Gtu July - 23 Progress Chart
Gtu July - 23 Progress Chart
% Completion 1.18
% Balance 98.82
Finalcial
ChartProg
Titl
RA1 28,311,877.00 1%
RA2
2400384834
1.18
0
0
99%
Finalcial
ChartProgress
Title
1%
% Completion
% Balance
99%
PROGRESS REPORT
School Of Engineering(G+3)
(A) Grid- 6 to 11
1 Excavation for footing NO 31 31
2 PCC for Footing NO 31 31
3 Footing NO 31 31
4 Pedestal NO 40 30
5 PCC for Plinth Beam LVL 1 0.3
6 Plinth Beam LVL 1 0.3
7 Anti Termite Treatment LVL 1
8 PCC for Grade slab LVL 1
9 Grade Slab LVL 1
10 GF Column with Stair & Lift LVL 1
11 GF Slab LVL 1
12 FF Column with Stair & Lift LVL 1
13 FF Slab LVL 1
14 SF Column with Stair & Lift LVL 1
15 SF Slab LVL 1
16 TF Column with Stair & Lift LVL 1
17 TF Slab LVL 1
18 Stair & Lift Cabin LVL 1
19 Parapet Wall LVL 1
20 Masonary GF LVL 1
21 Masonary FF LVL 1
22 Masonary SF LVL 1
23 Masonary TF LVL 1
24 Internal Plaster GF LVL 1
25 Internal Plaster FF LVL 1
26 Internal Plaster SF LVL 1
27 Internal Plaster TF LVL 1
28 Outer Plaster BUILD. 1
29 Internal Plumbing GF LVL 1
30 Internal Plumbing FF LVL 1
31 Internal Plumbing SF LVL 1
32 Internal Plumbing TF LVL 1
33 Terrace Plumbing LVL 1
34 Outer Plumbing LVL 1
35 Flooring with Stair GF LVL 1
36 Flooring with Stair FF LVL 1
37 Flooring with Stair SF LVL 1
38 Flooring with Stair TF LVL 1
39 Terrace Chinamoziac LVL 1
40 Door GF LVL 1
41 Door FF LVL 1
42 Door SF LVL 1
43 Door TF LVL 1
44 Door at Terrace LVL 1
45 Window & Vent. GF LVL 1
46 Window & Vent. FF LVL 1
47 Window & Vent. SF LVL 1
48 Window & Vent. TF LVL 1
49 Conduit Electric Works GF LVL 1
50 Conduit Electric Works FF LVL 1
51 Conduit Electric Works SF LVL 1
52 Conduit Electric Works TF LVL 1
53 Electric Works With wiring & Acc. GF LVL 1
54 Electric Works With wiring & Acc. FF LVL 1
55 Electric Works With wiring & Acc. SF LVL 1
56 Electric Works With wiring & Acc. TF LVL 1
57 Internal Color GF LVL 1
58 Internal Color FF LVL 1
59 Internal Color SF LVL 1
60 Internal Color TF LVL 1
61 Outer Color BUILD. 1
62 Lift Installation BUILD. 1
63 Fire safty line BUILD. 1
64 O.H.D. TANK BUILD. 1
Total
Total Work
Completed in Work
% REmainin
g in %
Excavation for footing 100.00 0.00
RCC 19.71 80.29
MASNORY 0.00 100.00
INTERNAL PLASTER 0.00 100.00
OUTER PLASTER 0.00 100.00
PLUMBING 0.00 100.00
FLOORING 0.00 100.00
DOOR 0.00 100.00
WINDOW 0.00 100.00
ELECTRICAL 0.00 100.00
INTERNAL COLUR 0.00 100.00
OUTER COLOUR 0.00 100.00
LIFT 0.00 100.00
FIRE 0.00 100.00
Jul-23
Total Total
Remainin Work Work
g Qty Complete REmainin
d in % g in %
0 100.00 0.00
0 100.00 0.00
0 100.00 0.00
10 75.00 25.00
0.7 30.00 70.00
0.7 30.00 70.00
1 0.00 100.00
1 0.00 100.00
1 0.00 100.00
1 0.00 100.00
1 0.00 100.00
1 0.00 100.00
1 0.00 100.00
1 0.00 100.00
1 0.00 100.00
1 0.00 100.00
1 0.00 100.00
1 0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
Chart Title
120.00
100.00
80.00
60.00
40.00
20.00
0.00
g C Y R L T RE
tin
R
RC OR S TE STE B IN RIN
G G
O OR OW ICA LUR OUR LIF FI
o N D D R O OL
r fo AS PL
A A
PL LUM LO
O IN CT LC C
fo M AL W L E A
n N T ER P F E R N T ER
tio R OU TE OU
va TE IN
xca IN
E
Complete
Sr. No. Item Description Unit Total d Remainin
Quantity Quantity g Qty
Total Total
Work Work
Complet REmainin
ed in % g in %
120.00
Excavation for footing 82.86 17.14 100.00
RCC 26.22 73.78
80.00
MASNORY 0.00 100.00
60.00
INTERNAL PLASTER 0.00 100.00
OUTER PLASTER 0.00 100.00 40.00
82.86 17.14
82.86 17.14
82.86 17.14
100.00 0.00
100.00 0.00
80.00 20.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
Chart Title
