Gtu July - 23 Progress Chart

Uploaded by

gtumcway
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
20 views

Gtu July - 23 Progress Chart

Uploaded by

gtumcway
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 93

For Graph

% Completion 1.18
% Balance 98.82

Finalcial
ChartProg
Titl

RA1 28,311,877.00 1%
RA2
2400384834
1.18
0
0

99%
Finalcial
ChartProgress
Title
1%

% Completion
% Balance

99%
PROGRESS REPORT
School Of Engineering(G+3)

Sr. No. Item Description Unit Total Completed


Quantity Quantity

(A) Grid- 6 to 11
1 Excavation for footing NO 31 31
2 PCC for Footing NO 31 31
3 Footing NO 31 31
4 Pedestal NO 40 30
5 PCC for Plinth Beam LVL 1 0.3
6 Plinth Beam LVL 1 0.3
7 Anti Termite Treatment LVL 1
8 PCC for Grade slab LVL 1
9 Grade Slab LVL 1
10 GF Column with Stair & Lift LVL 1
11 GF Slab LVL 1
12 FF Column with Stair & Lift LVL 1
13 FF Slab LVL 1
14 SF Column with Stair & Lift LVL 1
15 SF Slab LVL 1
16 TF Column with Stair & Lift LVL 1
17 TF Slab LVL 1
18 Stair & Lift Cabin LVL 1
19 Parapet Wall LVL 1
20 Masonary GF LVL 1
21 Masonary FF LVL 1
22 Masonary SF LVL 1
23 Masonary TF LVL 1
24 Internal Plaster GF LVL 1
25 Internal Plaster FF LVL 1
26 Internal Plaster SF LVL 1
27 Internal Plaster TF LVL 1
28 Outer Plaster BUILD. 1
29 Internal Plumbing GF LVL 1
30 Internal Plumbing FF LVL 1
31 Internal Plumbing SF LVL 1
32 Internal Plumbing TF LVL 1
33 Terrace Plumbing LVL 1
34 Outer Plumbing LVL 1
35 Flooring with Stair GF LVL 1
36 Flooring with Stair FF LVL 1
37 Flooring with Stair SF LVL 1
38 Flooring with Stair TF LVL 1
39 Terrace Chinamoziac LVL 1
40 Door GF LVL 1
41 Door FF LVL 1
42 Door SF LVL 1
43 Door TF LVL 1
44 Door at Terrace LVL 1
45 Window & Vent. GF LVL 1
46 Window & Vent. FF LVL 1
47 Window & Vent. SF LVL 1
48 Window & Vent. TF LVL 1
49 Conduit Electric Works GF LVL 1
50 Conduit Electric Works FF LVL 1
51 Conduit Electric Works SF LVL 1
52 Conduit Electric Works TF LVL 1
53 Electric Works With wiring & Acc. GF LVL 1
54 Electric Works With wiring & Acc. FF LVL 1
55 Electric Works With wiring & Acc. SF LVL 1
56 Electric Works With wiring & Acc. TF LVL 1
57 Internal Color GF LVL 1
58 Internal Color FF LVL 1
59 Internal Color SF LVL 1
60 Internal Color TF LVL 1
61 Outer Color BUILD. 1
62 Lift Installation BUILD. 1
63 Fire safty line BUILD. 1
64 O.H.D. TANK BUILD. 1

Total
Total Work
Completed in Work
% REmainin
g in %
Excavation for footing 100.00 0.00
RCC 19.71 80.29
MASNORY 0.00 100.00
INTERNAL PLASTER 0.00 100.00
OUTER PLASTER 0.00 100.00
PLUMBING 0.00 100.00
FLOORING 0.00 100.00
DOOR 0.00 100.00
WINDOW 0.00 100.00
ELECTRICAL 0.00 100.00
INTERNAL COLUR 0.00 100.00
OUTER COLOUR 0.00 100.00
LIFT 0.00 100.00
FIRE 0.00 100.00
Jul-23
Total Total
Remainin Work Work
g Qty Complete REmainin
d in % g in %

0 100.00 0.00
0 100.00 0.00
0 100.00 0.00
10 75.00 25.00
0.7 30.00 70.00
0.7 30.00 70.00
1 0.00 100.00
1 0.00 100.00
1 0.00 100.00
1 0.00 100.00
1 0.00 100.00
1 0.00 100.00
1 0.00 100.00
1 0.00 100.00
1 0.00 100.00
1 0.00 100.00
1 0.00 100.00
1 0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00

Chart Title
120.00
100.00
80.00
60.00
40.00
20.00
0.00
g C Y R L T RE
tin
R
RC OR S TE STE B IN RIN
G G
O OR OW ICA LUR OUR LIF FI
o N D D R O OL
r fo AS PL
A A
PL LUM LO
O IN CT LC C
fo M AL W L E A
n N T ER P F E R N T ER
tio R OU TE OU
va TE IN
xca IN
E

Total Work Completed in % Total Work REmaining in %


PROGRESS REPORT
School Of Pharmacy(G+3) Jul-23

Complete
Sr. No. Item Description Unit Total d Remainin
Quantity Quantity g Qty

1 Excavation for footing NO 35 29 6


2 PCC for Footing NO 35 29 6
3 Footing NO 35 29 6
4 Pedestal LVL 1 1 0
5 PCC for Plinth Beam LVL 1 1 0
6 Plinth Beam LVL 1 0.8 0.2
7 Anti Termite Treatment LVL 1 1
8 PCC for Grade slab LVL 1 1
9 Grade Slab LVL 1 1
10 GF Column with Stair & Lift LVL 1 1
11 GF Slab LVL 1 1
12 FF Column with Stair & Lift LVL 1 1
13 FF Slab LVL 1 1
14 SF Column with Stair & Lift LVL 1 1
15 SF Slab LVL 1 1
16 TF Column with Stair & Lift LVL 1 1
17 TF Slab LVL 1 1
18 Stair & Lift Cabin LVL 1 1
19 Parapet Wall LVL 1
20 Masonary GF LVL 1
21 Masonary FF LVL 1
22 Masonary SF LVL 1
23 Masonary TF LVL 1
24 Internal Plaster GF LVL 1
25 Internal Plaster FF LVL 1
26 Internal Plaster SF LVL 1
27 Internal Plaster TF LVL 1
28 Outer Plaster BUILD. 1
29 Internal Plumbing GF LVL 1
30 Internal Plumbing FF LVL 1
31 Internal Plumbing SF LVL 1
32 Internal Plumbing TF LVL 1
33 Terrace Plumbing LVL 1
34 Outer Plumbing LVL 1
35 Flooring with Stair GF LVL 1
36 Flooring with Stair FF LVL 1
37 Flooring with Stair SF LVL 1
38 Flooring with Stair TF LVL 1
39 Terrace Chinamoziac LVL 1
40 Door GF LVL 1
41 Door FF LVL 1
42 Door SF LVL 1
43 Door TF LVL 1
44 Door at Terrace LVL 1
45 Window & Vent. GF LVL 1
46 Window & Vent. FF LVL 1
47 Window & Vent. SF LVL 1
48 Window & Vent. TF LVL 1
49 Conduit Electric Works GF LVL 1
50 Conduit Electric Works FF LVL 1
51 Conduit Electric Works SF LVL 1
52 Conduit Electric Works TF LVL 1
53 Electric Works With wiring & Acc. GF LVL 1
54 Electric Works With wiring & Acc. FF LVL 1
55 Electric Works With wiring & Acc. SF LVL 1
56 Electric Works With wiring & Acc. TF LVL 1
57 Internal Color GF LVL 1
58 Internal Color FF LVL 1
59 Internal Color SF LVL 1
60 Internal Color TF LVL 1
61 Outer Color BUILD. 1
62 Lift Installation BUILD. 1
63 Fire safty line BUILD. 1
64 O.H.D. TANK BUILD. 1

Total Total
Work Work
Complet REmainin
ed in % g in %
120.00
Excavation for footing 82.86 17.14 100.00
RCC 26.22 73.78
80.00
MASNORY 0.00 100.00
60.00
INTERNAL PLASTER 0.00 100.00
OUTER PLASTER 0.00 100.00 40.00

PLUMBING 0.00 100.00 20.00


FLOORING 0.00 100.00 0.00
DOOR 0.00 100.00 ng C
RC OR
Y
ooti N
f AS PL
WINDOW 0.00 100.00 fo
r
M AL
n
ELECTRICAL 0.00 100.00 tio RN O
va TE
INTERNAL COLUR 0.00 100.00 ca I N
Ex
OUTER COLOUR 0.00 100.00
Total Work
LIFT 0.00 100.00
FIRE 0.00 100.00
Jul-23
Total Total
Work Work
Complete REmainin
d in % g in %

