0% found this document useful (0 votes)
106 views12 pages

C.V Skumar D.G.M Aarvee LTD Updated 5.april.2022 Updated

The document provides a curriculum vitae for Sanjay Kumar, who has over 20 years of experience as a civil engineer specializing in highway projects. He holds a Bachelor's degree in Civil Engineering and a Master's in Structural Engineering. Currently he works as a Highway Engineer/Deputy General Manager on a project to develop a 62km access controlled expressway in Uttar Pradesh, where his duties include supervision of construction, quality control, and ensuring work is done according to specifications. He has extensive experience managing highway projects according to national and international standards.

Uploaded by

Powerhouse Shaft
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
106 views12 pages

C.V Skumar D.G.M Aarvee LTD Updated 5.april.2022 Updated

The document provides a curriculum vitae for Sanjay Kumar, who has over 20 years of experience as a civil engineer specializing in highway projects. He holds a Bachelor's degree in Civil Engineering and a Master's in Structural Engineering. Currently he works as a Highway Engineer/Deputy General Manager on a project to develop a 62km access controlled expressway in Uttar Pradesh, where his duties include supervision of construction, quality control, and ensuring work is done according to specifications. He has extensive experience managing highway projects according to national and international standards.

Uploaded by

Powerhouse Shaft
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 12

CURRICULUM VITAE

CAREER;- An accomplished “CIVIL ENGINEER “ for Highway section in object oriented Execution ,Design and
analysis with extensive experience in the full life of cycle of Civil Engineer, Highway Engineer Including requirements
definition Prototyping Proof of concept, design, interfaces implementation Testing and Maintenance.

PROPOSED POSITION : DEPUTY TEAM LEADER/ RESIDENT ENGINEER/G.M


Name : Sanjay Kumar
Father’s Name : Shri Bal Krishna Yadav
Date of Birth : 25TH MAY 1976
E-Mail :  [email protected]
[email protected]
Nationality : Indian
Marital Status : Married
Languages Known : English & Hindi
Expected Date of Joining : 45 Days from date of offer
Mobile No : +91-7549782872 & +91-8210581637
TECHNICAL QUALIFICATION :
 Bachelor of Engineering in Civil from Bangalore University in 2002.
 M. Tech in Structural Engineering from JNTU Kakinada A.P 2021.

MEMBERSHIP OF PROFESSIONAL SOCIETIES:


Member, Indian Road Congress

KEY QUALIFICATION
I am a Civil Engineering Graduate with more than “Twenty Years” (20) of extensive experience in the
Construction Supervision and Project Management of Highways (Four lanes) including flexible
pavements & major bridge projects, Minor Bridges, Underpass & Culverts etc. funded by World Bank,
ADB and other lending agencies. He has rich experience in execution & consultancy supervision of all kinds
of civil engineering works and review of construction design drawings, approval of working drawings,
project monitoring and planning & scheduling CPM/ PERT activities for permanent works, evaluation of
Contractors’ resources; Preparing Quality Assurance Manuals; Materials Testing & Certification,
Approval of Works; Quality Control as per AASHTO/ ASTM/ BS/ MORTH/ IS Standards including its
Special Applications and Contract Technical Specifications, Variation Orders, Site Instructions, Interim
payment Certificates, sub-contractor bills approval etc. He is an expert in Contract administration,
Contract Management, Quantity Surveying, Project Execution, Tendering, and Preparation of Budget &
Cash Flow Statements, Costing, and Preparation of Programmes and Monitoring the works for Project
Execution. He has sufficient expertise in completing the assignments with in the schedule and budget. He has a
proven track record of developing procedures, policies, standards and implementing quality control
measures to maintain the quality.
He has got sufficient experience in World Bank & NHAI funded projects and
thus well versed with ICB norms & FIDIC conditions of contract & international best practices including
MORT&H Specifications including thorough Knowledge of modern plants,equipmets & machineries for
dressing of raw materials and the state of the art construction equipments used for advanced technology
construction purposes.

I am well conversant with IRC Guidelines and MORT&H Specifications.

DETAIL TASK ASSIGNED:


The Highway Engineer shall assist the Team Leader in the review of highway designs and drawings using
sophisticated computer software. Road inventory & condition survey. To carryout existing road condition survey
and listing all defects on bituminous surfacing, berms, drainage system, CD works and road furniture.
Supervision of pavement construction. Collection and sealing of samples for lab tests. Day-to-day site inspection.

