` DESCRIPTION
A. SUB STRUCTURE UnitQuantity ex/work rate Amount
1.EXCAVATION AND EARTH WORK
Excavation trenches for foundation to a
depth of not exceeding 100 cm starting
1.1 from the reduced ground level. m3 60 98 80 7840
excavation in hard rock to a depth from
100-300cm starting from the reduced
1.2 ground level. m3 100 294 130 38220
8.1
A) dia. 50MM M 9 24 25 600
B) dia. 80 MM M 20 32 28 896
C) dia 110 MM M 22 48 48 2304
Supply and fix hand wash basins made of
white vitreous china equipped with
consealed bracket made of grey mallable
cast iron white painted completes with
plug chains and traps (approved quality
by the engineer)
8.2
A hand wash basin size (600x405)mm no 8 4 698 2792
Supply and install shawer tray units made
of enamelled cast iron steel plate and
fiber glass including complete with all the
accessories .(approved quality by the
8.3 engineer)
A) shawer tray fiber glass complete
size(80x80)cm. no 4 4 681 2724
B) supply and fix soap holder including
fastering screws and the necessary
accessories(approved quality by the
engineer) no 4 4 62 248
Supply and fix Turkish type WC of
European made of white vitreous china
with high flush cistern and stop cock on
the water supply line, complete with all
accessories(Approved quality by the
Engineer)
8.4 no 8 0 750 0
Supply and install galvanized steel pipes
for cold and hot water distribution to all
sanitary fixtures according to the drawing
complete with the ecessary connection
pieces such as bends, unions, etc. unit
price shall include all the necessary
assistance to the installation of works
such as chiseling of walls, slabs, beam,
floor, etc. and closing them with concrete
or cement mortar, to normal condition and
excavation, back fill for out side the
installation shall be tested at apresure of
10kg/cm2 by the expense of the
contractor (approved quality by the
engineer)
8.5 0
A) sanitary installation 1/2 inch G.S. pipe
inside the building ML 60 0 45 0
B) sanitary installation 1and1/2 inch G.S.
pipe outside the building ML 85 0 128 0
9. ELECTRICAL INSTALLATION
WORKS 0
Supply and install light points fed through
PVC insulated conductors of 3*2.5mm 2
in thermoplastic conduits of dia. 16 mm
for recessed installation including junction
boxes with covers (screw type) and
insulting caps.
9.1 NO 42 468 310 145080
Connected and tested including lamps
and accessories complet all as specified
or described in lighting fittings.
9.2
A)Supply and fix philips TMS
012/2.36+2X TLD 36W+reflector NO 60 60 1280 76800
B) supply and fix TMS 012/1.18+1xTLD
18w NO 24 29 596 17284
9.3 socket out let and other point 0
Supply and install flush mounted socket
outlets of 16A, single phase and with
earthing contact fed through PVC
insulated conductors of 3 x 2.5 mm2 in
the thermoplastic conduits of diam. 16
mm for recessed installation including
junction boxes with covers and insulating
caps -all complete.
NO 100 129 230 29670
9.4 Telephone points
Supply and install Telephone points fed
through PVC insulated conductors of
2*0.6mm2 inside PVC conduits of 19mm
dia., including junction boxes with covers
and insulating screwcap connectors,
complete with all the necessary
accessories.
NO 8 12 200 2400
supply and install Bell call indicator
including junction boxes with covers and
insulating screw cap connectors,
complete with all the necessary
9.5 accessories. NO 2 0 1200 0
supply and fix AIR conditioner 48 btu with
9.6 all accessories. NO 4 0 15000 0
supply and fix 9kg ABC Dry chemical fire
9.7 extinguisher with all accessories. NO 2 2 1750 3500
supply, install and connect floor stand
main distribution board, MDB made of
steel with locable doors connected to
2(3*120/70)mm2 cable with (3*250)A main
circuit breaker, 3-phase and also consist
of
9.8
1pc ACB 200A/3ph
2pc ACB 160A/3ph
1pc ACB 100A/3ph
2pc ACB 80A/3ph
3pc ACB 25A/3ph
2pc ACB 32A/3ph
1pc ACB 63A/3ph
1pc MCB 10A/3ph
2pcHTC fusedswiches of 80A, 3-ph,
1pcsHTC fused swiches of 100A, 3-ph
complete with bus bar 1;20 rating of 800A
earthing lead and other accessories.