120.00
100.00
80.00
60.00
40.00
20.00
0.00
ng C Y R R G G R L R R T RE
oti RC OR S TE STE BIN RIN OO DOW ICA LU OU LIF FI
o N A A D R O L
r f AS PL PL LUM LO
O IN CT LC CO
fo M AL E R P F W
ELE N A E R
n R T
tio RN OUT TE OU
va TE IN
ca I N
Ex
Total
Complet
Total Remaini Work
Sr. No. Item Description Unit Quantity ed ng Qty Complet
Quantity ed in %
Total Total
Work Work
Complet REmaini
ed in % ng in %
120.00
Excavation for footing 100.00 0.00 100.00
RCC 2.06 97.94 80.00
60.00
MASNORY 0.00 100.00
40.00
INTERNAL PLASTER 0.00 100.00
20.00
OUTER PLASTER 0.00 100.00
0.00
PLUMBING 0.00 100.00 g C Y R
otin RC OR S TE
FLOORING 0.00 100.00 fo N A
r AS PL P
fo M AL ER
DOOR 0.00 100.00 n N T
tio R OU
WINDOW 0.00 100.00 va TE
xca IN
E
ELECTRICAL 0.00 100.00
INTERNAL COLUR 0.00 100.00 Total Work Com
OUTER COLOUR 0.00 100.00
LIFT 0.00 100.00
FIRE 0.00 100.00
Jul-23
Total
Work
REmaini
ng in %
0.00
65.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
Chart Title
120.00
100.00
80.00
60.00
40.00
20.00
0.00
tin
g
RC
C Y R R G G R W AL R R
LIF
T RE
o N OR S TE STE BIN RIN OO DO R IC OLU LOU FI
fo A A D IN
r AS PL PL LUM LO
O CT LC CO
fo M AL E R P F W
E LE N A E R
n
tio N T ER T
T ER OU I NT OU
IN
Complet Total
Total ed Remaini Work
Sr. No. Item Description Unit Quantit
y Quantit ng Qty Complet
y ed in %
Total
Work
REmaini
ng in %
0.00
0.00
0.00
0.00
0.00
30.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
Chart Title
120.00
100.00 100.00 100.00100.00100.00
100.00
80.00 75.00 83.33
80.00 75.00 80.00 75.00 75.0075.00
60.59
60.00
40.00 27.65
20.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00
g C Y R R G G R L R R T RE
otin RC OR S TE S TE B IN RIN OO DOW ICA LU OU LIF FI
fo N A A O D R O L
r AS PL PL LUM LO IN CT L C CO
fo M AL E R P F W
E LE N A E R
n
tio N T ER UT
a ER OU NT O
av IN
T I
Complet Total
Total ed Remaini Work
Sr. No. Item Description Unit Quantit
y Quantit ng Qty Complet
y ed in %
Total Total
Work Work
Complet REmaini
ed in % ng in %
Total
Work
REmaini
ng in %
18.92
25.23
50.45
60.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
Chart Title
00
00
00
00
00
00
00
ng C Y R R G G R L R R T RE
oti RC OR S TE STE BIN RIN OO DOW ICA LU OU LIF FI
o N A A D R O L
r f AS PL PL LUM LO
O IN CT LC CO
M AL E R P F W
ELE N A E R
R T
R N OUT TE OU
N TE IN
I
Complet Total
Total ed Remaini Work
Sr. No. Item Description Unit Quantit
y Quantit ng Qty Complet
y ed in %
Total Total
Work Work
Complet REmaini
ed in % ng in %
C
160.00
140.00
120.00
100.00
80.00
C
Excavation for footing 100.00 0.00 160.00
RCC 18.82 104.71 140.00
MASNORY 0.00 100.00 120.00
100.00
INTERNAL PLASTER 0.00 100.00 80.00
OUTER PLASTER 0.00 100.00 60.00
PLUMBING 0.00 133.33 40.00
20.00
FLOORING 0.00 100.00 0.00
DOOR 0.00 140.00 ng C Y
RC OR S TE S TE
R
ooti N A A
WINDOW 0.00 100.00 r f AS PL PL
fo M AL E R P
ELECTRICAL 0.00 125.00 n
tio E RN OUT
va T
INTERNAL COLUR 0.00 100.00 ca IN
Ex
OUTER COLOUR 0.00 100.00
LIFT 0.00 100.00 Total Work Complet
Total
Work
REmaini
ng in %
0.00
0.00
0.00
0.00
80.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
Chart Title
160.00
140.00
120.00
100.00
80.00
Chart Title
160.00
140.00
120.00
100.00
80.00
60.00
40.00
20.00
0.00
ng C Y R R G G R L R R T RE
oti RC OR STE S TE BIN RIN OO DOW ICA LU OU LIF FI
f o N A A O D N T R CO L
r AS PL PL LUM LO W
I
EC L CO
fo M AL E R P F EL R N A T E R
n
tio RN OUT TE OU
va TE IN
ca I N
Complet Total
Total ed Remaini Work
Sr. No. Item Description Unit Quantit
y Quantit ng Qty Comple
y ted in %
Total Total
