0% found this document useful (0 votes)
94 views6 pages

Monthly Production and Consumption

The document summarizes production data from a sinter plant for the month of June. It provides daily details on production amounts, return fines percentages, material consumption and bunker stock levels. It then compares the consumption of raw materials like iron ore, dolomite and limestone between April and June and analyzes the differences from planned production levels.

Uploaded by

jekiran
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
94 views6 pages

Monthly Production and Consumption

The document summarizes production data from a sinter plant for the month of June. It provides daily details on production amounts, return fines percentages, material consumption and bunker stock levels. It then compares the consumption of raw materials like iron ore, dolomite and limestone between April and June and analyzes the differences from planned production levels.

Uploaded by

jekiran
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 6

JUNE MONTHLY PRODUCTION

6/22/2023 6/23/2023 6/24/2023 6/25/2023


PRODUCTION 126.19 0 608.87 3298.78
RETURN FINES (MT) 324.79 0 1456.79 1568.5
RETURN FINE % 72.02 0 70.52 32.23
TOTALLYZER AFTER MIXER 0 0 0 3941.77
MACHINE RUNNING HOUR 8 0 9.86 19.17
MATERIAL
IRON ORE FINES WF3 374.48 0 248.94 1124.6
IRON ORE FINES WF4 380.7 0.0 252.5 780.1
IRON ORE FINES WF5 374.58 0 495.73 980.2
BASE MIX WF6 0 0 0 0
BASE MIX WF7 0 0 0 0
BASE MIX WF8 0 0 0 0
TOTAL IOF 1129.8 0 997.15 2884.86
DOLOMITE FINES 135.87 0 120.97 343.98
LIME STONE FINES 92.95 0 82.71 236.13
COKE FINES WF12 78.02 0 73.08 181.15
COKE FINES WF13 0 0 10.5 71.5
IN PLANT RETURN WF14 302.75 0.00 840.85 2485.10
IN PLANT RETURN WF15 0.00 0.00 47.67 118.73
IN PLANT DUST (T) 0.00 0.00 0.00 0.00
TOTAL RF 302.75 0.00 888.52 2603.83
TOTAL CONSUMPTION (T) 1739.39 0.00 3171.17 5846.32

COG COUNSUMPTION M3 6573.08 4425.7 45564.63 62164.56

MATERIAL RECEIVED FR
IRON ORE FINES 0 74 1138.9 1350.29
DOLOMITE FINES 0 0 0 357.53
LIME STONE FINES 0 195 0 523.13
COKE FINES 0 72 0 89.07

Date production
Note - april month production
19 and 20 april 892

460 460 460 460

0.03 #DIV/0! 0.13 0.37

395 395 395 395


3160 0 3895 7572
3034 0 3286 4273
RODUCTION AND CONSUMPTION
6/26/2023 6/27/2023 6/28/2023 6/29/2023 6/30/2023
2303.04 4880.52 2671.73 1741.13 3264.09
1384.68 1938.45 1398.89 1015.8 1351.26
37.53 28.43 34.37 36.91 29.28
2900.64 9578.12 6647.94 4109.58 4658.72
11.44 19.76 16.72 11.76 13.06
AL
1293.96 1641.52 683.1 618.03 648.79
877.7 1322.3 765.0 625.3 616.4
542.41 1225.15 613.52 309.1 835.84
0 0 593.55 0 0
0 0 580.84 0 0
0 0 431.18 0 0
2714.09 4188.96 3667.16 1552.39 2101.02
323.12 487.62 247.72 188.05 249.32
224.63 346.97 170.7 128.84 168.67
123.78 150.56 193.78 143.51 127.01
72.03 216.74 22.94 0 50.14
1461.03 684.25 1386.34 440.42 723.21
0.00 1704.62 292.23 1219.36 732.48
0.00 0.00 0.00 0.00 0.00
1461.03 2388.87 1678.57 1659.78 1455.69
3699.22 7499.94 5979.70 3686.37 3058.12

39482.88 54378.54 44972.2 43584.5 35218.63

TERIAL RECEIVED FROM RMHS


3719.13 3487.52 3303.6 968.76 0
104.24 1267.02 64 453.81 0
0 0 664.09 185 0
288.45 445.47 490.59 83.5 0

460 460 460 460 460

0.44 0.54 0.35 0.32 0.54

395 395 395 395 395


4519 7805 6604 4645 5159
2216 2925 3933 2904 1895
GRAND TOTAL Apr-23 PPC
18894.35 892 18896
10439.16
341.280861367126
31836.77
109.77

6633.42
5619.91
5376.53 17629
593.55
580.84
431.18 1605
19235.43
2096.65
1451.6
1070.89 1514.74
443.85
8323.95
4115.09
0
12439.04
34680.23

336364.72

14042.2
2246.6
1567.22
1469.08
Iron fines Base mix Dolomite LLime Coke Total

Consumption 2208 0 358 239 179 2984


Bunker stock 3394.5 2673 911 526 643 8147.5
Consumption 17629 1605 2097 1452 1515 24298
Bunker stock 0 1440 447 461 344 2692
Total 23231.5 5718 3813 2678 2681 38121.5

Iron fines Base mix Dolomite LLime Coke Total


April Consumption 2208 0 358 239 179 2984
June Consumption 17629 1605 2097 1452 1515 24298
Bunker stock 0 1440 447 461 344 2692
Total 19837 3045 2902 2152 2038 29974
PPC/RMHS 20637 2877 3684 2877 2784 32859
Diff -800 168 -782 -725 -746 -2885

Note: Return fines Bunker stock - 911 T


SINTER PLANT,NSL
MONTH
RAW MATERIAL RECEIVED QTY (MT)
IRON ORE DOLOMITE
FINES LIME
FINES
STONE FINES
COKE FINESBASE MIX
APRIL 5853 1146 993 1070 0
MAY 0 0 0 0 0
JUNE 14784 2538 1884 1714 2877
Base mix % 80 9.5 6.5 4
Base mix conversion 2302 273 187 115
Total 22939 3957 3064 2899 32859

2885
BASE MIX