NO 2 2 15000 30000
Total carried to summary
GRAND SUMMARY 2872171.262
REBET23.5% 674960.24657
AFTER REBET 2197211.01543
VAT15% 329581.6523145
TOTAL GRAND SUMMARY 2526792.667745
` DESCRIPTION
A. SUB STRUCTURE UnitQuantity ex/work rate Amount
8.1
A) dia. 50MM M 9 24 25 600
B) dia. 80 MM M 20 32 28 896
C) dia 110 MM M 22 48 48 2304
Supply and fix hand wash basins made of
white vitreous china equipped with
consealed bracket made of grey mallable
cast iron white painted completes with
plug chains and traps (approved quality
by the engineer)
8.2
A hand wash basin size (600x405)mm no 8 4 698 2792
Supply and install shawer tray units made
of enamelled cast iron steel plate and
fiber glass including complete with all the
accessories .(approved quality by the
8.3 engineer)
A) shawer tray fiber glass complete
size(80x80)cm. no 4 4 681 2724
B) supply and fix soap holder including
fastering screws and the necessary
accessories(approved quality by the
engineer) no 4 4 62 248
Supply and fix Turkish type WC of
European made of white vitreous china
with high flush cistern and stop cock on
the water supply line, complete with all
accessories(Approved quality by the
Engineer)
8.4 no 8 0 750 0
Supply and install galvanized steel pipes
for cold and hot water distribution to all
sanitary fixtures according to the drawing
complete with the ecessary connection
pieces such as bends, unions, etc. unit
price shall include all the necessary
assistance to the installation of works
such as chiseling of walls, slabs, beam,
floor, etc. and closing them with concrete
or cement mortar, to normal condition and
excavation, back fill for out side the
installation shall be tested at apresure of
10kg/cm2 by the expense of the
contractor (approved quality by the
engineer)
8.5 0
A) sanitary installation 1/2 inch G.S. pipe
inside the building ML 60 0 45 0
B) sanitary installation 1and1/2 inch G.S.
pipe outside the building ML 85 0 128 0
9. ELECTRICAL INSTALLATION
WORKS 0
Supply and install light points fed through
PVC insulated conductors of 3*2.5mm 2
in thermoplastic conduits of dia. 16 mm
for recessed installation including junction
boxes with covers (screw type) and
insulting caps.
9.1 NO 42 468 310 145080
Connected and tested including lamps
and accessories complet all as specified
or described in lighting fittings.
9.2
A)Supply and fix philips TMS
012/2.36+2X TLD 36W+reflector NO 60 60 1280 76800
B) supply and fix TMS 012/1.18+1xTLD
18w NO 24 29 596 17284
9.3 socket out let and other point 0
Supply and install flush mounted socket
outlets of 16A, single phase and with
earthing contact fed through PVC
insulated conductors of 3 x 2.5 mm2 in
the thermoplastic conduits of diam. 16
mm for recessed installation including
junction boxes with covers and insulating
caps -all complete.
NO 100 129 230 29670
9.4 Telephone points
Supply and install Telephone points fed
through PVC insulated conductors of
2*0.6mm2 inside PVC conduits of 19mm
dia., including junction boxes with covers
and insulating screwcap connectors,
complete with all the necessary
accessories.
NO 8 12 200 2400
supply and install Bell call indicator
including junction boxes with covers and
insulating screw cap connectors,
complete with all the necessary
9.5 accessories. NO 2 0 1200 0
supply and fix AIR conditioner 48 btu with
9.6 all accessories. NO 4 0 15000 0
supply and fix 9kg ABC Dry chemical fire
9.7 extinguisher with all accessories. NO 2 2 1750 3500
supply, install and connect floor stand
main distribution board, MDB made of
steel with locable doors connected to
2(3*120/70)mm2 cable with (3*250)A main
circuit breaker, 3-phase and also consist
of
9.8
1pc ACB 200A/3ph
2pc ACB 160A/3ph
1pc ACB 100A/3ph
2pc ACB 80A/3ph
3pc ACB 25A/3ph
2pc ACB 32A/3ph
1pc ACB 63A/3ph
1pc MCB 10A/3ph
2pcHTC fusedswiches of 80A, 3-ph,
1pcsHTC fused swiches of 100A, 3-ph
complete with bus bar 1;20 rating of 800A
earthing lead and other accessories.
