0% found this document useful (0 votes)
319 views

Voltage Drop Calculation

The document provides voltage drop calculations for electrical cables supplying power from various sources of supply to different locations at a development in Dubai. It includes the load served, cable sizes, lengths and voltage drop calculations to check if the voltage drop is within permissible limits of 3-5% for various circuits.

Uploaded by

Aluism
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
319 views

Voltage Drop Calculation

The document provides voltage drop calculations for electrical cables supplying power from various sources of supply to different locations at a development in Dubai. It includes the load served, cable sizes, lengths and voltage drop calculations to check if the voltage drop is within permissible limits of 3-5% for various circuits.

Uploaded by

Aluism
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 6

PROJECT: DUBAI CREEK VILLAS AT DUBAI GOLF & YACHT CLUB DUBAI, UAE

LOCATION: DUBAI CREEK AREA, DUBAI, UAE


MDB TO SMDB'S AND DB'S CABLES VOLTAGE DROP CALCULATION's
VOLTAGE DROP
CABLE SIZE AS PER
SERVICE CURRENT
CALCULATED Mv/A/m
LOAD CURRENT ON MAX. MCCB LENGTH CABLE
VOLTAGE (V) PHASE
(kW) (AMP) DEMAND (AMP) (m) TYPE
mV/A/m VD (%) VD
(AMP)
FROM TO RUNS CORES SIZE (mm2)

SMDB-A 357.2 400 644 451 800 3 302 3 4C 240 XLPE 0.2 9.08 2.3

SMDB-GV-01/ EC-01 209.4 400 378 264 400 3 220 2 4C 120 XLPE 0.4 11.64 2.9

SMDB-GV-01/ EC-02 231.8 400 418 293 500 3 435 2 4C 240 XLPE 0.2 12.73 3.2

SMDB-GV-01/ EC-03 204.1 400 368 258 400 3 436 2 4C 240 XLPE 0.2 11.24 2.8

MDB SMDB-GV-01/ EC-04 258.0 400 465 326 500 3 262 2 4C 240 XLPE 0.2 8.54 2.1

DB-LV 9.0 400 16 11 40 3 15 1 4C 10 XLPE 3.2 0.55 0.1

MDU-1 ( Existing) 165.9 400 299 210 300 3 37 1 4C 300 XLPE 0.2 1.55 0.4

MDU-2 ( Existing) 140.6 400 254 178 400 3 40 1 4C 300 XLPE 0.2 1.42 0.4

TOTAL 2.36

FORMULA
VD = [(mV x I x L)/1000]/N
N = Numbers of Set of Cables
PROJECT: DUBAI CREEK VILLAS AT DUBAI GOLF & YACHT CLUB DUBAI, UAE
LOCATION: DUBAI CREEK AREA, DUBAI, UAE
SMDB-A TO ESMDB'S CABLES VOLTAGE DROP CALCULATION's
VOLTAGE DROP Total
CABLE SIZE AS PER
SERVICE
CALCULATED Mv/A/m
LOAD CURRENT MCCB LENGTH CABLE
VOLTAGE (V) PHASE (%)
(kW) (AMP) (AMP) (m) TYPE
mV/A/m VD (%) VD Voltage
FROM TO RUNS CORES SIZE (mm )2
Drop

SMDB-RVB-01 83.4 400 150 200 3 116 1 4C 185 XLPE 0.3 5.24 1.31 3.58

SMDB-EVB-01 72.4 400 131 160 3 90 1 4C 95 XLPE 0.5 5.88 1.47 3.74

SMDB-RVG-02 81.7 400 147 200 3 59 1 4C 95 XLPE 0.5 4.35 1.09 3.36

SMDB-A SMDB-RVG-02 72.0 400 130 160 3 31 1 4C 70 XLPE 0.7 2.82 0.70 2.98

DB-LP-A 27.0 400 49 63 3 31 1 4C 25 XLPE 2.5 3.78 0.94 3.21

PEDESTAL-1 12.0 400 22 80 1 158 1 4C 25 XLPE 1.7 5.82 1.45 3.72

PEDESTAL-2 12.0 400 22 80 1 55 1 4C 25 XLPE 1.7 2.02 0.51 2.78

TOTAL 1.25 5.84

FORMULA
VD = [(mV x I x L)/1000]/N
N = Numbers of Set of Cables
PROJECT: DUBAI CREEK VILLAS AT DUBAI GOLF & YACHT CLUB DUBAI, UAE
LOCATION: DUBAI CREEK AREA, DUBAI, UAE
SMDB-GV-01,03,04/EC-01,02,03,04 TO DB-GV-01 TO DB-GV-18 CABLES VOLTAGE DROP CALCULATION's
VOLTAGE DROP Total
CURRENT ON CABLE SIZE AS PER
SERVICE
CURRENT MAX MCCB LENGTH CALCULATED Mv/A/m CABLE
LOAD (kW) VOLTAGE (V) PHASE (%)
(AMP) DEMAND (AMP) (m) TYPE
mV/A/m VD (%) VD Voltage
(AMP)
FROM TO RUNS CORES SIZE (mm )2
Drop

