on International System of Units, (SI) except where otherwise specified 6. SELECTION OF BLOWDOWN SYSTEMS 6.4 General While the various systems for the disposal of voluntary or involuntary vapor oF liquid are mentioned below, the actual selection of a disposal system shall be conducted in accordance with the expected frequency, duration of operation, required capacity and fluid properties, 6.2 Blowdown System for Vapor Relief Stream ‘Systems forthe disposal for voluntary and involuntary vapor discharges are: 41) To atmosphere 2) To lower pressure process vessel or system 3) To closed pressure relief system and flare 4) Acid gas fare 6.2.1 Vapor discharge to atmosphere Vapor relief streams shall be vented directly to atmosphere if all of the following conditions are satisfied (for a complete discussion on the subject see API RP 21): 1) Such disposal is not in confict with the present regulations concerning pollution and noise. 2) The vapor is effectively non-toxic and non-corrosive. 3) Vapor which is lighter than air or vapor of any molecular mass that is non-flammable, non-hazardous and non-condensable, 4) There is no risk of condensation of flammable or corrosive materials. '5) There is no chance of simultaneous release of liquid, apart from water. 6) Relief of flammable hydrocarbons direct to the atmosphere should be restricted to cases where it can be assured that they will be diluted with air to below the lower flammable limit. ‘This should occur well before they can come in contact with any source of ignition ‘The above condition can most easily be met if the vapors to be released have a density less than that of air. However, with proper design of the relief vent adequate dilution with air can be obtained in certain cases with higher density vapors. Methods of calculation are given in API RP 521 section 43. Exceptions: 41) Vapor from depressuring valves shall be discharged to a closed pressure relief system 2) Vapor which contains 1% H2S or more by volume, shall be discharged to a closed pressure relief system. 6.2.2 Vapor discharge to lower pressure process vessel or system Individual safety/relief valves may discharge to a lower pressure process system or vessel capable of handling the discharge,Irs July 1004 IPS-E-PR-460 ‘Atthough this type is rarely used, itis effective for discharges that contain materials which must be recovered 6.2.3 Vapor discharge to closed pressure reliof system and flare In all cases where the atmospheric discharge or release of vapor to a lower pressure system is not permissible or practicable, vapor shall be collected in a closed pressure relief system which terminates in a flare, namely flare system, Where the concentration of HS is such that ‘condensation of acid gas is probable, provision for a separate line, heat traced, shall be considered In all cases, the installation of a closed pressure relief system shall result in a minimum of air pollution and the release of combustion products. 6.2.4 Acid gas flare In process plants where HS free and H,S containing stream are to be flared, consideration should be given to the installation of a separate header and flare stack assembly for the H2S containing streams. The following provisions should be studied for the acid gas flare assembly 41) Automatic injection of fuel gas down stream of H2S pot in order to make the combustion stable 2) Steam injection for smokeless operation shall not be considered for H,S flare tp. '3) A.common pilot igniter shall be used to ignite all flare stacks including the acid flare. 