NO 2 2 15000 30000
Total carried to summary
GRAND SUMMARY 2872171.262
REBET23.5% 674960.24657
AFTER REBET 2197211.01543
VAT15% 329581.6523145
TOTAL GRAND SUMMARY 2526792.667745
152820.4
250 191.35
26.555
6.184
1110.86
2150.095 258
2408.095
8.904
44.52
63.6 298920
242872.5
82203
-71616.25
164.3
289311.372 64248.55
24*2*1.3 62.4
58.14
857.44
48.72
808.72
37800
37800
37800
170.52
839.84 502.25
857.44
528.96
540.56
3269.05
6000
6000
2700
10880
60000
2475002.387 2872171.262
` DESCRIPTION
A. SUB STRUCTURE Unit Quantity ex/work rate Amount
8.1
A) dia. 50MM M 9 24 25 600
B) dia. 80 MM M 20 32 28 896
C) dia 110 MM M 22 48 48 2304
Supply and fix hand wash basins
made of white vitreous china
equipped with consealed bracket
made of grey mallable cast iron
white painted completes with
plug chains and traps (approved
quality by the engineer)
8.2
hand wash basin size
A (600x405)mm no 8 4 698 2792
Supply and install shawer tray
units made of enamelled cast
iron steel plate and fiber glass
including complete with all the
accessories .(approved quality
by the engineer)
8.3
A) shawer tray fiber glass
complete size(80x80)cm. no 4 4 681 2724
B) supply and fix soap holder
including fastering screws and
the necessary
accessories(approved quality by
the engineer) no 4 4 62 248
Supply and fix Turkish type WC
of European made of white
vitreous china with high flush
cistern and stop cock on the
water supply line, complete with
all accessories(Approved quality
by the Engineer)
8.4 no 8 0 750 0
Supply and install galvanized
steel pipes for cold and hot water
distribution to all sanitary fixtures
according to the drawing
complete with the ecessary
connection pieces such as
bends, unions, etc. unit price
shall include all the necessary
assistance to the installation of
works such as chiseling of walls,
slabs, beam, floor, etc. and
closing them with concrete or
cement mortar, to normal
condition and excavation, back
fill for out side the installation
shall be tested at apresure of
10kg/cm2 by the expense of the
contractor (approved quality by
the engineer)
8.5
A) sanitary installation 1/2 inch
G.S. pipe inside the building ML 60 0 45 0
B) sanitary installation 1and1/2
inch G.S. pipe outside the
building ML 85 0 128 0
9. ELECTRICAL
INSTALLATION WORKS
Supply and install light points fed
through PVC insulated
conductors of 3*2.5mm 2 in
thermoplastic conduits of dia. 16
mm for recessed installation
including junction boxes with
covers (screw type) and insulting
caps.
9.1 NO 42 468 310 145080
Connected and tested including
lamps and accessories complet
all as specified or described in
lighting fittings.
9.2
A)Supply and fix philips TMS
012/2.36+2X TLD 36W+reflector
NO 60 60 1280 76800
B) supply and fix TMS
012/1.18+1xTLD 18w NO 24 29 596 17284
socket out let and other point
9.3
Supply and install flush mounted
socket outlets of 16A, single
phase and with earthing contact
fed through PVC insulated
conductors of 3 x 2.5 mm2 in the
thermoplastic conduits of diam.
16 mm for recessed installation
including junction boxes with
covers and insulating caps -all
complete.
NO 100 109 230 25070
9.4 Telephone points
Supply and install Telephone
points fed through PVC insulated
conductors of 2*0.6mm2 inside
PVC conduits of 19mm dia.,
including junction boxes with
covers and insulating screwcap
connectors, complete with all the
necessary accessories.
NO 8 12 200 2400
supply and install Bell call
indicator including junction boxes
with covers and insulating screw
cap connectors, complete with all
the necessary accessories.
9.5 NO 2 0 1200 0
supply and fix AIR conditioner 48
9.6 btu with all accessories. NO 4 0 15000 0
supply and fix 9kg ABC Dry
chemical fire extinguisher with all
9.7 accessories. NO 2 2 1750 3500
supply, install and connect floor
stand main distribution board,
MDB made of steel with locable
doors connected to
2(3*120/70)mm2 cable with
(3*250)A main circuit breaker, 3-
phase and also consist of
9.8
1pc ACB 200A/3ph
2pc ACB 160A/3ph
1pc ACB 100A/3ph
2pc ACB 80A/3ph
3pc ACB 25A/3ph
2pc ACB 32A/3ph
1pc ACB 63A/3ph
1pc MCB 10A/3ph
2pcHTC fusedswiches of 80A, 3-
ph, 1pcsHTC fused swiches of
100A, 3-ph complete with bus
bar 1;20 rating of 800A earthing
lead and other accessories.
NO 2 2 15000 30000
Total carried to summary
GRAND SUMMARY 2877992.04
REBET23.5% 676328.13
AFTER REBET 2201663.91
VAT15% 330329.34
TOTAL GRAND SUMMARY 2531993.25
2877992.037
676328.1294
2201663.9076
330249.58614
2531913.49374
BAR SCHEDULE
DIA. LENGTH N0.
LOCATION DIA.8 DIA.10 DIA. 12 DIA. 14 DIA. 16
Bars for intermedia 14 49.08 16 785.28
te beam.
Bars for intermedia 14 28.28 9 254.52
te beam.
Bars for intermedia 14 2 11 22
te beam.
Bars for intermedia 14 15.35 6 92.1
te beam.