82.86 17.14
82.86 17.14
82.86 17.14
100.00 0.00
100.00 0.00
80.00 20.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00
0.00 100.00

Chart Title
120.00
100.00
80.00
60.00
40.00
20.00
0.00
ng C Y R R G G R L R R T RE
oti RC OR S TE STE BIN RIN OO DOW ICA LU OU LIF FI
o N A A D R O L
r f AS PL PL LUM LO
O IN CT LC CO
fo M AL E R P F W
ELE N A E R
n R T
tio RN OUT TE OU
va TE IN
ca I N
Ex

Total Work Completed in % Total Work REmaining in %


PROGRESS REPORT
Connector Between Pharmacy &
Jul-23
Business Building

Total
Complet
Total Remaini Work
Sr. No. Item Description Unit Quantity ed ng Qty Complet
Quantity ed in %

1 Excavation for footing NO 40 40 0 100.00


2 PCC for Footing NO 40 14 26 35.00
3 Footing NO 40 40 0.00
4 Pedestal LVL 1 1 0.00
5 PCC for Plinth Beam LVL 1 1 0.00
6 Plinth Beam LVL 1 1 0.00
7 Anti Termite Treatment LVL 1 1 0.00
8 PCC for Grade slab LVL 1 1 0.00
9 Grade Slab LVL 1 1 0.00
10 GF Column with Stair & Lift LVL 1 1 0.00
11 GF Slab LVL 1 1 0.00
12 FF Column with Stair & Lift LVL 1 1 0.00
13 FF Slab LVL 1 1 0.00
14 SF Column with Stair & Lift LVL 1 1 0.00
15 SF Slab LVL 1 1 0.00
16 TF Column with Stair & Lift LVL 1 1 0.00
17 TF Slab LVL 1 1 0.00
18 Stair & Lift Cabin LVL 1 1 0.00
19 Parapet Wall LVL 1 0.00
20 Masonary GF LVL 1 0.00
21 Masonary FF LVL 1 0.00
22 Masonary SF LVL 1 0.00
23 Masonary TF LVL 1 0.00
24 Internal Plaster GF LVL 1 0.00
25 Internal Plaster FF LVL 1 0.00
26 Internal Plaster SF LVL 1 0.00
27 Internal Plaster TF LVL 1 0.00
28 Outer Plaster BUILD. 1 0.00
29 Internal Plumbing GF LVL 1 0.00
30 Internal Plumbing FF LVL 1 0.00
31 Internal Plumbing SF LVL 1 0.00
32 Internal Plumbing TF LVL 1 0.00
33 Terrace Plumbing LVL 1 0.00
34 Outer Plumbing LVL 1 0.00
35 Flooring with Stair GF LVL 1 0.00
36 Flooring with Stair FF LVL 1 0.00
37 Flooring with Stair SF LVL 1 0.00
38 Flooring with Stair TF LVL 1 0.00
39 Terrace Chinamoziac LVL 1 0.00
40 Door GF LVL 1 0.00
41 Door FF LVL 1 0.00
42 Door SF LVL 1 0.00
43 Door TF LVL 1 0.00
44 Door at Terrace LVL 1 0.00
45 Window & Vent. GF LVL 1 0.00
46 Window & Vent. FF LVL 1 0.00
47 Window & Vent. SF LVL 1 0.00
48 Window & Vent. TF LVL 1 0.00
49 Conduit Electric Works GF LVL 1 0.00
50 Conduit Electric Works FF LVL 1 0.00
51 Conduit Electric Works SF LVL 1 0.00
52 Conduit Electric Works TF LVL 1 0.00
53 Electric Works With wiring & Acc. GF LVL 1 0.00
54 Electric Works With wiring & Acc. FF LVL 1 0.00
55 Electric Works With wiring & Acc. SF LVL 1 0.00
56 Electric Works With wiring & Acc. TF LVL 1 0.00
57 Internal Color GF LVL 1 0.00
58 Internal Color FF LVL 1 0.00
59 Internal Color SF LVL 1 0.00
60 Internal Color TF LVL 1 0.00
61 Outer Color BUILD. 1 0.00
62 Lift Installation BUILD. 1 0.00
63 Fire safty line BUILD. 1 0.00
64 O.H.D. TANK BUILD. 1 0.00

Total Total
Work Work
Complet REmaini
ed in % ng in %
120.00
Excavation for footing 100.00 0.00 100.00
RCC 2.06 97.94 80.00
60.00
MASNORY 0.00 100.00
40.00
INTERNAL PLASTER 0.00 100.00
20.00
OUTER PLASTER 0.00 100.00
0.00
PLUMBING 0.00 100.00 g C Y R
otin RC OR S TE
FLOORING 0.00 100.00 fo N A
r AS PL P
fo M AL ER
DOOR 0.00 100.00 n N T
tio R OU
WINDOW 0.00 100.00 va TE
xca IN
E
ELECTRICAL 0.00 100.00
INTERNAL COLUR 0.00 100.00 Total Work Com
OUTER COLOUR 0.00 100.00
LIFT 0.00 100.00
FIRE 0.00 100.00
Jul-23

Total
Work
REmaini
ng in %

0.00
65.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00

Chart Title
120.00
100.00
80.00
60.00
40.00
20.00
0.00
tin
g
RC
C Y R R G G R W AL R R
LIF
T RE
o N OR S TE STE BIN RIN OO DO R IC OLU LOU FI
fo A A D IN
r AS PL PL LUM LO
O CT LC CO
fo M AL E R P F W
E LE N A E R
n
tio N T ER T
T ER OU I NT OU
IN

Total Work Completed in % Total Work REmaining in %


PROGRESS REPORT
School Of Business Administration Jul-23

Complet Total
Total ed Remaini Work
Sr. No. Item Description Unit Quantit
y Quantit ng Qty Complet
y ed in %

1 Excavation for footing NO 45 45 0 100.00


2 PCC for Footing NO 45 45 0 100.00
3 Footing NO 45 45 0 100.00
4 Pedestal LVL 1 1 0 100.00
5 PCC for Plinth Beam NO 1 1 0 100.00
6 Plinth Beam LVL 1 0.7 0.3 70.00
7 Anti Termite Treatment LVL 1 1 0.00
8 PCC for Grade slab LVL 1 1 0.00
9 Grade Slab LVL 1 1 0.00
10 GF Column with Stair & Lift LVL 1 1 0.00
11 GF Slab LVL 1 1 0.00
12 FF Column with Stair & Lift LVL 1 1 0.00
13 FF Slab LVL 1 1 0.00
14 SF Column with Stair & Lift LVL 1 1 0.00
15 SF Slab LVL 1 1 0.00
16 Stair & Lift Cabin LVL 1 1 0.00
17 Parapet Wall LVL 1 0.00
18 Masonary GF LVL 1 0.00
19 Masonary FF LVL 1 0.00
20 Masonary SF LVL 1 0.00
21 Internal Plaster GF LVL 1 0.00
22 Internal Plaster FF LVL 1 0.00
23 Internal Plaster SF LVL 1 0.00
24 Outer Plaster BUILD. 1 0.00
25 Internal Plumbing GF LVL 1 0.00
26 Internal Plumbing FF LVL 1 0.00
27 Internal Plumbing SF LVL 1 0.00
28 Terrace Plumbing LVL 1 0.00
29 Outer Plumbing LVL 1 0.00
30 Flooring with Stair GF LVL 1 0.00
31 Flooring with Stair FF LVL 1 0.00
32 Flooring with Stair SF LVL 1 0.00
33 Terrace Chinamoziac LVL 1 0.00
34 Door GF LVL 1 0.00
35 Door FF LVL 1 0.00
36 Door SF LVL 1 0.00
37 Door at Terrace LVL 1 0.00
38 Window & Vent. GF LVL 1 0.00
39 Window & Vent. FF LVL 1 0.00
40 Window & Vent. SF LVL 1 0.00
41 Conduit Electric Works GF LVL 1 0.00
42 Conduit Electric Works FF LVL 1 0.00
43 Conduit Electric Works SF LVL 1 0.00
44 Electric Works With wiring & Acc. GF LVL 1 0.00
45 Electric Works With wiring & Acc. FF LVL 1 0.00
46 Electric Works With wiring & Acc. SF LVL 1 0.00
47 Internal Color GF LVL 1 0.00
48 Internal Color FF LVL 1 0.00
49 Internal Color SF LVL 1 0.00
50 Outer Color BUILD. 1 0.00
51 Lift Installation BUILD. 1 0.00
52 Fire safty line BUILD. 1 0.00
53 O.H.D. TANK BUILD. 1 0.00
Total Total
Work Work
Complet REmaini
ed in % ng in %

