YORK REGION | WATER AND WASTEWATER MASTER PLAN | LAND ACKNOWLEDGMENT | AUGUST 2022 2
Whether a long time resident or new to one of our many vibrant communities,
one thing all York Region residents can depend on is access to safe, reliable
and efficient delivery of water and wastewater services.
As a thriving Region, careful planning is done to ensure key water and
wastewater infrastructure, including pipes, sewers and water treatment
plants, can effectively meet current and future demands.
The 2022 Water and Wastewater Master Plan Update looks ahead to our
future and identifies the infrastructure and programs required to support our
projected growth to 2 million residents and nearly 1 million jobs by 2051.
This Master Plan Update builds on the 2016 plan and continues to support
greater resiliency in our water and wastewater systems by using One Water
principles to guide decision-making.
The new plan integrates water and wastewater initiatives with the Region’s
Official Plan, the Transportation Master Plan and other strategies to ensure
service excellence meets the needs of our rapidly growing Region in the most
cost-effective way.
Together, we remain steadfast in our commitment for building strong, caring
and safe communities.
YORK REGION | WATER AND WASTEWATER MASTER PLAN | CONTENTS | AUGUST 2022 5
CONTENTS
6. The Infrastructure Plan ..............................................................................................................................70
6.1 Regional Projects to Address Region-wide Servicing Needs ...........................................................81
6.2 Cities of Markham, Richmond Hill and Vaughan ............................................................................82
6.3 Township of King ............................................................................................................................83
6.4 Town of Whitchurch-Stouffville ......................................................................................................83
6.5 Towns of Aurora, East Gwillimbury and Newmarket ........................................................................84
6.6 Town of Georgina ............................................................................................................................85
6.7 Updated Cost Estimates ................................................................................................................86
7. Implementing the Plan ...............................................................................................................................87
7.1 Delivering Infrastructure Projects ..................................................................................................88
Budget and Capital Plan ...............................................................................................................88
Environmental Assessments ..........................................................................................................88
Long-term Financial Sustainability................................................................................................89
Monitoring and Adapting ...............................................................................................................94
7.2 Achieving a Sustainable Water Future............................................................................................97
Demand Management....................................................................................................................98
Climate Change Actions ..............................................................................................................100
Water Equity and Liveability ........................................................................................................104
Measuring Success ......................................................................................................................107
8. Conclusion ................................................................................................................................................109
YORK REGION | WATER AND WASTEWATER MASTER PLAN | CONTENTS | AUGUST 2022 6
CONTENTS
Appendices
Appendix A - Infrastructure
A.1 Natural Environmental Features
A.2 Baseline Regional Water and Wastewater Systems
A.3 Design Criteria
A.4 Water and Wastewater Flows Forecasts
A.5 Detailed Alternative Servicing Strategies Evaluation
A.6 Infrastructure Costing Methodology
A.7 Additional Servicing Considerations
A.8 Primary System Master Plan Requirements
YORK REGION | WATER AND WASTEWATER MASTER PLAN | CONTENTS | AUGUST 2022 7
CONTENTS
Figures
Figure E.1 Population and Employment Growth Forecast in York Region Through the Provincial Growth Plan....... 10
Figure E.2 Growth-related Capital Infrastructure Costs ........................................................................................... 11
Figure 1.1 Regional and Local Water and Wastewater Service Delivery in York Region ...................................... 15
Figure 1.2 Regional Strategies and Plans Shaping the Water and Wastewater Master Plan................................... 16
Figure 1.3 York Region’s Accountability Framework ................................................................................................. 16
Figure 1.4 Municipal Class Environmental Assessment Process ............................................................................. 18
Figure 1.5 Consultation and Engagement Milestones............................................................................................... 20
Figure 2.1 York Region and Local Cities and Towns....................................................................................... 23
Figure 3.1 York Region Servicing History.................................................................................................................... 34
Figure 3.2 York Region Water Systems and Sources of Supply in 2021.................................................................... 36
Figure 3.3 York Region’s Baseline Water Infrastructure Systems in 2021 ............................................................... 37
Figure 3.4 Regional Wastewater Systems in 2021 ................................................................................................... 39
Figure 3.5 York Region’s Baseline Wastewater Infrastructure Systems in 2021...................................................... 40
Figure 3.6 Predicted Climate Trends for York Region by 2050................................................................................... 42
Figure 3.7 Examples of Mitigation and Adaptation Actions...................................................................................... 43
Figure 3.8 One Water Guiding Principles....................................................................................................... 44
Figure 4.1 Population and Employment Growth Forecast in York Region through the Provincial Growth Plan........ 48
Figure 4.2 Where New Population and Employment will go by 2051 ........................................................................ 50
Figure 4.3 Forecast Annual Regional Water Demand to 2051 .................................................................................. 51
Figure 5.1 Identifying a Preferred Strategy................................................................................................................ 56
Figure 5.2 Strategy 1: York Water System with Northern Connection........................................................................ 61
Figure 5.3 Strategy 2: York Water System without Northern Connection................................................................... 62
Figure 5.4 Preferred Strategy for Water Servicing: York Water System with Northern Connection............................ 67
Figure 5.5 Preferred Strategy for Wastewater Servicing............................................................................................ 68
Figure 6.1 Long-term Water Infrastructure Plan........................................................................................................ 79
Figure 6.2 Long-term Wastewater Infrastructure Plan.............................................................................................. 80
Figure 7.1 Total Cost of Servicing............................................................................................................................... 89
Figure 7.2 Estimated Costs to Acquire Growth-related Infrastructure...................................................................... 90
Figure 7.3 Operating Cost of Water and Wastewater Systems.................................................................................. 92
Figure 7.4 Estimated Cost of Renewal for Water and Wastewater Assets Over the Next 100 Years ....................... 93
Figure 7.5 Integrated Approach to Water and Wastewater Service Delivery............................................................. 95
Figure 7.6 Climate Risks to Regional Water and Wastewater Infrastructure ......................................................... 102
Tables
Table 4.1 Distribution of Population and Employment in York Region to 2051............................................... 49
Table 4.2 Residential and Employment Water Consumption Design Rates to 2051....................................... 52
Table 5.1 Screening of Water and Wastewater Servicing Concepts................................................................ 59
Table 5.2 Results of Evaluating Two Alternative Water Servicing Strategies.................................................. 65
Table 6.1 Growth-related Water and Wastewater Projects ............................................................................. 72
Table 6.2 Summary of Master Plan Expenditures for Growth Capital Projects ($000’s) to 2051.................... 86
YORK REGION | WATER AND WASTEWATER MASTER PLAN | CONTENTS | AUGUST 2022 8
EXECUTIVE SUMMARY
YORK REGION | WATER AND WASTEWATER MASTER PLAN | EXECUTIVE SUMMARY | AUGUST 2022 9
EXECUTIVE SUMMARY
Executive Summary
The Regional Municipality of York’s Water and Wastewater Master Plan is a key document that details how
the Region will provide safe, reliable services to new growth over the long term. It evaluates infrastructure
systems in a broad land-use and environmental context and describes, at a high level, the projects needed
to supply drinking water and manage wastewater in future.
The Master Plan is updated periodically to reflect changing conditions and new information. This update to
the 2016 Master Plan followed a process prescribed by the Municipal Engineers Association Municipal Class
Environmental Assessment, an approved process under the provincial Environmental Assessment Act.
It was undertaken in conjunction with a Municipal Comprehensive Review carried out by the Region that incor-
porated a new provincial growth forecast into the Regional Official Plan, and with an update to the Transpor-
tation Master Plan. This process included extensive consultation and engagement with partners
and stakeholders.
While reflecting the new growth forecast to 2051 (shown in Figure E.1 below), this update concludes that the
overall direction of the 2016 Water and Wastewater Master Plan remains valid. The update also recognizes
how the One Water concept, first described in the 2016 Master Plan, is being more fully incorporated into
master planning. One Water helps achieve a sustainable water future by recognizing that water is a finite
resource and finding ways to preserve its value in all settings.
Figure E.1 Population and Employment Growth Forecast in York Region Through the Provincial Growth Plan
The preferred strategy set out in 2016 and validated through this update is for future growth in the Region to
be serviced largely by leveraging and expanding existing water and wastewater systems. Through existing
intermunicipal agreements, most drinking water would continue to come from Lake Ontario, and treated
wastewater would mostly be returned to that watershed.
Groundwater will continue to round out our supply in the central area, with Lake Simcoe supplying the
northern end of the Region. Communities currently serviced by stand-alone water and wastewater systems
will continue to be serviced by those systems, except for Kleinburg in the City of Vaughan which will
eventually be connected to the York Durham Sewage System.
YORK REGION | WATER AND WASTEWATER MASTER PLAN | EXECUTIVE SUMMARY | AUGUST 2022 10
EXECUTIVE SUMMARY
The York Durham Sewage System and Duffin Creek Water Pollution Control Plant in Pickering (co-owned with
Durham Region) will be upgraded and expanded, with a new York Region-owned Water Reclamation Centre
to be established (pending outstanding provincial approvals) in the Lake Simcoe watershed.
The estimated cost to implement the water and wastewater infrastructure projects in this updated Master Plan
is $4.5 billion, comprising $1.0 billion for water and $3.5 billion for wastewater. These growth projects and
costs will feed into the Region’s Development Charges Bylaw as it is updated in 2022. Figure E.2 below
shows the planned capital expenditures over the 30-year planning horizon.
Ongoing programs to manage demand through water conservation and inflow and infiltration reduction are
integral to the infrastructure strategy to ensure we can meet increased demand cost-effectively with a con-
tinued decline in per-capita water use. This demand management approach is in line with our One Water
principles, which are reflected in programs and plans to address climate change and enhance water equity
and livability. Water equity ensures that all residents and businesses have access to clean, safe and affordable
water services while maximizing community benefits and fostering resilience in the face of a changing climate.
This updated Master Plan meets all applicable regulatory requirements, including a limit on water transfers
between the Lake Ontario and Lake Simcoe/Lake Huron watersheds under a bi-national Great Lakes agree-
ment. It also accords with overarching goals and objectives set out in the Region’s Vision, Strategic Plan and
other corporate and departmental plans. To ensure financial sustainability and in line with principles endorsed
by York Regional Council, this Master Plan will better leverage existing infrastructure systems and more tightly
align pacing of new capital projects with actual growth.
YORK REGION | WATER AND WASTEWATER MASTER PLAN | EXECUTIVE SUMMARY | AUGUST 2022 11
EXECUTIVE SUMMARY
As this update was finalized, the Region continued to await provincial approval of the Water Reclamation
Centre needed to add wastewater capacity in the north. An Individual Environmental Assessment for this
project was completed and submitted to the province in mid-2014. Given the rigorous study completed for the
Water Reclamation Centre and the time and money invested to date, this project continues to be considered
an essential part of the preferred servicing strategy for Aurora, East Gwillimbury and Newmarket.
With completion of this update, the preferred strategy and associated infrastructure plan are carried out
through projects funded through the ten-year capital plan. Budgets for specific infrastructure projects are
updated as necessary through the Region’s annual budget. Over time, the Environmental Services capital
plan responds to such factors as new financial constraints, delays or scope changes in project delivery, market
constraints and actual growth that differs from forecast.
All forecasts and outlooks are inherently uncertain, and this uncertainty increases as the time horizon extends
further into the future. A range of programs, plans, analyses and activities allow for adaptation to changing
conditions as plans are implemented in the coming years. Nonetheless, there are limits on the Region’s ability
to accommodate unexpected circumstances. This underscores the need to seek the right balance – between
costs, growth patterns, environmental preservation, and the needs of existing customers – as the Region acts
to implement the Master Plan.
INFRASTRUCTURE PLAN
• $4.5 Billion of infrastructure
to service growth over the
next 30 years
CONTINUED MONITORING
• Actual growth and available capacity
• Implementation of infrastructure
though the capital plan
• Progress of demand
management programs
• One Water approach
YORK REGION | WATER AND WASTEWATER MASTER PLAN | EXECUTIVE SUMMARY | AUGUST 2022 12
1.0 INTRODUCTION
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 1.0 INTRODUCTION | AUGUST 2022 13
1.1 WATER AND WASTEWATER MASTER PLAN PURPOSE
1.1 WATER AND WASTEWATER MASTER PLAN PURPOSE
The Regional Municipality of York’s Water and Wastewater Master Plan sets out an approach to meet the
needs of the Region’s growth. To reflect changing conditions and new information, the plan is updated period-
ically, generally on a five-year cycle. This update reflects revised growth forecasts identified in A Place to Grow:
Growth Plan for the Greater Golden Horseshoe and incorporated in the Regional Official Plan.
Since creation of the Region’s first master plans in the 1990s, a key purpose has been to ensure the infrastructure
serving new growth is cost effective and resilient. The most recent update in 2016 added a new purpose to the
plan: to develop an integrated, long-term strategy for sustainable water and wastewater services. This speaks
to the need to focus on environmental, social, and financial sustainability beyond the five-year time horizon.
The Water and Wastewater Master Plan informs updates to York Region’s Development Charges
Bylaw by detailing funding the Region will need to collect in development charges to recover
capital investments made in growth-driven capital projects.
THE PROBLEM STATEMENT FOR THIS MASTER PLAN UPDATE IS DEFINED AS FOLLOWS:
“Building on previous Master Plan recommendations, York Region is updating its long-term
water and wastewater servicing strategies and infrastructure program to accommodate
2.02 million people and 990,000 jobs by 2051 in accordance with the Regional Official Plan in
an environmentally, socially and fiscally responsible manner.”
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 1.0 INTRODUCTION | AUGUST 2022 14
1.2 YORK REGION’S ROLES IN WATER AND WASTEWATER
1.2 YORK REGION’S ROLES IN WATER AND WASTEWATER
York Region is a wholesale provider of drinking water, responsible for water production, treatment, storage
and bulk supply to its cities and town. Regional transmission mains transfer water to infrastructure owned and
operated by the local cities and towns, which in turn distribute it directly to end users.
Similarly, York Region acts as a wholesale provider of wastewater services, collecting wastewater from local mu-
nicipal sewers and conveying it through a network of trunk sewers and pumping stations to treatment plants.
York Region and its cities and towns share responsibility for water and wastewater systems and services,
as shown in Figure 1.1.