4) The HS flare header and subheaders may be heat traced in order to prevent the condensation acid gas. 6.3 Blowdown System for Liquid Relief Stream Systems for the disposal of voluntary and involuntary liquid discharges are: 1) To onsite liquid blowdown drum. 2) To lower pressure process vessel or system, 3) To oily water sewers only if the material will not cause hazardous conditions. 4) To pump suction if pump will not overheat or can withstand the expected temperature tise. 5) To burning pit 6) To vaporizer Thermal expansion relief valves may discharge small quantities of volatile liquid or vapor into the atmosphere, provided the valve outlet is in a safe location. 6.3.1 Liquid discharge to onsite liquid blowdown drum The liquid shall be discharged to an onsite liquid blowdown drum which is capable of retaining the liquid discharged at the required liquid relief rate for a period of 20 minutes. This drum shall have a vapor discharge line to the closed pressure relief system. 6.3.2 Liquid discharge to lower pressure process vessel or system ‘The liquid shall be discharged to @ lower pressure process vessel or system which is capable of handling the required liquid relief rate plus any flashed vapor. 6.3.3 Liquid discharge to oily water sewer Liquid discharge to an oily water sewer shall be nonvolatile and nontoxic. The required liquid reliefIreS July 1994 IPS-E-PR-460 rate shall be within the oil removal capabilty ofthe oily water treating system. 6.3.4 Liquid discharge to pump suction Required liquid relief shall discharge to an upstream liquid reservoir from which the pump takes suction. The liquid relief may discharge directly to the pump suction line if sufficient cooling is provided to prevent a temperature rise of the liquid recycled through the pump when the safety/reliof valve opens or when a constant displacement pump is used, 6.3.8 Liquid discharge to burning pit Liquid relief or voluntary liquid blowdown which need not be retumed to the process or discharged to an cily water sewer, shall be discharged to a burning pit, if environmentally accepted. 6.3.6 Liquid discharge to vaporizer The liquid shall be discharged to a vaporizer which is capable of vaporizing a liquid relief of no more than 5,000 kg/h, 7. DESIGN OF DISPOSAL SYSTEM COMPONENTS Depending on the process plant under consideration, a disposal system could consists of a combination of the following items: piping, knock-out drum, quench drum, seal drum, flare stack, ignition system, flare tip, and burning pit. 7.4 Piping 7.4.4 General In general, the design of disposal piping should conform to the requirements of ANSI / ASME 831.3 Installation details should conform to those specified in API Recommended Practice 520, Part Il 7.4.2 Inlet piping The design of inlet piping should be in accordance with API-RP-521, Section 5.4.1 7.4.3 Vapor relief header The sizing should be in accordance with API-RP-521, Section 5.4.1.2 in conjunction with Appendix ‘Aas a supplement to the above; and API-RP-520, Pait |, Section 7 and Appendix C therein.ul (OFF USTSA 0} 19401) pasn ave sainpaco.d Gurzs adid puepueis ‘paysiqeise useq eney uowiBes Yoke UI eunsseid yoeq pue peo] WNWIKeW 2ouQ, Jonyau UMOpMo|g aje1edas e ojU! spinby algesodsip Ie 12a:1p 0} algesiape |! ‘aIqissod se yoru se moy pinbyse6 eseyd-ony 0} enp sabuns yuanaid pue sped} J9peay jarre1 2oNpS1 0} 19P10 UI J9peay uMopmoyg pINbIT FLL ‘08 NG40} ,04 x z 0} uno Bulje0s ‘s061e) pue 009 NA 40} ,OL x | oxoge “Aaweu ‘sioquinu spjoukey yBty ie Aide s10398) uojsienuoo pue si019e) UORd) ancae