Commissioning Test
Commissioning Test
Equipment No Responsibility
Serial No Date
CC + MC SMU Reading
JOB SUMMARY
10 Field Operation 2 2
12 Field Operation 2 2
13 Mandatory Attachments 1 1
BUDGET TOTAL: 20 14
ACTUALS:
CONTENTS
Job Time sheet Parts Request Advice (PRA) Ref:
SAFETY
Relevant JSA
Completed:
Responsible Person Signature Date /
687976200.doc
1 of 31
<793C> <Engine Performance Test >
Serial Number Work Order Number Smart Point
After Recondition ID Number
Engine
Torque Convertor
Transmission
Differential
Final Drive, Brake &
Wheel LH
Final Drive, Brake &
Wheel RH
Front Suspension
Cylinder LH
Front Suspension
Cylinder RH
Rear Suspension
Cylinder LH
Rear Suspension
Cylinder RH
Front Service Brake
LH
Front Service Brake
RH
Lift/Hoist Cylinder LH
Lift/Hoist Cylinder RH
Steering Cylinder LH
Steering Cylinder RH
Particle Count all compartments and kidney lube as needed to meet required
specification
687976200.doc
2 of 31
<793C> <Engine Performance Test >
Name:
Signature:
Date:
Resource Budget
Labour Special Tools
Trade / Skill Type Hrs Part No Description Qty
ST1 2
Environmental Controls*
Std Id Environmental Std Description Std Id Waste Management Control
*Spillage / Clean up & Disposal of Contaminated Materials control sheets are available at work stations
MSDS**
Ref No. MSDS reference
687976200.doc
3 of 31
<793C> <Engine Performance Test >
*** JSA Read field is to be signed by employees indicating they have read and understood the JSA.
If there is not a relevant JSA for this activity then enter n/a.
687976200.doc
4 of 31
<793C> <Engine Performance Test >
Upgrade
Activity Figure Comment
C To C
Retrofit
B To C
No No, Tooling, Tolerance)
Measurement
Trucks
New
Cooling Temperature (During Test) Specs:
1
Suhu Pendingin (Selama Tes) More than 71 oC (160 oF) ________________
o
C
________________
o
F
Low Idle Rpm Specs:
2
Putaran Mesin Rendah Per Menit 700 + 10 _____________ RPM
_____________ PSI
687976200.doc
5 of 31
<793C> <Engine Performance Test >
Upgrade
C To C
Retrofit
B To C
No No, Tooling, Tolerance)
Measurement
Trucks
New
______________
PSI
_______________
PSI
_______________
PSI
_______________
PSI
Completed:
687976200.doc
6 of 31
<793C> <Engine Performance Test >
687976200.doc
7 of 31
<793C> <Power Train Performance Test >
Name:
Signature:
Date:
Resource Budget
Labour Special Tools
Trade / Skill Type Hrs Part No Description Qty
ST1 3
Environmental Controls*
Std Id Environmental Std Description Std Id Waste Management Control
*Spillage / Clean up & Disposal of Contaminated Materials control sheets are available at work stations
MSDS**
Ref No. MSDS reference
687976200.doc
8 of 31
<793C> <Power Train Performance Test >
*** JSA Read field is to be signed by employees indicating they have read and understood the JSA.
If there is not a relevant JSA for this activity then enter n/a.
687976200.doc
9 of 31
<793C> <Power Train Performance Test >
Seq Technical
Activity Record Actual Figure Comment SN
Upgrade
C To C
Retrofit
B To C
No Specification
Measurement
Trucks
(Parts No,
New
Tooling,
Tolerance)
Torque Converter Inlet Relief Pressure At Stall Specs:
1
Speed 135 psi +/-5psi
Tekanan Torque Converter Saat Stall
_____________
___ PSI
Torque Convertor outlet relief at stall speed(1672rpm+/-
Specs:
50 rpm)
2
50 to 80 psi
_____________
___ PSI
Pilot pressure at low idle Specs:
3
250+ 10 psi
_____________
___ PSI
Lock Up Clutch Maximum Pressure At 1300 Rpm Specs:
4
Tekanan Maksimum Lock Up Clutch Saat 1300 320 + 10 psi
Rpm
_____________
___ PSI
Maximum Pump Pressure At High Idle Torque Specs:
5
Converter Drive (Lock Up Solenoid Deenergized) 445 psi
Tekanan Maksimum Pump Saat High Idle Torque
Converter Drive (Lock Up Solenoid Deenergize) _____________
___ PSI
Pump Pressure At High Idle In Direct Drive (Lock Specs:
6
Up Clutch Solenoid Energized) 325 + 15 psi
Tekanan Pompa Saat High Idle Di Direct Drive
(Lock Up Clutch Solenoid Energized) _____________
___ PSI
Transmission Lubrication Pressure At Low Idle Specs:
7
Tekanan Pelumasan Transmission Saat Low Idle 0.7 to 9.4 psi
_____________
___ PSI
Transmission Lubrication Pressure At High Idle Specs:
8
Tekanan Pelumasan Transmission Saat High Idle 23 + 7 psi
_____________
___ PSI
Complete pressure test all packs
9
* Ensure All Substandard Equipment Conditions And, Or Backlogs Requiring Repair Are Reported To The Inspector Who Will Complete The Backlog Capture Form
* Do Not Keep The Torque Converter In A Stall Condition For Long Periods Of Time, Damaged Could Occur In The T/C, Engine And Brake.
