IMPLEMENTATION CHALLENGES
PLANNING FOR PRECAST
Awareness of precast
Future of precast
Development of Precast in India so far
• Number of precast manufacturing
units have been set up and are
being set up in India.
• The demand for precast systems is
rising day by day
• The developers and Govt.
Institutions have felt the necessity
of completion of projects faster and
thus pass on benefits to the
customers early as well as for
themselves
• Spirol from UK have set up a
facility in south India to supply the
steel plates required for beds duly
tying up with a local firm
• Bianchi from Italy have set up the
facility near to Mumbai and are
supplying the tilting moulds
required for making walls, as well
as for forms for columns, beams
and have already supplied to
number of precast manufacturers
in India.
S.N Client Equipment supplied from Unit
o
I Hyderabad
1 Janapriya Developers, Elematic, FINLAND Battery Mould
2 PRECA Prensoland, Spain
3 Skill promoter Nordimpianti, Italy
II COIMBATORE
TEEMAGE PRECAST ECHO, from 5 bed HCSplant
NETHERLANDS, & Battery Mould
WECKENMANN, Germany
INFOSYS MLCP
INFOSYS MLCP
INFOSYS MLCP
INFOSYS MLCP
INFOSYS MLCP
INFOSYS MLCP
INFOSYS MLCP
INFOSYS MLCP
INFOSYS MLCP
INFOSYS MLCP
WTC-
WTC-WORLD TRADE CENTRE, PUNE
Bangalore Development
Authority (BDA) B+S+18 floor
housing project
Doddabanahalli Bangalore
B+S+18 FLOOR HOUSING
PROJECT, DODDABANAHALLI,
BANGALORE
M/s. B.G.Shirke Construction
Technology Pvt Limited, Pune
built the structure using
Prefab technology
Office Building
in Hyderabad:
• Stilts- 2no’s + G +4 ; 1,65,000 sft
• Delivered in 4.5 months
Hospital Building:
G+4 – 1,20,000 sft : Built in 4
months
Precast elements used are, viz.,
Precast Prestressed Hollow
core slabs,
Prestressed beams,
Precast Retaining walls, Precast
Stairs,
Precast Lift walls,
Precast Architectural elements,
Precast ducts
Industrial Building in Hyderabad
• Cadbury’s project-
2,20,000 sft
• Composite
Construction:
Steel columns and
Beams + Precast
Hollow core slabs
• Delivered in 5
months
INTERNATIONAL SCHOOL BUILDING in Hyderabad
IT SEZ Office Building in
Hyderabad
Stilt+ G+4 – 1,65,000 sft –
built in 4 months
Precast elements used are,
viz.,
Precast Prestressed Hollow
core slabs,
Prestressed beams,
Precast Retaining walls,
Precast Stairs,
Precast Lift walls
Industrial
Buildings
Industrial Wagon
loading building in
Hyderabad
Delivered in 4 months
Few of the projects carried out by
VME Group, Chennai
D.R.D.O, CABS HANGER & OFFICES BUILDINGS,
BANGALORE.
NOVOTEL IBIS COMBO HOTEL, CHENNAI.
KHIVRAJ MOTORS – CAR SHOWROOM, CHENNAI
CHENNAI SILKS SHOWROOM, TIRUNELVELI
OFFICE BUILDING – GUINDY, CHENNAI
LAKESIDE, CHENNAI
Few of the projects carried out
by TEEMAGE, Coimbatore
M s TSM Canteen Block
• Built-up Area : 13,500 Sq.Ft
• Scope : Beams, Columns,
Hollow core slabs, Wall
panels, Solid Slabs and
Staircase
• Time: 38 days
M s. Rotary School,
School Tirupur, Tamilnadu
• Duration : 28 Days
• Built-up Area : 19,000 Sq.Ft
• Scope : Beams, Columns, Hollow
core slabs, Wall panels, Solid
Slabs and Staircase
M s. SCM Silks (P) Ltd : Tirupur, Tamil Nadu
• Duration : 30 Days
• Built-up Area : 52,300 Sq.Ft
• Scope : Beams, columns, Hollow
core slabs, Wall panels and
staircase
M s.Christian Medical
College
Vellore, Tamil Nadu
• Duration : 27 Days
• Built-up Area : 49,500 Sq.Ft
• Scope : Beams, Columns,
Hollow core slabs, Wall
panels and Staircase
• Supertech, from Noida,
Shobha Developers are
meeting their in House
requirements, while, KEF
Infra, and other companies
have also done different
structures across India.
Planning for
Precast
• For any project, precast needs to be
planned right from the beginning of
involving all the consultants.
• Sound design and planning is a must
involving all the consultants, viz.,
Architects, Structural, and MEP.
• In precast, after the design is frozen,
elements will go for production.
Thereby, there is a distinct advantage
of design freezing point happens to
the builders and developers.
Challenges in implementation
of Precast
The following are the challenges in
implementation of precast into
projects, viz.,
• Understanding of the Technology of
Precast
• Affordability of Precast
• Setting up cost of Precast units and
Payback period
• Viability of Precast Industry
• Entrepreneurs to set up
• Demand for Precast and Customers for
absorbing/using the Precast units
Challenges in implementation
of Precast
• Precast Awareness
amongst the builders and
Developers
• Resistance to change from
Conventional construction
• Taxes on precast elements
is also one of the main
retarding factors in precast
development, compared
with conventional
construction
Challenges in implementation
of Precast
• By adopting for precast, Builders
and developers should consider
that the time for completion of
projects will be reduced by 40 to
50% .
• This will in turn reduce overheads
on men and machinery .
• The space could be leased out
early or occupied and revenue
accruals on early leasing will in fact
give lot of savings compared to
conventional construction
PRECAST SET UP SCALE VS COST
Assumptions:
Unit size 500 sft
Design Simple
Configuration G+4