ou, 10N ete 70100 006 NG seu9 ortoo ose wa 1998 sttoo og wa sry sLL00 00s Na agi ezio0 oor Na cuz szio0 “4 08e NO ove e200 : 008 NO web seo - 4052 NO oe orioo ent ww S002 No zoL osioo c Ost NO se sooo : oot na sce eu00 ‘ oe Na Zz. s6100 Oy 31NG3HOS 0S NO ‘SualaW UW uoLovs [ (wu) az1s Sal NOUIOIes AdOOW, ____aWNwon ¥31aW¥iIa Ty dO LINN Yad HIONST ANFIWAINDS Od YOLOYS NOISYZANOD (wus 9p0'0 40 SS3NHONOH LNFTVAIND NO GaSvE) adid 1341S NVI19 NOd SHOLOW4 NOISHIANOD GNY SHOLOW4 NOLO TWOIdAL - Z 3TaVL Wo iyo *r0 S60 SCS GS) INSIGONVING | wo $060 (ISN¥)_IN3W3OSWINS zo 620 «0 ovO (waaans) NoWovelLNOO 6f00 seta_izo UisN¥)_NOWOVALLNOS, go 90 PO 20 “INSWSOUY NE v0 "NOLLOVELLNOO. SuaLaWvia 40 OWE _ 120 N3dO “SATVA SL¥O | 690 MO@IS dSINGONOT SSuOST-OS HONWES zo MOaTS ONIGTaM 33yO3C-sr | ero HONOWHL TWUBLVI 33YO30-SP zo ‘MOSS ONIGIAM 334030-06 | €60 — MOST3 WALIN-TIONIS 33NO30-09 ‘moa eco Nod HONOwHL 331 ONIGTaM| £60 — G3M3YOS-GYVANVIS 35Y930-06 ero Moa7a GaMRIOS FBwOIO-Sy | UEL — HONYUE HONOYHL 331 ONIGTAM, 0 NUNLay ONIGTaM 3aNOSC-08! | 221 — MOBTS BALIN-STONIS 33Y930-06 HONVaG HONOMHL JL 9¥0 — MOBN3 NALWW-TTONIS 3aNO30-SP | Z1'1 aLvoluays YO GaMauos NUALae 870 MOSTS MALIN-TTULL 33¥O3C-06 | $61 G3MSYOS-3S010 334930 O81 oso NN HONOWHL Weal | ez Nad SATVA XO3HD ONIMS 050 NNW HONOYH 331 GaLvORevs | OF NadO “3ATVA STONY N3dO ATA oso Now HOnOwHL 331 camzyos | $8 ONINNSS3Ud3O WOIdAL 650 __mos13 WaLIN-TIaNoG a3wOSC-05 | 16 ____Nad0 "3A 38019 a ‘NIL By NIL SONILLId did HOd SANTWAIN TWOIdAL- b STV 09¢-Ud-3-Sdl ‘post Aine Sd |I°eS duly 1994 IPS-E-PR-460 In determination of back pressure the following shall be taken into consideration 41) Flashing of liquid at reietsafety valve discharge or along the network due to pressure
You might also like
Process Plant Design and Simulation Handbook
PDF
100% (11)
Process Plant Design and Simulation Handbook
468 pages
Project - Execution - Plan - SHELL Sample PDF
PDF
90% (10)
Project - Execution - Plan - SHELL Sample PDF
96 pages
Standard Deliverable List For Feasibility Conceptual FEED Detailed Design
PDF
93% (59)
Standard Deliverable List For Feasibility Conceptual FEED Detailed Design
22 pages
DB-1718-999-P312-0205__[5(new)]__358004PDF
PDF
No ratings yet
DB-1718-999-P312-0205__[5(new)]__358004PDF
62 pages
Guidelines For Engineering Design For PR PDF
PDF
100% (8)
Guidelines For Engineering Design For PR PDF
427 pages
Epc Epcm Chart
PDF
91% (11)
Epc Epcm Chart
1 page
Introduction To Process Engineering and Design, Second Edition PDF
PDF
92% (13)
Introduction To Process Engineering and Design, Second Edition PDF
1,138 pages
Chemical Engineering Design Principles Sinnott PDF
PDF
100% (12)
Chemical Engineering Design Principles Sinnott PDF
1,436 pages
Asme b31.3 Training Seminar
PDF
96% (49)
Asme b31.3 Training Seminar
382 pages
Valves, Piping and Pipelines Handbook, Third Edition
PDF
98% (51)
Valves, Piping and Pipelines Handbook, Third Edition
696 pages
Detailed Engineering Design Phase
PDF
95% (22)
Detailed Engineering Design Phase
8 pages
Process Engineering Design Guide PDF
PDF
89% (9)
Process Engineering Design Guide PDF
90 pages
Relief and Blowdown System
PDF
91% (11)
Relief and Blowdown System
43 pages
Flare Modeling Parameters
PDF
No ratings yet
Flare Modeling Parameters
20 pages
Dynamic Depressuring - A Practical Guide (Revised)
PDF
100% (1)
Dynamic Depressuring - A Practical Guide (Revised)
19 pages
Process Design For Chemical Engineers
PDF
100% (10)
Process Design For Chemical Engineers
170 pages
Tutorial Depressuring 5
PDF
89% (9)
Tutorial Depressuring 5
26 pages