DB-GV-01 48.6 400 88 61 100 3 70 1 4C 50 XLPE 0.9 3.87 0.97 3.88

DB-GV-02 48.6 400 88 61 100 3 73 1 4C 50 XLPE 0.9 4.03 1.01 3.92

SMDB-GV-01/EC-01 DB-GV-03 48.6 400 88 61 100 3 162 1 4C 120 XLPE 0.4 3.98 0.99 3.90

DB-GV-04 48.6 400 88 61 100 3 165 1 4C 120 XLPE 0.4 4.05 1.01 3.92

DB-EX-1B 15.0 400 27 19 40 3 15 1 4C 10 XLPE 3.2 0.91 0.23 3.14

TOTAL 1.05 3.75

DB-GV-05 43.4 400 78 55 100 3 64 1 4C 50 XLPE 0.9 3.16 0.79 3.97

DB-GV-06 43.4 400 78 55 100 3 51 1 4C 50 XLPE 0.9 2.52 0.63 3.81

DB-GV-07 43.4 400 78 55 100 3 54 1 4C 50 XLPE 0.9 2.66 0.67 3.85


SMDB-GV-02/EC-02
DB-GV-08 43.4 400 78 55 100 3 121 1 4C 120 XLPE 0.4 2.65 0.66 3.85

DB-GV-09 43.4 400 78 55 100 3 179 2 4C 95 XLPE 0.5 2.45 0.61 3.80

DB-EX-2B 15.0 400 27 19 40 3 15 1 4C 10 XLPE 3.2 0.91 0.23 3.41

TOTAL 0.90 3.78

DB-GV-10 43.4 400 78 55 100 3 132 1 4C 95 XLPE 0.5 3.62 0.90 3.71

DB-GV-11 48.6 400 88 61 100 3 63 1 4C 35 XLPE 1.2 4.64 1.16 3.97

SMDB-GV-03/EC-03 DB-GV-12 48.6 400 88 61 100 3 56 1 4C 35 XLPE 1.2 4.12 1.03 3.84

DB-GV-13 48.6 400 88 61 100 3 58 1 4C 35 XLPE 1.2 4.27 1.07 3.88

DB-EX-3B 15.0 400 27 19 40 3 15 1 4C 10 XLPE 3.2 0.91 0.23 3.04


TOTAL 1.46 3.69
DB-GV-14 48.6 400 88 61 100 3 205 1 4C 95 XLPE 0.5 6.29 1.57 3.71

DB-GV-15 48.6 400 88 61 100 3 133 1 4C 50 XLPE 0.9 7.35 1.84 3.97

DB-GV-16 48.6 400 88 61 100 3 128 1 4C 50 XLPE 0.9 7.07 1.77 3.90
SMDB-GV-04/EC-04
DB-GV-17 48.6 400 88 61 100 3 63 1 4C 25 XLPE 1.7 6.57 1.64 3.78

DB-GV-18 48.6 400 88 61 100 3 58 1 4C 25 XLPE 1.7 6.05 1.51 3.65

DB-EX-4B 15.0 400 27 19 40 3 15 1 4C 10 XLPE 3.2 0.91 0.23 2.36

TOTAL 2.85 3.56

FORMULA
VD = [(mV x I x L)/1000]/N
N = Numbers of Set of Cables
PROJECT: DUBAI CREEK VILLAS AT DUBAI GOLF & YACHT CLUB DUBAI, UAE
LOCATION: DUBAI CREEK AREA, DUBAI, UAE
ESMDB-V(A&B) TO ESMDB-A & ESMDB-1B & ESMDB-2B CABLES VOLTAGE DROP CALCULATION's
VOLTAGE DROP Total
CABLE SIZE AS PER
SERVICE
CALCULATED Mv/A/m
LOAD CURRENT MCCB LENGTH CABLE
VOLTAGE (V) PHASE
(kW) (AMP) (AMP) (m) TYPE (%) Voltage
mV/A/m VD (%) VD
Drop
FROM TO RUNS CORES SIZE (mm2)

