100% found this document useful (1 vote)
1K views

Boq For Asphalt Roads & Parking 1

This document provides details on asphalt paving works for roads and parking areas at three temporary construction facilities (TCF) for a field gas compression project in Saudi Arabia. It includes specifications and quantities for different types of asphalt roads and estimates costs for items like excavation, sub-base installation, asphalt layers, and more. The total area of asphalt paving is over 60,000 square meters and is broken down into types of roads and parking areas with varying widths. Precise quantities, unit rates, and total costs are given for each work item.

Uploaded by

Ahmed Alnuaman
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
1K views

Boq For Asphalt Roads & Parking 1

This document provides details on asphalt paving works for roads and parking areas at three temporary construction facilities (TCF) for a field gas compression project in Saudi Arabia. It includes specifications and quantities for different types of asphalt roads and estimates costs for items like excavation, sub-base installation, asphalt layers, and more. The total area of asphalt paving is over 60,000 square meters and is broken down into types of roads and parking areas with varying widths. Precise quantities, unit rates, and total costs are given for each work item.

Uploaded by

Ahmed Alnuaman
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 8

SAUDI ARAMCO

TEMPORARY CONSTRUCTION FACILITIES - TCF -1, TCF2 & TCF 3


FIELD GAS COMPRESSION PROJECT
HARADH & HAWIYAH - KSA
Amount
Item Description Unit Qty Rate
S.R
ASPHALT PAVING FOR ROADS AND PARKINGS

A
TCF SITE - 1 (CAMP & SITE OFFICE)
ASPHALT WORKS for Roads & Car Parking. Total Area for Type I, II, II & IV = 60,970
m2
Ref Dwg. S-CI-DAL-1002 sht 001 & S-CI-DRD-1001 sht 001

A1 Type I - 15m wide Road ( Area = 10,515 m2)

Civil Works

1 600mm thk Excavation m3 7,700 10.00 77,000.00

2 Disposal of Excavated Soil Materials m3 7,700 5.00 38,500.00

3 230mm thk Sub-base Course m3 2,715 40.00 108,600.00

4 230mm thk Aggregate base course m3 2,567 40.00 102,680.00

5 Prime Coat Liquid Asphalt -MC - 70 m2 10,515 3.00 31,545.00

6 90mm thick Asphalt Binder Course Class A m3 946 380.00 359,480.00

7 Tack Coat RC - 250 m2 10,515 3.00 31,545.00

8 50mm thk Asphalt Wearing Course Class A m3 526 380.00 199,880.00

TOTAL for Asphalt Paving - Type I

A2 Type II - 7m wide Road ( Area = 37,876 m2)

Civil Works

1 600mm thk Excavation m3 28,277 10.00 282,770.00

2 Disposal of Excavated Soil Materials m3 28,277 5.00 141,385.00

3 230mm thk Sub-base Course m3 10,485 40.00 419,400.00

4 230mm thk Aggregate base course m3 9,598 40.00 383,920.00

5 Prime Coat Liquid Asphalt -MC - 70 m2 37,876 3.00 113,628.00

6 90mm thick Asphalt Binder Course Class A m3 3,409 380.00 1,295,420.00

7 Tack Coat RC - 250 m2 37,876 3.00 113,628.00

8 50mm thk Asphalt Wearing Course Class A m3 1,894 380.00 719,720.00

TOTAL for Asphalt Paving - Type II

A3 Type III - 9m wide Road ( Area = 10,641 m2)

Civil Works

1 600mm thk Excavation m3 8,288 10.00 82,880.00

2 Disposal of Excavated Soil Materials m3 8,288 5.00 41,440.00

3 230mm thk Sub-base Course m3 2,877 40.00 115,080.00

Page 1 of 8
SAUDI ARAMCO
TEMPORARY CONSTRUCTION FACILITIES - TCF -1, TCF2 & TCF 3
FIELD GAS COMPRESSION PROJECT
HARADH & HAWIYAH - KSA
Amount
Item Description Unit Qty Rate
S.R
4 230mm thk Aggregate base course m3 2,662 40.00 106,480.00

