Composit Pull wire off INA for inspection (may have to pull INX also)
Jump S-orSNorINA to INU=up or hold in UA1 relay
Jump S-orSNorINA to IND=down or hold in DA1 relay
Move directional limits off selector DLM & ULM
Final limits = H2 to H5 Down Final H3 to H4?
SOS = H5 to H9 (manual reset under car)
Gov = S- to H2
Or
KONE
KCM831 Hydro – limits = Connector XH1 terminals 1 to 5
Directional = Connector XS1 terminals 2 to 3
AMF
Hydro Take off wire on IO board RB3 (AUT)
Jump RB4 to run to +24
Jump +24 to X11 to run up.
Jump +24 to X12 to run down.
Up Directional Limit = CP3 to UDL
Otis
LRV Hydro Remove PM and ULV relays and replace with Button Relays.
Jumper Fuse 5 to terminal 88 to run up
Schindler
MPH1 Hydro TC6 to TC13 to run up
TC6 to TC 3 to run down
Up Directional Limit = TT8 to TT9
MPH II Toggle to inspection.
Up Directional Limit = TT1 to TT2
Esco
Esco To put on inspection jump CP2 to INS.
Jump CP2 to UIN to run up.
Jump CP2 to DIN to run down.
Up Directional Limit = 4 to 6
Baxco
Hydro Toggle to inspection.
Jump INS to UP to run up.
Jump INS to DN to run down.
Top Directional Limit = SS to UDS
Top Final Limit = S10 to TF
U.S. Elevator
Ascention 2000 Pull wire off TV10 to put on inspection.
To run up touch wire off TV10 to TV11
To run down touch wire off TV10 to TV12
Up Directional Limit = TV26 to TV 30
Elevator Controls
Hydro Toggle to inspection.
Up Directional Limit = 28 to 30
Top Final Limit = 17 to 24 or 23A to 24
Cetek
Flex-H Up Directional = STP to US
Top Final = SH1 to SH3
Electrodyn Systems
Hydro Pull wire off of G9 to put on inspection.
Jump M5 to H1 to run up. (or E8 to H1)
Jump M5 to H2 to run down. (or E8 to H2)
Top Limit = G7 to E7
Car calls = K4 to J5, J4, J3…
A&F
Hydro Remove wire off 19 to put on inspection.
Jump 6 to 20 to run up.
Jump 6 to 21 to run down.
Up Directional Limit = 6 to 13
Galaxy
Hydro Toggle to inspection.
Up Directional Limit = SFC to UN
Top Final Limit = RPR to TF
VMI
Hydro Remove wire off 5W to put on inspection.
Jump 99E to 18A to run up.
Up Directional Limit = 8E to 11E
Top Final Limit = 1W to 2W
Harris
Hydro Remove wire off OE2 to put on inspection.
Jump E6 to ISU to run up.
Jump D4 to ISD to run down.
Up Directional Limit = D3 to UDL
Jump 99E to 22A to run down.
South Eastern
Hydro Remove wire off 35 to put on inspection.
Jump 35 to SU to run up.
Jump 35 to SD to run down.
Up Directional Limit = 30 to 49
Top Final Limit = 1 to 1A
Fujitec
Hydro Remove wire off P23 to put on inspection.
Jump P67 to F12 to run up.
Jump P6Y to F12 to run down.
Up Directional Limit = PL9 to P17
Top Final Limit = P8 or P7 to PSD
Swift
Futura Up Directional Limit = LCS to SU1 & LCS to UNL
Down Directional Limit = LCS to SD1 & LCS to DNL\
Top Final Limit = GV to FL
Bottom Final Limit = FL to LBS
S.O.S. Switch = HS to ICS
Governor Switch = LCS to GV
Westinghouse
FRL Toggle to “Hand” for inspection.
Hold in 81 and 81U relays to run up.
Hold in 81 and 81D relays to run down.
Up Directional Limit = 73 to 76
Down Directional Limit = 75 to 76
Final Limit Switches = 52 to 54
Governor Switch = 71 to 72
S.O.S. Switch = 74 to 79
Hollister Whitney
Rope Gripper Jump RG5 to RG6 in gripper box.
Screw set screws in to clamp to prevent setting.
Schumacher
Hydro Jump INS to ULI to run up.
Jump INS to DLI to run down.
Up Directional Limit = NLC to UN2