Figure 1.1 Regional and Local Water and Wastewater Service Delivery in York Region
York Region works with its nine local municipal partners to coordinate timely service delivery in the short and
long term, guided by policies within the Regional Official Plan, and in consultation with conservation authorities
on such issues as source water protection.
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 1.0 INTRODUCTION | AUGUST 2022 15
1.3 MASTER PLAN CONTEXT AND ALIGNMENT WITH
REGIONAL COUNCIL’S VISION
1.3 MASTER PLAN CONTEXT AND ALIGNMENT WITH REGIONAL COUNCIL’S VISION
The Water and Wastewater Master Plan is developed in the context of Regional strategies and plans.
As outlined in the diagram below, the Master Plan is a corporate plan providing the key functions
of water and wastewater service planning and implementation to 2051:
Figure 1.2 Regional Strategies and Plans Shaping the Vision guides York Regional Council and
Water and Wastewater Master Plan staff decisions towards achieving “Strong,
Caring, Safe Communities.” York Region’s
Vision, Strategic Plan, Multi-Year Budget,
Departmental Plans and Individual Perfor-
mance Plans adhere to the Accountability
Framework (Figure 1.3) to achieve our com-
mitments to Council for our communities.
Departmental planning is key to aligning
departmental priorities with the Strategic
Plan, Multi-Year Budget and, ultimately, the
Vision. Departmental Plans are informed by
and support: the Regional Official Plan, Mas-
ter Plans, Council direction, provincial and
federal mandates and/or other regulatory/
legislative requirements.
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 1.0 INTRODUCTION | AUGUST 2022 16
1.4 HOW THE PLAN UPDATE WAS CARRIED OUT
The Strategic Plan, updated every four years, is a roadmap emphasizing priorities over each term of York
Regional Council. In 2019, Regional Council adopted the 2019-2023 Strategic Plan. Specific goals and
objectives influencing water and wastewater master planning include:
Support safe communities by ensuring water meets all relevant standards
Build sustainable communities and protect the environment by delivering and promoting
environmentally sustainable services
Deliver trusted and efficient services by ensuring reliable, responsive, effective, efficient and fiscally
responsible service delivery while managing the Region’s assets for current and future generations
These goals and objectives are reflected in this plan through its attention to ensuring delivery of high-quality
drinking water and wastewater services using safe, reliable infrastructure that minimizes impacts on the envi-
ronment and is financially sustainable.
The Regional Fiscal Strategy helps to achieve long-term financial sustainability through carefully managing
the Region’s capital plan, reserves and debt. Its influence on infrastructure planning is described in Section
4.3. The fiscal strategy also affects the Region’s annual budget, which includes a 10-year capital plan that is
updated each year.
Other Regional plans play a role in how the Water and Wastewater Master Plan is implemented. These include
asset management plans, demand management strategies and climate change plans, discussed in Section 3.3.
Of particular importance is the Region’s adoption of a One Water approach to managing water resources.
One Water leverages the natural water cycle to make the best use of every source of water, including water
that has passed through municipal systems. It also helps minimize the use of other inputs, including energy,
to mitigate climate change impacts.
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 1.0 INTRODUCTION | AUGUST 2022 17
1.4 HOW THE PLAN UPDATE WAS CARRIED OUT
Depending on the nature and complexity of an individual project, it may be subject to further review under
the provincial Environmental Assessment Act, as discussed in Section 2.6. The Act provides for a municipal class
environmental assessment for municipal projects that are similar in nature, are carried out routinely, have a
predictable range of environmental effects, and respond to mitigating measures. Most infrastructure projects
undertaken by the Region fall within the framework for municipal class environmental assessments.
The Act also provides for a comprehensive environmental assessment process, less frequently used, that
applies to large, complex projects with the potential for significant environmental effects. This is referred
to as a full or individual environmental assessment.
Figure 1.4 outlines the municipal class environmental assessment process and requirements for each
phase. The number of phases to be completed for a particular project depends on the nature of the
project. The Municipal Engineers Association requires that a master plan follow, at a minimum, the
first two phases of the process. This update to the Master Plan followed phases 1 and 2.
Note: The Region uses the terms “Alternative Strategies” and “Preferred Strategy” to describe what the Municipal
Engineers Association process calls “Alternative Solutions” and “Preferred Solution”
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 1.0 INTRODUCTION | AUGUST 2022 18
1.4 HOW THE PLAN UPDATE WAS CARRIED OUT
Use of Approach 1 in Preparing the Master Plan
Different approaches can be used to develop a master plan. York Region followed Approach 1 set out in Ap-
pendix 4 of the current Municipal Engineers Association Municipal Class Environmental Assessment document.
As part of Approach 1, the Master Plan identifies how each individual project is expected to proceed through
the environmental assessment process. In some cases, this will involve following phases 3, 4 and/or 5 as
shown in Figure 1.4. Schedule B and C projects will undergo project-specific environmental assessments to ful-
fil the municipal class environmental assessment consultation and documentation requirements. All schedule
B projects will require filing of the Project File Report for public review. All Schedule C projects will fulfil phases
3 and 4 of the Class Environmental Assessment process prior to filing an Environmental Study Report for public
review. This is discussed in more detail in Section 7.1 on implementation.
By providing the rationale for all projects, the Master Plan fulfills the first two phases of the municipal class
environmental assessment process and supports any future environmental assessments that may be needed.
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 1.0 INTRODUCTION | AUGUST 2022 19
1.4 HOW THE PLAN UPDATE WAS CARRIED OUT
Consultation and engagement took place through three phases over the course of updating the Master Plan:
Those identified as having an interest in the Master Plan update were notified of opportunities to give feed-
back at each milestone in Figure 1.5. The process was designed to ensure feedback was taken into consid-
eration. More information on the consultation approach and those identified as having an interest can be
found in Appendix B.1. Section 2.5 provides a summary of Indigenous communities, partner and stakeholder
views, and Appendix B sub-volumes provide notices used to communicate the Master Plan update along with
detailed feedback gathered through the open houses.
In the balance of this update:
Section 2 outlines the general context for master planning, including factors specific to the
Region as well as the regulatory framework that applies to water and wastewater
Section 3 provides an overview of the existing Regional systems
Section 4 discusses the planning outlook, including forecasts of population and water use,
for the period covered by this update
Section 5 explains how the preferred servicing strategy was selected
Section 6 outlines related infrastructure needs and costs
Section 7 outlines implementation, detailed costs and monitoring
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 1.0 INTRODUCTION | AUGUST 2022 20
2.0 GENERAL CONTEXT
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 2.0 GENERAL CONTEXT | AUGUST 2022 21
2.1 CURRENT YORK REGION POPULATION AND ECONOMY
2.1 CURRENT YORK REGION POPULATION AND ECONOMY
Established in 1971, York Region consists of nine local municipalities: the cities of Markham, Richmond Hill
and Vaughan; the towns of Aurora, East Gwillimbury, Georgina, Newmarket and Whitchurch-Stouffville and
the Township of King.
Its central location directly north of the City of Toronto in the Greater Toronto Area has helped to make the
Region one of the fastest-growing and large municipalities in Ontario. At the time of its creation, it had just
under 200,000 residents and 50,000 jobs. Over the past 50 years, it has grown more than seven-fold to
1.2 million people and 600,000 jobs in more than 54,000 business establishments across several
industries. It has also become one of Canada’s most diverse communities.
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 2.0 GENERAL CONTEXT | AUGUST 2022 22
2.2 GEOGRAPHY AND NATURAL ENVIRONMENT
Figure 2.1 York Region and Local Cities and Towns
Watershed Boundary
Sutton
Road
48
Highway
Municipal Boundary Pefferlaw
Regional Boundary
Town of
East
Gwillimbury
Mount
Albert
Schomberg of Town of
Newmarket Whitchurch-
Township 404
Stouffville 48
of King 400
Town of
Ballantrae
Aurora
Stouffville
Kleinburg
City of
City of Richmond City of
Vaughan Hill Markham
Peel Region
Durham Region
427
407
0 2 4 6 8Km
City of Toronto
¯
LAKE ONTARIO
O:\Solid_Waste\Projects\2021\20210411_MPlan\Tools\January\Local.mxd
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 2.0 GENERAL CONTEXT | AUGUST 2022 23
2.3 CULTURAL HERITAGE AND ARCHAEOLOGICAL RESOURCES
2.3 CULTURAL HERITAGE AND ARCHAEOLOGICAL RESOURCES
Archaeological resources in York Region include sites that may contain artifacts, remains of structures, cultural
deposits or subsurface strata of human origin.
Physical remains of cultural heritage can be extremely fragile. Policies in the Regional Official Plan commit
York Region to responsible archaeological management, and its Regional Archaeological Management Plan
outlines the process for archaeological assessments.
Project-specific environmental assessments will include detailed assessment of archaeological and cultural
heritage features and the project’s potential impacts and, where applicable, mitigation measures.
Indigenous Communities
Engagement with Indigenous communities was coordinated with the Municipal Comprehensive Review and
Transportation Master Plan update. The Region coordinated engagement individually based on their interest,
capacity, and availability as there is currently no provincially approved framework for engaging with Indige-
nous communities. A consultant and Indigenous facilitator supported all engagement activities. The opportu-
nity to engage with and learn from Indigenous communities was valuable, as their unique historic and cultural
relationship to the land and water gives rise to important perspectives on how to manage the natural environ-
ment and water resources. The Region looks forward to continuing these conversations.
Feedback was received from several Indigenous communities and is summarized below.
Indigenous communities encourage York Region to develop lasting, long-term relationships;
this would provide a more proactive approach to involve communities in projects and initiatives
at the outset allowing time for meaningful engagement and input
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 2.0 GENERAL CONTEXT | AUGUST 2022 24
2.5 INDIGENOUS COMMUNITIES, PARTNER AND
STAKEHOLDER VIEWS
impacts arising from growth that may affect traditional Indigenous ways of life:
York Region acknowledges the relationship Indigenous communities have with the natural environment and
acknowledges the central importance of water in the culture and lives of Indigenous people. York Region is
committed to sustainable management and use of water and protection of the natural environment not only
in the present, but also over the long term for future generations by:
Sharing the importance of water and continued need for conservation and
stewardship within its communities
Continuing to deliver high quality water and wastewater services
Implementation of projects identified in the Master Plan will recognize the archaeological importance of
the lands in York Region to Indigenous communities and will follow applicable regulatory requirements
to consult and engage communities with Aboriginal or treaty rights.
Indigenous Communities
Indigenous communities in the Water and Wastewater Master Plan refers to First Nations (as recognized under the
Indian Act) as well as Indigenous peoples including urban Indigenous who live throughout York Region and are not
officially recognized under the Indian Act. This inclusive approach reflects a range of Indigenous peoples that have
historical interests and/or treaty rights or live in York Region. View the treat map.
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 2.0 GENERAL CONTEXT | AUGUST 2022 25
2.5 INDIGENOUS COMMUNITIES, PARTNER AND
STAKEHOLDER VIEWS
delivery and planning; in light of near-term wastewater capacity constraints due to delays in
provincial approval of Upper York Sewage Solutions (discussed in more detail in Section 2.6),
local municipalities were interested in exploring innovative interim servicing solutions with
the Region so that development can continue
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 2.0 GENERAL CONTEXT | AUGUST 2022 26
2.5 INDIGENOUS COMMUNITIES, PARTNER AND
STAKEHOLDER VIEWS
Land Developers
The building and land development industry plans and constructs homes, offices and commercial/industrial
buildings that accommodate growth across the Region and must connect to water and wastewater services.
Engagement with the York chapter of the Building Industry and Land Development Association (BILD), which
represents larger developers in the Greater Toronto Area, was coordinated with the Municipal Comprehensive
Review and update to the Transportation Master Plan; land developers who are not BILD members were able
to provide input through public open houses.
The industry is concerned about future system capacity and timing and growth-related costs, which
are recovered through development charges on new construction; like local municipalities, they ex-
pressed frustration in the protracted provincial approval process for infrastructure solutions to deal
with servicing constraints in the towns of Aurora and Newmarket and the communities of Holland
Landing, Queensville and Sharon in the Town of East Gwillimbury
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 2.0 GENERAL CONTEXT | AUGUST 2022 27
2.6 REGULATORY AND POLICY FRAMEWORK
2.6 REGULATORY AND POLICY FRAMEWORK
Important considerations in planning water and wastewater systems include laws and plans protecting the
natural environment and sensitive geographical areas, policies around growth, and guidance around selection,
design, and operation of infrastructure.
The following sections cite and describe relevant regulatory and policy considerations. This update to the
Water and Wastewater Master Plan has been drafted for consistency with these requirements.
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 2.0 GENERAL CONTEXT | AUGUST 2022 28
2.6 REGULATORY AND POLICY FRAMEWORK
York Region Wastewater Act, 2021
In 2014, the Region completed an individual environmental assessment for the proposed Upper York Sewage
Solutions initiative. This project would accommodate growth in the towns of Aurora, East Gwillimbury and
Newmarket through three main components: a Water Reclamation Centre near the East Holland River in the Lake
Simcoe/Lake Huron watershed, a phosphorus offset reduction program and a twinned forcemain (pumped sewer
pipe) from the Town of Newmarket to the Town of Aurora. The 2016 Water and Wastewater Master Plan identi-
fied Upper York Sewage Solutions as part of its preferred servicing strategy. To date, the provincial government
has allowed the forcemain twinning to go ahead but has not rendered a decision on the other components.
In October 2021, the provincial government enacted the York Region Wastewater Act, 2021. This legislation
puts an indefinite hold on any decision by the Minister of the Environment, Conservation and Parks on the Up-
per York Sewage Solutions environmental assessment, prevents any further action being taken by York Region
to advance this project and seeks to limit the province’s liability for taking these steps. The province has also
appointed the York Region Wastewater Advisory Panel to provide confidential advice on options to address
wastewater servicing capacity needs in the upper parts of York Region.
Given the work and expense already completed in the environmental assessment and other preparation, and
the pressing need to meet provincial deadlines for updating the Development Charges Bylaw, the Region will
continue to plan for the Upper York Sewage Solutions initiative until it is directed otherwise.