CV of Sanjay Kumar        Page 1/12


Ensure that the field tests are conducted as per the frequency and relevant codes and specifications. To take
measurements and keep measurement records, as per the direction Highway Engineer. To maintain inspection
reports, site records, field test data. To monitor progress of work and implementation of the construction &
maintenance programs.Checking of contractor’s site reports for regular maintenance.To ensure that the works
are being executed as per approved standards & codes. To check the erection of road barriers, signage’s, road
markings by concessionaire during construction. He will be responsible to carry out the followings:-

 Fixation of alignment including both horizontal and vertical curves in the field and take Pre-work
measurement at site.
 Review Contractor's work programs, work methods, working drawings and temporary works proposals
and make recommendations accordingly.
 Check Contractor's traffic management and safety plans and ensure that he complies with them.
 Preparation of Bill of Quantities, Cost Estimate. Rate analysis. Preparation Bid documents and Bid
evaluation report.
 Conduct all necessary surveys for final design & execution of works.
 Assist the SRE in construction supervision and leading site teams and all other activities.
 Liaise with RHD field based staff and keep them informed of the construction activities.
 Attend progress review meeting and convene regular site meetings.
 Assist in implementing Consultants management systems covering supervision. testing, measurement and
recording.
 Check setting out of the works and issue necessary instruction to the Contractor with approval of SRE.
 Examine & verify Contractor's work in the field and check work volume and certify Contractor's interim
and final payment certificate and recommend to Team Leader for progress & Final payment.
 Assist SRE in issuing Variation Orders. Time extension and permission to sublet Works after RHD
approval.
 Keep records of test results and Test certificates and communications.
 Monitor quality of works and materials and report on construction progress.
 Identity improper works and make recommendations to the SRE accordingly.
 Check and certify as build drawing prepared by the Contractor.
 Assist the SRE in preparing monthly progress report.
 Assist the SRE to review, Contractor's dispute or claim, if any.
 Perform any other activities for successful completion of work and entrusted by the SRE
COMPUTER SKILL:
 Knowledge of Computer Software like MS Office &Auto CAD.

 RELEVANT ASSIGNMENT INCLUDING :-

 EMPLOYMENT RECORDS:- List of Projects, which demonstrates all the abilities/Characteristics above
are listed below:-
(1)Employment Record : M/S AARVEE ASSOCIATES ARCHITECTS ENGINEERS & CONSULTANTS
PVT . LTD. HYDERABAD
Period : 1st.Oct 2018 to Till Date
Post Held : HIGHWAY ENGINEER /D.G.M
Project Name :- Consultancy Services for Authority’s Engineer For Supervision of Development of “Agra to
Lucknow (Pkg-II) 53+500 To 115+500 Access Controlled Expressway (Green Field) Project” on EPC Basis.

Name of the Project : Development of Firozabad (Village: Gura) to Etawah


(Village: Munj) (km 53+500 to km 115+500) Access
Controlled Expressway (Green Field) Project in the
State of Uttar Pradesh on EPC Basis
Client : Uttar Pradesh Expressways Industrial Development

CV of Sanjay Kumar        Page 2/12


Authority (UPEIDA)
External Technical Auditor : M/s RITES Limited
Authority’s Engineer : M/s Ayesa-Aarvee‘JV’
EPC Contractor : M/s Afcons Infrastructure Limited
Total Project Length : 62km (6-Lane km)
Type of Pavement : Flexible
Contract Price : INR 1990.84 Crore
Date of Agreement : 29th October 2014
Appointed Date : 4thMarch 2015

