The plant handover report summarizes the installation and configuration of a 200kW rooftop solar project. Key items checked include plant capacity, inverter and string monitor details, weather sensors, portal access settings, and data upload configuration. Open items were noted such as submitting electrical schematics and enabling additional portal features.

Uploaded by

Swarnendu Deb
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
76 views

Updated Handover Form - Checklist

The plant handover report summarizes the installation and configuration of a 200kW rooftop solar project. Key items checked include plant capacity, inverter and string monitor details, weather sensors, portal access settings, and data upload configuration. Open items were noted such as submitting electrical schematics and enabling additional portal features.

Uploaded by

Swarnendu Deb
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 14

SuryaLog

(Monitoring and Controlling with AI)

Plant/Site Handover Report


Project type Rooftop: YES Ground mount : Date : 20/08/2022

Datalogger :- ZED+DL :- Local Monitoring:- SWP:-


Suryalog Product
PVDG+DL :- SMB :- DC_DC :- RMS RUF:-
Type
PVDG+ZED+DL:- YES Grid+DL :- PCU:-
Customer Name
Site Name
Engineer Name SWARNENDU DEB Site Person Name & Mob No: NARENDRA SHARMA (89200 33244)
Site Address
Plant Capacity AC Cap: 200 KW DC Cap: 250.15 KW

Content ✔/× Remark


Sales Form ✔
Sales SLD ✔
Internal dispatch form Submitted ✔
Electrical SLD Submitted ×
Onsite Updated SLD Submitted ×
Updated Local setting Submitted ✔
Plant registrtaion from Submitted ✔
DG & ZED Trial ✔ DG & ZED TRIAL
Commissioning Form Submitted ✔
Commissioning Certificate Submitted ✔
Download Setting Submitted ✔
FTP Enable (No of FTP) ×
No. of Weather sensor ✔
Login ID ✔
Portal Demo ✔
Inverter SMB ✔
Hardware Version ✔ 0.2.76
Software Version ✔ 2.3.11
DI Board ×
MPPT Enable ×
GSM (SIM) IP Details Dongle WIFI

1) Operator Name: 1) IP: 192.168.1.12 1) Make: 1) SSID:

2) SIM card No: 2) Subnet Mask: 2) Model No.: 2) Password:


255.255.255.0
Upload Medium
3) Gateway:
192.168.1.1

4) DNS1: 192.168.1.1

5) DNS2: 8.8.8.8

Basic Advanced Remark


Plant ✔ Sour ×
Inverter ✔ Grid ✔
Portal Access
Enable MJB × ADD ×
Weather × Mete ×
INV Status
Log ×
Note:
SuryaLog
(Monitoring and Controlling with AI)

Hardware Point
Hardware Point Example
1) CH1:- Ex.
2) CH2:- 1) CH1:-4-20mA
ADC Port 3) CH3:- 2) CH2:-0-10V
4) CH4:- 3) CH3:-0-2V
4) CH4:-0-5V

Connected SPD & UPS YES


HB LED YES
Suryalog Converter N/A
DIO N/A
Sensor Power Supply 12V Ex- 12V or 24 V (DC)

Device Customization

R&D
Customization

Project
Customization
(In connection)

Future Expansion

Checked By

Name:-

Sign :-

Authorised by

Name :-

Sign :-
Submited by
Name Sign
1) SWARNENDU DEB
2)
3)
SuryaLo
(Monitoring and Cont

CHECKL
S.N CONTENT

Plant status

Solar MFM (Plant) power Verified

Day Generation Reports of plant

PR % Calculation of plant

Plant AC/DC capacity same on settings -


Device page/plant page/portal/Handover form/registration form

Spikes in Graphical View


1 Plant
Total Gen (KWh) of solar MFM is increasing or not

If on site more than 1 solar MFM are used ( or MFM in Wing) then addition of all
MFM power should match with main solar MFM (Plant) and same day Gen should
match with main solar MFM (Plant)

Addition of all inverter power should be match with main solar MFM (Plant) and s
Day Gen should be match.