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 2.0 GENERAL CONTEXT | AUGUST 2022 29
2.6 REGULATORY AND POLICY FRAMEWORK
Changes to the Act are intended to streamline the environmental assessment process for most projects and
will result in changes to the approvals process to be followed for Regional projects. Regulations to implement
new environmental assessment processes are currently under development by the province, which will outline
the process to be followed for future Regional projects, including those listed in Section 6. The Master Plan has
been structured to adapt to this regulatory change when it occurs.
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 2.0 GENERAL CONTEXT | AUGUST 2022 30
2.6 REGULATORY AND POLICY FRAMEWORK
The Oak Ridges Moraine is a component of the Greenbelt. An important source of groundwater recharge, the
moraine is protected by its own provincial legislation and conservation plan under the Oak Ridges Moraine
Conservation Act, 2001. Generally, where the Oak Ridges Moraine plan covers a specific geographic area, it
takes precedence over policies in the Greenbelt Plan. Future growth cannot generally be accommodated
except in approved settlement areas, and there are restrictions on how and where infrastructure can be located.
Servicing considerations for select communities located within the Greenbelt and Oak Ridges Moraine are
included in Appendix A.7. This information could be used as a basis to consider municipal servicing
implications if provincial policy restrictions are removed in the future.
Covering much of the northern part of the Region, Lake Simcoe and its tributaries make up an area of spe-
cial natural environmental interest, containing wetlands, forests and other natural features. Human-related
pressures, including phosphorus loading, led to creation of the provincial Lake Simcoe Protection Act, 2008
and an associated Lake Simcoe Protection Plan. The Protection Plan limits phosphorus discharges, including
those from municipal wastewater treatment facilities and does not allow for any new wastewater treatment
facility to be built unless it replaces an existing treatment facility. In addition, Provincial environmental policy
often issues competing requirements focused on areas that are easier to regulate, not necessarily the most
significant sources. There is a need for more integrated policy thinking to mitigate conflicts like the Hazardous
and Special Products Regulation which recommends consumers use up left over fertilizer which conflicts with
provincial regulations for controlling non-point sources of nutrients.
In addition to provincial protection, York Region’s Official Plan recognizes these systems and key natural fea-
tures that support healthy ecosystems, such as valleylands, woodlands, streams and lakes. It sets out policies
around use, protection and enhancement of the Regional Greenlands System, which includes many of these
features. These policies underlie the objective of this Master Plan to deliver sustainable servicing and align
with the watershed plans discussed below.
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 2.0 GENERAL CONTEXT | AUGUST 2022 31
2.6 REGULATORY AND POLICY FRAMEWORK
Rouge National Urban Park
Created by federal legislation in 2015, the Rouge National Urban Park is a new type of protected area —a na-
tional park within an urban area that includes part of the City of Markham and Town of Whitchurch-Stouffville
within York Region. Regional infrastructure is located within or close to the park, so this update considered the
park’s management plan. When infrastructure work needs to be done in or near the park, the Region will pro-
tect its natural features. Both the Rouge National Urban Park agreement and the Rouge National Urban Park Act
provide a strong foundation for protecting a broad range of Regional interests including: growth management,
infrastructure (e.g. water wastewater and roads), agriculture, transit and utilities. The agreement provides for
future infrastructure needs, protects easements and allows for maintenance activities including the ongoing
rehabilitation of the York Durham Sewage System.
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 2.0 GENERAL CONTEXT | AUGUST 2022 32
3.03.1 EVOLUTION
OVERVIEW OF WATER AND
WASTEWATER IN YORK REGION
3.2 CURRENT SYSTEMS
3.3 CURRENT PROGRAMS AND INITIATIVES SUPPORTING INFRASTRUCTURE
3.4 USING THE ONE WATER APPROACH
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 3.0 OVERVIEW | AUGUST 2022 33
3.1 EVOLUTION
3.1 EVOLUTION
As York Region has grown, its water and wastewater services and systems have evolved to keep pace.
Figure 3.1 provides an overview of key decisions and events that have significantly shaped the Region’s
servicing strategy.
1990s
• First Master Plans for water and YDSS 143 KM of watermains
• Water for Tomorrow program 158 KM of wastewater mains
introduced 700,000 residents
• Duffin Creek plant expanded
2000s
• Master Plan updates 285 KM of watermains
• Aurora and Newmarket receive 281 KM of wastewater mains
Lake Ontario supply
1.0 MILLION residents
• Service agreements with Peel Region
• King City and Stouffville connect
to YDSS
2010s
• Master Plan update 358 KM of watermains
• Stouffville, King City and Kleinburg- 359 KM of wastewater mains
Nashville receive Lake Ontario supply
1.2 MILLION residents
• Duffin Creek plant expanded again
• Holland Landing, Queensville and
Sharon connect to YDSS
*Regional water and wastewater mains only. Length of mains and population cumulative over each decade.
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 3.0 OVERVIEW | AUGUST 2022 34
3.2 CURRENT SYSTEMS
3.2 CURRENT SYSTEMS
The following sections provide an overview of water and wastewater systems currently in service.
The Master Plan focuses on municipal servicing only. It excludes developments serviced by privately owned
and operated communal water and wastewater systems. Through the Municipal Comprehensive Review,
interest was expressed in the provision of water and wastewater services for the communities of Ballantrae,
Gormley and Vandorf-Preston Lake in the Town of Whitchurch-Stouffville. These communities were not consid-
ered for significant growth nor for provision of municipal servicing because of current provincial policy restric-
tions. In addition, interest was expressed for an increase in servicing capacity in Nobleton in the Township of
King and Mount Albert in the Town of East Gwillimbury, which are not considered for significant growth due to
provincial policy restrictions. Appendix A.7 outlines considerations for servicing these communities currently
restricted through provincial policy if those restrictions are lifted in the future. It also includes further informa-
tion about private communal systems.
Water Systems
The Regional water system supplies roughly 123 billion litres of water to residents and businesses annually,
enough to fill about 50,000 Olympic-size swimming pools.
Through agreements with neighbouring municipalities, over 90% of York Region’s total supply has come from
Lake Ontario in recent years, with groundwater supplying close to 7% and water from Lake Simcoe the remain-
ing amount. Groundwater, which is drawn from municipal wells, may be a community’s only supply, or in some
areas may be mixed with Lake Ontario water.
York Region’s water infrastructure is made up of:
T he York water system, which is the Region’s largest drinking water treatment and supply system;
it services the towns of Newmarket and Aurora, parts of the Town of East Gwillimbury (Holland
Landing, Queensville and Sharon), King City in the Township of King, the community of Stouffville
in the Town of Whitchurch-Stouffville and the cities of Markham, Richmond Hill and Vaughan; this
system distributes Lake Ontario water. In the towns of Aurora, Newmarket and East Gwillimbury,
Lake Ontario supply is blended with groundwater from the Yonge Street aquifer, and in the
community of Stouffville it is supplemented with local groundwater
The Georgina water system, which draws water from Lake Simcoe to serve residents of the
Town of Georgina
Five stand-alone groundwater supply systems, which service communities in the Greenbelt Plan
area where regulation prevents lake-based supply, as explained in Section 2.6. These groundwater
systems are in the communities of Ansnorveldt, Nobleton and Schomberg in Township of King;
Ballantrae-Musselman’s Lake in the Town of Whitchurch-Stouffville; and Mount Albert in the Town
of East Gwillimbury
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 3.0 OVERVIEW | AUGUST 2022 35
3.2 CURRENT SYSTEMS
Figure 3.2 illustrates York Region’s water systems and sources of supply. Most York Region residents are
served by one of these municipal water systems. Many farms and other rural properties, however, rely on
private on-site water systems such as wells.
Figure 3.2 York Region Water Systems and Sources of Supply in 2021
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 3.0 OVERVIEW | AUGUST 2022 36
3.2 CURRENT SYSTEMS
The water system is continually evolving as new infrastructure is constructed, modified or taken off-line. For
the purpose of this Master Plan, the baseline water infrastructure system included all infrastructure in place
or under construction before January 2022. The baseline is shown in Figure 3.3.
The baseline was the starting point from which this Master Plan update assessed the need for any additional
water servicing. Appendix A.2 provides a detailed discussion of York Region’s current water infrastructure system.
!
!
#
#
"
"!
! #
"
# #
# !
!
!
!
#
#
!
!
!
!
Simcoe County #
#
#
#
!
! !
!
#
"
#
# Town" #
# !
! !
!
! #
# !
! !
# of
# #
#
# Newmarket
!
!
Town of
!
!
Township
!
#
!
"
# ##
of King !
!
!!
" Whitchurch- ! !
!
!
Town of Stouffville
# Aurora
# #
#
#
##
# "
#
# #
#
#
#
#
# !
!
#
"
#
"
!!
!!
"
" !!
!
!
!
!
#
# ##
#
"
#
" #
"
#!
!
## City of #
" !
" #
" !
Richmond
#
# #
"
# Hill
#
"
#
"
#
"
#
"!!
#
"
# #
#
City of City of
"
"
Vaughan Markham
"
Peel Region
0 2 4 6 8Km
Durham Region
#
# #
# "
"
#
#
City of Toronto
"
"
¯
LAKE ONTARIO
O:\Solid_Waste\Projects\2021\20210411_MPlan\Tools\January\Baselinewater.mxd
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 3.0 OVERVIEW | AUGUST 2022 37
3.2 CURRENT SYSTEMS
Wastewater Systems
As with water supply, York Region has agreements with neighbouring municipalities for wastewater treatment:
ith Durham Region, it co-owns the Duffin Creek Water Pollution Control Plant, trunk sewers
W
and other infrastructure located in Pickering; the Duffin Creek plant treats about 85% of the
Region’s wastewater
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 3.0 OVERVIEW | AUGUST 2022 38
3.2 CURRENT SYSTEMS
Figure 3.4 illustrates York Region’s wastewater systems and receiving water bodies. Most residents in York
Region are connected to municipal services. Many farms and other rural properties rely on private servicing
such as wells and septic systems.
Figure 3.4 Regional Wastewater Systems in 2021
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 3.0 OVERVIEW | AUGUST 2022 39
3.2 CURRENT SYSTEMS
The baseline wastewater infrastructure systems are shown in Figure 3.5.
A detailed explanation of York Region’s existing wastewater infrastructure systems can be found in Appendix
A.2. Like our regional water systems, our wastewater infrastructure systems constantly evolve. This Master
Plan update considers all infrastructure in place or under construction before January 2022 as the baseline
in assessing the need for additional wastewater servicing.
! " "
City of
City of
Vaughan
Richmond
! Hill City of
Markham
Peel Region
"
0 2 4 6 8Km
Durham Region
"
City of Toronto
" "
¯
!
!
LAKE ONTARIO
O:\Solid_Waste\Projects\2021\20210411_MPlan\Tools\January\baselinewaste.mxd
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 3.0 OVERVIEW | AUGUST 2022 40
3.3 CURRENT PROGRAMS AND INITIATIVES SUPPORTING INFRASTRUCTURE
3.3 CURRENT PROGRAMS AND INITIATIVES SUPPORTING INFRASTRUCTURE
Going hand in hand with the 30-year plan for new infrastructure projects set out in this Master Plan is a suite
of programs and initiatives, including those outlined below, to manage system demand, care for assets and
address climate change. By reducing the burden on infrastructure, such programs lessen or defer the need to
expand and add to systems, and are key to efficient and cost-effective servicing.
Water Conservation
Since York Region introduced the 1997 Long-Term Water Supply Master Plan and the Water for Tomorrow
program, water conservation plans have been key to managing the demand for water. Over the past 23 years,
an estimated 27 megalitres a day has been saved because of the Region’s Water for Tomorrow and Long-Term
Water Conservation Strategy programming, the latter introduced in 2011.
This work has translated into declining per capita residential consumption. Between 2016 and 2020, water
consumption per capita averaged 194 litres a day for single-family households, down from 207 litres a day
over the previous five-year period. This value excludes total system demand, which includes total consumption
from all sectors, including non-revenue water. The Region’s aspirational goal is to reduce residential consump-
tion to an average of 150 litres by 2051. It is important to note that while this goal is valuable to discourage
wasting water and to price services equitably, water and wastewater systems must be designed based not on
average flows, but on the highest expected flows, as discussed in Section 4.2. York Region manages demand
on water and wastewater systems through programs that encourage communities, residents and businesses
to consider how much water they use, when they use it and how they dispose of it.
The Region’s Long-Term Water Conservation Strategy and programs, updated in 2021, emphasize cost-effec-
tive opportunities to realize long-term water savings, as described further in Section 7.2. The updated strategy
is available in Appendix C.1.
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 3.0 OVERVIEW | AUGUST 2022 41
3.3 CURRENT PROGRAMS AND INITIATIVES SUPPORTING INFRASTRUCTURE
Asset Management
Asset management planning for municipal infrastructure is another provincial regulatory requirement under
Ontario Regulation 588/17 influencing infrastructure planning. The Region developed a Corporate Asset Man-
agement Policy and related plan with the goal of minimizing costs of infrastructure over its entire life cycle,
from construction through operation to decommissioning. The Corporate Asset Management Plan, adopted by
Regional Council in 2018, considers inspection, repair, renewal, replacement and other needs over a 100-year
time horizon. In recognition of the importance of managing and maintaining infrastructure assets to ensure
sustainable service delivery, a comprehensive Water and Wastewater Asset Management Plan was developed
in 2017 to provide input to the Corporate Asset Management Plan. Updates to both of these asset manage-
ment plans are anticipated by 2024. To ensure financial sustainability, reserves are maintained through the
water and wastewater user rates to recover the full costs of providing services, including day-to-day operating
expenses and contributions to reserves to cover current and future rehabilitation and replacement costs. This
principal of full cost recovery is a long-standing Regional commitment that is outlined in the Region’s Water
and Wastewater Financial Sustainability Plan.
To get the most value from investments and minimize disruption to communities, the Region looks for
alignment with the timing of this renewal work with growth-related projects, wherever possible.
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 3.0 OVERVIEW | AUGUST 2022 42
3.3 CURRENT PROGRAMS AND INITIATIVES SUPPORTING INFRASTRUCTURE
Addressing climate change calls for two approaches: mitigation and adaptation. Mitigation refers to reducing
greenhouse gas (GHG) emissions to slow human-induced global warming. Adaptation refers to taking action
to reduce negative impacts associated with existing and future climate change. Examples of mitigation and
adaption actions are illustrated in Figure 3.7.