DESCRIPTION OF DUTIES: -As HIGHWAY ENGINEER Work carry out detail is checking & Setting out data
of work including line level and layout to ensure conformity with drawing. Carryout of execution of all works as
per approved method statement of various item of work and ensure quality as per requirement. Setting up and
organization of Laboratory and on-site testing for Soil and Bitumen, Investigation of barrow materials for
embankments, Investigation of minor and major bridges for foundations, Investigation of quarries for materials,
Preparation and implementation of Quality Control aspects, Assistance in location and supervision of establishment of
aggregate crushers and bituminous mix plants.
 Making the list of materials as per BOQ and also checking of availability in the quarry and suggesting alternate
arrangements.
 Checking of Material Specification as per working drawings, DPR and Contract drawings.
 Preparation of working drawings as per site condition with reference to IRC.
 Recording of measurements & Implementation of quality control monitoring system and reporting formats.
 Checking field measurement and survey details, interpretation of technical specifications and contract provisions,
 Checking the day-to-day progress of Structures’ works as per the Quality standards and specifications.
 Study and Review of Reports and Tender Drawings
 Maintain day-by-day project diary to record all major events of the project.
Conducting initial survey and preparation of revised estimate with proposals.
 Finalizing Alignment of roads and minor structures.
 Executing Pipe culverts and slab Culverts according the MOST Specification.
 Programming and monitoring daily progress along with AHE’s, FE’s and AME’s.
 Monitoring of work’s progress with contractors and client.
 Checking of Running Account bills every Month those prepared by ARE’s and FE’s.
 Preparation of Sub-Grade, GSB, WBM, and B.T layers as per MOST specification and getting approval for the
same from the client.
 To review design reports, specification and tender documents for pavement works.
• To ensure project quality system is applied during pavement construction. Understanding of pavement design
methodologies and method of construction.
• Ensure very close and clear coordination of his team activities with the other construction supervision staff.
• Pavement evaluation using available technology and equipment.
• Review of method statement submitted by the contractor.
• Understanding pavement layout (horizontal and vertical alignment), singing, pavement marking and street
furniture.
• Review and approve (make recommendation for approval by SRE) of all submitted materials by the contractor.
• Understanding of General, Project specification, tender documents and international standards (AASHTO, BS,
and ASTM, etc.).
• Understanding Operating Procedures (NCR, ITP, RIFT, IR, etc.).
CV of Sanjay Kumar        Page 3/12
• Supervise, participate and direct sampling and testing\analysis of all pavement materials per the contract and the
specifications.
• Maintain records of test results and all taken corrective actions.
• Provide inputs on changes/variations/claims related to pavement, if any.
• Liaison and coordination with client, concerned authorities, consultant, sub-contractor and contractor.
 Inspecting all the roads covered under UPEIDA along with sub-staff and client.
 Conducting Field-tests whenever necessary and approval of the material and quality.
 Executing Pipe culverts and slab Culverts according the MOST Specification.
 Preparing Variation Orders. & Submission of Final Bill with all relevant details road wise/ package wise.
 Preparing and submitting constructed structure’s drawings to client.

(2)Employment Record : M/S SURBANA JURONG CONSULTANTS PVT. LTD.


Period : 2nd .APRIL 2018 to 11th. Oct. 2018
Post Held : RESIDENT ENGINEER /CONSTRUCTION MANAGER
Project Name : - Project Management Consultancy Service of Investigation, Design and Construction
of Road, Drains, Water Supply, Sewerage, STP, utility Ducts for Power & ICT, Reuse waterline
& Avenue Plantaation, compatible with trunk infrastructure in Layouts for Land and Avenue
Plantation, Compatible with Trunk Infrastructure in layouts for Land Pooling Schemes for
Inavolu (P), Krishnayapalem (P), Kurgallu (P), Mandadam (P) and Nowluru (P) in Zone-10 area
in Amravati-Capital city, Andhra Pradesh.
Project Cost :-1018.45 Crores
Road Length : 94.50 Kms.
EPC : L&T Construction Ltd.

DESCRIPTION OF DUTIES: -As a RESIDENT ENGINEER Work carry out detail is checking & Setting out
data of work including line level and layout to ensure conformity with drawing. Carryout of execution of all
works as per approved method statement of various item of work and ensure quality as per requirement. Setting
up and organization of Laboratory and on-site testing for Soil and Bitumen, Investigation of barrow materials for
embankments, Investigation of minor and major bridges for foundations, Investigation of quarries for materials,
Preparation and implementation of Quality Control aspects, Assistance in location and supervision of establishment of
aggregate crushers and bituminous mix plants.
 Making the list of materials as per BOQ and also checking of availability in the quarry and suggesting alternate
arrangements.
 Checking of Material Specification as per working drawings, DPR and Contract drawings.
 Preparation of working drawings as per site condition with reference to IRC.
 Recording of measurements
 Implementation of quality control monitoring system and reporting formats.
 Checking field measurement and survey details, interpretation of technical specifications and contract provisions,
 Checking the day-to-day progress of Structures’ works as per the Quality standards and specifications.
 Supervision of open foundations of Minor Bridges and RCC Box Culverts.
 Supervision of different types of sub structures (Wall and Circular type).
 Supervision of different types of pier caps, square pedestals, formwork.
 Study and Review of Reports and Tender Drawings