Excavation for footing 100.00 0.00


RCC 27.65 60.59
MASNORY 0.00 80.00
INTERNAL PLASTER 0.00 75.00 120.00
OUTER PLASTER 0.00 100.00 100.00
100.00
PLUMBING 0.00 83.33 80.00 75.
80.00
60.59
FLOORING 0.00 75.00 60.00
DOOR 0.00 80.00 40.00 27.65
WINDOW 0.00 75.00 20.00
ELECTRICAL 0.00 75.00 0.00 0.00 0.00
0.00
INTERNAL COLUR 0.00 75.00 g C Y R
otin RC OR S TE
fo N A
OUTER COLOUR 0.00 100.00 r AS PL PL
fo M AL E R
LIFT 0.00 100.00 n N T
tio ER OU
va T
FIRE 0.00 100.00 xca IN
E

Total Work Com


Jul-23

Total
Work
REmaini
ng in %

0.00
0.00
0.00
0.00
0.00
30.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
Chart Title
120.00
100.00 100.00 100.00100.00100.00
100.00
80.00 75.00 83.33
80.00 75.00 80.00 75.00 75.0075.00
60.59
60.00
40.00 27.65
20.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00
g C Y R R G G R L R R T RE
otin RC OR S TE S TE B IN RIN OO DOW ICA LU OU LIF FI
fo N A A O D R O L
r AS PL PL LUM LO IN CT L C CO
fo M AL E R P F W
E LE N A E R
n
tio N T ER UT
a ER OU NT O
av IN
T I

Total Work Completed in % Total Work REmaining in %


PROGRESS REPORT
Admin Building Jul-23

Complet Total
Total ed Remaini Work
Sr. No. Item Description Unit Quantit
y Quantit ng Qty Complet
y ed in %

1 Excavation for footing NO 111 90 21 81.08


2 PCC for Footing NO 111 83 28 74.77
3 Footing NO 111 55 56 49.55
4 Pedestal LVL 1 0.4 0.6 40.00
5 PCC for Plinth Beam LVL 1 1 0.00
6 Plinth Beam LVL 1 1 0.00
7 Anti Termite Treatment LVL 1 1 0.00
8 PCC for Grade slab LVL 1 1 0.00
9 Grade Slab LVL 1 1 0.00
10 GF Column with Stair & Lift LVL 1 1 0.00
11 GF Slab LVL 1 1 0.00
12 FF Column with Stair & Lift LVL 1 1 0.00
13 FF Slab LVL 1 1 0.00
14 SF Column with Stair & Lift LVL 1 1 0.00
15 SF Slab LVL 1 1 0.00
16 TF Column with Stair & Lift LVL 1 1 0.00
17 TF Slab LVL 1 1 0.00
18 Stair & Lift Cabin LVL 1 1 0.00
19 Parapet Wall LVL 1 0.00
20 Masonary GF LVL 1 0.00
21 Masonary FF LVL 1 0.00
22 Masonary SF LVL 1 0.00
23 Masonary TF LVL 1 0.00
24 Internal Plaster GF LVL 1 0.00
25 Internal Plaster FF LVL 1 0.00
26 Internal Plaster SF LVL 1 0.00
27 Internal Plaster TF LVL 1 0.00
28 Outer Plaster BUILD. 1 0.00
29 Internal Plumbing GF LVL 1 0.00
30 Internal Plumbing FF LVL 1 0.00
31 Internal Plumbing SF LVL 1 0.00
32 Internal Plumbing TF LVL 1 0.00
33 Terrace Plumbing LVL 1 0.00
34 Outer Plumbing LVL 1 0.00
35 Flooring with Stair GF LVL 1 0.00
36 Flooring with Stair FF LVL 1 0.00
37 Flooring with Stair SF LVL 1 0.00
38 Flooring with Stair TF LVL 1 0.00
39 Terrace Chinamoziac LVL 1 0.00
40 Door GF LVL 1 0.00
41 Door FF LVL 1 0.00
42 Door SF LVL 1 0.00
43 Door TF LVL 1 0.00
44 Door at Terrace LVL 1 0.00
45 Window & Vent. GF LVL 1 0.00
46 Window & Vent. FF LVL 1 0.00
47 Window & Vent. SF LVL 1 0.00
48 Window & Vent. TF LVL 1 0.00
49 Conduit Electric Works GF LVL 1 0.00
50 Conduit Electric Works FF LVL 1 0.00
51 Conduit Electric Works SF LVL 1 0.00
52 Conduit Electric Works TF LVL 1 0.00
53 Electric Works With wiring & Acc. GF LVL 1 0.00
54 Electric Works With wiring & Acc. FF LVL 1 0.00
55 Electric Works With wiring & Acc. SF LVL 1 0.00
56 Electric Works With wiring & Acc. TF LVL 1 0.00
57 Internal Color GF LVL 1 0.00
58 Internal Color FF LVL 1 0.00
59 Internal Color SF LVL 1 0.00
60 Internal Color TF LVL 1 0.00
61 Outer Color BUILD. 1 0.00
62 Lift Installation BUILD. 1 0.00
63 Fire safty line BUILD. 1 0.00
64 O.H.D. TANK BUILD. 1 0.00

Total Total
Work Work
Complet REmaini
ed in % ng in %

Excavation for footing 81.08 18.92


RCC 9.67 90.33
MASNORY 0.00 100.00 Chart
INTERNAL PLASTER 0.00 100.00 120.00
OUTER PLASTER 0.00 100.00 100.00
PLUMBING 0.00 100.00 80.00
FLOORING 0.00 100.00 60.00
DOOR 0.00 100.00 40.00
WINDOW 0.00 100.00 20.00
ELECTRICAL 0.00 100.00 0.00
INTERNAL COLUR 0.00 100.00 ng C Y R
RC OR S TE STE BIN
R G
ooti N A A
OUTER COLOUR 0.00 100.00 r f AS PL PL LUM LO
fo M AL E R P F
LIFT 0.00 100.00 n N UT
tio R
va TE O
FIRE 0.00 100.00 ca IN
Ex

Total Work Completed in %


Jul-23

Total
Work
REmaini
ng in %

18.92
25.23
50.45
60.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00

Chart Title
00
00
00
00
00
00
00
ng C Y R R G G R L R R T RE
oti RC OR S TE STE BIN RIN OO DOW ICA LU OU LIF FI
o N A A D R O L
r f AS PL PL LUM LO
O IN CT LC CO
M AL E R P F W
ELE N A E R
R T
R N OUT TE OU
N TE IN
I

Total Work Completed in % Total Work REmaining in %


PROGRESS REPORT
Class-III Quarters(G+5, 20 Unit) Jul-23

Complet Total
Total ed Remaini Work
Sr. No. Item Description Unit Quantit
y Quantit ng Qty Complet
y ed in %