Check Inverter Day generation reports

Check DC & AC Capacity. of all Inverter Should be match with Plant AC & DC C

AC current *voltage = power

2 Inverter
DC current *voltage = power
2 Inverter
Spikes in Graphical View

Total Gen (KWh) of Inverter is increasing or not

PR should be correct as per Addition of all inverter day Gen. Please check in Tabula
view>> Inverter>>Day gen matrix tab

SMB voltage*Current = power

Summation of string current (I) = total current


3 SMB
SMB details in Plant registration form & Handover form

Used inverter as SMB / SMB Externally Connected

Day Gen reports of Wing

Total Gen (KWh) of Wing is increasing or not

Summation of wing Power = Total power of all inverter in that particular wing

4 Wing Summation of Wing Day gen= Day Gen of all inverter in that particular wing

Check DC & AC Capacity. of particular Inverter Should be match with individual w


AC & DC Cap.

Check DC & AC Capacity. of addition of all wings Should be match with Plant AC
DC Cap.

PR (%) Calculation

.Connect No. of sensors


No. of analog Sensors and Name

No. of digital Sensors and Name

is it Correct the data of All Radiation sensors /module /Ambient Sensor Etc

is it Correct the INS report of all sensors (Tilte, Ex-Tilte, GH & Ex-GH)

is it correct the PR (%) Calculation as per standard formula

5 Weather Spikes in Graphical view

Customer wants sensors labele change

Customer wants Customization PR formula

Customer wants Customization Avg PR formula

Crosscheck Details of sensors in plant registration form/Handover form

Mention direction of sensors name & Roof like

Zero Export
8 Controlling
PVDG

Data Push on FTP


FTP Login Credentials
9 FTP DATA is correct as per formate
9 FTP

which format data is pushing on FTP to client ( Suryalog or Cleanmax etc)

10 Portal Customization
Note :

Remark
SuryaLog
(Monitoring and Controlling with AI)

CHECKLIST
CONTENT ✔/×

Plant) power Verified ✔

tion Reports of plant ✔

ation of plant

C capacity same on settings -



/plant page/portal/Handover form/registration form

aphical View ×

KWh) of solar MFM is increasing or not ✔

re than 1 solar MFM are used ( or MFM in Wing) then addition of all solar
should match with main solar MFM (Plant) and same day Gen should
main solar MFM (Plant)

ll inverter power should be match with main solar MFM (Plant) and same

uld be match.

er Day generation reports ✔

AC Capacity. of all Inverter Should be match with Plant AC & DC Cap. ✔

voltage = power ✔
voltage = power ✔

aphical View ×

KWh) of Inverter is increasing or not ✔

e correct as per Addition of all inverter day Gen. Please check in Tabular
ter>>Day gen matrix tab

*Current = power ✔

f string current (I) = total current ✔

in Plant registration form & Handover form ✔

as SMB / SMB Externally Connected ✔

ports of Wing

KWh) of Wing is increasing or not

f wing Power = Total power of all inverter in that particular wing

f Wing Day gen= Day Gen of all inverter in that particular wing

AC Capacity. of particular Inverter Should be match with individual wing


p.

AC Capacity. of addition of all wings Should be match with Plant AC &

ulation

of sensors 1
g Sensors and Name

Sensors and Name 1

he data of All Radiation sensors /module /Ambient Sensor Etc ✔

he INS report of all sensors (Tilte, Ex-Tilte, GH & Ex-GH)

he PR (%) Calculation as per standard formula

aphical view

nts sensors labele change

nts Customization PR formula

nts Customization Avg PR formula

Details of sensors in plant registration form/Handover form

ction of sensors name & Roof like


FTP
redentials

rect as per formate


data is pushing on FTP to client ( Suryalog or Cleanmax etc)
with AI)

NOTE EXAMPALE

Last Log (Date & Time) :


If Externally then Mention Make :

_______________________________________
_____
SURYASENSOR 1) Tilt

If Yes, Mention sensor labales for ex.


Tilte radiation>> Sensor lable name

If Yes, firstly discuss with ou internal


team and mention formula

If Yes, theck calculation as Avg PR

If Yes, Mention sensor direction for ex.


1) Tilte radiation>> West Roof
2) GH radiation>> South Roof

If Exports : _________ Kwh