5 Prime Coat Liquid Asphalt -MC - 70 m2 10,641 3.00 31,923.00

6 90mm thick Asphalt Binder Course Class A m3 958 380.00 364,040.00

7 Tack Coat RC - 250 m2 10,641 3.00 31,923.00

8 50mm thk Asphalt Wearing Course Class A m3 532 380.00 202,160.00

TOTAL for Asphalt Paving - Type III

A4 Type IV - 8m wide Road ( Area = 1,938 m2)

Civil Works

1 600mm thk Excavation m3 1,406 10.00 14,060.00

2 Disposal of Excavated Soil Materials m3 1,406 5.00 7,030.00

3 230mm thk Sub-base Course m3 523 40.00 20,920.00

4 230mm thk Aggregate base course m3 485 40.00 19,400.00

5 Prime Coat Liquid Asphalt -MC - 70 m2 1,938 3.00 5,814.00

6 90mm thick Asphalt Binder Course Class A m3 174 380.00 66,120.00

7 Tack Coat RC - 250 m2 1,938 3.00 5,814.00

8 50mm thk Asphalt Wearing Course Class A m3 97 380.00 36,860.00

TOTAL for Asphalt Paving - Type IV

A5 ASPHALT WORKS for Roads & Car Parking. Total Area for Type I & II = 68,341 m2
Ref Dwg. S-CI-DAL-1002 sht 001 & S-CI-DRD-1001 sht 001
Type I - 15m wide Road ( Area = 8,383 m2)

1 600mm thk Excavation m3 6,289 10.00 62,890.00

2 Disposal of Excavated Soil Materials m3 6,289 5.00 31,445.00

3 230mm thk Sub-base Course m3 2,196 40.00 87,840.00

4 230mm thk Aggregate base course m3 2,062 40.00 82,480.00

5 Prime Coat Liquid Asphalt -MC - 70 m2 8,383 3.00 25,149.00

6 90mm thick Asphalt Binder Course Class A m3 7,545 380.00 2,867,100.00

7 Tack Coat RC - 250 m2 8,383 3.00 25,149.00

8 50mm thk Asphalt Wearing Course Class A m3 419 380.00 159,220.00

TOTAL for Asphalt Paving - Type I

A6 Type II - 7m wide Road ( Area = 57,918 m2)

1 600mm thk Excavation m3 43,579 10.00 435,790.00

2 Disposal of Excavated Soil Materials m3 43,579 5.00 217,895.00

Page 2 of 8
SAUDI ARAMCO
TEMPORARY CONSTRUCTION FACILITIES - TCF -1, TCF2 & TCF 3
FIELD GAS COMPRESSION PROJECT
HARADH & HAWIYAH - KSA
Amount
Item Description Unit Qty Rate
S.R
3 230mm thk Sub-base Course m3 16,171 40.00 646,840.00

4 230mm thk Aggregate base course m3 14,840 40.00 593,600.00

5 Prime Coat Liquid Asphalt -MC - 70 m2 57,918 3.00 173,754.00

6 90mm thick Asphalt Binder Course Class A m3 5,213 380.00 1,980,940.00

7 Tack Coat RC - 250 m2 57,918 3.00 173,754.00

8 50mm thk Asphalt Wearing Course Class A m3 2,896 380.00 1,100,480.00

TOTAL for Asphalt Paving - Type II

SULFUR EXTENDED ASPHALT WORKS


for Ring Roads.
A7 Total Area for Type I = 101,036 m2
Ref Dwg. S-CI-DAL-1002 sht 006 & sht 007 &
R-AR-DAL-0100 sht 001
Type I - 15m wide Road ( Area = 101,036 m2)

1 600mm thk Excavation m3 71,764 10.00 717,640.00

2 Disposal of Excavated Soil Materials m3 71,764 5.00 358,820.00

3 230mm thk Sub-base Course m3 25,366 40.00 1,014,640.00

4 230mm thk Aggregate base course m3 24,027 40.00 961,080.00

5 Prime Coat Liquid Asphalt -MC - 70 m2 101,036 3.00 303,108.00

6 90mm thick Asphalt Binder Course Class A m3 9,093 380.00 3,455,340.00

7 Tack Coat RC - 250 m2 101,036 3.00 303,108.00

8 50mm thk Asphalt Wearing Course Class A m3 5,052 380.00 1,919,760.00

Total for Asphalt Road - Type I

A8 Type II - 7m wide Road ( Area = 55,475 m2)