Bars for intermedia 14 65.26 10 652.6
te beam.
Bars for intermedia 14 18.35 5 91.75
te beam. 18.35 7 128.45
Bars for stair case 14
Bars for stair case 16 10.78 40 431.2
Bars for stair case 16 5.25 22 115.5
stirups for 8 1344.5 1.4 1882.3
intermediate beam
stirups for 8 964.8 1.2 1157.76
stair case
first floor slab 10 17.86 78 1393.08
first floor slab 10 17.62 54 951.48
first floor slab 10 31.2 68 2121.6
first floor slab 10 19.7 122 2403.4
first floor slab 10 43.72 98 4284.56
first floor slab 10 18.8 34 639.2
first floor slab 10 55.72 3 167.16
first floor slab 12 4.5 164 738
first floor slab 12 5.2 67 348.4
first floor slab 12 3.8 54 205.2
first floor slab 12 4.9 13 63.7
WE / I Certify that the contractor is now entitled to the sum of birr 1,279,548.80
ONE MILION TWO HUNDRED SEVENTY NINE THOUSAD FIVE HUNDRED FOURTY EIGHT & 80/100
2067113.006 260,797.2278
103355.6503
__________
____________
TAKE OFF SHEET FOR ANIMALS CRASH
item NO L*w*h TOTAL DESCRPATION
A) SUB-STRUCTURE
1)EXCAVATON AND EARTH WORK
1.1 4.06
5.24
0.35
7.446 m3 BULK Excavation to adpth of35cm
1.2 24
0.5
0.5
6 m3 excavation for pit
B)SUPER STRUCTURE
1.1 1 34
2.2
74.8
1 9
2.5
22.5
ML supplyand weld diameter of 3 inch and 2mm thick circular
97.3 galvanazed
1.2 1
132
ML supplyand weld diameter of 2 inch and 2mm thick circular
132 galvanazed
1.3 1 132
2.3
303.6 kg SUPPLY AND FIX 40*40*2MM
1.4 2 4.06
3.44
27.9328 m2 EGA 500mm width
1.5 22 0.16
6
21.12
34 3.14
0.076
2.2
17.850
9 3.14
0.076
2.5
5.369
44.339 m2 apply one coat of antirust and two coats of oil paint
1.6 1 24
0.5
0.5
6 m3 concrete c-25 in 360kg/m3 filled into
1.7 1 4.06
5.24
21.2744
1 8
0.45
3.6
24.874 m2 25cm thick hard core
1.8 1 4.06
5.24
21.2744
1 8
0.45
3.6
24.874 m2 mass -concrete C-15 in 280kg/m3
6.381281
0.99
0.45
0.75
3
5.19
56.83333
278.909
1.68 121.2648
24
40.32
21.0714
TAKE OFF sheet for k/gaba
item NO L*w*h TOTAL DESCRPATION
1.1 5.8
5
29 M2 clear of site
1.2 3.8
3
3.3
37.62 m3 excavvation for pit
1.3 3.8
3
0.2
2.28 m3 excavvation in hard core
1.4 3.8
3
3.3
37.62 m3
3.8
3
0.2
2.28 m3
39.9 total volume m3 cart away
1.5 1.4
2.2
3.08 M2
2 3.8
1
7.6 m2
10.68 m2 hard core
2) masonary-work
2.1 2 3.8
0.65
3.5
17.29 m3
2 1.7
0.65
3.5
7.735 m3
2 3.8
0.5
0.5
1.9 m3
26.925 m3 total volume masonary work
2.2 2 3.8
0.5
0.5
1.9 m3
3) concrete- work
3.1a 4
3.8
15.2 m2 ground floor slab
3.2b 2 3.8
0.5
0.25
0.95 m3
2 2
0.5
0.25
0.5 m3
1.45 m3 concrete work for grade beam
3.3a 4 3.8
0.25
3.8 m2
4 2
0.25
2 m2
5.8 m2 Area of form-work
3.3b 2.8
2
5.6 m2Area of form -work
B) Super-structure
1) concrete work
1.1a 4 3
0.25
0.2
0.6 m3 concrete work for columun
1.1b 2 3.8
0.25
0.2
0.38 m3
2 3
0.25
0.2
0.3 m3
0.68 m3 total concrete work for top liel beam
1.1c 2 3.8
0.2
0.2
0.304 m3 total volume concrete to linten
1.2a 16 3
0.25
12 m2 total Area from -work for columun
1.2b 6 3.8
0.25
5.7 m2
6 3
0.25
4.5 m2
10.2 m2 total Area from -work for top tiel beam
1.2c 6 3.8
0.2
4.56 m2 total Area from -work to linten
2) BLOCK WORK
2.1 2 3
3
18 M2
2 3.96
1.27
10.0584 M2
3.8
3
11.4 M2
4 2.4
1.2
11.52 M2
50.9784 M2 Area of H.C.B WALL
HIRSHA GETER LIMIAT BET TSHFET FINISHING WORK
Item A. SUB STRUCTURE
DESCRIPTION Unit Quantity rate Amount
8.1
A) dia. 50MM M 9 25 225
B) dia. 80 MM M 20 28 560
C) dia 110 MM M 22 48 1056
Supply and fix hand wash basins made of
white vitreous china equipped with
consealed bracket made of grey mallable
cast iron white painted completes with