687976200.doc
11 of 31
<793C> <Power Train Performance Test >
Completed:
687976200.doc
12 of 31
<793C> <Air and Brake System Performance Test >
Name:
Signature:
Date:
Resource Budget
Labour Special Tools
Trade / Skill Type Hrs Part No Description Qty
ST1 3
Environmental Controls*
Std Id Environmental Std Description Std Id Waste Management Control
*Spillage / Clean up & Disposal of Contaminated Materials control sheets are available at work stations
*** JSA Read field is to be signed by employees indicating they have read and understood the JSA.
If there is not a relevant JSA for this activity then enter n/a.
687976200.doc
13 of 31
<793C> <Air and Brake System Performance Test >
Seq No Technical
New Trucks
Activity Record Actual Figure Comment SN
Upgrade
Specification
C To C
Retrofit
B To C
Measurement
(Parts No,
Tooling,
Tolerance)
Maximum Delivery Specs:
1
Pressure Of The 710 psi
Parking And
Secondary Brake
Control Valve At High _______________
Idle. (Park Brake PSI
Release)
Maksimum tekanan
rem parkir dan kontrol
valve rem cadangan
pada posisi high idle
687976200.doc
14 of 31
<793C> <Air and Brake System Performance Test >
Seq No Technical
New Trucks
Activity Record Actual Figure Comment SN
Upgrade
Specification
C To C
Retrofit
B To C
Measurement
(Parts No,
Tooling,
Tolerance)
system rem PSI
- Lh Front 15.4 psi
- Rh Rear _______________
PSI
_______________
PSI
Seq No Technical
New Trucks
Activity Record Actual Figure Comment SN
Upgrade
Specification
C To C
Retrofit
B To C
Measurement
(Parts No,
Tooling,
Tolerance)
Parking & Secondary 550 to 650 _______________
Brake Release Pump psi PSI
Pressure
Tekanan pelepasan
rem dan parkir
* Ensure All Substandard Equipment Conditions And, Or Backlogs Requiring Repair Are Reported To The Inspector Who Will Complete The Backlog Capture Form
* Do Not Allow The Oil To Exceed 124 Degree Celsius.
Completed:
687976200.doc
16 of 31
< 793C> <Steering System Performance Test >
Name:
Signature:
Date:
Resource Budget
Labor Special Tools
Trade / Skill Type Hrs Part No Description Qty
ST1 2
Environmental Controls*
Std Id Environmental Std Description Std Id Waste Management Control
*Spillage / Clean up & Disposal of Contaminated Materials control sheets are available at work stations
MSDS**
Ref No. MSDS reference
687976200.doc
17 of 31
< 793C> <Steering System Performance Test >
*** JSA Read field is to be signed by employees indicating they have read and understood the JSA.
If there is not a relevant JSA for this activity then enter n/a.
687976200.doc
18 of 31
< 793C> <Steering System Performance Test >
Seq Technical
Activity Record Actual Figure Comment SN
Upgrade
C To C
Retrofit
Specification
B To C
No Measurement
(Parts No,
Trucks
New
Tooling,
Tolerance)
Steering Nitrogen Specs:
1
Accumulator Charging 950 + 50 psi
Pressure
Tekanan steering akumulator _______________ PSI
charge
687976200.doc
19 of 31
< 793C> <Steering System Performance Test >
Seq Technical
Activity Record Actual Figure Comment SN
Upgrade
C To C
Retrofit
Specification
B To C
No Measurement
(Parts No,
Trucks
New
Tooling,
Tolerance)
_______________ PSI
Specs:
Cut in At Low Idle 2785 + 45 psi
Tekanan cut in saat low idle
_______________ PSI
Completed:
687976200.doc
20 of 31
< 793C> < Hoist System Performance Test >
Name:
Signature:
Date:
Resource Budget
Labor Special Tools
Trade / Skill Type Hrs Part No Description Qty
ST1 1
Environmental Controls*
Std Id Environmental Std Description Std Id Waste Management Control
*Spillage / Clean up & Disposal of Contaminated Materials control sheets are available at work stations
The B to C Upgrade trucks are using b hoist cylinders therefore 793b 1hl pressures apply
C to C retrofit trucks use a mix of 793b or 793c hoist cylinders identify correct cylinders and pressures
before commencing testing
MSDS**
Ref No. MSDS reference
*** JSA Read field is to be signed by employees indicating they have read and understood the JSA.
If there is not a relevant JSA for this activity then enter n/a.