Work Work
Complet REmaini
ed in % ng in %
Total
Work
REmainin
g in %
0.00
0.00
0.00
0.00
0.00
0.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
Chart Title
0
0
0
0
0
0
0
g C Y R R G G R L R R T RE
otin RC OR S TE S TE BIN RIN OO DOW ICA LU OU LIF FI
fo N A A D TR O L
AS PL PL LUM LO
O IN L C CO
W EC
M AL E R P F EL RNA TER
N UT
ER O TE OU
T IN
IN
Complet Total
Total ed Remaini Work
Sr. No. Item Description Unit Quantit
y Quantit ng Qty Comple
y ted in %
Total Total
Work Work
Complet REmaini
ed in % ng in %
Total
Work Compound Wall Length(RMT)
REmainin
g in %
Type- 1A 204
81.85 Type-1B 188.2
81.85 Type-1C 21.8
81.85 Type-2B 124.8
85.59 Type-3A 917.9
97.48 Type-3B 57.8
100.00
100.00 Type-4 2650
100.00 Total 4164.5
Complet Total
Total ed Remaini Work
Sr. No. Item Description Unit Quantit
y Quantit ng Qty Complet
y ed in %
Total Total
Work Work
Complet REmaini
ed in % ng in %
Total
Work
REmaini
ng in %
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
PROGRESS REPORT
Boys Hostel(G+3) May-23
Complet Total
Total ed Remaini Work
Sr. No. Item Description Unit Quantit
y Quantit ng Qty Complet
y ed in %
Total Total
Work Work
Comple REmaini
ted in % ng in %
Total
Work
REmaini
ng in %
2.22
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
PROGRESS REPORT
Class-II Quarters(G+5, 20 Unit) May-23
Complet Total
Total ed Remaini Work
Sr. No. Item Description Unit Quantit
y Quantit ng Qty Complet
y ed in %
Total Total
Work Work
Complet REmaini
ed in % ng in %
Excavation for footing #DIV/0! #DIV/0!
RCC #DIV/0! #DIV/0!
MASNORY 0.00 100.00
INTERNAL PLASTER 0.00 100.00
OUTER PLASTER 0.00 100.00
PLUMBING 0.00 133.33
FLOORING 0.00 100.00
DOOR 0.00 140.00
WINDOW 0.00 100.00
ELECTRICAL 0.00 125.00
INTERNAL COLUR 0.00 100.00
OUTER COLOUR 0.00 100.00
LIFT 0.00 100.00
FIRE 0.00 100.00
May-23
Total
Work
REmaini
ng in %
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
PROGRESS REPORT
Central Library(G+2) May-23
Complet Total
Total ed Remaini Work
Sr. No. Item Description Unit Quantit
y Quantit ng Qty Complet
y ed in %
Total
Work
REmaini
ng in %
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
PROGRESS REPORT
Registrar Bunglow(G+1) May-23
Complet Total
Total ed Remaini Work
Sr. No. Item Description Unit Quantit
y Quantit ng Qty Complet
y ed in %
Total Total
Work Work
Complet REmaini
ed in % ng in %
Total
Work
REmaini
ng in %
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
PROGRESS REPORT
Cafeteria(G) May-23
Complet Total
Total ed Remaini Work
Sr. No. Item Description Unit Quantit
y Quantit ng Qty Complet
y ed in %
Total Total
Work Work
Complet REmaini
ed in % ng in %
Total
Work
REmaini
ng in %
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
PROGRESS REPORT
ATM & Post Office(G) May-23
Complet Total
Total ed Remaini Work
Sr. No. Item Description Unit Quantit
y Quantit ng Qty Complet
y ed in %
Total Total
Work Work
Complet REmaini
ed in % ng in %
Total
Work
REmaini
ng in %
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
PROGRESS REPORT
Animal House(G) May-23
Complet Total
Total ed Remaini Work
Sr. No. Item Description Unit Quantit
y Quantit ng Qty Complet
y ed in %
Total Total
Work Work
Complet REmaini
ed in % ng in %
Total
Work
REmaini
ng in %
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
PROGRESS REPORT
Connecter Building(G+2) May-23
Complet Total
Total ed Remaini Work
Sr. No. Item Description Unit Quantit
y Quantit ng Qty Complet
y ed in %
Total
Work
REmaini
ng in %
2.22
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00