1 Excavation for footing NO 32 32 0 100.00


2 PCC for Footing NO 32 32 0 100.00
3 Footing NO 32 32 0 100.00
4 Pedestal NO 48 48 0 100.00
5 PCC for Plinth Beam LVL 1 0.2 0.8 20.00
6 Plinth Beam LVL 1 1 0.00
7 Anti Termite Treatment LVL 1 1 0.00
8 PCC for Grade slab LVL 1 1 0.00
9 Grade Slab LVL 1 1 0.00
10 GF Column with Stair & Lift LVL 1 1 0.00
11 GF Slab LVL 1 1 0.00
12 FF Column with Stair & Lift LVL 1 1 0.00
13 FF Slab LVL 1 1 0.00
14 SF Column with Stair & Lift LVL 1 1 0.00
15 SF Slab LVL 1 1 0.00
16 TF Column with Stair & Lift LVL 1 1 0.00
17 TF Slab LVL 1 1 0.00
18 4F Column with Stair & Lift LVL 1 1 0.00
19 4F Slab LVL 1 1 0.00
20 5F Column with Stair & Lift LVL 1 1 0.00
21 5F Slab LVL 1 1 0.00
22 Stair & Lift Cabin LVL 1 1 0.00
23 Parapet Wall LVL 1 0.00
24 Masonary GF LVL 1 0.00
25 Masonary FF LVL 1 0.00
26 Masonary SF LVL 1 0.00
27 Masonary TF LVL 1 0.00
28 Internal Plaster GF LVL 1 0.00
29 Internal Plaster FF LVL 1 0.00
30 Internal Plaster SF LVL 1 0.00
31 Internal Plaster TF LVL 1 0.00
32 Internal Plaster 4F LVL 1 0.00
33 Internal Plaster 5F LVL 1 0.00
34 Outer Plaster BUILD. 1 0.00
35 Internal Plumbing GF LVL 1 0.00
36 Internal Plumbing FF LVL 1 0.00
37 Internal Plumbing SF LVL 1 0.00
38 Internal Plumbing TF LVL 1 0.00
39 Internal Plumbing 4F LVL 1 0.00
40 Internal Plumbing 5F LVL 1 0.00
41 Terrace Plumbing LVL 1 0.00
42 Outer Plumbing LVL 1 0.00
43 Flooring with Stair GF LVL 1 0.00
44 Flooring with Stair FF LVL 1 0.00
45 Flooring with Stair SF LVL 1 0.00
46 Flooring with Stair TF LVL 1 0.00
47 Flooring with Stair 4F LVL 1 0.00
48 Flooring with Stair 5F LVL 1 0.00
49 Terrace Chinamoziac LVL 1 0.00
50 Door GF LVL 1 0.00
51 Door FF LVL 1 0.00
52 Door SF LVL 1 0.00
53 Door TF LVL 1 0.00
54 Door 4F LVL 1 0.00
55 Door 5F LVL 1 0.00
56 Door at Terrace LVL 1 0.00
57 Window & Vent. GF LVL 1 0.00
58 Window & Vent. FF LVL 1 0.00
59 Window & Vent. SF LVL 1 0.00
60 Window & Vent. TF LVL 1 0.00
61 Window & Vent. 4F LVL 1 0.00
62 Window & Vent. 5F LVL 1 0.00
63 Conduit Electric Works GF LVL 1 0.00
64 Conduit Electric Works FF LVL 1 0.00
65 Conduit Electric Works SF LVL 1 0.00
66 Conduit Electric Works TF LVL 1 0.00
67 Conduit Electric Works 4F LVL 1 0.00
68 Conduit Electric Works 5F LVL 1 0.00
69 Electric Works With wiring & Acc. GF LVL 1 0.00
70 Electric Works With wiring & Acc. FF LVL 1 0.00
71 Electric Works With wiring & Acc. SF LVL 1 0.00
72 Electric Works With wiring & Acc. TF LVL 1 0.00
73 Electric Works With wiring & Acc. 4F LVL 1 0.00
74 Electric Works With wiring & Acc. 5F LVL 1 0.00
75 Internal Color GF LVL 1 0.00
76 Internal Color FF LVL 1 0.00
77 Internal Color SF LVL 1 0.00
78 Internal Color TF LVL 1 0.00
79 Internal Color 4F LVL 1 0.00
80 Internal Color 5F LVL 1 0.00
81 Outer Color BUILD. 1 0.00
82 Lift Installation BUILD. 1 0.00
83 Fire safty line BUILD. 1 0.00
84 O.H.D. TANK BUILD. 1 0.00

Total Total
Work Work
Complet REmaini
ed in % ng in %
C
160.00
140.00
120.00
100.00
80.00
C
Excavation for footing 100.00 0.00 160.00
RCC 18.82 104.71 140.00
MASNORY 0.00 100.00 120.00
100.00
INTERNAL PLASTER 0.00 100.00 80.00
OUTER PLASTER 0.00 100.00 60.00
PLUMBING 0.00 133.33 40.00
20.00
FLOORING 0.00 100.00 0.00
DOOR 0.00 140.00 ng C Y
RC OR S TE S TE
R
ooti N A A
WINDOW 0.00 100.00 r f AS PL PL
fo M AL E R P
ELECTRICAL 0.00 125.00 n
tio E RN OUT
va T
INTERNAL COLUR 0.00 100.00 ca IN
Ex
OUTER COLOUR 0.00 100.00
LIFT 0.00 100.00 Total Work Complet

FIRE 0.00 100.00


Jul-23

Total
Work
REmaini
ng in %

0.00
0.00
0.00
0.00
80.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00

Chart Title
160.00
140.00
120.00
100.00
80.00
Chart Title
160.00
140.00
120.00
100.00
80.00
60.00
40.00
20.00
0.00
ng C Y R R G G R L R R T RE
oti RC OR STE S TE BIN RIN OO DOW ICA LU OU LIF FI
f o N A A O D N T R CO L
r AS PL PL LUM LO W
I
EC L CO
fo M AL E R P F EL R N A T E R
n
tio RN OUT TE OU
va TE IN
ca I N

Total Work Completed in % Total Work REmaining in %


PROGRESS REPORT
VC Bunglow(G+1) Jul-23

Complet Total
Total ed Remaini Work
Sr. No. Item Description Unit Quantit
y Quantit ng Qty Comple
y ted in %

1 Excavation for footing NO 26 26 0 100.00


2 PCC for Footing NO 26 26 0 100.00
3 Footing NO 26 26 0 100.00
4 Pedestal LVL 1 1 0 100.00
5 PCC for Plinth Beam LVL 1 1 0 100.00
6 Plinth Beam LVL 1 1 0 100.00
7 Anti Termite Treatment LVL 1 1 0.00
8 PCC for Grade slab LVL 1 1 0.00
9 Grade Slab LVL 1 1 0.00
10 GF Column with Stair & Lift LVL 1 1 0.00
11 GF Slab LVL 1 1 0.00
12 FF Column with Stair & Lift LVL 1 1 0.00
13 FF Slab LVL 1 1 0.00
14 Stair & Lift Cabin LVL 1 1 0.00
15 Parapet Wall LVL 1 0.00
16 Masonary GF LVL 1 0.00
17 Masonary FF LVL 1 0.00
18 Internal Plaster GF LVL 1 0.00
19 Internal Plaster FF LVL 1 0.00
20 Outer Plaster BUILD. 1 0.00
21 Internal Plumbing GF LVL 1 0.00
22 Internal Plumbing FF LVL 1 0.00
23 Terrace Plumbing LVL 1 0.00
24 Outer Plumbing LVL 1 0.00
25 Flooring with Stair GF LVL 1 0.00
26 Flooring with Stair FF LVL 1 0.00
27 Terrace Chinamoziac LVL 1 0.00
28 Door GF LVL 1 0.00
29 Door FF LVL 1 0.00
30 Door at Terrace LVL 1 0.00
31 Window & Vent. GF LVL 1 0.00
32 Window & Vent. FF LVL 1 0.00
33 Conduit Electric Works GF LVL 1 0.00
34 Conduit Electric Works FF LVL 1 0.00
35 Electric Works With wiring & Acc. GF LVL 1 0.00
36 Electric Works With wiring & Acc. FF LVL 1 0.00
37 Internal Color GF LVL 1 0.00
38 Internal Color FF LVL 1 0.00
39 Outer Color BUILD. 1 0.00
40 Lift Installation BUILD. 1 0.00
41 Fire safty line BUILD. 1 0.00
42 O.H.D. TANK BUILD. 1 0.00

Total Total
Work Work
Complet REmaini
ed in % ng in %

Excavation for footing 100.00 0.00


RCC 29.41 47.06
MASNORY 0.00 60.00 Chart
INTERNAL PLASTER 0.00 50.00 120.00
OUTER PLASTER 0.00 100.00 100.00
PLUMBING 0.00 66.67 80.00
FLOORING 0.00 50.00 60.00
DOOR 0.00 60.00 40.00
WINDOW 0.00 50.00 20.00
ELECTRICAL 0.00 50.00 0.00
g C Y R R G
INTERNAL COLUR 0.00 50.00 otin RC OR S TE S TE BIN
fo N A A
OUTER COLOUR 0.00 100.00 r A S PL PL U M OO
n
fo M AL E R PL FL
tio N UT
LIFT 0.00 100.00 va TER O
FIRE 0.00 100.00 xca IN
E

Total Work Completed in %


ti R T T I
oo NO LAS LAS MB O
rf AS P P LU F L O
fo M AL R P
on N UTE
va
ti
TER O
xca IN
E

Total Work Completed in %


Jul-23

Total
Work
REmainin
g in %

0.00
0.00
0.00
0.00
0.00
0.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00

Chart Title
0
0
0
0
0
0
0
g C Y R R G G R L R R T RE
otin RC OR S TE S TE BIN RIN OO DOW ICA LU OU LIF FI
fo N A A D TR O L
AS PL PL LUM LO
O IN L C CO
W EC
M AL E R P F EL RNA TER
N UT
ER O TE OU
T IN
IN

