Pile Load Test Pile No2
Pile Load Test Pile No2
PPE: Helmet, safety shoes, gloves, goggle, Leather gloves Job Location: Project site
Inspection of Falling of load Sinking of ground Serious personnel injury - proper compaction of ground that could withstand the
ground Crane collapse Damage to property Max load of test.
Inspection of Falling Failure of Crane Serious injuries / Fatality - Crane, Slings, Shackles, belts and all lifting
Crane, Lifting load/Falling Failure of lifting gears Property damage tackles shall be Inspection passed.
gears object - Crane should have passed the load Test.
- 3rd Party certification of Fitness should be
ensured for Crane and all other lifting tackle e.g.
slings shackles etc.
Placing of cross Falling of beams Inappropriate supports Personnel Injury, bending - Blocks to be provided under the beams
beams Pinch point for of beams - Targetted safety talk with riggers cautioning
riigger Riggers not attentive Injury to riggers about pinch points, riggers to wear leather gloves
JOB SAFETY ANALYSIS SHEET
Slinging of load Falling object Under rated lifting gears Personnel injury / Integrity of the hook embedded in the block to be
block Yielding of lifting Uncertified lifting gears Fatality verified by visual inspection. In case of doubt, do
tackles Inappropriate sling fixing Property damage not use that block unless its DPT has been
Falling personnel Improper fall protection carried out & declared Fit.
Inspection of each block to be carried out for any
cracks , particularly around the hook.
- Only Trained & authorized personnel shall work
- All personnel working at height shall protect
against falling.
- Certified / inspected lifting gears shall be used.
Falling of load / - Failure of Crane Serious injuries / Fatality - Safety Talk shall be conducted to explain JSA
Lifting & Unbalancing of - Failure of lifting Property damage with all participants before lifting
placing of load crane point of hook - Only 4 authorized personnel shall go up to work
block on Skidding of - Improper lifting on plat form.
Kentledge beams - Inadequate Placing - Designated signalman wearing high visibility
Falling of of CRANE jacket to be allowed to give signals to the crane
personnel - High wind velocity operator.
- Improper fall - Crane outriggers shall be extended fully.
protection - Ground shall have hard surface & Outrigger pads
to be used.
- Area around the work place shall be barricaded
to stop unauthorized entry.
- No body should stay under suspended load or
move through the operating radius of boom.
- The weight of the load shall be taken smoothly
without allowing it to jerk.
- Stand by man to be assigned with mega phone to
warn against unsafe position of people working
on plat form.
- The entire activity shall be performed under the
supervision of a qualified Supervisor & Safety
officer.
Integrity of Sliding / Inappropriate beams for Serious injuries / Fatality - Contractor to ensure integrity of beams through
beams to be unbalancing of the job. Property damage due to load calculation.
checked block Sliding of girder / collapse of Plat form - Correct beams shall be deployed & so placed to
JOB SAFETY ANALYSIS SHEET
bending of beam bear rated load.
- Secure beams by weld / wedge to avoid sliding /
skidding
WARNING.. IF THERE IS ANY ABNORMAL SITUATION OBSERVED WITH RESPECT TO TESTING RESULT OR PHYSICAL CONDITION ACTIVITY WOULD IMMEDIATELY BE
STOPPED
JOB SAFETY ANALYSIS SHEET
Note:
1) Testing to be done only by Kentledge method of pile test.
2) Procedure for recording observation during testing shall be the same as followed earlier.