The Region is committed to mitigating impacts of climate change with a goal of achieving net-zero GHG emis-
sions by 2050. York Region’s Energy Conservation and Demand Management Plan lays out programs and
projects to reduce energy use and GHG emissions associated with the delivery of Regional services. The plan
is updated every five years as required under the Electricity Act, 1998. The last update, completed in 2019,
features short, medium and long-term GHG reduction targets to 2051.
The main use of energy in water and wastewater systems is for pumping and wastewater aeration. Energy use
can be reduced by operating more efficiently and encouraging water conservation. In line with the Energy Con-
servation and Demand Management Plan, potential GHG emissions were considered in selecting a preferred
strategy, as described in Section 5, Table 5.2: Results of Evaluating Two Alternative Water Servicing Strategies.
Even with substantial mitigation efforts, York Region will continue to feel climate change impacts, and needs
to adapt to these and take action to reduce its negative impacts. As the plan is implemented, making sure
assets are resilient in the face of expected higher temperatures and wetter/drier extremes may call for updating
design requirements.
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 3.0 OVERVIEW | AUGUST 2022 43
3.4 USING THE ONE WATER APPROACH
3.4 USING THE ONE WATER APPROACH
An important purpose of this Master Plan update is ensuring long-term sustainability of water and wastewa-
ter systems, following the direction of York Regional Council at the time of the 2016 update.
The Region is increasingly using an integrated One Water approach to work towards greater sustainability.
Adopted by utilities around the world, One Water recognizes that all sources of water – drinking water, waste-
water, recycled water, rainwater, stormwater and more – are part of a finite global resource. By leveraging
previously untapped sources of water and natural instead of built solutions, One Water benefits communities
and the environment while costing less than traditional approaches.
Recognizing municipal water systems as part of the larger water cycle in the natural world aligns with the
circular economy concept that focuses on conserving, reusing and repurposing resources, not just extracting,
using and disposing of them.
In York Region, the three guiding principles of One Water are integrate, innovate and ‘infrastretch’ as defined
in Figure 3.8 below.
INTEGRATION
Take a coordinated, holistic approach
to water resource management.
DECISION- INNOVATION
MAKING Practice and explore new concepts and
ideas to promote cost efficiency and
environmental sustainability.
INFRASTRETCHING
Maximize the useful life and capacity of built
infrastructure to defer capital investment.
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 3.0 OVERVIEW | AUGUST 2022 44
3.4 USING THE ONE WATER APPROACH
Integrate
One Water recognizes all forms of water are ultimately
connected in a complex, living system
To better manage and protect that living system,
people must work together to share and connect
their plans, practices, knowledge and information
Integrating also means working together within the
Region to create a collaborative One Water culture by
adopting whole systems thinking, joining up plans
and practices, and building relationships with
entities throughout and even beyond the Region
Innovate
Innovative solutions to complex problems are needed
to enhance systems and services by better matching
water sources and water uses; innovation can be a
new idea, product or new way of doing things that
achieves more with the same or fewer resources
One Water should inspire and support innovative Water Reuse Research Demonstration Project
approaches that add value to water services for the York Region continues to explore new
benefit of residents, businesses and the environment opportunities to expand its One Water
approach through research and innovation.
Infrastretch
In 2020, the Region completed the award-winning
The One Water approach is critical to making
Water Reuse Research Demonstration Project,
infrastructure more resilient, reliable and
which involved reusing treated wastewater
cost effective
effluent for irrigation at a sod farm. The project
Infrastretching is a term used by York Region which received the Ontario Water Works Association
means maximizing the useful capacity and useful (OWWA) 2020 Water Efficiency Award.
life of built infrastructure to minimize and/or defer
The demonstration project identified some
capital investment; this principle focuses on the
limitations in applying reused water, including
physical water and wastewater assets as well as
salt content from water softeners used in the
on supportive green infrastructure
area. York Region is now researching potential
non-agriculture applications, for example, street
tree irrigation or other commercial or industrial
uses by nearby businesses. Through an economic
feasibility study in 2022, York Region hopes to
identify businesses that can use reused water
from wastewater or dewatering sites.
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 3.0 OVERVIEW | AUGUST 2022 45
3.4 USING THE ONE WATER APPROACH
Our One Water approach is most effective and fully realized when all three of these principles are brought
together to solve complex problems facing water services and communities.
One Water goes far beyond the Region’s own actions. Just as the natural water cycle operates at different
scales, from small ponds and creeks to vast oceans, One Water ideas and initiatives can take place at the
household, business, community or watershed level.
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 3.0 OVERVIEW | AUGUST 2022 46
4.0 OUTLOOK
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 4.0 OUTLOOK | AUGUST 2022 47
4.1 UPDATE TO GROWTH PLAN FORECASTS AND EXPECTED INTENSIFICATION
4.1 UPDATE TO GROWTH PLAN FORECASTS AND EXPECTED INTENSIFICATION
This updated Master Plan refines the long-term servicing strategy that was outlined in 2016. The refinements
largely reflect revised planning projections to 2051 developed through the Municipal Comprehensive Review,
which informed the updated Regional Official Plan.
These planning projections are based on 2020 Ontario government updates to population and employment
forecasts in A Place to Grow: Growth Plan for the Greater Golden Horseshoe. Provincial direction is outlined in
Section 2.6.
In addition to updating forecasts in 2020, the province extended the forecast period by 10 years, from 2041
to 2051. Overall, significant growth is expected across York Region by 2051, as shown in Figure 4.1. This
represents the addition of roughly 800,000 people and 345,000 jobs between 2021 and 2051, the greatest
percentage growth of any Greater Toronto and Hamilton Area municipality.
Figure 4.1 Population and Employment Growth Forecast in York Region through the Provincial Growth Plan
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 4.0 OUTLOOK | AUGUST 2022 48
4.1 UPDATE TO GROWTH PLAN FORECASTS AND EXPECTED INTENSIFICATION
The province requires municipalities to identify and plan for infrastructure needed to support its growth fore-
casts. York Region and other regional municipalities, in coordination with local municipal planners, distribute
provincial projections to the local level.
Updated figures for York Region, taken from the Municipal Comprehensive Review, are shown in Table 4.1 and
Figure 4.2 below.
In southern York Region communities, urban boundaries will expand considerably in the cities of Markham
and Vaughan. Areas of high intensification are also planned, with greater density of residents and jobs than
was expected in 2016.
Major growth is also forecast in the north, particularly in the Town of East Gwillimbury, where significant
new land will be brought into the urban boundary. Moderately higher growth than set out in 2016 is
planned in the towns of Aurora and Newmarket.
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 4.0 OUTLOOK | AUGUST 2022 49
4.1 UPDATE TO GROWTH PLAN FORECASTS AND EXPECTED INTENSIFICATION
Figure 4.2 Where New Population and Employment will go by 2051*
700,000
600,000
500,000
Residential
400,000
Population
300,000
Employment
Employment
Residential
Residential
Residential
Residential
200,000
Residential
Employment
Employment
Residential
Employment
Employment
Employment
Employment
Employment
Residential
Residential
100,000
0
Aurora
East Gwillimbury
Georgina
King
Markham
Newmarket
Richmond Hill
Vaughan
Whitchurch-Stouffville
Current (2021) Forecasted Growth
*This reflects the Draft 2022 Regional Official Plan and is subject to change based on Regional Official Plan approval.
On October 21, 2021, York Regional Council approved a growth scenario for the 2022 Regional Official Plan
update. This scenario includes 50% intensification annually to 2041 and 55% annually from 2041 to 2051.
Four motions were approved with respect to growth and urban expansion in the City of Markham, Township of
King and the towns of East Gwillimbury and Whitchurch-Stouffville. Section 6 and Appendix A.7 further discuss
how water and wastewater servicing has been considered for each motion.
As well as providing the Regional forecast, the province sets out minimum intensification and density targets
through A Place to Grow. The emphasis is on compact growth that is ideally supported by transit.
Transit has become a more important consideration with extension of the subway line from the City of Toronto
into York Region. A link to Vaughan Metropolitan Centre was completed in 2017, triggering major high-inten-
sity development in that area. More recently, the provincial and federal governments announced their support
for the Yonge North Subway Extension Project, extending the Yonge line to the Langstaff Gateway area near
Highway 7 and Yonge Street in Richmond Hill, which is a Regional priority.
The Region has also introduced a new framework in the Regional Official Plan for major transit station
areas, which aims to support the development of transit-supportive communities around higher order
transit stations. Over 70 major transit station areas have been identified across the Region, supported
by a comprehensive set of policies, mapping and density targets to help guide local municipalities on
planning for major transit station areas.
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 4.0 OUTLOOK | AUGUST 2022 50
4.2 WATER AND WASTEWATER FLOW PROJECTIONS
4.2 WATER AND WASTEWATER FLOW PROJECTIONS
Projections of expected water and wastewater flows are a key input to planning future servicing.
200,000
180,000
160,000
140,000
120,000
Megalitres
100,000
80,000
60,000
40,000
20,000
The light blue shaded band shows the 95% confidence interval above and below the average. Statistically,
actual demand can be expected to fall within this band 95% of the time. This is a reminder that all forecasts
are subject to uncertainty.
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 4.0 OUTLOOK | AUGUST 2022 51
4.2 WATER AND WASTEWATER FLOW PROJECTIONS
For greater certainty that adequate servicing will be in place
when needed, and in line with previous master plans, the
Region used the upper bound of the projection in Figure 4.3 –
that is, the highest predicted demand within the 95% confi- Considering Long-term Impacts
dence interval — as the starting point for planning. of Working From Home on Water
Demand Forecasting
This gave a forecast for total water demand across the Region.
Table 4.2 shows the design consumption rates for residential Working from home during the
and employment sectors. The table shows that per person daily pandemic shifted the usual
water consumption in litres per capita per day (Lpcd), whether consumption pattern between
at home or in a workplace, is expected to decrease over time industrial/commercial/institutional (ICI)
because of water conservation efforts. These rates underpinned and residential with the residential
the analysis of future water needs. share increasing and the ICI share
dropping as businesses were closed
Table 4.2 Residential and Employment Water Consumption and many residents began working
Design Rates to 2051 from home. Despite this change in
relative use by these sectors there
Year was no discernible impact on total
Design Rate
2021 2026 2031 2036 2041 2051 Regional water use. Impacts of any
Residential lasting changes in consumption
221 214 207 200 195 195
(Lpcd) patterns due to the pandemic will
Employment continue to be monitored and
161 159 158 155 151 151 considered in future modelling.
(Lpcd)
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 4.0 OUTLOOK | AUGUST 2022 52
4.3 FISCAL AND LAND USE PLANNING IMPLICATIONS
Wastewater Flow Projection
In dry weather, flows collected in the wastewater system correlate well with the amount of drinking water
consumed.
Design of wastewater systems must consider “wet weather flow” conditions because some water inevitably
enters the sanitary sewer system as a result of rainfall or snowmelt. This drives peak flows that the system
must accommodate. The Region sizes its wastewater system to handle flows that would result from a 25-year
storm event – a storm of such size and intensity that it would typically happen only once every 25 years.
For this Master Plan update, the Region reviewed its 25-year design storm to consider the latest measured
flow data as well as the potential for climate change to result in more extreme weather events. This review
found that the current design storm continues to be valid.
Appendix A.3 and A.4 provide more information on technical design criteria and wastewater flow forecasting
respectively.
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 4.0 OUTLOOK | AUGUST 2022 53
4.3 FISCAL AND LAND USE PLANNING IMPLICATIONS
The Regional Fiscal Strategy, which aims to strike a balance between current and long-term financial needs,
is addressing these impacts. The strategy achieves balance by carefully managing the capital plan, building
reserves for future needs and limiting the use of development-charge-supported debt. Greater accuracy in
forecasting growth, supported by continual monitoring and adjustment in plans as needed, also helps the
Region provide the right service at the right time.
Through the Municipal Comprehensive Review and updates to the master plans, two key goals were to distrib-
ute local municipal growth to better leverage existing infrastructure systems and more tightly align the pacing
of new capital projects with actual growth. These goals promote financial sustainability and were in line with
principles endorsed by York Regional Council in June 2019. They are key to creating fiscal room for the next
generation of infrastructure projects, including the Region’s share of the Yonge North Subway Extension.
Phasing growth is important to ensure that communities are developed as complete communities, that
residents will have access to a wide range of services and amenities within the same community (such
as schools, parks, libraries, transit and jobs) in a timely manner. Phasing new communities is further outlined
in chapter 4 of the Draft Regional Official Plan in the “Phasing in New Community Areas” policies.
Major changes in planning can affect servicing plans, as they may require infrastructure to be upsized, projects
to be advanced and/or new projects added. Section 7.1 provides more details on how the Region takes an
adaptive approach to implementation to accommodate such changes.
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 4.0 OUTLOOK | AUGUST 2022 54
5.0 OPTIONS FOR
SERVICING GROWTH
5.1 ARRIVING AT A PREFERRED STRATEGY FOR SERVICING
5.2 THE 2016 DIRECTION TO MEET GROWTH NEEDS
5.3 SCREENING THE CONCEPTS
5.4 DEVELOPING ALTERNATIVE STRATEGIES TO ADDRESS WATER AND WASTEWATER SERVICING NEEDS
5.5 EVALUATING ALTERNATIVE STRATEGIES
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 5.0 OPTIONS FOR SERVICING GROWTH | AUGUST 2022 55
5.1 ARRIVING AT A PREFERRED STRATEGY FOR SERVICING
5.1 ARRIVING AT A PREFERRED STRATEGY FOR SERVICING
The Municipal Engineers Association framework for master planning considers water and wastewater servic-
ing needs in the context of the whole servicing system.
This Master Plan update identified a preferred strategy for servicing through a two-stage process:
1. Screening of servicing concepts, which are various techniques or tools available to the Region that
could be used independently or in combination to address servicing needs at a conceptual level
2. Developing and evaluating alternative strategies; these evolve from the servicing concepts to yield
comprehensive and feasible approaches to address water and wastewater servicing needs
The diagram in Figure 5.1 shows the process:
Figure 5.1 Identifying a Preferred Strategy
The starting point for the review was the preferred strategy identified in the 2016 Master Plan update and
subsequent studies and analyses.