CV of Sanjay Kumar        Page 4/12


 Maintain day-by-day project diary to record all major events of the project.
 Conducting initial survey and preparation of revised estimate with proposals.
Finalizing Alignment of roads and minor structures.
Executing Pipe culverts and slab Culverts according the MOST Specification.
Programming and monitoring daily progress along with ABE’s, FE’s and AME’s.
Monitoring of work’s progress with contractors and client.
Checking of Running Account bills every Month those prepared by ARE’s and FE’s.
Preparation of Sub-Grade, GSB, WBM, and B.T layers as per MOST specification and getting approval for the
same from the client.
Inspecting all the roads covered under APCRDA along with sub-staff and client.
Conducting Field-tests whenever necessary and approval of the material and quality.
Executing Pipe culverts and slab Culverts according the MOST Specification.
Preparing Variation Orders.
Submission of Final Bill with all relevant details road wise/ package wise.
Preparing and submitting constructed structure’s drawings to client.
To review design reports, specification and tender documents for pavement works.
To ensure project quality system is applied during pavement construction. Understanding of pavement design
methodologies and method of construction.
Ensure very close and clear coordination of his team activities with the other construction supervision staff..
Pavement evaluation using available technology and equipment.
Review of method statement submitted by the contractor..
Understanding pavement layout (horizontal and vertical alignment), singing, pavement marking and street furniture.
 Review and approve (make recommendation for approval by SRE) of all submitted materials by the contractor.
 Understanding of General, Project specification, tender documents and international standards (AASHTO, BS, and
ASTM, etc.).
Understanding Operating Procedures (NCR, ITP, RIFT, IR, etc.).
Supervise, participate and direct sampling and testing\analysis of all pavement materials per the contract and the
specifications.
Maintain records of test results and all taken corrective actions.
Provide inputs on changes/variations/claims related to pavement, if any.
Liaison and coordination with client, concerned authorities, consultant, sub-contractor and contractor.

(3)Employer : M/S Consulting Engineers Group Ltd.


Period : Aug. 2016 to 31ST .March.2018
Position : Highway Maintenance Engineer.(D.G.M)
Project : Six Laning of Surat – Dahisar Section of NH- 8 FROM Km.263.00 Km. 502.00 in states
of Gujarat & Maharashtra BOT project (Toll) on DBFO pattern under NHDP Phase – V.
Client : National Highway Authority of India
Concessionaire : IRB, Surat Dahisar Tollway Pvt. Ltd.
Project Cost :2250 Crores. .
Description of Duties: As Highway Engineer responsible for the day to day inspection/supervision of road works as
per IRC / IS guidelines and MORTH & Specifications. Monitor the execution of work with quality assurance,
laboratory and field tests as per the technical specifications of the contract. As per the inspection and test plan approved
by the team leader Carried out Construction Supervision and maintenance of roadwork.

CV of Sanjay Kumar        Page 5/12


Evaluating, analyzing and correlating the quantity provision in estimate with construction drawing. Working out the
actual quantity with respect to the quantity provision of particular item in contract. Preparing and reviewing estimate for
varied work i.e. Change of Scope.
Established item rates for all 14 no. Change of Scope works amounting Rs 142 Crores. Checked the measurement of
varied work jointly with the representative of the Concessionaire. Apart from the Change of Scope work other balance
works such as 100 km. of service road in the project highway utility shifting, measured during execution and
recommended to employer for payment. Assisted Team leader to issue completion certificate and worked out
bonus/penalty as per contract.
Checked the maintenance and work program submitted by the concessionaire considering their maintenance
performance and assisted Team leader to recommend accordingly. Reviewed the corridor maintenance plan and
monitored the monthly progress of work. Calculated the savings in the project against the varied work as requested by
the employer.

Responsible for testing of different material like soil, sand, aggregate, cement, bitumen for items involved in Road
works if need arises as per the MOST & IS specifications. Responsible for checking and providing approval of design
mixes (JMF) for GSB, BM, DBM, BC with PMB-40, etc. in consultation with the material engineer.