1 600mm thk Excavation m3 45,496 10.00 454,960.00

2 Disposal of Excavated Soil Materials m3 45,496 5.00 227,480.00

3 230mm thk Sub-base Course m3 16,684 40.00 667,360.00

4 230mm thk Aggregate base course m3 14,830 40.00 593,200.00

5 Prime Coat Liquid Asphalt -MC - 70 m2 55,475 3.00 166,425.00

6 90mm thick Asphalt Binder Course Class A m3 4,993 380.00 1,897,340.00

7 Tack Coat RC - 250 m2 55,475 3.00 166,425.00

8 50mm thk Asphalt Wearing Course Class A m3 2,774 380.00 1,054,120.00

TOTAL for Asphalt Paving - Type II

Summary of TCF1
1 600mm thk Excavation m3 212,799.00 10.00 2,127,990.00
2 Disposal of Excavated Soil Materials m3 212,799.00 5.00 1,063,995.00
3 230mm thk Sub-base Course m3 77,017.00 40.00 3,080,680.00
4 230mm thk Aggregate base course m3 71,071.00 40.00 2,842,840.00

Page 3 of 8
SAUDI ARAMCO
TEMPORARY CONSTRUCTION FACILITIES - TCF -1, TCF2 & TCF 3
FIELD GAS COMPRESSION PROJECT
HARADH & HAWIYAH - KSA
Amount
Item Description Unit Qty Rate
S.R
5 Prime Coat Liquid Asphalt -MC - 70 m2 283,782.00 3.00 851,346.00
6 90mm thick Asphalt Binder Course Class A m3 32,331.00 380.00 12,285,780.00
7 Tack Coat RC - 250 m2 283,782.00 3.00 851,346.00
8 50mm thk Asphalt Wearing Course Class A m3 14,190.00 380.00 5,392,200.00
Total for Asphalt Roads & Parking - TC1 28,496,177.00

Page 4 of 8
SAUDI ARAMCO
TEMPORARY CONSTRUCTION FACILITIES - TCF -1, TCF2 & TCF 3
FIELD GAS COMPRESSION PROJECT
HARADH & HAWIYAH - KSA
Amount
Item Description Unit Qty Rate
S.R

TCF SITE - 2 (CAMP & SITE OFFICE)

Asphalt Paving for Roads & Parking Area


(7m,8m,9m &15m Wide Roads)
Camp = 42,668 m2, Office = 59,100 m2
Outside Road (Ring Road) = 183,900 m2
Total Area = 285,668 m2 , (Drawing S-CI-DRD-1001-001)

Asphalt Paving for Roads & Parking Area


(7m,8m,9m &15m Wide Roads)
B1
Total Area = 42,668m2
(Drawing S-CI-DRD-1001-001)
1 600mm thk Excavation m3 25,601 10.00 256,008.00
2 Disposal of Scraped Soil materials m 3
25,601 5.00 128,004.00
3 230mm thk Sub Base Materials with Aggregates having grading (Class A & B) m 3
9,814 40.00 392,545.60
4 230mm thk Aggregate Base Course (Class B) m3 9,814 40.00 392,545.60
5 Prime Coat M-70 m2 48,668 3.00 146,004.00
6 90mm thk Asphalt Concrete Binder Course m3 3,840 380.00 1,459,245.60
7 Tack Coat m2 48,668 3.00 146,004.00
8 50mm thk Asphalt Surface/Wearing Course m 3
2,133 380.00 810,692.00

Asphalt Paving for Roads & Parking Area


B2 (7m,8m,9m &15m Wide Roads)
Office = 59,100m2 (Drawing S-CI-DRD-1001-001)
1 600mm thk Excavation m3 35,460 10.00 354,600.00
2 Disposal of Scraped Soil materials m3 35,460 5.00 177,300.00
3 230mm thk Sub Base Materials with Aggregates having grading (Class A & B) m 3
13,593 40.00 543,720.00
4 230mm thk Aggregate Base Course (Class B) m 3
13,593 40.00 543,720.00
5 Prime Coat M-70 m 2
59,100 3.00 177,300.00
6 90mm thk Asphalt Concrete Binder Course m 3
5,319 380.00 2,021,220.00
7 Tack Coat m 2
59,100 3.00 177,300.00
8 50mm thk Asphalt Surface/Wearing Course m 3
2,955 380.00 1,122,900.00