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 5.0 OPTIONS FOR SERVICING GROWTH | AUGUST 2022 56
5.2 THE 2016 DIRECTION TO MEET GROWTH NEEDS
5.2 THE 2016 DIRECTION TO MEET GROWTH NEEDS
The preferred strategy from the previous Master Plan update is referred to as the 2016 Servicing Strategy. It
planned for future growth in the Region to be serviced largely by leveraging and expanding existing water and
wastewater systems. Most drinking water would continue to come from Lake Ontario, and most wastewater
would be returned to that watershed for treatment.
Key elements of the 2016 Servicing Strategy are:
Introduce water supply from Lake Simcoe to supplement the current Lake Ontario and groundwater
supply in the Town of East Gwillimbury and parts of the Town of Newmarket, and return wastewater
flows to Lake Simcoe via the proposed Water Reclamation Centre and related infrastructure
Continue to supply the cities of Markham, Vaughan and Richmond Hill and part of the Township of
King with Lake Ontario water and return the related wastewater flows to Lake Ontario via the York
Durham Sewage System
Continue to supply the towns of Whitchurch-Stouffville and Aurora and most of the Town of New-
market with blended groundwater and Lake Ontario water and return wastewater flows via the
York Durham Sewage System. A portion of wastewater flows from the Town of Newmarket will be
treated at the Water Reclamation Centre
Continue to supply the Town of Georgina with Lake Simcoe water and return wastewater flows via
the Keswick and Sutton water resource recovery facilities
Continue to supply stand-alone communities with groundwater and return wastewater flows to
individual water resource recovery facilities in those communities
Since 2016, the Region has been moving ahead on approved projects from the 2016 Servicing Strategy:
York Regional Council approved adding a new pump to the Maple Pressure District 8 pumping
station in the City of Vaughan
The province approved the environmental assessment for additional water and wastewater service
in northeast Vaughan
The province approved the environmental assessment for the Duffin Creek Water Pollution Control
Plant outfall strategy
The Region commissioned a new twin forcemain (pumped sewer pipe) between the towns of
Newmarket and Aurora in 2021, making the system more reliable and resilient
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 5.0 OPTIONS FOR SERVICING GROWTH | AUGUST 2022 57
5.3 SCREENING THE CONCEPTS
The province permitted twinning of the forcemain from Upper York Sewage Solutions to go ahead owing
to system security concerns, making it the only component of the proposed Upper York Sewage Solutions
initiative yet approved. As a result of delays in approving the other components, York Regional Council
authorized two interim projects in 2018 to provide capacity to meet growth needs in the towns of Aurora,
East Gwillimbury and Newmarket:
Upgrades to the Aurora sewage pumping station, completed in 2021
A new pumping station near the intersection of Yonge Street and Henderson Drive in the
Town of Aurora, on which construction started in summer 2021
The costs and disruptions related to these projects would have been avoided if the province had provided
timely approval of Upper York Sewage Solutions, which remains valid to this day and has been awaiting a
provincial decision on the environmental assessment since it was submitted in 2014.
The 2016 strategy also included continuing demand management programs like water conservation and
inflow and infiltration reduction. These programs, which support environmental and financial sustainability,
fit well with the One Water approach that the Region began integrating into its planning in 2016.
Optimize
Optimization, also called infrastretching, means maximizing the useful capacity and useful life of
built infrastructure to minimize and/or defer capital investment. An example of this is managing
the timing of flows in the wastewater pipe network to smooth peak flows at capacity bottle-
necks. Optimization can allow for system expansion to be done strategically, as needed.
To screen these servicing concepts, the Region considered applicable regulations, technical and financial
implications, and potential impact on the natural environment and communities at a high level to assess
the advantages and disadvantages of each servicing concept. Table 5.1 describes each of the concepts as
well as results of screening.
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 5.0 OPTIONS FOR SERVICING GROWTH | AUGUST 2022 58
5.3 SCREENING THE CONCEPTS
Table 5.1 Screening of Water and Wastewater Servicing Concepts
Expand Leverage existing • Enables long-term growth • Capital costs may Yes
and optimize infrastructure in line with Places to be significant
existing systems and expand Grow Act, 2005 This option is an essential
systems strategically as • Construction component of long-term
needed. • Ensures compliance with impacts residents servicing that meets the
Safe Drinking Water Act, and businesses and needs of York Region’s
2002 and Ontario Water potentially impacts communities now and in
Resources Act the natural environ- the future.
ment
• Makes best use of
existing plans and
agreements (i.e. Region’s
capital plan, long-term
agreements with Durham,
Toronto and Peel)
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 5.0 OPTIONS FOR SERVICING GROWTH | AUGUST 2022 59
5.4 D EVELOPING ALTERNATIVE STRATEGIES TO
ADDRESS WATER AND WASTEWATER SERVICING NEEDS
This screening stage confirmed that high-level concepts for long-term servicing remain the same as in the
2016 Master Plan: expand and optimize the existing system and continue measures to manage demand.
Both concepts are needed because managing all future demand without new infrastructure would not be
feasible and expanding the system without demand management would not make best use of financial
or water resources.
5.4 DEVELOPING ALTERNATIVE STRATEGIES TO ADDRESS WATER AND WASTEWATER SERVICING NEEDS
The second stage of the process involved developing and evaluating high-level alternatives, called alternative
strategies, based on these two concepts.
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 5.0 OPTIONS FOR SERVICING GROWTH | AUGUST 2022 60
5.4 D EVELOPING ALTERNATIVE STRATEGIES TO
ADDRESS WATER AND WASTEWATER SERVICING NEEDS
Figure 5.2 Strategy 1: York Water System with Northern Connection
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 5.0 OPTIONS FOR SERVICING GROWTH | AUGUST 2022 61
5.4 D EVELOPING ALTERNATIVE STRATEGIES TO
ADDRESS WATER AND WASTEWATER SERVICING NEEDS
Figure 5.3 Strategy 2: York Water System without Northern Connection
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 5.0 OPTIONS FOR SERVICING GROWTH | AUGUST 2022 62
5.4 D EVELOPING ALTERNATIVE STRATEGIES TO
ADDRESS WATER AND WASTEWATER SERVICING NEEDS
Preferred Strategy for Wastewater Servicing
As was the case in 2016, analysis of future wastewater needs showed that additional treatment and convey-
ance capacity will be needed to accommodate expected growth.
This update identified only one preferred strategy for wastewater servicing, which aligns with the direction set
out in the 2016 Master Plan:
Continued use of the York Durham Sewage System, including future expansion of the Duffin Creek
Water Pollution Control Plant and the collector system, to service most of the Region’s population
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 5.0 OPTIONS FOR SERVICING GROWTH | AUGUST 2022 63
5.5 E VALUATING ALTERNATIVE STRATEGIES
Major growth is expected elsewhere in the Region, particularly in the southern York Region communities, and
this will require significant expansion of the York Durham Sewage System. The preferred strategy addresses
this need as well.
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 5.0 OPTIONS FOR SERVICING GROWTH | AUGUST 2022 64
5.5 E VALUATING ALTERNATIVE STRATEGIES
Table 5.2 Results of Evaluating Two Alternative Water Servicing Strategies
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 5.0 OPTIONS FOR SERVICING GROWTH | AUGUST 2022 65
5.5 E VALUATING ALTERNATIVE STRATEGIES
The updated evaluation confirmed that Strategy 1: York Water System with Northern Connection, which
links Lake Simcoe to the north end of the York Water System, had the highest score and remains the
preferred strategy for water servicing.
While the two alternative strategies ranked the same across several criteria, the York Water System
with Northern Connection Strategy’s technical and jurisdictional/regulatory advantages gave it the
higher score. Looking in more detail at the scores in Table 5.2, the preferred strategy would:
Reduce water age in parts of the Region, reducing potential water quality challenges
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 5.0 OPTIONS FOR SERVICING GROWTH | AUGUST 2022 66
5.5 E VALUATING ALTERNATIVE STRATEGIES
Figure 5.4 Preferred Strategy for Water Servicing: York Water System with Northern Connection
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 5.0 OPTIONS FOR SERVICING GROWTH | AUGUST 2022 67
5.5 E VALUATING ALTERNATIVE STRATEGIES
Figure 5.5 Preferred Strategy for Wastewater Servicing
Section 6 describes the detailed infrastructure plan related to the high-level preferred strategies,
while Section 7 discusses implementation.
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 5.0 OPTIONS FOR SERVICING GROWTH | AUGUST 2022 68
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 5.0 OPTIONS FOR SERVICING GROWTH | AUGUST 2022 69
6.0 THE INFRASTRUCTURE
PLAN
6.1 REGIONAL PROJECTS TO ADDRESS REGION-WIDE SERVICING NEEDS
6.2 CITIES OF MARKHAM, RICHMOND HILL AND VAUGHAN
6.3 TOWNSHIP OF KING
6.4 TOWN OF WHITCHURCH-STOUFFVILLE
6.5 TOWNS OF AURORA, EAST GWILLIMBURY AND NEWMARKET
6.6 TOWN OF GEORGINA
6.7 UPDATED COST ESTIMATES
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 6.0 THE INFRASTRUCTURE PLAN | AUGUST 2022 70
6.0 THE INFRASTRUCTURE PLAN
THE INFRASTRUCTURE PLAN
Through the servicing strategy, the Water and Wastewater Master Plan provides the overall vision for how the
Region will provide safe, reliable services to new growth over the long term. This long-term vision involves
delivering projects that expand existing infrastructure and make systems more robust. This section outlines
the infrastructure plan and identifies projects and costs to meet growth needs to 2051.
While the preferred water and wastewater servicing strategy is similar to the strategy identified in the 2016
Master Plan, there have been some changes. This update focused on refining details of the 2016 infrastructure
plan to take into account the new 2051 planning horizon and updated Regional Official Plan. This resulted in
some changes to expected infrastructure sizing, timing and costs. Refinements also considered how to reduce
lifecycle costs and make the system overall more resilient.
Master plans identify the need for specific groups of projects to meet servicing needs and describe them at
a high level to help plan for and guide future work. At this stage, however, projects are conceptual in nature.
Details of specific solutions – including location, final size and choice of technology – are defined as specific
projects are carried out, reflecting new information as it becomes available.
As in the 2016 Master Plan, this update identified upgrades and expansions to parts of the system to bring
additional water supply to communities where local capacity would otherwise be constrained. Projects are
planned and phased to address needs that vary across local municipalities in future years, as well as to meet
overall Regional needs. For wastewater, upgrades and expansions of infrastructure will be needed to convey
and treat wastewater flows from different catchment areas.
Table 6.1 highlights all the growth-related water and wastewater projects including phasing, cost and local
municipality serviced. Section 6.7 provides details on the methodology used in calculating project costs. Figure
6.1 shows water-related infrastructure projects and expected phasing, while Figure 6.2 shows wastewater-re-
lated projects and phasing.
The following sections summarize the water and wastewater projects needed to support growth. As the
Regional water and wastewater systems are designed to serve multiple municipalities, projects have been
grouped accordingly.
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 6.0 THE INFRASTRUCTURE PLAN | AUGUST 2022 71
6.0 THE INFRASTRUCTURE PLAN
Table 6.1 Growth-related Water and Wastewater Projects
Cost-shared programs
Toronto Water Supply - Cost-Shared Works
W1 Continue implementation of cost-shared capital projects within the City of Toronto $ 77,800 Ongoing Various X X X X X X X X
to permit gradual increase of water supply to York Region in accordance with
current Servicing Agreement.
Peel Water Supply - Cost-Shared Works
W2 Continue implementation of cost-shared capital projects within Region of Peel to $ 16,160 Ongoing Various X X X X X X
permit gradual increase of water supply to York Region in accordance with current
Servicing Agreement.
Peel System Cost-Shared Works
WW1 Continue implementation of cost-shared projects in the Region of Peel to allow $ 8,370 Ongoing Various X
diversion of York wastewater flows for treatment in Peel wastewater system in
accordance with current Servicing Agreement.
Duffin Creek Water Pollution Control Plant Outfall Effluent Strategy Class EA
WW10 $ 12,340 2022-2031 completed X X X X X X X
Optimize capacity of existing Duffin Creek Water Pollution Control Plant Outfall. 2019
Duffin Creek Water Pollution Control Plant Stage 1 and 2 Chlorine Chamber Expansion
WW11 Construct a new chlorine contact chamber to increase the Duffin Creek Water $ 15,480 2022-2031 Schedule A X X X X X X X
Pollution Control Plant disinfection capacity.
Upper York Water Reclamation Centre Individual
Construct a new Water Reclamation Centre in East Gwillimbury to accommodate growth EA
and allow decommissioning of Holland Landing Lagoons as recommended in the completed
WW21 $ 549,940 2022-2031
2014,
X X X
Individual Class Environmental Assessment completed in 2014 (pending approval). This
project will provide an overall benefit to the Lake Simcoe watershed through the integral pending
phosphorus offsetting program component of Upper York Sewage Solutions. approval
Holland Landing Lagoon Decommissioning
WW19 Decommission Holland Landing Lagoons following commissioning of the new Water $ 1,100 2022-2031 Schedule A+ X
Reclamation Centre.
Keswick Wastewater Servicing
Class EA
WW23 Increase capacity of Keswick Water Resource Recovery Facility as recommended $ 41,820 2022-2041 completed X
in the completed Class Environmental Assessment and implement growth related 2006
upgrades at Keswick Sewage Pumping Station.