plug chains and traps (approved quality by
the engineer)
8.2
A hand wash basin size (600x405)mm no 8 698 5584
Supply and install shawer tray units made
of enamelled cast iron steel plate and fiber
glass including complete with all the
accessories .(approved quality by the
8.3 engineer)
A) shawer tray fiber glass complete
size(80x80)cm. no 4 681 2724
B) supply and fix soap holder including
fastering screws and the necessary
accessories(approved quality by the
engineer) no 4 62 248
Supply and fix Turkish type WC of
European made of white vitreous china
with high flush cistern and stop cock on
the water supply line, complete with all
accessories(Approved quality by the
Engineer)
8.4 no 8 750 6000
Supply and install galvanized steel pipes
for cold and hot water distribution to all
sanitary fixtures according to the drawing
complete with the ecessary connection
pieces such as bends, unions, etc. unit
price shall include all the necessary
assistance to the installation of works
such as chiseling of walls, slabs, beam,
floor, etc. and closing them with concrete
or cement mortar, to normal condition and
excavation, back fill for out side the
installation shall be tested at apresure of
10kg/cm2 by the expense of the
contractor (approved quality by the
engineer)
8.5 0
A) sanitary installation 1/2 inch G.S. pipe
inside the building ML 60 45 2700
B) sanitary installation 1and1/2 inch G.S.
pipe outside the building ML 85 128 10880
9. ELECTRICAL INSTALLATION
WORKS
Supply and install light points fed through
PVC insulated conductors of 3*2.5mm 2 in
thermoplastic conduits of dia. 16 mm for
recessed installation including junction
boxes with covers (screw type) and
insulting caps.
9.1 NO 42 310 13020
Connected and tested including lamps
and accessories complet all as specified
or described in lighting fittings.
9.2
A)Supply and fix philips TMS 012/2.36+2X
TLD 36W+reflector NO 60 1280 76800
B) supply and fix TMS 012/1.18+1xTLD
18w NO 24 596 14304
9.3 socket out let and other point
Supply and install flush mounted socket
outlets of 16A, single phase and with
earthing contact fed through PVC
insulated conductors of 3 x 2.5 mm2 in the
thermoplastic conduits of diam. 16 mm for
recessed installation including junction
boxes with covers and insulating caps -all
complete.
NO 100 230 23000
9.4 Telephone points
Supply and install Telephone points fed
through PVC insulated conductors of
2*0.6mm2 inside PVC conduits of 19mm
dia., including junction boxes with covers
and insulating screwcap connectors,
complete with all the necessary
accessories.
NO 8 200 1600
supply and install Bell call indicator
including junction boxes with covers and
insulating screw cap connectors, complete
with all the necessary accessories.
9.5 NO 2 1200 2400
supply and fix AIR conditioner 48 btu with
9.6 all accessories. NO 4 15000 60000
supply and fix 9kg ABC Dry chemical fire
9.7 extinguisher with all accessories. NO 2 1750 3500
supply, install and connect floor stand
main distribution board, MDB made of
steel with locable doors connected to
2(3*120/70)mm2 cable with (3*250)A main
circuit breaker, 3-phase and also consist
of
9.8
1pc ACB 200A/3ph
2pc ACB 160A/3ph
1pc ACB 100A/3ph
2pc ACB 80A/3ph
3pc ACB 25A/3ph
2pc ACB 32A/3ph
1pc ACB 63A/3ph
1pc MCB 10A/3ph
2pcHTC fusedswiches of 80A, 3-ph,
1pcsHTC fused swiches of 100A, 3-ph
complete with bus bar 1;20 rating of 800A
earthing lead and other accessories.