Also, responsible for checking of cross sections, attending technical quarries submitted by the concessionaire.
Responsible for close monitoring and implementation of the road safety measures as per safety manuals referred during
the construction activities. Review the safety measures adopted by the concessionaire during execution of work. Review
the progress reports submitted by the concessionaire and Prepare weekly, monthly reports on the progress of works.

(4)Employment Record: M/S FEEDBCK INFRA PVT. LTD.


Period : 5TH.APRIL 2013 to 18TH. AUG.2016
Post Held : HIGHWAY ENGINEER (D.G.M)
Project : PROJECT MANAGEMENT CONSULTANCY SERVICE for four-lanning of Jetpur- Somnath Section of
NH-8D from KM 0.000 to KM 123.473 of Stretch in the Road of the State of Gujarat to be executed on BOT (Package
Id-JS) Length Of KMs.127.00 to be Developed into 4 lane, 8.5 M wide carriageway each with footpath & Service Road-
7.0 m & 5.5m Wide NH-8D by Design, Finanence, Build, Operate &Transfer“DFBOT” Basis.
Concessionaire :   JETPUR –SOMNATH TOLLWAY PTE. LTD.
CLIENT : NHAI
Cost : 848.00 Crores.
EPC Cost : 974.00 Crores.
Project involved : Major Bridges 7, Minor Bridges 47, &ROB-4,
PUP 4, & VUP 11, Box Culvert 137, Pipe Culvert 5.
EPC Contractor : BACKBONE ENTERPRISES LTD. (RAJKOT-GUJARAT)
Responsibilities:

 Responsible for supervision of the project under FIDIC conditions of contract covering the assignments.
 Review of the detailed design and recommending necessary changes and modifications as per the requirements.
 Examination and certification of the construction drawings.
 Preparation of Quality Assurance Plan, Inception Report, various Review Reports Supervise the works on day
to day basis and to do check the material and workmanship of the works. Inspection Daily activity describe in
R.F.I every day.
 Provision towards quality assurance and carry out quality control tests. Identify Construction delays and
recommend to the NHAI the remedial measures to expedite the progress.
 Verify the safety measures provided for the traffic and project workers. Evolve MIS and provide it to the NHAI.
To direct the Concessionaire in all matters concerning construction safety and care of the works and if required,
to request the concessionaire to provide any necessary lights, guard, fencing etc.
 Responsible for supervision & monitoring the progress of bridge work, supervision, scrutiny, approving the
final setting out by the contractor, reviewing drawings, review of Contractors methodology of construction, All
other activities as per provisions of the Concessionaire Agreement.& also other responsible for construction of
Road Works as per MOST &IRC specifications