Nobleton Wastewater Servicing Class EA
WW13 Increase capacity of the Nobleton wastewater system to accommodate the population $ 21,970 2032-2041 completed X
identified in the recently completed Class Environmental Assessment. 2021
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 6.0 THE INFRASTRUCTURE PLAN | AUGUST 2022 72
6.0 THE INFRASTRUCTURE PLAN
Table 6.1 Growth-related Water and Wastewater Projects (continued)
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 6.0 THE INFRASTRUCTURE PLAN | AUGUST 2022 73
6.0 THE INFRASTRUCTURE PLAN
Table 6.1 Growth-related Water and Wastewater Projects (continued)
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 6.0 THE INFRASTRUCTURE PLAN | AUGUST 2022 74
6.0 THE INFRASTRUCTURE PLAN
Table 6.1 Growth-related Water and Wastewater Projects (continued)
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 6.0 THE INFRASTRUCTURE PLAN | AUGUST 2022 75
6.0 THE INFRASTRUCTURE PLAN
Table 6.1 Growth-related Water and Wastewater Projects (continued)
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 6.0 THE INFRASTRUCTURE PLAN | AUGUST 2022 76
6.0 THE INFRASTRUCTURE PLAN
Table 6.1 Growth-related Water and Wastewater Projects (continued)
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 6.0 THE INFRASTRUCTURE PLAN | AUGUST 2022 77
6.0 THE INFRASTRUCTURE PLAN
Table 6.1 Growth-related Water and Wastewater Projects (continued)
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 6.0 THE INFRASTRUCTURE PLAN | AUGUST 2022 78
6.0 THE INFRASTRUCTURE PLAN
Figure 6.1 Long-term Water Infrastructure Plan Fox
LAKE SIMCOE
Fox
LAKE SIMCOE
LONG TERM WATER
LONG TERM WA
Island Island
Georgina Georgina
Snake
Island
Snake
Island INFRASTRUCTURE
INFRASTRUCTU
W1 Toronto Water Supply - Cost-Shared Works Island Island PLAN PLAN
Metro Road Metro Road
W2 Peel Water Supply - Cost-Shared Works !
(
!
(
North !
(
!
(
North New Infrastructure New Infrastructure
Black River Road Black River Road
East Woodbridge Pumping Station #
#
W25 #
#
#
#
W25 #
#
)#
" *X
W!( "
)
Projects 2022 - 2031 #
*X
W!( Projects 2022 - 203
W3 48 48
Avenue
( "
Avenue
Projects 2042 - 2051 ( Projects 2042 - 205
W5 York Peel Feedermain Upgrade Pollock Road Town of
Pollock Road Town of
ay
ay
Infrastructure Expansion Infrastructure Expansion
Georgina Georgina
sw
sw
Woodbine
Woodbine
Northeast Vaughan Water Servicing
e en
e en
" # #
W6 Glenwoods Avenue Glenwoods Avenue
"
) *
#WX !
X (
! Projects 2022 - 2031
"
) *W
" #
X(! X ! Projects 2022 - 203
Qu
Qu
"*
) #
#WX
X(! "*
Projects 2032 - 2041
) #
#WX
X(! Projects 2032 - 204
e
) W24 ) W24 Ravenshoe Road Ravenshoe Road " ! " !
Th
Th
#
#" #
#"
W7 Vaughan Storage Expansion
"*
)
" #W
# X(
X !
! "*
Projects 2042 - 2051
) #W
# X(! " X ! Projects 2042 - 205
sion Road
East TownlineRoad
W8 Nobleton Water Servicing Town of Town of
D Decommission D Decommission
East Townline
North Richmond Hill Pumping Station East East
sion
W9
Decommissioning Gwillimbury Gwillimbury Alignment to be Determined Alignment to be Det
2nd Conces
2nd Conces
# Queensville Sideroad # Queensville Sideroad Exisiting Infrastructure Exisiting Infrastructure
Richmond Hill Langstaff Gateway Provincial Urban # !
! # !
!
Street
Street
! !
D
!
! !
!
Bathurst
!
Bathurst
W18 !
W18 !
(
! Well ! Well
Simcoe County Simcoe County #
#
W19 W20 #
#
W19 W20
Road
Road
W14 Bloomington - Bayview Watermain Davis Drive West
Town" Davis Drive West
Town" ##!## Interconnection / Interconnection /
#
Y Y
!
!
#
!
! !
!
!
9 9
#
!
#
! !
! #
!
#
!
!
W18 #
"
)
!
W18 #
"
)
! ! "
#
"
) !
!
!
## "
#
"
) !
!
!
Pressure Improvement Pressure Improveme
McCowan
McCowan
! !
of of
cession
cession
Highway 27
Highway 27
12th Con
12th Con
18th Sideroad 18th Sideroad Future Urban Area* Future Urban Area*
!
! !
!
#
W16 #
"
# W15 #
Town of ! #
W16 #
"
# W15 #
Town of
#
* *
400
!
# 400 # Urban Area* Urban Area*
Town of Town of
!!
! !
!
! !
! !
!
Whitchurch-
!
Whitchurch-
"
) ! "
) !
Weston R
W18
treet
treet
eet
eet
*
"
) *
"
)
cession
cession
e
e
Towns and Villages* Towns and Villages
Aurora Aurora##
Ninth Lin
Ninth Lin
Westo
et
t
Stouffville Stouffville
Keele Str
Keele Str
Dufferin S
Dufferin S
of King
Leslie Stre
W19 Yonge Street Watermain of King # W14
#
" # W14
#
"
#
#
Area within ORMCP conditional Area within ORMCP
# " " ##
10th Con
10th Con
15th Sideroad
# #
# 15th Sideroad ##
W20 Green Lane Leslie Street Watermain #
# #
#
Bloomington Road
#
# #
#
Bloomington Road upon amendments to Ontario upon amendments
#
# #
#
!#
"
#
"
!
404
!!
404
#
"
!
!#
"
!
!
Regulation 140/02** Regulation 140/02**
#
# !!
!
#
# !
Bethesda Sideroad
!
!
Bethesda Sideroad
W21 East Gwillimbury Water Servicing "! ( ! " (! #
# #
# Road Road
Avenue
Avenue
! !
!
(
!
!! #
# !
!
!
(
! #
#
! W8 !
(
#
!
(
W8 W13 # W13
W22 Queensville Elevated Tank No. 2 "
# "
#
)#*#" #
" Highway Highway
City of ") #* Stouffville Road # Stouffville Road "
#
# City ofW12
* W11 " !
W11
! !
!
#
* # W11 "
*W7W11 "
! !
# # Municipal Boundary Municipal Boundary
! !
#"
"))" )"
))"# W12
W23 Holland Landing Storage ExpansionKirby Road W6* #*W7 #
"#
W6 # #
)
" "
W12
Richmond * Richmond #
"
#
W12
Warden
# " Kirby Road
) #)
" Warden #
*
19th Avenue
#
*
19th Avenue Regional Boundary Regional Boundary
W11 D W11
West Park Heights Pumping Station and Watermain #
# #
D
"
D# W9
Hill #
# #
# W9
"
D Hill
Road
W7 #
Road
W24 #
# W4
*
" W7 #
* #
" W4
*
"
# *
Elgin Mills Road East Elgin Mills Road East
"
) #"
# " "
) #
" #
# *This
*This reflects the Draft 2022 Regional Official reflects the Draft 2022 Regional O
Plan,
" "
# " "
# #
Highway 50
"
Highway 50
"
!
! # "
!! # # #
City of City of
McCowan
McCowan
Road
Road
currently under review through the Municipalcurrently under review through the Mun
Georgina Water System Upgrades City of Major Mackenzie Drive West City of Major Mackenzie Drive West
Woodbine Jane Street
W25
t
"
" "
"
Vaughan Vaughan Markham Markham based on Regional Official Plan approval. based on Regional Official Plan approv
Kennedy
Kennedy
enue enue
Avenue
Avenue
Durham Region
Durham Region
Woodbine
X
# W #
X W
X
et
#
et
#
# # " " 0 5 10 0 5 1
Yonge Stre
Yonge Stre
V
W4 W4 # #
#
427 427
# Kilometres Kilometres
407 407
W3 D
"
D W3 D
"
D Steeles Avenue East Steeles Avenue East
W2 W2
City of Toronto W1 City of Toronto W1
Produced by: The Regional Municipality of York, Produced by: The Regional Municipality of York,
Environmental Services Department, Environmental Services Department,
Infrasturcture Asset Management Branch Infrasturcture Asset Management Branch
© Copyright, The Regional Municipality of York 2022© Copyright, The Regional Municipality of York 2022
© Copyright, The Regional Municipalities of Durham©andCopyright, The Regional
Peel, County of Municipalities of Durham a
Simcoe, City of Toronto Simcoe, City of Toronto
© Queen’s Printer for Ontario 2003-2022 , Includes © Queen’s and
Greenbelt Printer
Oakfor Ontario 2003-2022 , Includes Gr
LAKE ONTARIO LAKE
RidgesONTARIO
Moraine Boundaries and Water Features Ridges Moraine Boundaries and Water Features
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 6.0 THE INFRASTRUCTURE PLAN | AUGUST 2022 79
6.0 THE INFRASTRUCTURE PLAN
Figure 6.2 Long-term Wastewater Infrastructure Plan Fox Fox
Island LAKE SIMCOE
Island
Georgina
LAKE SIMCOE
Georgina
LONG TERM LONG TERM
Snake Island
Snake Island WASTEWATER WASTEWATER
WW1 Peel System Cost-Shared Works
Island
Metro Road
Island INFRASTRUCTURE
INFRASTRUCTU
West Vaughan Sewage Servicing Metro Road
WW2 " North
WW24 "" )
"
)
"
Black River Road
North
WW24 " "")
"
) Black River Road PLAN PLAN
Avenue
!
Avenue
" !
!
(
!
( !
!
!
(
!
(
New Infrastructure New Infrastructure
)
"
)
48
"
)
"
)
WW3 )#
" *X
W!( "
)
Projects 2022 - 2031 #
*X
W!( Projects 2022 - 2031
Woodbine
Woodbine
York Durham Sewage System Conveyance Optimization )#
WW4
Old Homestead Road Old Homestead Road
" *X
W!( )#
"
Projects 2032 - 2041 *X
W!( Projects 2032 - 2041
Pollock Road Town of
Pollock Road Town of
WW5 York Durham Sewage System Expansion "!
"
)!
(
!
(
WW23 )!
"!
(
Georgina
WW23
"!
(
Georgina )#
" *X
W!( )#
"
Projects 2042 - 2051 *X
W!( Projects 2042 - 2051
Glenwoods Avenue Glenwoods Avenue
Infrastructure Expansion Infrastructure Expansion
Leslie Street Sewage Pumping Station and Forcemain
WW6 Ravenshoe Road
"*#
" " Ravenshoe Road
)"#WX(! X ! Projects 2022 - 2031
"
) #W
*
" #
X(
! X ! Projects 2022 - 2031
WW7
Richmond Hill Langstaff Gateway Provincial Urban Growth Town of Town of "*
)
"
#W
# X(
X !
! Projects 2032 - 2041
"
)"
#W
* X(
# X! ! Projects 2032 - 2041
" #
Centre Wastewater Servicing * "* #W
East Townline
#WX
East Townline
WW22
East East "
) !
X (
! Projects 2042 - 2051
) # X(
! " X ! Projects 2042 - 2051
WW22
WW8
WW9
North Markham Trunk Sewer
Primary Trunk Sewer
!
(
!
((
!
WW21 Gwillimbury
Queensville Sideroad
!
(
!
( (
!
WW21 Gwillimbury
Queensville Sideroad
D Decommission
D Decommission
"
)
"
) "
) WW20 "
)
"
) "
) WW20 Alignment to be Determined Alignment to be Dete
Duffin Creek Water Pollution Control Plant WW19 D
!
! WW18 Doane Road WW19 D
!
! !
!WW18 Doane Road !
! Exisiting Infrastructure Exisiting Infrastructure
WW10
Outfall Effluent Strategy WW18 "
)
"
"
)
Mount Albert Road
WW18 "
)
"
"
)
" Mount Albert Road " " " Pumping Station " "
Pumping Station
# #
Street
Duffin Creek Water Pollution Control Plant Stage 1 and 2
Street
WW11 WW18 " "
)
"
) WW18 "
)
" # Equalization Tank # Equalization Tank
Chlorine Chamber Expansion
"
)
WW17 Herald Road WW17 Herald Road Water Resource Water Resource
!
Bathurst
!
Bathurst
Duffin Creek Water Pollution ControlSimcoe
Plant County Simcoe "
"
)
)
# "
"
)
)
# Recovery Facility Recovery Facility
DavisCounty
""
# ""
WW4 # WW4
Road
WW12
Road
Growth Expansions Drive West
Town Davis Drive West Town
" !
!
9
" !
" !
9
of
Y Flow Control Gate
Y Flow Control Gate
McCowan
of "
McCowan
cession
"
cession
WW13 Nobleton Wastewater Servicing 19th Sideroad 19th Sideroad Vivian Road Vivian Road Wastewater Main Wastewater Main
Newmarket Newmarket
48 48
Highway 27
Future Urban Area*
12th Con
12th Con
oad
400 400
Town of Town of
TownshipTown of Whitchurch- Town of
Weston R
Weston R
treet
WW16 York Durham Sewage System Interim Servicing Township Towns and Villages*
treet
Towns and Villages*
Whitchurch-
eet
eet
cession
e
cession
e
Ninth Lin
Ninth Lin
King Aurora
Keele Str
Aurora
Keele Str
"
Dufferin S
) "
Dufferin S
) Area within ORMCP conditional Area within ORMCP
WW17 Newmarket Diversion Sewer of King ofWW16 Stouffville
WW16 Stouffville upon amendments to Ontario upon amendments to
10th Con
10th Con
et
et
15th Sideroad 15th Sideroad Bloomington Road Bloomington Road
East Gwillimbury Sewage Pumping Station Expansions
Leslie Stre
Leslie Stre
Regulation 140/02** Regulation 140/02**
WW18 WW14 404 WW14 404
Bethesda Sideroad Bethesda Sideroad Road Road
"
Avenue
) "
Avenue
!
!
!
( "
)
"
) "
)!!
!!
(
)
"
"
)
"
) )
"
) )
"
Highway
!
(
WW19 Holland Landing Lagoon Decommissioning WW13 Highway
(
WW13 WW15 Stouffville RoadWW15 Stouffville Road
Road
Road
Municipal Boundary
t
t Municipal Boundary
Jane Stree
Jane Stree
East Queensville Sewage Pumping Station and Forcemain
WW20
Warden
Regional Boundary
Warden
Kirby Road Regional Boundary
Kennedy
Kirby Road
Kennedy
19th Avenue 19th Avenue
City of Cityof
of
Road
Road
WW21 Upper York Water Reclamation Centre City City of Elgin Mills Road East Elgin Mills Road East *This reflects the Draft 2022 Regional Official
*ThisPlan,
reflects the Draft 2022 Regional Of
Vaughan Vaughan City of City of
currently under review through the Municipal
currently under review through the Mun
Highway 50
Highway 50
McCowan
!