NO 2 15000 30000
Total carried to summary
GRAND SUMMARY 2796448.7
REBET23.5% 657165.4
AFTER REBET 2139283.3
VAT15% 320892.50
TOTAL GRAND SUMMARY 2460175.8
AGRICULTURAL GROWTH PROGRAME/A.G.P/PROJECT
BILL OF QUANRTITY FOR TABYALIMIAT ANIMALS CRASH
A.SUB STRUCTURE UNIT QUAN. E/work RATA TOTAL
1.1 Bulk excavation to adepth of 35cm from
reduced grvelound levle M3 7.1 7.446 10 74.46
1.2 Excavation For pit 50cm*50cm
width and not exceeding 50cm M3 4.125 6 20 120
B.SUPER STRUCTURE
Supply and erect diameter of 2 inch and 2mm
thick circular galvanized pipe vertical post
exposed height should be 150 cm and 50cm
to be insert with concrete,please refer detail
drawing
1.1 ml 95.48 97.3 450 43785
Supply and weld diameter of 2 inch and 2mm
thick circular galvanized pipe three horizontal
bracing price include welding spacing should
according to detail drawing and three coats of
oil paint
1.2 ml 132 132 170 22440
Supply and fix 40*40*2mm thick RHS roof
truss and purlin price includes welding and J
bolt and other accessories.
1.3 kg 278.909 303.600 50 15180
EGA 500mm width and 0.40mm thick roof
cover price includes J bolt and other
accessories.
1.4 m2 25.908 27.9328 260 7262.528
Apply one coat of antirust and two coats of oil
paint.
1.5 m2 15 44.339 30 1330.17
Concrete C-25 in 360kg/m3 filled in to
1.6 m3 4.125 6 1800 10800
25 cm thick stone Hard core 45cm width and
1.7 800cm length m2 17.61 24.874 120 2984.88
Mass Concrete C-15 in 280kg/m3 filled in to
1.8 floor path m2 17.61 24.874 150 3731.1
Total carried to summary 107708.138
Grand Summary 107708.138
Rebet--11--% 11847.8952
After Rebet 95860.2428
V.A.T 15 % 14379.036
Total Grand Summary With V.A.T 110239.2788
6736.08
107708.138
Bill of Quantity For Kebele 02 New Drainage,Suspended Slab
and Maintenance Of Old Drainage
Item Discription Unit Quan. E/work Rate
A.SUB STRUCTURE
1.Excavation and Earth Work
1.1 Demolishing Cement mortar stone
massonry foundation wall and placing
the stone in the municipality office
of Endabaguna town m3 81.25 180 165.25
1.2 Demolishing stone Hard Core
and placing the stone in the
municipality office of Endabaguna town m2 114 120 95.5
1.3 Demolishing Mass Concrete m2 114 120 95.5
1.4 Excavation abto 150 cm from
the existing excavated place with
the given design. m3 937.5 718.67 112
1.5 Back fill under hard core and for the
two side of the drainage with selected
material from quary site at an
average depth of 20cm and
well compacted layer by layer
according to the given design. m3 140 217.828 146.5
1.6 Cart away excavated material to not
more than 2km away from the site m3 937.5 1451.8 85.5
1.7 25cm thick hard basaltick stone or
equivalent stone Hard core m2 340 306.5 125
Total Carried to Summary
2.Massonry Work
2.1 80cm thick on the bottom and 50cm
thick on the top hard basaltick stone or
equivalent semi dressed stone massonry
jointing cement sand
mortar ratio 1:3 . m3 364 457.9 800
2.2 Apply pointing to indicated
internal and external stone
massonry foundation wall Surface
in cement mortar ratio 1:3 . m2 340 486.9 32
Total Carried to Summary
3.Concrete Work
Provide and place steel reinforcement bars
according to structural drawings. Price
includes cutting, bending, placing in position
3.1 and tying wires
a Diam. 16mm deformed bar kg 3719.18 3708.37 30
AFTER REBET
VAT15%
TOTAL GRAND SUMMARY
Bill of Quantity For Kebele 02 New Drainage,Suspended Slab
and Maintenance Of Old Drainage
Item Discription Unit Quan. Rate
A.SUB STRUCTURE
1.Excavation and Earth Work
1.1 Demolishing Cement mortar stone
massonry foundation wall and placing
the stone in the municipality office
of Endabaguna town m3 81.25 40
1.2 Demolishing stone Hard Core
and placing the stone in the
municipality office of Endabaguna town m2 114 40
1.3 Demolishing Mass Concrete m2 114 30
1.4 Excavation abto 150 cm from m3 937.5 90
the existing excavated place with
the given design.