ESMDB-B / THRU ATS-


B / MDB-B2/SS-5514B
ESMDB-V(A&B 74.7 400 135 200 3 135 1 4C 120 XLPE 0.4 7.28 1.82

ESMDB-A 19.5 400 35 63 3 302 1 4C 70 XLPE 0.5 5.31 1.33 3.15

ESMDB-GV-1B 25.1 400 45 63 3 435 1 4C 120 XLPE 0.3 5.91 1.48 3.30

ESMDB-V (A&B)
ESMDB-GV-2B 30.1 400 54 80 3 262 1 4C 95 XLPE 0.3 4.27 1.07 2.89

TOTAL 0.95

FORMULA
VD = [(mV x I x L)/1000]/N
N = Numbers of Set of Cables
PROJECT: DUBAI CREEK VILLAS AT DUBAI GOLF & YACHT CLUB DUBAI, UAE
LOCATION: DUBAI CREEK AREA, DUBAI, UAE
ESMDB-GV-1B&2B TO EDB-GV-01 TO EDB-GV-18 CABLES VOLTAGE DROP CALCULATION's
VOLTAGE DROP Total
CABLE SIZE AS PER
SERVICE
CALCULATED Mv/A/m
LOAD CURRENT MCCB LENGTH CABLE
VOLTAGE (V) PHASE
(kW) (AMP) (AMP) (m) TYPE (%) Voltage
mV/A/m VD (%) VD
Drop
FROM TO RUNS CORES SIZE (mm2)

EDB-RVG-01 3.6 230 11 32 1 245 1 2C 50 XLPE 0.9 2.49 0.62 3.77


EDB-RVG-02 3.6 230 11 32 1 241 1 2C 50 XLPE 0.9 2.45 0.61 3.76
EDB-EVG-01 3.1 230 10 32 1 149 1 2C 25 XLPE 1.7 2.46 0.62 3.91
ESMDB-A
EDB-EVG-02 3.1 230 10 32 1 146 1 2C 25 XLPE 1.7 2.41 0.60 3.49
PLOT-A LIFTING STATION -1 3.0 230 9 32 3 95 1 4C 10 XLPE 3.2 2.86 0.72 3.86
PLOT-A LIFTING STATION -2 3.0 230 9 32 3 50 1 4C 10 XLPE 3.2 1.51 0.38 3.52
EDB-GV-01 4.3 230 13 32 1 245 1 2C 70 XLPE 0.7 2.31 0.58 3.88

EDB-GV-02 4.3 230 13 32 1 241 1 2C 70 XLPE 0.7 2.28 0.57 3.87

EDB-GV-03 4.3 230 13 32 1 149 1 2C 35 XLPE 1.2 2.41 0.60 3.90

EDB-GV-04 4.3 230 13 32 1 146 1 2C 35 XLPE 1.2 2.36 0.59 3.89

ESMDB-GV-1B EDB-GV-05 3.5 230 11 32 1 64 1 2C 10 XLPE 3.2 2.25 0.56 3.86

EDB-GV-06 3.5 230 11 32 1 50 1 2C 10 XLPE 3.2 1.76 0.44 3.74

EDB-GV-07 3.5 230 11 32 1 55 1 2C 10 XLPE 3.2 1.93 0.48 3.78

EDB-GV-08 3.5 230 11 32 1 120 1 2C 25 XLPE 1.7 2.24 0.56 3.86

EDB-GV-09 3.5 230 11 32 1 178 1 2C 35 XLPE 1.2 2.35 0.59 3.88

EDB-GV-10 3.5 230 11 32 1 132 1 2C 25 XLPE 1.7 2.46 0.62 3.50

EDB-GV-11 4.3 230 13 32 1 267 1 2C 35 XLPE 1.2 4.32 1.08 3.97

EDB-GV-12 4.3 230 13 32 1 260 1 2C 35 XLPE 1.2 4.21 1.05 3.94

EDB-GV-13 4.3 230 13 32 1 210 1 2C 35 XLPE 1.2 3.40 0.85 3.74

EDB-GV-14 4.3 230 13 32 1 204 1 2C 35 XLPE 1.2 3.30 0.83 3.71


ESMDB-GV-2B
EDB-GV-15 4.3 230 13 32 1 133 1 2C 25 XLPE 1.7 3.05 0.76 3.65

EDB-GV-16 4.3 230 13 32 1 127 1 2C 16 XLPE 2.5 4.28 1.07 3.96

EDB-GV-17 4.3 230 13 32 1 62 1 2C 10 XLPE 3.2 2.68 0.67 3.56

EDB-GV-18 4.3 230 13 32 1 57 1 2C 10 XLPE 3.2 2.46 0.62 3.50

ISO. FOR LP-02-B 5.5 400 10 40 3 10 1 4C 10 XLPE 3.2 0.32 0.08 2.97

TOTAL

FORMULA
VD = [(mV x I x L)/1000]/N
N = Numbers of Set of Cables