D ! Comprehensive Review and is subject toComprehensive
change Review and is subject t
D
WW23 Keswick Wastewater Servicing Hill Markham Hill
WW8 Markham WW8
based on Regional Official Plan approval.based on Regional Official Plan approv
th Avenue 16th Avenue
Avenue
Avenue
16
WW3 Rutherford Road WW3 Rutherford Road **Urban designations are conditional upon
**Urban designations are conditional upo
WW24 Sutton Wastewater Servicing
Peel Region
Durham Region
Highway 7
Durham Region
WW5
Woodbine
WW5
Woodbine
WW2 WW2 14th Avenue
Highway 7 Highway 7 14th Avenue Kilometres Kilometres
WW5 WW5
V
427 427
407 407
"
)
" "
) "
)
"
) ) East
Steeles Avenue
"
) Steeles Avenue East
WW1 " "
"
)
" WW1 W
X "
)
" W
X
WW4 WW5 WW6 WW4 WW5 WW6
City of Toronto City of Toronto
Produced by: The Regional Municipality of York, Produced by: The Regional Municipality of York,
WW9 WW9 Environmental Services Department, Environmental Services Department,
Infrasturcture Asset Management Branch Infrasturcture Asset Management Branch
© Copyright, The Regional Municipality of York 2022© Copyright, The Regional Municipality of York 2022
© Copyright, The Regional Municipalities of Durham©and Peel, County
Copyright, of
The Regional Municipalities of Durham and
WW12 !
!
(
!
!
(
(
!
WW11 !
( WW12 !
!
(
!
!
(
(
!
WW11!
( Simcoe, City of Toronto Simcoe, City of Toronto
© Queen’s Printer for Ontario 2003-2022 , Includes ©
Greenbelt
Queen’sand Oakfor Ontario 2003-2022 , Includes Gree
Printer
WW10 LAKE ONTARIO WW10 LAKE
RidgesONTARIO
Moraine Boundaries and Water Features Ridges Moraine Boundaries and Water Features
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 6.0 THE INFRASTRUCTURE PLAN | AUGUST 2022 80
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 6.0 THE INFRASTRUCTURE PLAN | AUGUST 2022 81
6.2 C ITIES OF MARKHAM, RICHMOND HILL AND VAUGHAN
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 6.0 THE INFRASTRUCTURE PLAN | AUGUST 2022 82
6.3 T OWNSHIP OF KING
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 6.0 THE INFRASTRUCTURE PLAN | AUGUST 2022 83
6.5 T OWNS OF AURORA, EAST GWILLIMBURY AND NEWMARKET
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 6.0 THE INFRASTRUCTURE PLAN | AUGUST 2022 84
6.6 T OWN OF GEORGINA
In addition, using the One Water principle of infrastretching, the Region in partnership with local munici-
palities and developers have found opportunities through inflow and infiltration reduction works to provide
servicing capacity in constrained areas. Recently, inflow and infiltration works in the Town of Newmarket have
supported non-profit housing initiatives. The Region will continue to look for opportunities to leverage inflow
and infiltration reduction in other municipalities with capacity constraints to generate capacity to support
non-profit housing initiatives.
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 6.0 THE INFRASTRUCTURE PLAN | AUGUST 2022 85
6.7 U PDATED COST ESTIMATES
Table 6.2 Summary of Master Plan Expenditures for Growth Capital Projects ($000’s) to 2051
Year
System Total ($000’s)
2022-2031 2032-2041 2042-2051
Water $273,640 $452,880 $252,950 $979,470
Wastewater $1,461,010 $1,042,100 $1,008,390 $3,511,500
Total $1,734,650 $1,494,980 $1,261,340 $4,490,970
Wastewater infrastructure makes up more than three-quarters of total costs. Substantial expansion of treat-
ment capacity and the wastewater pipe network is needed. In comparison, water infrastructure and treatment
capacity to service long-term growth are largely in place now, although additional water infrastructure is
required to address specific constraints and growth areas.
Costs are highest in the first 10-year period from 2022-2031 because the proposed Upper York Water Rec-
lamation Centre is planned to be completed during this timeframe (pending provincial approvals). Projects
(like West and Northeast Vaughan Infrastructure) underway to connect expanded urban areas in the City of
Vaughan to existing systems also represent a significant share of costs in this first decade.
Investment needs will continue into the following decades as the York Durham Sewage System, which handles
the bulk of the Region’s wastewater, is reaching capacity. Major works will focus on expanding its two com-
ponents, the Duffin Creek plant and related sewer network. Other projects will expand and add to water and
wastewater infrastructure to service communities in the Lake Simcoe watershed.
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 6.0 THE INFRASTRUCTURE PLAN | AUGUST 2022 86
7.0 IMPLEMENTING
THE PLAN
7.1 DELIVERING INFRASTRUCTURE PROJECTS
7.2 ACHIEVING A SUSTAINABLE WATER FUTURE
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 7.0 IMPLEMENTING THE PLAN | AUGUST 2022 87
7.1 D ELIVERING INFRASTRUCTURE PROJECTS
ENVIRONMENTAL ASSESSMENTS
The municipal class environmental assessment process sets out the scope and level of investigation for different
types of projects based on the nature of a project and potential environmental effects. Projects are classified into
different schedules that contain descriptions of proposed works. Schedule B and C projects require project-specific
class environmental assessments, following the requirements of the Environmental Assessment Act. An alternative
process are full or individual environmental assessments under Part II of the Act for large scale projects that are
not capable of being addressed by the municipal class environmental assessment process.
Project-specific environmental assessments provide a detailed inventory of relevant environmental conditions
and assess potential impacts. The process includes consultation with Indigenous peoples, regulatory agencies
and the public. Where applicable, measures to avoid or mitigate impacts are identified. Through this process,
project needs and assumptions made in the Master Plan are re-evaluated and defined in further detail and a
preferred solution is identified.
As discussed in Section 2.6, several changes are in progress to the environmental assessment process set out
by the Environmental Assessment Act. As these changes come into effect, York Region will adapt how it under-
takes projects to remain in compliance with the Act.
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 7.0 IMPLEMENTING THE PLAN | AUGUST 2022 88
7.1 D ELIVERING INFRASTRUCTURE PROJECTS
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 7.0 IMPLEMENTING THE PLAN | AUGUST 2022 89
7.1 D ELIVERING INFRASTRUCTURE PROJECTS
Acquisition Costs
The estimated cost of acquiring new infrastructure identified in this Master Plan update is $4.5 billion. Expected
timing of investments is shown in Figure 7.2. Together with remaining capacity in the existing system, this
new infrastructure will support growth to 2051.
300
Upper York Water Duffin Creek Growth Duffin Creek Growth and
Reclamation Centre, Expansion, Upper York York Durham Sewage
West and Northeast Servicing Infrastructure System Expansion
250 Vaughan Servicing Expansions 1 and 2,
North Markham Servicing
200
Expenditures ($ millions)
150
100
50
0
2022
2023
2024
2025
2026
2027
2028
2029
2030
2031
2032
2033
2034
2035
2036
2037
2038
2039
2040
2041
2042
2043
2044
2045
2046
2047
2048
2049
2050
2051
Wastewater (2021 MP) Water (2021 MP) 2016 MP Index
Note: All costs are expressed in 2020 dollars and do not account for inflation
As noted in Section 6.7, wastewater components of the infrastructure plan make up most of the investment
needed. Peaks in the graph reflect major project expenditures to implement the Upper York Water Reclamation
Centre, Duffin Creek plant expansions and servicing urban expansion areas.
Expenditures are weighted in the first 10 years and, to a lesser degree between 2032 and 2041, as key systems
need to be expanded or improved so that servicing is in place to support growth in later years.
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 7.0 IMPLEMENTING THE PLAN | AUGUST 2022 90
7.1 D ELIVERING INFRASTRUCTURE PROJECTS
Compared to the previous Master Plan, this update includes over a billion dollars of additional infrastructure
to support the extended planning horizon to 2051. Costs were updated for projects carried forward from the
2016 Master Plan, to account for inflation and changes to scope and sizing, which contributed to the higher
cost of the infrastructure program. To provide servicing to 2051, a few large projects are required including:
Water Reclamation Centre Expansion 2 - estimated cost over $200 million
Duffin Creek Water Pollution Control Plant Expansions - estimated cost over $500 million
York Durham Sewage System Conveyance Expansion - estimated cost approximately $325 million
Plus a few additional smaller projects including York East Water Servicing and King City
Wastewater - estimated cost over $150 million
Ongoing Costs
As new infrastructure components are added to the existing water and wastewater asset base, they increase
the Region’s ongoing costs. As shown in Figure 7.1, ongoing costs include both day-to-day operating costs
and renewal costs.
New infrastructure contributes to higher day-to-day operating costs as additional assets will require energy
and chemical inputs, staffing and routine maintenance. Another source of future operating costs to support
growth will also come from purchased services through the Region’s long-standing servicing agreements with
neighbouring regions and the City of Toronto. These purchased services include water services provided by
Peel Region and the City of Toronto, a wastewater service agreement with Peel Region and the co-ownership
and operating agreements with Durham Region for the York Durham Sewage System primary system
including the Duffin Creek plant.
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 7.0 IMPLEMENTING THE PLAN | AUGUST 2022 91
7.1 D ELIVERING INFRASTRUCTURE PROJECTS
Figure 7.3 shows expected operating costs associated with both the Region’s existing system and the new water
and wastewater infrastructure needed to support growth. The area in blue shows the incremental increase in
operating costs as more assets are brought online to service growing communities. Operating costs associated
with the existing asset base shown in green are also expected to increase over time in pace with inflation.
Millions
$600
$500
$400
$300
$200
$100
0
2022
2023
2024
2025
2026
2027
2028
2029
2030
2031
2032
2033
2034
2035
2036
2037
2038
2039
2040
2041
2042
2043
2044
2045
2046
2047
2048
2049
2050
2051
Existing Assets Master Plan Growth Infrastructure
As assets age, they will need to be rehabilitated and eventually replaced. This spending is known as renewal
costs and over the past 5 years, has averaged about $100 million annually. Together, existing and new assets
will require more than $20 billion in renewal costs over the next 100 years.
As shown in Figure 7.4, water and wastewater renewal needs are expected to be lower in the near term as the
Region’s water and wastewater systems are still relatively young. As the new infrastructure identified in this
Master Plan ages, incremental renewal costs are expected to increase over time as different components
come due for renewal. The Region uses a 100-year time frame for renewal needs that reflects the long life
of most major water and wastewater assets. Together, existing and new assets will require more than
$20 billion in renewal costs over the next 100 years.
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 7.0 IMPLEMENTING THE PLAN | AUGUST 2022 92
7.1 D ELIVERING INFRASTRUCTURE PROJECTS
Figure 7.4 Estimated Cost of Renewal for Water and Wastewater Assets Over the Next 100 Years
3000
2500
Expenditures ($ millions)
2000
1500
1000
500
0
2022-2031 2032-2041 2042-2051 2052-2061 2062-2071 2072-2081 2082-2091 2092-2101 2102-2111 2112-2121
Funding
The Region follows provincial requirements and industry best practice in funding the costs of water and
wastewater services.
York Region’s costs to acquire water and wastewater assets to meet growth needs are primarily funded
by development charge revenue, as discussed in Section 4.3. Development charges are collected from
developers to support growth-related infrastructure provided by the municipality.
As recommended by industry groups and other authorities, user rates pay for the full costs of providing ongoing
services. Full costs are made up of day-to-day operating expenses and larger, more sporadic costs to rehabilitate
and replace assets. The latter are covered by a share of user rate revenue that goes each year into asset replace-
ment reserves. The Region’s Water and Wastewater Financial Sustainability Plan explains how user rates fully
fund capital needs without the use of debt in a manner that is fair to both current and future generations.
Financial sustainability of water and wastewater systems is not just about having the upfront capital to build
assets but also being able to pay ongoing costs. Should anticipated growth not be realized, the Region may
face two financial pressures: reduced collections of development charges and lower-than-forecast revenues
from end users. For this reason, the Region will continue to leverage existing infrastructure systems as much as
possible and more tightly align pacing of new capital projects with actual growth, as discussed in Section 4.3.
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 7.0 IMPLEMENTING THE PLAN | AUGUST 2022 93
7.1 D ELIVERING INFRASTRUCTURE PROJECTS
Considering Total Cost of Servicing to Make Better Decisions
Decisions about the type and design of an asset used to provide service can have a profound impact on costs
over its entire useful life. This is an important aspect of infrastructure planning and implementation. By the
time infrastructure is commissioned, up to 95% of the opportunity to influence or reduce these costs has
already passed.
The Master Plan provides the first key opportunity to minimize these costs. In evaluating potential alternative
strategies to service planned growth, it considers both the upfront acquisition cost and ongoing costs. The
Master Plan is also the first point for deciding whether new assets are required, what types of new assets
should be considered, where they are needed and when they need to be built or acquired.
In moving from master planning to implementing specific projects, the Region will make the next level of
decisions that influence total costs. These decisions around design elements like technology or material or
location of assets for ease of access must balance financial considerations with technical, reliability, safety
and other needs.
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 7.0 IMPLEMENTING THE PLAN | AUGUST 2022 94
7.1 D ELIVERING INFRASTRUCTURE PROJECTS
Ways of Monitoring and Adapting
One Water principles were adopted to guide the decision-making process of the Master Plan and will continue
to be instrumental in the ongoing monitoring and adaptation during implementation.
One Water’s holistic approach provides a framework for adaptive management through:
Integration, which means creating synergies and increasing efficiency in systems by closely
monitoring the effects of demand management and asset management initiatives
Innovation, which involves exploring new concepts and ideas throughout implementation to
promote cost-efficiency and environmental sustainability
Infrastretching, which maximizes useful capacity and life of the existing system and established
long-term servicing agreements
Figure 7.5 shows the range of programs, plans, analyses and activities in the Environmental Services
department and across the Region that support adaptation to changing conditions.