Total Work Completed in % Total Work REmaining in %


oti R T T
NO LAS LAS MB OR
I I
DO D R I COL OLO L FI
fo AS P P O IN CT L C
U E
M AL ER PL FL W
EL RNA TER
N T
R OU TE OU
TE IN
IN

Total Work Completed in % Total Work REmaining in %


PROGRESS REPORT
Compound Wall & Road Jul-23

Complet Total
Total ed Remaini Work
Sr. No. Item Description Unit Quantit
y Quantit ng Qty Comple
y ted in %

(A) Compound Wall


1 Excavation for Compound Wall RMT. 4164.5 756 3408.5 18.15
2 PCC for Compound Wall RMT. 4164.5 756 3408.5 18.15
3 Below G.L. Masonary and RCC Wall RMT. 4164.5 756 3408.5 18.15
4 Above G.L. Masonary and RCC Wall RMT. 4164.5 600 3564.5 14.41
5 1st Coat Plaster Work RMT. 4164.5 105 4059.5 2.52
6 2nd Coat Plaster Work RMT. 4164.5 4164.5 0.00
7 Colour Work RMT. 4164.5 4164.5 0.00
8 MS Gril RMT. 4165 4165 0.00

(B) Road Work

1 Excavtion/Levelling RMT. 4500 1494 3006 33.20


2 Sub Grade RMT. 4500 792 3708 17.60
3 GSB RMT. 4500 640 3860 14.22
4 DLC RMT. 4500 4500 0.00
5 PQC RMT. 4500 4500 0.00

Total Total
Work Work
Complet REmaini
ed in % ng in %

Compound Wall 18.15 81.85


Road 6.96 63.63
Jul-23

Total
Work Compound Wall Length(RMT)
REmainin
g in %

Type- 1A 204
81.85 Type-1B 188.2
81.85 Type-1C 21.8
81.85 Type-2B 124.8
85.59 Type-3A 917.9
97.48 Type-3B 57.8
100.00
100.00 Type-4 2650
100.00 Total 4164.5

66.80 728.7 600.7


82.40
85.78
100.00
100.00
PROGRESS REPORT
Girls Hostel(G+3) May-23

Complet Total
Total ed Remaini Work
Sr. No. Item Description Unit Quantit
y Quantit ng Qty Complet
y ed in %

1 Excavation for footing NO 44 -44 #DIV/0!


2 PCC for Footing NO 0 #DIV/0!
3 Footing NO 0 #DIV/0!
4 Pedestal NO 0 #DIV/0!
5 PCC for Plinth Beam LVL 1 1 0.00
6 Plinth Beam LVL 1 1 0.00
7 Anti Termite Treatment LVL 1 1 0.00
8 PCC for Grade slab LVL 1 1 0.00
9 Grade Slab LVL 1 1 0.00
10 GF Column with Stair & Lift LVL 1 1 0.00
11 GF Slab LVL 1 1 0.00
12 FF Column with Stair & Lift LVL 1 1 0.00
13 FF Slab LVL 1 1 0.00
14 SF Column with Stair & Lift LVL 1 1 0.00
15 SF Slab LVL 1 1 0.00
16 TF Column with Stair & Lift LVL 1 1 0.00
17 TF Slab LVL 1 1 0.00
18 Stair & Lift Cabin LVL 1 1 0.00
19 Parapet Wall LVL 1 0.00
20 Masonary GF LVL 1 0.00
21 Masonary FF LVL 1 0.00
22 Masonary SF LVL 1 0.00
23 Masonary TF LVL 1 0.00
24 Internal Plaster GF LVL 1 0.00
25 Internal Plaster FF LVL 1 0.00
26 Internal Plaster SF LVL 1 0.00
27 Internal Plaster TF LVL 1 0.00
28 Outer Plaster BUILD. 1 0.00
29 Internal Plumbing GF LVL 1 0.00
30 Internal Plumbing FF LVL 1 0.00
31 Internal Plumbing SF LVL 1 0.00
32 Internal Plumbing TF LVL 1 0.00
33 Terrace Plumbing LVL 1 0.00
34 Outer Plumbing LVL 1 0.00
35 Flooring with Stair GF LVL 1 0.00
36 Flooring with Stair FF LVL 1 0.00
37 Flooring with Stair SF LVL 1 0.00
38 Flooring with Stair TF LVL 1 0.00
39 Terrace Chinamoziac LVL 1 0.00
40 Door GF LVL 1 0.00
41 Door FF LVL 1 0.00
42 Door SF LVL 1 0.00
43 Door TF LVL 1 0.00
44 Door at Terrace LVL 1 0.00
45 Window & Vent. GF LVL 1 0.00
46 Window & Vent. FF LVL 1 0.00
47 Window & Vent. SF LVL 1 0.00
48 Window & Vent. TF LVL 1 0.00
53 Conduit Electric Works GF LVL 1 0.00
54 Conduit Electric Works FF LVL 1 0.00
55 Conduit Electric Works SF LVL 1 0.00
56 Conduit Electric Works TF LVL 1 0.00
57 Electric Works With wiring & Acc. GF LVL 1 0.00
58 Electric Works With wiring & Acc. FF LVL 1 0.00
59 Electric Works With wiring & Acc. SF LVL 1 0.00
60 Electric Works With wiring & Acc. TF LVL 1 0.00
61 Internal Color GF LVL 1 0.00
62 Internal Color FF LVL 1 0.00
63 Internal Color SF LVL 1 0.00
64 Internal Color TF LVL 1 0.00
65 Outer Color BUILD. 1 0.00
66 Lift Installation BUILD. 1 0.00
68 Fire safty line BUILD. 1 0.00
70 O.H.D. TANK BUILD. 1 0.00

Total Total
Work Work
Complet REmaini
ed in % ng in %

Excavation for footing #DIV/0! #DIV/0!


RCC #DIV/0! #DIV/0!
MASNORY 0.00 100.00
INTERNAL PLASTER 0.00 100.00
OUTER PLASTER 0.00 100.00
PLUMBING 0.00 100.00
FLOORING 0.00 100.00
DOOR 0.00 100.00
WINDOW 0.00 100.00
ELECTRICAL 0.00 100.00
INTERNAL COLUR 0.00 100.00
OUTER COLOUR 0.00 100.00
LIFT 0.00 100.00
FIRE 0.00 100.00
May-23

Total
Work
REmaini
ng in %

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
PROGRESS REPORT
Boys Hostel(G+3) May-23

Complet Total
Total ed Remaini Work
Sr. No. Item Description Unit Quantit
y Quantit ng Qty Complet
y ed in %

1 Excavation for footing NO 45 44 1 97.78


2 PCC for Footing NO 45 45 0.00
3 Footing NO 45 45 0.00
4 Pedestal NO 45 45 0.00
5 PCC for Plinth Beam LVL 1 1 0.00
6 Plinth Beam LVL 1 1 0.00
7 Anti Termite Treatment LVL 1 1 0.00
8 PCC for Grade slab LVL 1 1 0.00
9 Grade Slab LVL 1 1 0.00
10 GF Column with Stair & Lift LVL 1 1 0.00
11 GF Slab LVL 1 1 0.00
12 FF Column with Stair & Lift LVL 1 1 0.00
13 FF Slab LVL 1 1 0.00
14 SF Column with Stair & Lift LVL 1 1 0.00
15 SF Slab LVL 1 1 0.00
16 TF Column with Stair & Lift LVL 1 1 0.00
17 TF Slab LVL 1 1 0.00
18 Stair & Lift Cabin LVL 1 1 0.00
19 Parapet Wall LVL 1 0.00
20 Masonary GF LVL 1 0.00
21 Masonary FF LVL 1 0.00
22 Masonary SF LVL 1 0.00
23 Masonary TF LVL 1 0.00
24 Internal Plaster GF LVL 1 0.00
25 Internal Plaster FF LVL 1 0.00
26 Internal Plaster SF LVL 1 0.00
27 Internal Plaster TF LVL 1 0.00
28 Outer Plaster BUILD. 1 0.00
29 Internal Plumbing GF LVL 1 0.00
30 Internal Plumbing FF LVL 1 0.00
31 Internal Plumbing SF LVL 1 0.00
32 Internal Plumbing TF LVL 1 0.00
33 Terrace Plumbing LVL 1 0.00
34 Outer Plumbing LVL 1 0.00
35 Flooring with Stair GF LVL 1 0.00
36 Flooring with Stair FF LVL 1 0.00
37 Flooring with Stair SF LVL 1 0.00
38 Flooring with Stair TF LVL 1 0.00
39 Terrace Chinamoziac LVL 1 0.00
40 Door GF LVL 1 0.00
41 Door FF LVL 1 0.00
42 Door SF LVL 1 0.00
43 Door TF LVL 1 0.00
44 Door at Terrace LVL 1 0.00
45 Window & Vent. GF LVL 1 0.00
46 Window & Vent. FF LVL 1 0.00
47 Window & Vent. SF LVL 1 0.00
48 Window & Vent. TF LVL 1 0.00
53 Conduit Electric Works GF LVL 1 0.00
54 Conduit Electric Works FF LVL 1 0.00
55 Conduit Electric Works SF LVL 1 0.00
56 Conduit Electric Works TF LVL 1 0.00
57 Electric Works With wiring & Acc. GF LVL 1 0.00
58 Electric Works With wiring & Acc. FF LVL 1 0.00
59 Electric Works With wiring & Acc. SF LVL 1 0.00
60 Electric Works With wiring & Acc. TF LVL 1 0.00
61 Internal Color GF LVL 1 0.00
62 Internal Color FF LVL 1 0.00
63 Internal Color SF LVL 1 0.00
64 Internal Color TF LVL 1 0.00
65 Outer Color BUILD. 1 0.00
66 Lift Installation BUILD. 1 0.00
68 Fire safty line BUILD. 1 0.00
70 O.H.D. TANK BUILD. 1 0.00