Page 5 of 8
SAUDI ARAMCO
TEMPORARY CONSTRUCTION FACILITIES - TCF -1, TCF2 & TCF 3
FIELD GAS COMPRESSION PROJECT
HARADH & HAWIYAH - KSA
Amount
Item Description Unit Qty Rate
S.R
Asphalt Paving for External Roads & Roundabout
(15m Wide Roads)
B3
Total Area = 132,228 m2
(Drawing S-CI-DRD-1001-001)
1 600mm thk Excavation m3 79,337 10.00 793,368.00
2 Disposal of Scraped Soil materials m 3
79,337 5.00 396,684.00
3 230mm thk Sub Base Materials with Aggregates having grading (Class A & B) m3 30,412 40.00 1,216,497.60
4 230mm thk Aggregate Base Course (Class B) m3 30,412 40.00 1,216,497.60
5 Prime Coat M-70 m 2
132,228 3.00 396,684.00
6 90mm thk Asphalt Concrete Binder Course m 3
11,901 380.00 4,522,197.60
7 Tack Coat m2 132,228 3.00 396,684.00
8 50mm thk Asphalt Surface/Wearing Course m3 6,611 380.00 2,512,332.00

Asphalt Paving for Ring Road


(7m Wide Roads)
B4
Total Area = 8,301 Lm x 7.0m = 58,107 m2
(Drawing S-CI-DRD-1001-001)
1 600mm thk Excavation m3 34,864 10.00 348,642.00
2 Disposal of Scraped Soil materials m 3
34,864 5.00 174,321.00
3 230mm thk Sub Base Materials with Aggregates having grading (Class A & B) m 3
13,365 40.00 534,584.40
4 230mm thk Aggregate Base Course (Class B) m3 13,365 40.00 534,584.40
5 Prime Coat M-70 m2 58,107 3.00 174,321.00
6 90mm thk Asphalt Concrete Binder Course m3 5,230 380.00 1,987,259.40
7 Tack Coat m2 58,107 3.00 174,321.00
8 50mm thk Asphalt Surface/Wearing Course m3 2,905 380.00 1,104,033.00

Summary of TCF2
Excavtion for (230mm thk Sub Base, 230mm thk Aggregate Base
1 m3 175,262 10.00
Course,90mm thk Binder Course & 50mm thk Wearing Course)
1,752,618.00
2 Disposal of Scraped Soil materials m3 175,262 5.00 876,309.00

3 230mm thk Sub Base Materials with Aggregates having grading (Class A & B) m3 67,184
40.00 2,687,347.60
4 230mm thk Aggregate Base Course (Class B) m3 67,184 40.00 2,687,347.60
5 Prime Coat M-70 m2 298,103 3.00 894,309.00
6 90mm thk Asphalt Concrete Binder Course m 3
26,289 380.00 9,989,922.60
7 Tack Coat m2 298,103 3.00 894,309.00
8 50mm thk Asphalt Surface/Wearing Course m3 14,605 380.00 5,549,957.00
Total for Asphalt Roads & Parking - TC2 25,332,119.80

Page 6 of 8
SAUDI ARAMCO
TEMPORARY CONSTRUCTION FACILITIES - TCF -1, TCF2 & TCF 3
FIELD GAS COMPRESSION PROJECT
HARADH & HAWIYAH - KSA
Amount
Item Description Unit Qty Rate
S.R

TCF SITE - 3 (CAMP & SITE OFFICE)

Asphalt Paving for Roads & Parking Area


(7m,8m,9m &15m Wide Roads)
Camp = 47,788 m2, Office = 66,192 m2
Outside Road (Ring Road) = 205,968 m2
Total Area = 319,948 m2 , (Drawing S-CI-DRD-1001-001)
Asphalt Paving for Roads & Parking Area
C1 (7m,8m,9m &15m Wide Roads)
Total Area = 48,379m2 (Drawing S-CI-DRD-1001-001)
1 600mm thk Excavation m3 29,027 10.00 290,274.00
2 Disposal of Scraped Soil materials m3 29,027 5.00 145,137.00

3 230mm thk Sub Base Materials with Aggregates having grading (Class A & B) m3 11,127 40.00 445,086.80