BP Hazop Training
PDF
100% (6)
BP Hazop Training
37 pages
Crane TP-410 Flow of Fluids
PDF
100% (2)
Crane TP-410 Flow of Fluids
135 pages
ASME B31.3 Process Piping Course Training Material PDF
PDF
50% (4)
ASME B31.3 Process Piping Course Training Material PDF
385 pages
250 Piping Design Guide
PDF
92% (26)
250 Piping Design Guide
779 pages
Piping Materials Guide
PDF
89% (9)
Piping Materials Guide
356 pages
Calculation Sheet For Flares: User Supplied Inputs (Grey Cells)
PDF
No ratings yet
Calculation Sheet For Flares: User Supplied Inputs (Grey Cells)
1 page
Data Sheet Ko Drum 43-401
PDF
No ratings yet
Data Sheet Ko Drum 43-401
14 pages
Flare Modeling Parameters
PDF
100% (1)
Flare Modeling Parameters
26 pages
08572 Trht Tp Pr 00 Oo 207 Isolation and Spare Philosophy
PDF
No ratings yet
08572 Trht Tp Pr 00 Oo 207 Isolation and Spare Philosophy
38 pages
SPD0056ERN - 1 Depressuring
PDF
No ratings yet
SPD0056ERN - 1 Depressuring
25 pages
Flare To TspecFlaretot
PDF
No ratings yet
Flare To TspecFlaretot
5 pages
IRI Lay Out Spacing PDF
PDF
No ratings yet
IRI Lay Out Spacing PDF
36 pages
ENGINEERING DESIGN GUIDELINES Flare Systems Rev3.4web
PDF
No ratings yet
ENGINEERING DESIGN GUIDELINES Flare Systems Rev3.4web
25 pages
(Ethyl-Benzene Recovery) : Major Equipment Design
PDF
No ratings yet
(Ethyl-Benzene Recovery) : Major Equipment Design
35 pages
Hazardous Zone, Class, Division
PDF
No ratings yet
Hazardous Zone, Class, Division
26 pages
Basics of Gas Flaring
PDF
100% (1)
Basics of Gas Flaring
2 pages
Estimate Subsonic Flare Tip Pressure Drop With Graph Derived Correlation
PDF
100% (1)
Estimate Subsonic Flare Tip Pressure Drop With Graph Derived Correlation
3 pages
14-ApGreid - Line Sizing Rev.2
PDF
No ratings yet
14-ApGreid - Line Sizing Rev.2
18 pages
Matlab Program Computes Thermal
PDF
No ratings yet
Matlab Program Computes Thermal
9 pages
Correctly Modeling and Calculating Combustion Efficiencies in Fired Equipment
PDF
No ratings yet
Correctly Modeling and Calculating Combustion Efficiencies in Fired Equipment
23 pages
C2 Quench Tower
PDF
No ratings yet
C2 Quench Tower
28 pages
Heatradiationfro00guig PDF
PDF
No ratings yet
Heatradiationfro00guig PDF
94 pages
MMP-CKL-0008 checklist-HTRI
PDF
No ratings yet
MMP-CKL-0008 checklist-HTRI
6 pages
Taitel and Dukler Horizontal Models
PDF
No ratings yet
Taitel and Dukler Horizontal Models
9 pages
Tank Venting 001
PDF
No ratings yet
Tank Venting 001
14 pages
Flares
PDF
No ratings yet
Flares
18 pages
Process Control: Batangas State University
PDF
No ratings yet
Process Control: Batangas State University
11 pages
Fire Relief Dynamic Study
PDF
No ratings yet
Fire Relief Dynamic Study
2 pages
Flare Stack - Final
PDF
0% (1)
Flare Stack - Final
7 pages
Dessicant-Dryer-Sizing-GPSA-Indah Kiat
PDF
No ratings yet
Dessicant-Dryer-Sizing-GPSA-Indah Kiat
2 pages
P & I Design LTD: Emergency Relief System (Ers) Sizing Software Methods & Practice
PDF
100% (1)
P & I Design LTD: Emergency Relief System (Ers) Sizing Software Methods & Practice
29 pages
Flare For Design
PDF
100% (1)
Flare For Design
4 pages
Input From Simulation Result From Table or Chart Assumption
PDF
100% (1)
Input From Simulation Result From Table or Chart Assumption
31 pages
Flare Noise Prediction
PDF
100% (2)
Flare Noise Prediction
3 pages
Baijan Savalan Flaresim 03022015 Reva
PDF
No ratings yet
Baijan Savalan Flaresim 03022015 Reva
25 pages
Tower Internals
PDF
No ratings yet
Tower Internals
63 pages
SOP - Start-Up & Shut Down Procedure of Thermal Craker Heater De-Coking
PDF
100% (1)