Total Total
Work Work
Comple REmaini
ted in % ng in %

Excavation for footing 97.78 2.22


RCC 0.00 100.00
MASNORY 0.00 100.00
INTERNAL PLASTER 0.00 100.00
OUTER PLASTER 0.00 100.00
PLUMBING 0.00 100.00
FLOORING 0.00 100.00
DOOR 0.00 100.00
WINDOW 0.00 100.00
ELECTRICAL 0.00 100.00
INTERNAL COLUR 0.00 100.00
OUTER COLOUR 0.00 100.00
LIFT 0.00 100.00
FIRE 0.00 100.00
May-23

Total
Work
REmaini
ng in %

2.22
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
PROGRESS REPORT
Class-II Quarters(G+5, 20 Unit) May-23

Complet Total
Total ed Remaini Work
Sr. No. Item Description Unit Quantit
y Quantit ng Qty Complet
y ed in %

1 Excavation for footing NO 0 #DIV/0!


2 PCC for Footing NO 0 #DIV/0!
3 Footing NO 0 #DIV/0!
4 Pedestal NO 0 #DIV/0!
5 PCC for Plinth Beam LVL 1 1 0.00
6 Plinth Beam LVL 1 1 0.00
7 Anti Termite Treatment LVL 1 1 0.00
8 PCC for Grade slab LVL 1 1 0.00
9 Grade Slab LVL 1 1 0.00
10 GF Column with Stair & Lift LVL 1 1 0.00
11 GF Slab LVL 1 1 0.00
12 FF Column with Stair & Lift LVL 1 1 0.00
13 FF Slab LVL 1 1 0.00
14 SF Column with Stair & Lift LVL 1 1 0.00
15 SF Slab LVL 1 1 0.00
16 TF Column with Stair & Lift LVL 1 1 0.00
17 TF Slab LVL 1 1 0.00
4F Column with Stair & Lift LVL 1 1 0.00
4F Slab LVL 1 1 0.00
5F Column with Stair & Lift LVL 1 1 0.00
5F Slab LVL 1 1 0.00
18 Stair & Lift Cabin LVL 1 1 0.00
19 Parapet Wall LVL 1 0.00
20 Masonary GF LVL 1 0.00
21 Masonary FF LVL 1 0.00
22 Masonary SF LVL 1 0.00
23 Masonary TF LVL 1 0.00
24 Internal Plaster GF LVL 1 0.00
25 Internal Plaster FF LVL 1 0.00
26 Internal Plaster SF LVL 1 0.00
27 Internal Plaster TF LVL 1 0.00
Internal Plaster 4F LVL 1 0.00
Internal Plaster 5F LVL 1 0.00
28 Outer Plaster BUILD. 1 0.00
29 Internal Plumbing GF LVL 1 0.00
30 Internal Plumbing FF LVL 1 0.00
31 Internal Plumbing SF LVL 1 0.00
32 Internal Plumbing TF LVL 1 0.00
Internal Plumbing 4F LVL 1 0.00
Internal Plumbing 5F LVL 1 0.00
33 Terrace Plumbing LVL 1 0.00
34 Outer Plumbing LVL 1 0.00
35 Flooring with Stair GF LVL 1 0.00
36 Flooring with Stair FF LVL 1 0.00
37 Flooring with Stair SF LVL 1 0.00
38 Flooring with Stair TF LVL 1 0.00
Flooring with Stair 4F LVL 1 0.00
Flooring with Stair 5F LVL 1 0.00
39 Terrace Chinamoziac LVL 1 0.00
40 Door GF LVL 1 0.00
41 Door FF LVL 1 0.00
42 Door SF LVL 1 0.00
43 Door TF LVL 1 0.00
Door 4F LVL 1 0.00
Door 5F LVL 1 0.00
44 Door at Terrace LVL 1 0.00
45 Window & Vent. GF LVL 1 0.00
46 Window & Vent. FF LVL 1 0.00
47 Window & Vent. SF LVL 1 0.00
48 Window & Vent. TF LVL 1 0.00
Window & Vent. 4F LVL 1 0.00
Window & Vent. 5F LVL 1 0.00
53 Conduit Electric Works GF LVL 1 0.00
54 Conduit Electric Works FF LVL 1 0.00
55 Conduit Electric Works SF LVL 1 0.00
56 Conduit Electric Works TF LVL 1 0.00
Conduit Electric Works 4F LVL 1 0.00
Conduit Electric Works 5F LVL 1 0.00
57 Electric Works With wiring & Acc. GF LVL 1 0.00
58 Electric Works With wiring & Acc. FF LVL 1 0.00
59 Electric Works With wiring & Acc. SF LVL 1 0.00
60 Electric Works With wiring & Acc. TF LVL 1 0.00
Electric Works With wiring & Acc. 4F LVL 1 0.00
Electric Works With wiring & Acc. 5F LVL 1 0.00
61 Internal Color GF LVL 1 0.00
62 Internal Color FF LVL 1 0.00
63 Internal Color SF LVL 1 0.00
64 Internal Color TF LVL 1 0.00
Internal Color 4F LVL 1 0.00
Internal Color 5F LVL 1 0.00
65 Outer Color BUILD. 1 0.00
66 Lift Installation BUILD. 1 0.00
68 Fire safty line BUILD. 1 0.00
70 O.H.D. TANK BUILD. 1 0.00

Total Total
Work Work
Complet REmaini
ed in % ng in %
Excavation for footing #DIV/0! #DIV/0!
RCC #DIV/0! #DIV/0!
MASNORY 0.00 100.00
INTERNAL PLASTER 0.00 100.00
OUTER PLASTER 0.00 100.00
PLUMBING 0.00 133.33
FLOORING 0.00 100.00
DOOR 0.00 140.00
WINDOW 0.00 100.00
ELECTRICAL 0.00 125.00
INTERNAL COLUR 0.00 100.00
OUTER COLOUR 0.00 100.00
LIFT 0.00 100.00
FIRE 0.00 100.00
May-23

Total
Work
REmaini
ng in %

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
PROGRESS REPORT
Central Library(G+2) May-23

Complet Total
Total ed Remaini Work
Sr. No. Item Description Unit Quantit
y Quantit ng Qty Complet
y ed in %