687976200.doc
21 of 31
< 793C> < Hoist System Performance Test >
Seq Technical
Activity Record Actual Figure Comment SN
Upgrade
C To C
Retrofit
B To C
No Specification
Measurement
Trucks
(Parts No,
New
Tooling,
Tolerance)
The Hoist Relief Pressure Specs:
1
Raise…. (Engine At High Idle
RPM)
Tekanan Hoist saat posisi naik _______________
high idle PSI
687976200.doc
22 of 31
< 793C> < Field Operation >
Name:
Signature:
Date:
Resource Budget
Labor Special Tools
Trade / Skill Type Hrs Part No Description Qty
ST1 1
Environmental Controls*
Std Id Environmental Std Description Std Id Waste Management Control
*Spillage / Clean up & Disposal of Contaminated Materials control sheets are available at work stations
MSDS**
Ref No. MSDS reference
*** JSA Read field is to be signed by employees indicating they have read and understood the JSA.
If there is not a relevant JSA for this activity then enter n/a.
687976200.doc
23 of 31
< 793C> < Field Operation >
687976200.doc
24 of 31
< 793C> < Field Operation >
Activity Technical Specification (Parts No, Record Actual Completed Figure Comment SN
No
Tooling, Tolerance) Measurement
Yes No
Pre Operational checks
2 Yes No
Auto Retarder is hard wired (switch
removed)
3 Yes No
Auto Retarder speed is set to 1851 rpm
4 Yes No
Maximum Body up Gear 1st
5 Yes No
Maximum Transmission Speed 4th
6 Yes No
No Active faults
7 Yes No
Fan Control is ON
9 Yes No
Auto Lube Timer is Set
10 Yes No
Pay Load is Calibrated
11 Yes No
Machine Performed within operational
Tolerances
687976200.doc
25 of 31
< 793C> < Field Operation >
Completed:
687976200.doc
26 of 31
<793> < Mandatory Attachments >
Name:
Signature:
Date:
Resource Budget
Labor Special Tools
Trade / Skill Type Hrs Part No Description Qty
ST1 1
Environmental Controls*
Std Id Environmental Std Description Std Id Waste Management Control
*Spillage / Clean up & Disposal of Contaminated Materials control sheets are available at work stations
MSDS**
Ref No. MSDS reference
*** JSA Read field is to be signed by employees indicating they have read and understood the JSA.
687976200.doc
27 of 31
<793> < Mandatory Attachments >
If there is not a relevant JSA for this activity then enter n/a.
687976200.doc
28 of 31
<793> < Mandatory Attachments >
No
Upgrade
C To C
Retrofit
Part Number Description Responsibility Completed S/N
B To C
Trucks
New
1 Yes No
Dispatch System PTFI
2 PTFI Yes No
Two way radio
3 Yes No
Fire suppression system PTFI
4 Yes No
Ground level extinguisher PTFI
6 Yes No
Fire extinguisher fitted to Rhs platform PTFI
7 Yes No
Strobe lights fitted to lhs and rhs air boxes Brackets and lights
supplied by FMI
Fitted by PTTU
8 Yes No
Manual ball valve fitted to main discharge on air tank Supplied by FMI
Fitted by PTTU
9 Yes No
Truck numbers fitted to Radiator Grill, Left, right and rear of Dump Numbers supplied by FMI
body Fitted by PTTU
10 Yes No
Extended mirror bracket on rhs platform to accompany extra mirror Mirror and bracket
supplied by PTFI
687976200.doc
29 of 31
<793> < Mandatory Attachments >
Fitted by PTTU
11 Yes No
Left and Right tail lights fitted to lower rear dump body Brackets and lights
supplied by FMI
Fitted by PTTU
687976200.doc
30 of 31
<793> < Mandatory Attachments >
Equipment has been inspected and is completed for handover to Freeport Operations :
WO No
Freeport Maintenance
Name Signature Date / Time
Freeport Operations
Trakindo
Name Signature Date / Time
687976200.doc
31 of 31