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 7.0 IMPLEMENTING THE PLAN | AUGUST 2022 95
7.1 D ELIVERING INFRASTRUCTURE PROJECTS
Closely monitoring available capacity in the infrastructure system and development activity enables the
Region to coordinate servicing capacity with growth/development, as the province requires municipalities
at a minimum to provide a three-year supply of residential units. Demand management programs to encourage
water conservation and reduce inflow and infiltration help make more capacity available in the Regional system.
The Region’s proactive management of water and wastewater servicing capacity will effectively support
development needs while minimizing risks associated with over-extending the infrastructure system.
Three key elements of proactive capacity management include:
Modeling to understand available system capacity and near-term restrictions
Monitoring including both flow monitoring and allocation tracking
Coordinated management of capacity assignment and continued refinement of infrastructure
plans as needed and where feasible when development needs deviate from master plans
The 10-year capital plan sets out sequencing of projects/programs to meet growth and asset management
needs. The capital plan is reviewed each year as part of the budget, which provides an opportunity to
recalibrate plans to reflect changing circumstances. Shifting circumstances considered in capital plan
updates include financial pressures, changes to projects in implementation and coordination with other
projects including asset management works or infrastretching and optimization initiatives. Recalibrating
inevitably involves trade-offs. Within a fixed budget, adding, advancing or expanding a project means
something else has to be reduced or removed, and related spending may never be recouped.
Limitations
While the Region strives for flexibility in implementing infrastructure, there are limits on its ability to accom-
modate unexpected circumstances:
Large Regional infrastructure projects take considerable time: seven years from plan to completion
is typical, but larger projects can take more than a decade
The size of projects means that they must be timed appropriately; expanding or adding infrastruc-
ture earlier than planned can have both financial and operational consequences, the latter because
of such potential impacts as poor water quality
Infrastretching has its limits; pushing existing assets too far beyond their capacity can increase
operating risks and may reduce the level of service to existing users beyond acceptable limits
Prolonged delays in receiving provincial approvals result in major costs and risks that the Region
cannot reasonably plan for; this Master Plan update continues to consider the Water Reclamation
Centre a key component of long-term servicing for the three municipalities in the Upper York area;
should the province render a decision requiring a different direction, there would be numerous
implications including considerations outside of this Master Plan update
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 7.0 IMPLEMENTING THE PLAN | AUGUST 2022 96
7.2 A CHIEVING A SUSTAINABLE WATER FUTURE
These factors underscore the need to continually seek the right balance — between costs, growth patterns
and the needs of existing customers. Monitoring growth, system capacity and evolving circumstances are key
to adapting service delivery to needs as they change.
Over the next 30 years, as growth and development patterns become clearer, municipal comprehensive
reviews and master plan updates will provide several opportunities to recalibrate the water and wastewater
servicing plan. In addition, timing of delivery can be adjusted through the budget process.
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 7.0 IMPLEMENTING THE PLAN | AUGUST 2022 97
7.2 A CHIEVING A SUSTAINABLE WATER FUTURE
DEMAND MANAGEMENT
Long-Term Water Conservation Strategy
Demand management plays an integral role in planning the Region’s water and wastewater infrastructure.
Managing water demand through water conservation and efficiency adds real capacity to existing and future
infrastructure systems, in turn reducing the amount of energy consumed and GHG emissions released and is a
prime example of the One Water principle of infrastretching.
A September 2021 update to the Region’s Long-Term Water Conservation Strategy identified four overarching
objectives:
1. Promote the responsible use of water as a resource
2. Apply a One Water approach to enhance water system sustainability and promote efficiency
3. Reduce water consumption as population increases for sustainable long-term servicing
4. Be a water efficiency and conservation influencer for residents, the industry and regulatory partners
The strategy’s five program areas focus on cost-effective ways to realize long-term water savings:
1. Support Regional and local cities and towns’ efforts to reduce system losses and other sources of
non-revenue water
2. Continue to raise awareness and engage residents and students on conserving water, especially in
outdoor uses, and encourage greater water efficiency in new residential developments
3. Support conservation among industrial, commercial and institutional water users through programs
and targeted incentives
4. Continue to advance research into centralized municipal and decentralized water reuse
5. Demonstrate leadership by improving the efficiency of York Region’s own facilities and operations
Appendix C.1 provides the full updated strategy.
To successfully deliver this Master Plan update, the Region will require support from its local cities and towns
and the province, as well as collaboration with other jurisdictions and stakeholders. It will implement, evaluate
and refine its programs over the next five years.
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 7.0 IMPLEMENTING THE PLAN | AUGUST 2022 98
7.2 A CHIEVING A SUSTAINABLE WATER FUTURE
Inflow and Infiltration Reduction Strategy
Reducing inflow and infiltration from the wastewater systems provides real capacity to existing systems and
defers the need for future infrastructure to service growth; this is a prime example of the One Water principle
of infrastretching. Integrating inflow and infiltration reduction into day-to-day operational needs and decision
making and implementing advanced technologies and intelligent information systems are also examples of
the integration and innovation principles of One Water.
In September 2021, the Region’s Inflow and Infiltration Reduction Strategy was updated. Main objectives of
the 2021 strategy update are:
Ensure continuous progress is made towards reaching the 2031 inflow and infiltration reduction
target of 40 million litres a day; this target is required to meet the Southeast Collector Trunk Sewer
individual environmental assessment condition of approval set by the province in 2010
Support Regional growth and sustainability goals while balancing overall cost and benefits
Refine partnership framework to enhance inflow and infiltration reduction programming at
both the Region and nine local municipalities
Continue to be an inflow and infiltration reduction leader, promoting innovation, adaptation,
and digital integration in data collection and analysis to drive actions towards the long-term
reduction target
The strategy update is organized around five program areas:
1. Enhance partnerships among York Region, local municipalities and the development community, all
of which have a role to play in reducing unnecessary water entering the sanitary sewer system
2. Monitor flows and continue to collect data to set local municipal inflow and infiltration reduction
targets and pinpoint high-priority areas for local improvement efforts
3. Advance data collection and analytics by installing more meters in Regional trunk sewers and using
innovative tools to analyze flow data and better plan and track work
4. Expand assessment and rehabilitation programming, refine policies and bylaws and enhance
partnership initiatives with developers for continued inflow and infiltration reduction in existing
sanitary sewer systems
5. Develop and adopt a new development standard for inflow and infiltration management consis-
tently across the Region and introduce monitoring requirements for the prevention of inflow and
infiltration in new sanitary sewer systems
Appendix C.2 provides the full updated strategy.
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 7.0 IMPLEMENTING THE PLAN | AUGUST 2022 99
7.2 A CHIEVING A SUSTAINABLE WATER FUTURE
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 7.0 IMPLEMENTING THE PLAN | AUGUST 2022 100
7.2 A CHIEVING A SUSTAINABLE WATER FUTURE
As noted in Section 3.3, the corporate Energy Conservation and Demand Management Plan looks for ways to
reduce emissions across Regional government. Currently, approximately 90% of the energy used in water and
wastewater facilities is from electricity. The plan, updated most recently in 2019, also identified energy savings
from reducing water consumption, since water supply and wastewater conveyance both require energy for
pumping, and from putting efficiency measures in place at individual facilities.
Climate adaptation is also important. Adapting means taking action to reduce negative impacts of existing
and future climate change. Regular maintenance and inspection keep our infrastructure in a good state of
repair, which helps make it more resilient in case of extreme weather events. Some of this work, on
wastewater infrastructure, is done in partnership with conservation authorities and servicing partners.
In recent years, climate change adaption measures have been implemented to improve the Region’s resiliency
to a changing climate. For example, drinking water sources have been evaluated using 10-year drought
scenarios to understand risks to groundwater sources, which drove development of specific policies under
the Source Protection Plans for York Region. For wastewater systems, a 25-year design storm scenario was
used to allow for sufficient consideration of climate change on wastewater capacity. To build on this work,
a climate change roadmap has been completed in 2020 to identify and address the highest future climate
risks to York Region’s water and wastewater infrastructure as shown in Figure 7.6. It focuses on:
Designing systems for climate resilience
Improving corporate internal governance and culture regarding climate change
Improving the capacity to adapt at an operational level
Building knowledge of climate risks
Reducing negative impacts to the environment from the servicing system
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 7.0 IMPLEMENTING THE PLAN | AUGUST 2022 101
7.2 A CHIEVING A SUSTAINABLE WATER FUTURE
Many of the 33 actions outlined in the roadmap were developed to directly align with actions discussed in
the draft Climate Change Action Plan so that it can serve as a component of the broader corporate plan.
Over the next five years, work will be undertaken to update design guidelines, embed climate change lens
in the Environmental Assessment process, update emergency operating and business continuity procedures
to address high risks, refine odour management programs and develop performance metrics to measure
progress toward a resilient water and wastewater system.
The Region will continue to implement initiatives and monitor climate risks that increase resilience of
infrastructure and delivery of water and wastewater services.
Figure 7.6 Climate Risks to Regional Water and Wastewater Infrastructure
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 7.0 IMPLEMENTING THE PLAN | AUGUST 2022 102
7.2 A CHIEVING A SUSTAINABLE WATER FUTURE
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 7.0 IMPLEMENTING THE PLAN | AUGUST 2022 103
7.2 A CHIEVING A SUSTAINABLE WATER FUTURE
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 7.0 IMPLEMENTING THE PLAN | AUGUST 2022 104
7.2 A CHIEVING A SUSTAINABLE WATER FUTURE
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 7.0 IMPLEMENTING THE PLAN | AUGUST 2022 105
7.2 A CHIEVING A SUSTAINABLE WATER FUTURE
York Region is a leader in supplying drinking water that meets stringent provincial standards. In 2020, 100%
of laboratory-analyzed samples were within regulated standards, and all provincial inspections of the Region’s
drinking water systems scored 100%. These scores reflected systems and operations in communities across the
Region. Through a focus on operations excellence including implementing an Integrated Management System
(comprising the Drinking Water Quality Management Standard along with ISO 14001) the Region is working
to ensure our drinking water remains safe now and into the future.
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 7.0 IMPLEMENTING THE PLAN | AUGUST 2022 106
7.2 A CHIEVING A SUSTAINABLE WATER FUTURE
MEASURING SUCCESS
To achieve York Region’s vision of strong, caring, safe communities, the Region sets and measures progress
on key priorities set out in the 2019 to 2023 Strategic Plan. Annual reporting ensures objectives are met.
Delivering and promoting environmentally sustainable services stress the importance of demand management
activities. Ensuring fiscally responsible, reliable, and responsive service delivery means services are delivered to
residents and businesses in the Region in the most efficient and effective way possible. Successful implemen-
tation of this Master Plan will be evaluated by providing available capacity to ensure we meet the Provincial
Policy Statement 2020. Municipalities must as a minimum provide three-year supply of residential units, with
an option to consider a five-year servicing supply. This performance indicator is also outlined in the Regional
Official Plan and reported to Council as part of the capacity monitoring report.
Developing a deeper understanding of current and potential water equity concerns and opportunities in York
Region could provide a broader view of the impact that water plays in York Region’s residents’ lives, health
and enjoyment and in the economic vitality of its communities.
A growing number of United States and international utilities have been developing One Water initiatives to
respond to regional water challenges. Research is being carried out by the Water Research Foundation to help
utilities and municipalities identify effective strategies and viable technological, policy, institutional, and financial
pathways towards One Water. The Region will continue to review and integrate knowledge and learnings from
other jurisdictions into its own programs and plans as it advances toward a sustainable water future.
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 7.0 IMPLEMENTING THE PLAN | AUGUST 2022 107
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 7.0 IMPLEMENTING THE PLAN | AUGUST 2022 108
8.0 CONCLUSION
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 8.0 CONCLUSION | AUGUST 2022 109
8.0 C ONCLUSION
CONCLUSION
Realizing the aspirations of the Region’s Vision will depend on operating water and wastewater systems
responsibly and efficiently, and meeting growth needs prudently.
This Master Plan update, which outlines $4.5 billion in growth projects, supports those goals. It aligns with
the Municipal Comprehensive Review process by ensuring there is enough capacity in the right areas of the
Region at the right time as the Region’s population reaches a forecast 2.02 million by 2051.
The Master Plan is a dynamic document that will be recalibrated as needed to ensure investments align with
actual growth. The plan is expected to be updated within the next five years in coordination with the next
updates to the Regional Official Plan and Transportation Master Plan. As with this and previous plans, it will
seek out the views of residents, Indigenous communities, municipal councils and staff and others to help
inform its direction.
Safe and reliable water and wastewater services are central to social, environmental, and economic well-being.
The COVID-19 pandemic that began two years ago has served as a reminder of how quickly and dramatically
conditions can change, and how public service delivery must be ready to respond. Sobering new studies, as
well as reports of unprecedented severe weather around the world, underscore the need to address climate
change and protect people and the environment.
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 8.0 CONCLUSION | AUGUST 2022 110
8.0 C ONCLUSION
Meeting such challenges requires well-designed and maintained systems supported by highly proficient staff
and leading-edge technology.
And it requires the wisdom to understand that water is a precious and finite resource.
Demand management programs like water conservation, inflow and infiltration reduction and energy con-
servation and demand management play an integral role in planning and delivering the Region’s water and
wastewater services. That is why sustainable planning for infrastructure is increasingly linked to the One Wa-
ter approach, which recognizes the value of water in all forms and settings and stresses the need to support
and work with natural processes.
York Region will also maintain rates that cover the costs of operating and renewing water and wastewater
assets and help prevent water being wasted. It will continue to work with local municipalities, partners, the
development industry and others to turn the principles of One Water into action.
With this 2022 Master Plan update, York Region remains at the forefront in delivering water and wastewater
services that depend on excellence in building and operating complex systems. By embodying the lead-
ing-edge principles of One Water, it will contribute to building stronger communities across York Region
and a healthier, more resilient environment for all.
Intebeja Mani (1933 - 2006) was a visionary Indigenous leader, statesman, philosopher and spiritual leader.
As Chief of the Stoney Nation, Mani helped protect the rights of all Indigenous peoples by bringing attention
to Indigenous issues. He is immortalized through his teachings and writings.
YORK REGION | WATER AND WASTEWATER MASTER PLAN | 8.0 CONCLUSION | AUGUST 2022 111
2022 YORK REGION
WATER AND WASTEWATER
MASTER PLAN