1 Excavation for footing NO 0 #DIV/0!


2 PCC for Footing NO 0 #DIV/0!
3 Footing NO 0 #DIV/0!
4 Pedestal NO 0 #DIV/0!
5 PCC for Plinth Beam NO 0 #DIV/0!
6 Plinth Beam LVL 1 1 0.00
7 Anti Termite Treatment LVL 1 1 0.00
8 PCC for Grade slab LVL 1 1 0.00
9 Grade Slab LVL 1 1 0.00
10 GF Column with Stair & Lift LVL 1 1 0.00
11 GF Slab LVL 1 1 0.00
12 FF Column with Stair & Lift LVL 1 1 0.00
13 FF Slab LVL 1 1 0.00
14 SF Column with Stair & Lift LVL 1 1 0.00
15 SF Slab LVL 1 1 0.00
18 Stair & Lift Cabin LVL 1 1 0.00
19 Parapet Wall LVL 1 0.00
20 Masonary GF LVL 1 0.00
21 Masonary FF LVL 1 0.00
22 Masonary SF LVL 1 0.00
24 Internal Plaster GF LVL 1 0.00
25 Internal Plaster FF LVL 1 0.00
26 Internal Plaster SF LVL 1 0.00
28 Outer Plaster BUILD. 1 0.00
29 Internal Plumbing GF LVL 1 0.00
30 Internal Plumbing FF LVL 1 0.00
31 Internal Plumbing SF LVL 1 0.00
33 Terrace Plumbing LVL 1 0.00
34 Outer Plumbing LVL 1 0.00
35 Flooring with Stair GF LVL 1 0.00
36 Flooring with Stair FF LVL 1 0.00
37 Flooring with Stair SF LVL 1 0.00
39 Terrace Chinamoziac LVL 1 0.00
40 Door GF LVL 1 0.00
41 Door FF LVL 1 0.00
42 Door SF LVL 1 0.00
44 Door at Terrace LVL 1 0.00
45 Window & Vent. GF LVL 1 0.00
46 Window & Vent. FF LVL 1 0.00
47 Window & Vent. SF LVL 1 0.00
53 Conduit Electric Works GF LVL 1 0.00
54 Conduit Electric Works FF LVL 1 0.00
55 Conduit Electric Works SF LVL 1 0.00
57 Electric Works With wiring & Acc. GF LVL 1 0.00
58 Electric Works With wiring & Acc. FF LVL 1 0.00
59 Electric Works With wiring & Acc. SF LVL 1 0.00
61 Internal Color GF LVL 1 0.00
62 Internal Color FF LVL 1 0.00
63 Internal Color SF LVL 1 0.00
65 Outer Color BUILD. 1 0.00
66 Lift Installation BUILD. 1 0.00
68 Fire safty line BUILD. 1 0.00
70 O.H.D. TANK BUILD. 1 0.00
Total Total
Work Work
Complet REmaini
ed in % ng in %

Excavation for footing #DIV/0! #DIV/0!


RCC #DIV/0! #DIV/0!
MASNORY 0.00 80.00
INTERNAL PLASTER 0.00 75.00
OUTER PLASTER 0.00 100.00
PLUMBING 0.00 83.33
FLOORING 0.00 75.00
DOOR 0.00 80.00
WINDOW 0.00 75.00
ELECTRICAL 0.00 75.00
INTERNAL COLUR 0.00 75.00
OUTER COLOUR 0.00 100.00
LIFT 0.00 100.00
FIRE 0.00 100.00
May-23

Total
Work
REmaini
ng in %

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
PROGRESS REPORT
Registrar Bunglow(G+1) May-23

Complet Total
Total ed Remaini Work
Sr. No. Item Description Unit Quantit
y Quantit ng Qty Complet
y ed in %

1 Excavation for footing NO 44 -44 #DIV/0!


2 PCC for Footing NO 0 #DIV/0!
3 Footing NO 0 #DIV/0!
4 Pedestal NO 0 #DIV/0!
5 PCC for Plinth Beam LVL 1 1 0.00
6 Plinth Beam LVL 1 1 0.00
7 Anti Termite Treatment LVL 1 1 0.00
8 PCC for Grade slab LVL 1 1 0.00
9 Grade Slab LVL 1 1 0.00
10 GF Column with Stair & Lift LVL 1 1 0.00
11 GF Slab LVL 1 1 0.00
12 FF Column with Stair & Lift LVL 1 1 0.00
13 FF Slab LVL 1 1 0.00
18 Stair & Lift Cabin LVL 1 1 0.00
19 Parapet Wall LVL 1 0.00
20 Masonary GF LVL 1 0.00
21 Masonary FF LVL 1 0.00
24 Internal Plaster GF LVL 1 0.00
25 Internal Plaster FF LVL 1 0.00
28 Outer Plaster BUILD. 1 0.00
29 Internal Plumbing GF LVL 1 0.00
30 Internal Plumbing FF LVL 1 0.00
33 Terrace Plumbing LVL 1 0.00
34 Outer Plumbing LVL 1 0.00
35 Flooring with Stair GF LVL 1 0.00
36 Flooring with Stair FF LVL 1 0.00
39 Terrace Chinamoziac LVL 1 0.00
40 Door GF LVL 1 0.00
41 Door FF LVL 1 0.00
44 Door at Terrace LVL 1 0.00
45 Window & Vent. GF LVL 1 0.00
46 Window & Vent. FF LVL 1 0.00
53 Conduit Electric Works GF LVL 1 0.00
54 Conduit Electric Works FF LVL 1 0.00
57 Electric Works With wiring & Acc. GF LVL 1 0.00
58 Electric Works With wiring & Acc. FF LVL 1 0.00
61 Internal Color GF LVL 1 0.00
62 Internal Color FF LVL 1 0.00
65 Outer Color BUILD. 1 0.00
66 Lift Installation BUILD. 1 0.00
68 Fire safty line BUILD. 1 0.00
70 O.H.D. TANK BUILD. 1 0.00

Total Total
Work Work
Complet REmaini
ed in % ng in %

Excavation for footing #DIV/0! #DIV/0!


RCC #DIV/0! #DIV/0!
MASNORY 0.00 60.00
INTERNAL PLASTER 0.00 50.00
OUTER PLASTER 0.00 100.00
PLUMBING 0.00 66.67
FLOORING 0.00 50.00
DOOR 0.00 60.00
WINDOW 0.00 50.00
ELECTRICAL 0.00 50.00
INTERNAL COLUR 0.00 50.00
OUTER COLOUR 0.00 100.00
LIFT 0.00 100.00
FIRE 0.00 100.00
May-23

Total
Work
REmaini
ng in %

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
PROGRESS REPORT
Cafeteria(G) May-23

Complet Total
Total ed Remaini Work
Sr. No. Item Description Unit Quantit
y Quantit ng Qty Complet
y ed in %

1 Excavation for footing NO 44 -44 #DIV/0!


2 PCC for Footing NO 0 #DIV/0!
3 Footing NO 0 #DIV/0!
4 Pedestal NO 0 #DIV/0!
5 PCC for Plinth Beam LVL 1 1 0.00
6 Plinth Beam LVL 1 1 0.00
7 Anti Termite Treatment LVL 1 1 0.00
8 PCC for Grade slab LVL 1 1 0.00
9 Grade Slab LVL 1 1 0.00
10 GF Column with Stair & Lift LVL 1 1 0.00
11 GF Slab LVL 1 1 0.00
18 Stair & Lift Cabin LVL 1 1 0.00
19 Parapet Wall LVL 1 0.00
20 Masonary GF LVL 1 0.00
24 Internal Plaster GF LVL 1 0.00
28 Outer Plaster BUILD. 1 0.00
29 Internal Plumbing GF LVL 1 0.00
33 Terrace Plumbing LVL 1 0.00
34 Outer Plumbing LVL 1 0.00
35 Flooring with Stair GF LVL 1 0.00
39 Terrace Chinamoziac LVL 1 0.00
40 Door GF LVL 1 0.00
44 Door at Terrace LVL 1 0.00
45 Window & Vent. GF LVL 1 0.00
53 Conduit Electric Works GF LVL 1 0.00
57 Electric Works With wiring & Acc. GF LVL 1 0.00
61 Internal Color GF LVL 1 0.00
65 Outer Color BUILD. 1 0.00
66 Lift Installation BUILD. 1 0.00
68 Fire safty line BUILD. 1 0.00
70 O.H.D. TANK BUILD. 1 0.00

Total Total
Work Work
Complet REmaini
ed in % ng in %

Excavation for footing #DIV/0! #DIV/0!