1.5 Back fill under hard core and for the
two side of the drainage with selected
material from quary site at an
average depth of 20cm and
well compacted layer by layer
according to the given design. m3 140 100
1.6 Cart away excavated material to not
more than 2km away from the site m3 937.5 50
1.7 25cm thick hard basaltick stone or
equivalent stone Hard core m2 340 140
Total Carried to Summary
2.Massonry Work
2.1 80cm thick on the bottom and 50cm
thick on the top hard basaltick stone or
equivalent semi dressed stone massonry
jointing cement sand
mortar ratio 1:3 . m3 364 900
2.2 Apply pointing to indicated
internal and external stone
massonry foundation wall Surface
in cement mortar ratio 1:3 . m2 340 50
Total Carried to Summary
3.Concrete Work
Provide and place steel reinforcement bars
according to structural drawings. Price
includes cutting, bending, placing in position
3.1 and tying wires
a Diam. 16mm deformed bar kg 3719.18 25
Total
11460 6 573
11460 6 573
366320 93.9
75120
15580.8
381900.8
111251.1
18720
1360
61382
17560
210273.1
919683.142
128755.63988
790927.50212
118639.125318
909566.627438 790984.6082
39549.23041
-79032.7888280001
0
d Slab
Total
3250
4560
3420
84375
14000
46875
47600
204080
67.4355
327600
17000
344600
65.7885
91.5
92979.5
20800
12480
720
40800
16800
163779.5 163779.5
712459.5
0
712459.5
0
712459.5
TAKE OFF SHEET FOR ENDABAGUNA KEBELE 02
NEW DRAINAGE ,SUSPENDED SLAB AND MAINTENANCE OF OLD DRAINAGE
ITEM NO L*W*H QTY DESCRIPTION
1.Excavation and Earth Work
1.1 2 85
0.5
1.5
127.500 m3
2 35
0.5
1.5
52.500 M3 1
180.000 M3 Demolishing Stone Massonry 2
1.2 1 120 3
1 4
120.000 m3 Demolishing hard core 5
1.3 1 120 6
1 7
120.000 m3 Demolishing mass-concrete 8
1.4 1 100.6 9
1.5
4.3
648.870 m3 Excavation abto 150 cm from
1 75 the existing excavated
2.9
0.8 174.000 m3
822.870 m3
104.200 m3 Deduct for hard Rrock
718.670 M3 total Excavation abto 150 cm from
the existing excavated
1.5 2 175
2
0.2
140.000 m3
1 55
0.9
0.6 48
29.700 m3
8 4
3.2
0.47
48.128 m3
217.828 m3 Back fill under hard core and for the
two side of the drainage with selected material
1.6 1 180.000 180.000 M3 item1.1 Demolishing Stone Massonry
1 120.000 120.000 M3 item 1.2 Demolishing hard core
1 120.000 120.000 M3 item 1.3 Demolishing mass-concrete
1 1031.8 1031.800 M3 item 1.4 total Excavation
1451.800 m3 total cart away
1.7 1 100.6
2.5
251.500 m2 Hard Core for new drainage
1 55
1
55.000 m2 Hard Core for old drainage
306.500 m2 Total Hard Core
2.Massonry Work
2.1 2 100.6
0.65
2.42
316.5 m3 Masonry wall for new drainage
1 75
0.65 m3 Masonry wall for old drainage
2.9 141.4
457.9 m3 Total Masonry wall
2.2 2 100.6
2.42
486.9 m2 apply pointing Masonry wall
3. Concrete Work
3.2 3 4
3
0.2
7.200 m3
1 4
4
0.2
3.200 m3
10.400 m3 total C-30 Concrete for Suspended Slab
3.3 1 4
3
12.000 m2
1 4
4
4.000 m2
16.000 m2 form-work
3.4 1 100.6
2.5
251.500 m2 Mass Concrete for new drainage
1 75
1
75.000 m2 Mass Concrete for old drainage
326.500 m2 total area of mass concrete
3.2 0.5 175.6
2
175.600 m2 Copping for New Drainege
0.5 90
1 45.000 Copping for Old Drainege
3.3 8 4.4
40
1.5786 2222.6688 m3 Diameter 16 Double Reinforcement
6 3.3
40
1.5786
1250.2512
6 4.6
30
1.5786
1307.0808
4 4.6
40
1.5786
1161.8496
3719.1816
85
40
125
0.2
1.6
2.5
4.3
2.5 0.75
2.4 1.5
2.45 1.5
2.52 3.5
2.5 0.75
2.55 2.2
2.54 1.457143
2.7 1.557143
5.65 0.778571
25.81
2.867778
4.667778
1.3
-0.55
1.05
4.9
5
30
40
3.3
1.578667
1 yonas 1,125,360.707
2 Teklay 1,331,945.56 3
3 Andom 1,145,746.64
4 Muley 1,235,631.72 1
5 Brhane 1,190,305.49
6 Hiwet 1,236,282.384 2
Total 7,265,272.501
Average 1210878.75016667
Average *0.6 726527.250100002
Engineering ESTIMATION 1573312.25
Engi.Esti*0.4 629324.9
0.6*A+0.4*E 1355852.1501
TO*0.1 135585.21501
10% Down 1220266.93509
10%Up 1491437.36511
1 ZELEALEM 641,515.320
2 TAREKE 723,644.80
3 WELAY 780,077.85
4 TILAHUN 765,207.70
Total 2,910,445.670
Average 727611.4175
Average *0.6 436566.8505
Engineering ESTIMATION 905394.90
Engi.Esti*0.4 362157.96
0.6*A+0.4*E 798724.8105
TO*0.1 79872.48105
10% Down 718852.32945
10%Up 878597.29155
BAR SCHEDULE
DIA. LENGTH N0.