CV of Sanjay Kumar        Page 6/12


 Day to day coordination with client for execution, material testing and quality Control, setting up of testing
laboratory at site, Management of manpower, material and equipment; Making of work methodology for
various construction activities for the above project for minimum.
 Use of manpower material and equipment. Checking of Running Account bills every Month those prepared by
AHE’s and FE’s.
 Preparation of Sub-Grade, GSB, WBM, and B.T layers as per MOST specification and getting approval for the
same from the client.
 Inspecting all the roads covered under NHAI along with sub-staff and client.
 Conducting Field-tests whenever necessary and approval of the material and quality & Executing according the
MORSTH Specification with Preparing Variation Orders. Submission of Final Bill with all relevant details road
wise/ package wise.
 To review design reports, specification and tender documents for pavement works.
 To ensure project quality system is applied during pavement construction. Understanding of pavement design
methodologies and method of construction.
 Ensure very close and clear coordination of his team activities with the other construction supervision staff.
 Pavement evaluation using available technology and equipment.
 Review of method statement submitted by the contractor.
 Understanding pavement layout (horizontal and vertical alignment), singing, pavement marking and street
furniture.
 Review and approve (make recommendation for approval by SRE) of all submitted materials by the contractor.
 Understanding of General, Project specification, tender documents and international standards (AASHTO, BS,
and ASTM, etc.).
 Understanding Operating Procedures (NCR, ITP, RIFT, IR, etc.).
 Supervise, participate and direct sampling and testing\analysis of all pavement materials per the contract and the
specifications.Maintain records of test results and all taken corrective actions.Provide inputs on
changes/variations/claims related to pavement, if any.
 Liaison and coordination with client, concerned authorities, consultant, sub-contractor and contractor.
DESCRIPTION OF DUTIES: -As a HIGHWAY ENGINEER (Sr. Manager) Work carry out detail is checking &
Setting out data of work including line level and layout to ensure conformity with drawing. Carryout of
execution of all works as per approved method statement of various item of work and ensure quality as per
requirement. Setting up and organization of Laboratory and on-site testing for Soil and Bitumen, Investigation of
barrow materials for embankments, Investigation of minor and major bridges for foundations, Investigation of quarries
for materials, Preparation and implementation of Quality Control aspects, Assistance in location and supervision of
establishment of aggregate crushers and bituminous mix plants.
 Making the list of materials as per BOQ and also checking of availability in the quarry and suggesting alternate
arrangements.
 Checking of Material Specification as per working drawings, DPR and Contract drawings.
 Preparation of working drawings as per site condition with reference to IRC.
 Recording of measurements
 Implementation of quality control monitoring system and reporting formats.
 Checking field measurement and survey details, interpretation of technical specifications and contract provisions,
 Checking the day-to-day progress of Structures’ works as per the Quality standards and specifications.
 Supervision of open foundations of Minor Bridges and RCC Box Culverts.
 Supervision of different types of sub structures (Wall and Circular type).
 Supervision of different types of pier caps, square pedestals, formwork.
 Study and Review of Reports and Tender Drawings
 Maintain day-by-day project diary to record all major events of the project.
 Conducting initial survey and preparation of revised estimate with proposals.
Finalizing Alignment of roads and minor structures.
Executing Pipe culverts and slab Culverts according the MOST Specification.
Programming and monitoring daily progress along with ABE’s, FE’s and AME’s.
Monitoring of work’s progress with contractors and client.
Checking of Running Account bills every Month those prepared by ARE’s and FE’s.
CV of Sanjay Kumar        Page 7/12
Preparation of Sub-Grade, GSB, WBM, and B.T layers as per MOST specification and getting approval for the
same from the client.
Inspecting all the roads covered under JSTPL along with sub-staff and client.
Conducting Field-tests whenever necessary and approval of the material and quality.
Executing Pipe culverts and slab Culverts according the MOST Specification.
Preparing Variation Orders.
Submission of Final Bill with all relevant details road wise/ package wise.
Preparing and submitting constructed structure’s drawings to client

(5) Employment Record: M/S STUP CONSULTANTS PVT. LTD.


Period : Sept.2012 to APRIL2013
Post Held : HIGHWAY ENGINEER

Project : Improvement works of ADITYAPUR-KANDRA Road (Package Id-AK ) Length Of


KMs.15.100(From Kms. 0.000 to Kms 15.700) to be Developed into 4 lane(9.5 M wide carriageway each with
footpath &Service Road-5.5m Wide SH-05 & connecting SH-25 (Chaiwasa) and NH-19 (Kandra) with Chaiwasa-
Kandra-Chowka in district Saraikela-Kharshawan of JharKhand.
& II Assignments :-Improvement works of CHAIWASA-KANDRA-CHOWKA Road (Package Id-CKC)
Length Of KMs.68.700 (from Km 0.000 to Kms 68.700) to be Developed into 4 lane(9.5 M wide carriageway each
with footpath &Service Road-5.5m Wide SH-05 & connecting SH-25 (Chaiwasa) and NH-19 (Kandra) with
Chaiwasa-Kandra-Chowka in district Saraikela-Kharshawan of JharKhand by Build, Operate
&Transfer“BOT” Basis.
Concessionaire : JRPICL
Cost : 589.00 Crores.
EPC Cost : 600.00 Crores.
Funding Agency : Govt . of Jharkhand
Project involved : Major Bridges 1, Minor Bridges 13, RUB 1&ROB1,
PUP 4, & VUP 1, Box Culvert 137, Pipe Culvert 5.
EPC Contractor : GKC Projects Ltd. (Hyderabad-A.P)
Responsibilities:

