IC 4 Week Project Timeline Template 10660

This document provides a 4-week project timeline template. The template includes a table with columns for each week broken down by day. Tasks are listed along with assigned staff, start and end dates, duration, and status. The template allows users to enter task details to plan and track a project over a 4-week period divided into daily time blocks.

Uploaded by

Jarre Angking
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
64 views

IC 4 Week Project Timeline Template 10660

This document provides a 4-week project timeline template. The template includes a table with columns for each week broken down by day. Tasks are listed along with assigned staff, start and end dates, duration, and status. The template allows users to enter task details to plan and track a project over a 4-week period divided into daily time blocks.

Uploaded by

Jarre Angking
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

4 WEEK PROJECT TIMELINE TEMPLATE

Wk 1 Wk 2 Wk 3 Wk 4
WEEK BEGINNING January January January February
Monday, January 15, 2024 <–– Enter Week Start Date; chart days and dates will populate automatically, to right. Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun

START END DURATION


TASK NAME ASSIGNED TO
DATE DATE in days
STATUS 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 01 02 03 04 05 06 07 08 09 10 11

Task 1 - enter your own text here 01/15 01/16 2 Complete

Subtask 1.1 01/16 01/16 1 Complete

Task 2 - enter your own text here 01/17 01/19 3 In Progress

Subtask 2.1 01/18 01/19 2 On Hold

Task 3 01/17 01/26 10 Not Started

Task 4 01/21 01/23 3 Not Started

Task 5 01/24 01/27 4 Not Started

Task 6 01/26 02/02 8 Not Started

Task 7 01/26 01/30 5 Not Started

Task 8 01/30 01/30 1 Not Started

Not Started

Not Started

Not Started

Not Started

Not Started

Not Started

Not Started

Not Started

Not Started
4 WEEK PROJECT TIMELINE TEMPLATE
Wk 1 Wk 2 Wk 3 Wk 4
WEEK BEGINNING January January January February
Monday, January 15, 2024 <–– Enter Week Start Date; chart days and dates will populate automatically, to right. Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun

START END DURATION


TASK NAME ASSIGNED TO
DATE DATE in days
STATUS 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 01 02 03 04 05 06 07 08 09 10 11
Any articles, templates, or information provided by Smartsheet on the website are for reference
only. While we strive to keep the information up to date and correct, we make no representations
or warranties of any kind, express or implied, about the completeness, accuracy, reliability,
suitability, or availability with respect to the website or the information, articles, templates, or
related graphics contained on the website. Any reliance you place on such information is
therefore strictly at your own risk.

You might also like