SOP - Start-Up & Shut Down Procedure of Thermal Craker Heater De-Coking
10 pages
Aspen Flare System Analyzer
PDF
50% (2)
Aspen Flare System Analyzer
10 pages
FlareTot - Total Flare Analysis
PDF
No ratings yet
FlareTot - Total Flare Analysis
8 pages
Process Safety and Environmental Protection
PDF
100% (1)
Process Safety and Environmental Protection
20 pages
Truobleshooting Refinery Vacuum Tower
PDF
0% (1)
Truobleshooting Refinery Vacuum Tower
33 pages
Simulation and Evaluation of Flare Gas Recovery Unit For Refineries
PDF
100% (2)
Simulation and Evaluation of Flare Gas Recovery Unit For Refineries
7 pages
CH 2 Pumps Operation: Operating Conditions
PDF
No ratings yet
CH 2 Pumps Operation: Operating Conditions
43 pages
Ejector Technology For Efficient and Cost Effective Flare Gas Recovery
PDF
100% (1)
Ejector Technology For Efficient and Cost Effective Flare Gas Recovery
35 pages
Theoretical and Observational Assessments of Flare Efficiencies
PDF
No ratings yet
Theoretical and Observational Assessments of Flare Efficiencies
7 pages
SO2 Gas - Sulphur Burner Outlet Analysis Chart PDF
PDF
No ratings yet
SO2 Gas - Sulphur Burner Outlet Analysis Chart PDF
2 pages
PSV Webinar Final
PDF
No ratings yet
PSV Webinar Final
37 pages
Analysis of Production Loss in Ammonia and Urea Plants IJF March 21
PDF
No ratings yet
Analysis of Production Loss in Ammonia and Urea Plants IJF March 21
11 pages
Catalyst Passivation For Safer, More Efficient Turnarounds
PDF
No ratings yet
Catalyst Passivation For Safer, More Efficient Turnarounds
4 pages
PSV Releiving Temp
PDF
No ratings yet
PSV Releiving Temp
3 pages
Gasoline: US Gallon 115,000 Btu 121 MJ 32 MJ/liter (LHV) - HHV 125,000 Btu/gallon 132 MJ/gallon 35 MJ/liter
PDF
No ratings yet
Gasoline: US Gallon 115,000 Btu 121 MJ 32 MJ/liter (LHV) - HHV 125,000 Btu/gallon 132 MJ/gallon 35 MJ/liter
12 pages
2.heat-Exchangers From Ch6 - Mihir's Handbook
PDF
No ratings yet
2.heat-Exchangers From Ch6 - Mihir's Handbook
12 pages
Horizontal KO Pot V1.2
PDF
No ratings yet
Horizontal KO Pot V1.2
6 pages
E-Pr-460 Process Design Flare and Blowdown Vessels
PDF
100% (1)
E-Pr-460 Process Design Flare and Blowdown Vessels
37 pages
E PR 460
PDF
No ratings yet
E PR 460
37 pages
Ips e PR 460 1999
PDF
No ratings yet
Ips e PR 460 1999
37 pages
MEKPCO FLARE NETWORK DESIGN ASPEN FLARENET
PDF
No ratings yet
MEKPCO FLARE NETWORK DESIGN ASPEN FLARENET
32 pages
Project Standard PDF
PDF
No ratings yet
Project Standard PDF
12 pages
Project Standards and Specifications Flare and Blowdown Systems Rev01
PDF
100% (1)
Project Standards and Specifications Flare and Blowdown Systems Rev01
12 pages
Exxon - EXXON PDC VOL I
PDF
97% (36)
Exxon - EXXON PDC VOL I
281 pages
Efficient Petrochemical Processes Technology, D&O PDF
PDF
100% (2)
Efficient Petrochemical Processes Technology, D&O PDF
406 pages
Process Engineering Design Manual
PDF
86% (7)
Process Engineering Design Manual
308 pages
Piping and Pipeline Engineering
PDF
95% (220)
Piping and Pipeline Engineering
519 pages
HAZOP Saudi Aramco HAZOP Guidelines
PDF
100% (17)
HAZOP Saudi Aramco HAZOP Guidelines
92 pages
Understanding Oil & Gas Business
PDF
97% (36)
Understanding Oil & Gas Business
349 pages
Flares
PDF
93% (15)
Flares
44 pages
PROCESS Depressurisation
PDF
100% (4)
PROCESS Depressurisation
38 pages
Flare and Blowdown
PDF
100% (7)
Flare and Blowdown
37 pages
Work Book Model
PDF
No ratings yet
Work Book Model
52 pages
Knock Out Drum Sizing Parameters Value Unit Remark: Gas Outlet Nozzle
PDF
No ratings yet
Knock Out Drum Sizing Parameters Value Unit Remark: Gas Outlet Nozzle
11 pages