LOCATION DIA. 16
Bars for Suspeded slab 16 3.95 16
Bars for intermedia 14 28.28 9
te beam.
Bars for intermedia 14 2 11
40.5
1 TI 790,984.60
2 Shishay 757,429.87
3 welay 712,459.50
4 Tewodrose 820,806.45
5 Aerefayne 738,570.13
6 Senay 667,362.72
7 Tesfahuney 809,774.72
8 Zelealem 877,511.07
9 Bayew 892,717.83
10 Samsom 767,067.52
Total 7,834,684.41
Average 783468.441
Average *0.6 470,081.06
Engineering Est 984094.93
Engineering Est*0.4 393637.972
863,719.03
86371.903
777,347.13
1 Zelealem 954,561.90 1235631.72
2 Tareke 831,277.67 780077.85
3 welay 780,077.85 2015709.57
4 Tilahun 765,207.70
Total 3,331,125.12
Average 832781.28
Average *0.6 499,668.768
Engineering Est 905394.9
Engineering Est*0.4 362157.96
861,826.728
86182.6728
775,644.055
948,009.401
Bill of Quantity For Kebele 02 New Drainage,Suspended Slab
and Maintenance Of Old Drainage
Item Discription Unit Quan. Rate
A.SUB STRUCTURE
1.Excavation and Earth Work
1.1 Demolishing Cement mortar stone
massonry foundation wall and placing
the stone in the municipality office
of Endabaguna town m3 81.25 137.72
1.2 Demolishing stone Hard Core
and placing the stone in the
municipality office of Endabaguna town m2 114 5.51
1.3 Demolishing Mass Concrete m2 114 13.77
1.4 Excavation abto 150 cm from
the existing excavated place with
the given design. m3 937.5 110.18
1.5 Back fill under hard core and for the
two side of the drainage with selected
material from quary site at an
average depth of 20cm and
well compacted layer by layer
according to the given design. m3 140 194.05
1.6 Cart away excavated material to not
more than 2km away from the site m3 937.5 96.93
1.7 25cm thick hard basaltick stone or
equivalent stone Hard core m2 340 97.58
Total Carried to Summary
2.Massonry Work
2.1 80cm thick on the bottom and 50cm
thick on the top hard basaltick stone or
equivalent semi dressed stone massonry
jointing cement sand
mortar ratio 1:3 . m3 364 996.33
2.2 Apply pointing to indicated
internal and external stone
massonry foundation wall Surface
in cement mortar ratio 1:3 . m2 340 43.75
Total Carried to Summary
3.Concrete Work
Provide and place steel reinforcement bars
according to structural drawings. Price
includes cutting, bending, placing in position
3.1 and tying wires
a Diam. 16mm deformed bar kg 3719.18 27.72
Total
11189.75
628.14
1569.78
103293.75
27167
90871.875
33177.2
267897.495 267897.495
362664.12
14875
377539.12
103095.6696
23695.36
59724.4
10714.2
197229.6296
842666.2446
842666.2446
126399.93669
969066.18129
BILL OF QUANTITY FOR SUPPLEMENTARY CONTRACT
Item DESCRIPTION Unit Quantirate
A. SUB STRUCTURE
1.EXCAVATION AND EARTH WORK
1.1Excavation trenches for foundation to a depth om3 60 80
1.2excavation in hard rock to a depth from 100-30 m3 100 130
Amount
4800
13000
BAR SCHEDULE FOR ENDABAGUNA
SUSPENDED SLAB
Dia Length No of bars
Location (mm) (m) No.ba Elem. T.No ø16mm
Suspended slab 16 4.25 64 3 192 816
Suspended slab 16 3.25 84 3 252 819.00
Suspended slab 16 4.25 84 1 4 357.00
Suspended slab 16 4.25 84 1 84 357.00
Total length (m) 2,349.00
Unit weight (k.g) 1.5787
Total wt (k.g) 3,708.37
2.95 16
30.5 16
56.832
1.57866666667
1,854.19
55,625.70
CERTIFICATE OF PAYMENT
Date :-28/09/2009E.C
Project:- NEW DRAINAGE,SUSPENDED SLAB AND
MAINTENANCE OF OLD DRAINAGE
Location:- ENDABAGUNA contract value
amount
687,812.703 39549.2304
51,077.243
103,114.799
366,206.320
54,930.948
421,137.268
421,137.268
& 587/1000) Only.
ved by ________________
nature _________________