0% found this document useful (0 votes)
26 views10 pages

FR CP Self Assessment Consolidation

This document provides instructions for consolidating data from multiple site workbooks into a single workbook for fatal risk control protocol (FRCP) self-assessments. The instructions specify how to copy data ranges from site workbooks into the consolidated workbook, paste as values only, and update the defined name for the data range. Charts in the consolidated workbook use this data range to visualize compliance scores by site, FRCP category, and employee/contractor groups.

Uploaded by

Akhtar Quddus
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
26 views10 pages

FR CP Self Assessment Consolidation

This document provides instructions for consolidating data from multiple site workbooks into a single workbook for fatal risk control protocol (FRCP) self-assessments. The instructions specify how to copy data ranges from site workbooks into the consolidated workbook, paste as values only, and update the defined name for the data range. Charts in the consolidated workbook use this data range to visualize compliance scores by site, FRCP category, and employee/contractor groups.

Uploaded by

Akhtar Quddus
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 10

HSEC TOOLKIT

FATAL RISK CONTROL PROTOCOLS


SELF-ASSESSMENT
CONSOLIDATED DATA

Enter Business Unit Here


Instructions For Completion

The data for the consolidation needs to be copied in from the various site workbooks. To do this you will need to do
the following:

1 Open the site's Self-Assessment Workbook and go to the "RawData" sheet.


2 Select the cell range A5:K204, this has been named "Results" to make it easier to select by selecting it from the
drop down list in the Name Box on the Formula Bar.
3 Copy the selected range of cells.
4 Switch back to this work book and select the "RawData" sheet.
5 Click on the first empty cell in column A at the end of the list of data. e.g. For the first time this will be cell A5, then
A205, A405 etc
6 Important: Choose from the Menus: Edit, Paste Special, Values. This will paste in only the values from the self-
assessment workbook and not the formulae which would create unnecessary links between the files.
7 Repeat Steps 1 - 7 for each site's Self-Assessment Workbook, adding each lot of data to the end of the existing
table being built up in this work book.
8 In this workbook, select the "RawData" worksheet.
9 Re-define the "RawData" range name to include the newly added data. To do this you will need to:
10 Click anywhere in the table of data, then press [Ctrl]+* to highlight the entire table.
11 From the Menus, choose: Insert, Name, Define.
12 Type the name "RawData" (without the quotes). This should replace the currently highlighted name
"Business_Unit". Then click on the OK button.
You should now be able to refresh the data in the Pivot table on the "Pivot Table" sheet, and this should use all the
data that you have now copied into the workbook.

IMPORTANT NOTES
1 When pasting the data into this work book, ALWAYS use the Paste Special, Values only.
2 Do not delete the pivot table on the "Pivot Table" sheet as the data in the predefined charts depends on it. It can
however been changed to include different fields or re-arranged without affecting the predefined charts.
Raw Data for FRCP Audits from sites
Business Unit Site FRCP Item Category BHPB Contractor BHPScore
es
Contract Score Total Comments
Data
Site Average of BHPScore Average of Contract Score Average of Total
Grand Total
Overall Score Across Enter Business Unit Here By Fatal Risk
Control Protocol
100%

90%

80%

70%

60%
Compliance

Total
50%
Target
40%

30%

20%

10%

0%
(blank Grand 0 0 0 0 0 0 0 Over
) Total all

Fatal Risk Control Protocol


Overall Score Across Enter Business Unit Here By Site
100%

90%

80%

70%

60%
Compliance

50% Total
Target
40%

30%

20%

10%

0%
(blan Gran 0 0 0 0 0 0 0 0 Over
k) d To- all
tal

Site
Category Scores Across West Australian Iron Ore By Fatal
Risk Control Protocol
100%

90%

80%

70%

60% Grand Total


0
Compliance

50% 0
Overall
40%
Target
30%

20%

10%

0%
Gran 0 0 0 0 0 0 0 0 Over
d To- all
tal

Fatal Risk Control Protocol


Category Scores Across Enter Business Unit Here By Site
100%

90%

80%

70%

60%
Grand Total
Compliance

50% 0
0
40% Overall
Target
30%

20%

10%

0%
Gran 0 0 0 0 0 0 0 0 0 Over
d To- all
tal

Site
Employee/Contractor Scores Across West Australian Iron Ore
By Fatal Risk Control Protocol
100%

90%

80%

70%

60%
Employees
Compliance

50% Contractors
Overall
40% Target

30%

20%

10%

0%
(blan Gran 0 0 0 0 0 0 0 Over
k) d To- all
tal

Fatal Risk Control Protocol


Employee/Contractor Scores Across West Australian Iron Ore
By Site
100%

90%

80%

70%

60%
Employees
Compliance

50% Contractors
Overall
40% Target

30%

20%

10%

0%
(blan Gran 0 0 0 0 0 0 0 0 Over
k) d To- all
tal

Site

You might also like