RCC #DIV/0! #DIV/0!
MASNORY 0.00 40.00
INTERNAL PLASTER 0.00 25.00
OUTER PLASTER 0.00 100.00
PLUMBING 0.00 50.00
FLOORING 0.00 25.00
DOOR 0.00 40.00
WINDOW 0.00 25.00
ELECTRICAL 0.00 25.00
INTERNAL COLUR 0.00 25.00
OUTER COLOUR 0.00 100.00
LIFT 0.00 100.00
FIRE 0.00 100.00
May-23

Total
Work
REmaini
ng in %

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
PROGRESS REPORT
ATM & Post Office(G) May-23

Complet Total
Total ed Remaini Work
Sr. No. Item Description Unit Quantit
y Quantit ng Qty Complet
y ed in %

1 Excavation for footing NO 44 -44 #DIV/0!


2 PCC for Footing NO 0 #DIV/0!
3 Footing NO 0 #DIV/0!
4 Pedestal NO 0 #DIV/0!
5 PCC for Plinth Beam LVL 1 1 0.00
6 Plinth Beam LVL 1 1 0.00
7 Anti Termite Treatment LVL 1 1 0.00
8 PCC for Grade slab LVL 1 1 0.00
9 Grade Slab LVL 1 1 0.00
10 GF Column with Stair & Lift LVL 1 1 0.00
11 GF Slab LVL 1 1 0.00
18 Stair & Lift Cabin LVL 1 1 0.00
19 Parapet Wall LVL 1 0.00
20 Masonary GF LVL 1 0.00
24 Internal Plaster GF LVL 1 0.00
28 Outer Plaster BUILD. 1 0.00
29 Internal Plumbing GF LVL 1 0.00
33 Terrace Plumbing LVL 1 0.00
34 Outer Plumbing LVL 1 0.00
35 Flooring with Stair GF LVL 1 0.00
39 Terrace Chinamoziac LVL 1 0.00
40 Door GF LVL 1 0.00
44 Door at Terrace LVL 1 0.00
45 Window & Vent. GF LVL 1 0.00
53 Conduit Electric Works GF LVL 1 0.00
57 Electric Works With wiring & Acc. GF LVL 1 0.00
61 Internal Color GF LVL 1 0.00
65 Outer Color BUILD. 1 0.00
66 Lift Installation BUILD. 1 0.00
68 Fire safty line BUILD. 1 0.00
70 O.H.D. TANK BUILD. 1 0.00

Total Total
Work Work
Complet REmaini
ed in % ng in %

Excavation for footing #DIV/0! #DIV/0!


RCC #DIV/0! #DIV/0!
MASNORY 0.00 40.00
INTERNAL PLASTER 0.00 25.00
OUTER PLASTER 0.00 100.00
PLUMBING 0.00 50.00
FLOORING 0.00 25.00
DOOR 0.00 40.00
WINDOW 0.00 25.00
ELECTRICAL 0.00 25.00
INTERNAL COLUR 0.00 25.00
OUTER COLOUR 0.00 100.00
LIFT 0.00 100.00
FIRE 0.00 100.00
May-23

Total
Work
REmaini
ng in %

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
PROGRESS REPORT
Animal House(G) May-23

Complet Total
Total ed Remaini Work
Sr. No. Item Description Unit Quantit
y Quantit ng Qty Complet
y ed in %

1 Excavation for footing NO 44 -44 #DIV/0!


2 PCC for Footing NO 0 #DIV/0!
3 Footing NO 0 #DIV/0!
4 Pedestal NO 0 #DIV/0!
5 PCC for Plinth Beam NO 0 #DIV/0!
6 Plinth Beam LVL 1 1 0.00
7 Anti Termite Treatment LVL 1 1 0.00
8 PCC for Grade slab LVL 1 1 0.00
9 Grade Slab LVL 1 1 0.00
10 GF Column with Stair & Lift LVL 1 1 0.00
11 GF Slab LVL 1 1 0.00
18 Stair & Lift Cabin LVL 1 1 0.00
19 Parapet Wall LVL 1 0.00
20 Masonary GF LVL 1 0.00
24 Internal Plaster GF LVL 1 0.00
25 Internal Plaster FF LVL 1 0.00
26 Internal Plaster SF LVL 1 0.00
27 Internal Plaster TF LVL 1 0.00
28 Outer Plaster BUILD. 1 0.00
29 Internal Plumbing GF LVL 1 0.00
33 Terrace Plumbing LVL 1 0.00
34 Outer Plumbing LVL 1 0.00
35 Flooring with Stair GF LVL 1 0.00
39 Terrace Chinamoziac LVL 1 0.00
40 Door GF LVL 1 0.00
44 Door at Terrace LVL 1 0.00
45 Window & Vent. GF LVL 1 0.00
53 Conduit Electric Works GF LVL 1 0.00
57 Electric Works With wiring & Acc. GF LVL 1 0.00
61 Internal Color GF LVL 1 0.00
65 Outer Color BUILD. 1 0.00
66 Lift Installation BUILD. 1 0.00
68 Fire safty line BUILD. 1 0.00
70 O.H.D. TANK BUILD. 1 0.00

Total Total
Work Work
Complet REmaini
ed in % ng in %

Excavation for footing #DIV/0! #DIV/0!


RCC #DIV/0! #DIV/0!
MASNORY 0.00 40.00
INTERNAL PLASTER 0.00 100.00
OUTER PLASTER 0.00 100.00
PLUMBING 0.00 50.00
FLOORING 0.00 25.00
DOOR 0.00 40.00
WINDOW 0.00 25.00
ELECTRICAL 0.00 25.00
INTERNAL COLUR 0.00 25.00
OUTER COLOUR 0.00 100.00
LIFT 0.00 100.00
FIRE 0.00 100.00
May-23

Total
Work
REmaini
ng in %

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
PROGRESS REPORT
Connecter Building(G+2) May-23

Complet Total
Total ed Remaini Work
Sr. No. Item Description Unit Quantit
y Quantit ng Qty Complet
y ed in %

1 Excavation for footing NO 45 44 1 97.78


2 PCC for Footing NO 5 5 0.00
3 Footing NO 30 30 0.00
4 Pedestal NO 30 30 0.00
5 PCC for Plinth Beam LVL 1 1 0.00
6 Plinth Beam LVL 1 1 0.00
7 Anti Termite Treatment LVL 1 1 0.00
8 PCC for Grade slab LVL 1 1 0.00
9 Grade Slab LVL 1 1 0.00
10 GF Column with Stair & Lift LVL 1 1 0.00
11 GF Slab LVL 1 1 0.00
12 FF Column with Stair & Lift LVL 1 1 0.00
13 FF Slab LVL 1 1 0.00
14 SF Column with Stair & Lift LVL 1 1 0.00
15 SF Slab LVL 1 1 0.00
18 Stair & Lift Cabin LVL 1 1 0.00
19 Parapet Wall LVL 1 0.00
20 Masonary GF LVL 1 0.00
21 Masonary FF LVL 1 0.00
22 Masonary SF LVL 1 0.00
24 Internal Plaster GF LVL 1 0.00
25 Internal Plaster FF LVL 1 0.00
26 Internal Plaster SF LVL 1 0.00
28 Outer Plaster BUILD. 1 0.00
29 Internal Plumbing GF LVL 1 0.00
30 Internal Plumbing FF LVL 1 0.00
31 Internal Plumbing SF LVL 1 0.00
33 Terrace Plumbing LVL 1 0.00
34 Outer Plumbing LVL 1 0.00
35 Flooring with Stair GF LVL 1 0.00
36 Flooring with Stair FF LVL 1 0.00
37 Flooring with Stair SF LVL 1 0.00
39 Terrace Chinamoziac LVL 1 0.00
40 Door GF LVL 1 0.00
41 Door FF LVL 1 0.00
42 Door SF LVL 1 0.00
44 Door at Terrace LVL 1 0.00
45 Window & Vent. GF LVL 1 0.00
46 Window & Vent. FF LVL 1 0.00
47 Window & Vent. SF LVL 1 0.00
53 Conduit Electric Works GF LVL 1 0.00
54 Conduit Electric Works FF LVL 1 0.00
55 Conduit Electric Works SF LVL 1 0.00
57 Electric Works With wiring & Acc. GF LVL 1 0.00
58 Electric Works With wiring & Acc. FF LVL 1 0.00
59 Electric Works With wiring & Acc. SF LVL 1 0.00
61 Internal Color GF LVL 1 0.00
62 Internal Color FF LVL 1 0.00
63 Internal Color SF LVL 1 0.00
65 Outer Color BUILD. 1 0.00
66 Lift Installation BUILD. 1 0.00
68 Fire safty line BUILD. 1 0.00
70 O.H.D. TANK BUILD. 1 0.00
Total Total
Work Work
Comple REmaini
ted in % ng in %

Excavation for footing 97.78 2.22


RCC 0.00 88.24
MASNORY 0.00 80.00
INTERNAL PLASTER 0.00 75.00
OUTER PLASTER 0.00 100.00
PLUMBING 0.00 83.33
FLOORING 0.00 75.00
DOOR 0.00 80.00
WINDOW 0.00 75.00
ELECTRICAL 0.00 75.00
INTERNAL COLUR 0.00 75.00
OUTER COLOUR 0.00 100.00
LIFT 0.00 100.00
FIRE 0.00 100.00
May-23

Total
Work
REmaini
ng in %

2.22
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00

You might also like