4 230mm thk Aggregate Base Course (Class B) m3 11,127 40.00 445,086.80

5 Prime Coat M-70 m2 48,379 3.00 145,137.00

6 90mm thk Asphalt Concrete Binder Course m3 4,354 380.00 1,654,561.80

7 Tack Coat m2 48,379 3.00 145,137.00

8 50mm thk Asphalt Surface/Wearing Course m3 2,419 380.00 919,201.00

Asphalt Paving for Roads & Parking Area


C2 (7m Wide Roads)
Office = 55,353m2 (Drawing S-CI-DRD-1001-001)
1 600mm thk Excavation m3 33,212 10.00 332,118.00
2 Disposal of Scraped Soil materials m3 33,212 5.00 166,059.00

3 230mm thk Sub Base Materials with Aggregates having grading (Class A & B) m3 12,731 40.00 509,247.60

4 230mm thk Aggregate Base Course (Class B) m3 12,731 40.00 509,247.60

5 Prime Coat M-70 m2 55,353 3.00 166,059.00

6 90mm thk Asphalt Concrete Binder Course m3 4,982 380.00 1,893,072.60

7 Tack Coat m2 55,353 3.00 166,059.00

8 50mm thk Asphalt Surface/Wearing Course m3 2,768 380.00 1,051,707.00

Asphalt Paving for External Roads & Roundabout


C3 (15m Wide Roads) Total Area = 131,321 m2
(Drawing S-CI-DRD-1001-001)
1 600mm thk Excavation m3 78,793 10.00 787,926.00
2 Disposal of Scraped Soil materials m 3
78,793 5.00 393,963.00

Page 7 of 8
SAUDI ARAMCO
TEMPORARY CONSTRUCTION FACILITIES - TCF -1, TCF2 & TCF 3
FIELD GAS COMPRESSION PROJECT
HARADH & HAWIYAH - KSA
Amount
Item Description Unit Qty Rate
S.R
3 230mm thk Sub Base Materials with Aggregates having grading (Class A & B) m3 30,204 40.00 1,208,153.20

4 230mm thk Aggregate Base Course (Class B) m3 30,204 40.00 1,208,153.20

5 Prime Coat M-70 m2 131,321 3.00 393,963.00

6 90mm thk Asphalt Concrete Binder Course m3 11,819 380.00 4,491,178.20

7 Tack Coat m2 131,321 3.00 393,963.00

8 50mm thk Asphalt Surface/Wearing Course m3 6,566 380.00 2,495,099.00

Asphalt Paving (7m Wide Roads)


C4 Total Area = 8,619 Lm x 7.0m = 60,333 m2
(Drawing S-CI-DRD-1001-001)
1 600mm thk Excavation m3 36,200 10.00 361,998.00
2 Disposal of Scraped Soil materials m 3
36,200 5.00 180,999.00

3 230mm thk Sub Base Materials with Aggregates having grading (Class A & B) m3 13,877 40.00 555,063.60

4 230mm thk Aggregate Base Course (Class B) m3 13,683 40.00 547,335.60

5 Prime Coat M-70 m2 60,333 3.00 180,999.00

6 90mm thk Asphalt Concrete Binder Course m3 5,430 380.00 2,063,388.60

7 Tack Coat m2 60,333 3.00 180,999.00

8 50mm thk Asphalt Surface/Wearing Course m3 3,017 380.00 1,146,327.00

Summary of TCF3
1 Excavation m3 177,232 10.00 1,772,316.00

2 Disposal of Scraped Soil materials m3 177,232 5.00 886,158.00

3 230mm thk Sub Base Materials with Aggregates having grading (Class A & B) m3 67,939 40.00 2,717,551.20

4 230mm thk Aggregate Base Course (Class B) m3 67,746 40.00 2,709,823.20

5 Prime Coat M-70 m2 295,386 3.00 886,158.00

6 90mm thk Asphalt Concrete Binder Course m3 26,585 380.00 10,102,201.20

7 Tack Coat m2 295,386 3.00 886,158.00

8 50mm thk Asphalt Surface/Wearing Course m3 14,769 380.00 5,612,334.00

Total for Asphalt Roads & Parking - TC3 25,572,699.60

Grand Total for TCF1,TCF2 & TCF3 79,400,996.40