Doosan P222LE, EAYOA203184 Blangkejeren
Doosan P222LE, EAYOA203184 Blangkejeren
FAT ENGINEERING
Specialist energy Supply, maintenance, repairing, machining, Management and Operations
Thanks you for your inquiry, hereby we are pleased to offer our price :
ACTUAL CONDITION
p i:;i1ii-r #E#4i1t:;l
Fag* 115
s
No. L0/ FAT/ t / 2a16
al:l
F.r5i*215
s
No. 10/ FAT/ 1 | 2016
No Part number Part number Qtt Unit Price (USDI Total Price (USDI
1 65.01201-0312C LINER; CYUNDER 12 PCS 371.58 4,458.96
2 401002-o0785 SR'NG 24 PCS 13.65 153.8
3 401002-00785 $RING 24 PCS 25.20 504.8
4 150107-001m MACHINING CRANKSHAFT l UNIT 1,502.06 1,y)2.06
5 55.02410-0100 BEARING: CONNECflNG ROD 12 PCS 53-43 541.16
6 55.02410-0200 BEARING: CONNECTING ROD 12 PCS 30.45 365.52
7 55.02501-0704 PISTON 5 PCS 3L4.27 1,591.35
9 55.9081s-0022A RING: LOCK 10 PCS 2.LO 21.00
10 110100+(x)022 PISTON RING KIT 12 SET 150.69 1,928.28
LL 150113-fiD51 CYLINDER HEAD AsS'Y l UNIT L,937.83 1,937.&l
12 65.04101-0375C VALVE; INTAKE 1 PCS 33.58 33.58
13 65.04101-0357C VALVE; EXHAUST 1 PCS 34.00 34.00
Page3l5
t
No. 10/ rAT/ 1 / 2a,5
18 6s.@901-m40 GASKET; EXHAUST 12 PCS 15.75 189.00
19 51.03901-0348 GASKET, CYUNDER HEAD 12 PCS 73-92 887.(N
;iirtiriiirli,.l.,,,|l fittri;itiit;i1,r.:,1 !i:ii.,:l;r,lt 1i..-..i tr:iii::iitiii11:ilii::l ilili;iil,i.:
20 5s.10102-6047 NOZLE; INJECIION 12 PCS 36.01 432.!2
27 55.98701-0055 RING; SEAL 12 PCS 1.10 13.20
i:triiii:,t:iir-i,. rijiilrjiriii',:rl liilliti:itl:itl ili:,1{:}jii;-i; tiij:.r,tii1;,ir,l:,: i,:jlijlii:ff
22 65.01201-0312C LINER; CYUNDER 12 PCS 371..81
23 65.96601A0237 GASKET 12 PCS L.47 Lt.il
24 401004-m022 PISTON RING KIT 12 PCS 160.69
25 401002-oo78s O.RING 24 PCS 13.55 163.8t)
26 401002-00786 O.RING 12 PCS 25.20 302.40
77 65.02410-0100 BEARING: CONECrING ROD 12 PCS 54.10
28 55.02410-0200 BEARING: CONECTING ROD 12 PCS 30.45
;tliiliilir iiili:liai:iitr,;ri:1 ',1,jii:)ijtiii,ii
29 65.0111&,fi)80 BEARING; MAIN 5 SET 45.11 270.ffi
30 65.01111-6539 WASHER; THRUST 1 SET [email protected] 560.21
31 55.0213$m01 RING; WEAR (FRoNT) 1 PCS 65.04 65.04
32 65.0213GmO2 RING; WEAR (REAR) 1 PCS 68.19 63.19
33 5s.0190340200 GASKET; FLYWHEEL HOUSING 1 PCS 9.83 9.83
34 55.01903A0201 GASKETI FLYWHEEL HOUSING 1 PCS 10.s2 10.52
35 55.01905-0032 GASKET 1 PCS 14.99 14.99
35 55.96501-0054 GASKET 1 PCS 3.14 3-14
37 65.0151G01s3A SEAL; OIL 1 PCS 89.91 89.91
3A 65.0151&0141 SEAL;OlL 1 PCS 89.91 89.91
illiiiri li:liii:,tiri ii;:iiiiiiiiiiit $: :;r;.;::::iii?;11ffi ;,1ti:iiri:;:i::il
39 65.05901A0080 GASKET; OIL FILTER COVER 1 PCS s.24 5.24
40 65.(E901-OO14 GASKFT 1 PCS 13.53 13.53
4L 65.96601-02218 GASKET 4 PCS 2.92 11.58
42 55.05902Afi)41 GASKET: OIL COOIER HOUSING 1 PCS 30.42 30.42
liLiririiitr:it; ii;i:i i,ii;illi: :;i-::iilt:;:fi +:riliitf;:..itl;r,
43 65.08:n1-0050 GASKFT 2 PCS 6.29 12.58
M 65.08901-00238 GASI(ET; EXHAUSI MANI FOLD 12 PCS 6.29 75.8
45 65.15!Xt1-0010 GASKET; EXHAUST PIPE 1 PCS 20.99 20.99
fiiliLr.liiri ,i:
t
No. 10/ FAT/ t | zarc
58 65.05520-6007 SEAL; MECHANICAT 1 PCS 46.47 46.47
59 65.93410'0087 BEARING 1 PCS 130.30 130.30
60 55.06512-0017A COVER; WATER PUMP 1 PCS 42.O9 42.8
61 55.0tr01A0074 GASKET; WATER PUMP 1 pcs 7.69 7.69
Total cost
L. Fat engineering will provide the common tools and all spares and special tools
2. Any repair, reconditioning, supply spare parts, consumable not specifled here in will be charged
additional.
3. Lifting facilities to be provided by Owner to convey engine parts, Overhaul (or standard overhaul) is
defined as opening, cleaning, testing and or calibration, adjusting or lapping in, remounting and
function testing. Any repairs, reconditioning, supply of materials/spares not specified herein will be
additional charged and the additionaldelivery time will not be held accountable on Fat engineering. All
purchases, sub-contract, spare parts, etc. provided by Fat engineering, that is not part
of this contrac*
will be quoted for prior approval by The Owner.
4. Delay created by additionalworks, delay in spares, waiting time or otherfactors not caused by
ourselves will not be held accountrable on Fat engineering
5' Consumables as per attacfied list will be provided by Faiengineering except rags, oil cleaning, grease,
solar, etc.
6. Hotel (if required) wiil be invoiced
7. Fat engineering STANDARD TERMS AND CONDITIONS wilt be a apptied (wifi be provided upon
request).
8. Estimated completion time 15 - 20 days, the fix completion time will be subjected to final confirmation
scope of works.
We trust our price quotation wiil meet your requirement. Thank you
Page5l5
il