 Responsible for supervision of the project under FIDIC conditions of contract covering the assignments.
 Review of the detailed design and recommending necessary changes and modifications as per the requirements.
 Examination and certification of the construction drawings.
 Preparation of Quality Assurance Plan, Inception Report, various Review Reports Supervise the works on day
to day basis and to do check the material and workmanship of the works. Inspection Daily activity describe in
R.F.I every day.
 To review design reports, specification and tender documents for pavement works.
 To ensure project quality system is applied during pavement construction. Understanding of pavement design
methodologies and method of construction.
 Ensure very close and clear coordination of his team activities with the other construction supervision staff.
 Pavement evaluation using available technology and equipment.
 Review of method statement submitted by the contractor.
 Understanding pavement layout (horizontal and vertical alignment), singing, pavement marking and street
furniture.Review and approve (make recommendation for approval by SRE) of all submitted materials by the
contractor.Understanding of General, Project specification, tender documents and international standards
(AASHTO, BS, and ASTM, etc.).

CV of Sanjay Kumar        Page 8/12


 Understanding Operating Procedures (NCR, ITP, RIFT, IR, etc.).
 Supervise, participate and direct sampling and testing\analysis of all pavement materials per the contract and the
specifications.
 Maintain records of test results and all taken corrective actions.
 Provide inputs on changes/variations/claims related to pavement, if any.
 Liaison and coordination with client, concerned authorities, consultant, sub-contractor and contractor.
 Provision towards quality assurance and carry out quality control tests. Identify Construction delays and
recommend to the NHAI the remedial measures to expedite the progress.
 Verify the safety measures provided for the traffic and project workers. Evolve MIS and provide it to the NHAI.
To direct the Concessionaire in all matters concerning construction safety and care of the works and if required,
to request the concessionaire to provide any necessary lights, guard, fencing etc.
 Responsible for supervision & monitoring the progress of bridge work, supervision, scrutiny, approving the
final setting out by the contractor, reviewing drawings, review of Contractors methodology of construction, All
other activities as per provisions of the Concessionaire Agreement.& also other responsible for construction of
Road Works as per MOST &IRC specifications.
 Day to day coordination with client for execution, material testing and quality Control, setting up of testing
laboratory at site, Management of manpower, material and equipment; Making of work methodology for
various construction activities for the above project for minimum. Use of manpower material and equipment.

(6) Employment Record: M/S LOUIS BERGER GROUP INC. (U.S.A)


Period : April.2011 to Sept.2012
Post Held : A.H.E (MANAGER)
Project : Independent Engineer Consultancy Services for 6- Lanning of Existing Road From km 364.125 Km
To396.000 and Km0.000 to Km 58.245(approximately 93.560Km) on the Kishangarh –Ajmer-Beawar section on
NH-08 in the State of Rajasthan by Build, Operate & Transfer (“BOT”) under NHDPN Phase-III on Design,
Build, Finance, Operate and Transfer (DBFOT) Basis.
Concessionaire : Soma Isolux Kishangarh Beawar Tollway Pvt. Ltd.
Cost : 824.00 Crores.
EPC Cost : 1054.00 Crores.
Project involved : Major Bridges 1, Minor Bridges 26, Flyover 2, ROB 2, PUP 4 & VUP 6,
Box Culvert 120, Pipe Culvert 40.
EPC Contractor : Soma Enterprises Ltd. (Hyderabad-A.P) &
Isolex Corsan (India) Limited, New Delhi

Duties & Responsibility:-Supervise the works on day to day basis and to do check the material and workmanship of
the works. Inspection Daily activity describe in R.F.I every day. Provision towards quality assurance and carry out
quality control tests. Process design, calculations, equipment sizing, preparation of purchase specifications, technical
evaluation of the bids, and participation in technical meetings with vendors and clients/consultants, vendor document
review/approval and site technical support. Analysis and design of Steel and RCC structures. Preparation of Technical
Specifications and BOQ for Tender purpose Keywords: Process design, calculations, equipment sizing, preparation of
purchase specifications, technical evaluation of the bids, STAAD PRO, Soil Mechanics, Pile / Machine Foundations,
Water Retaining Structure, RCC, Power, Structural, BOP. Identify Construction delays and recommend to the NHAI the
remedial measures to expedite the progress. Verify the safety measures provided for the traffic and project workers.
Planning and execution of Asphalts, WMM, GSB&Earthworks.Machinery allocation utilization. Act as mentor to less
experienced team members, providing technical guidance and advice. Co-ordinate work with multi-disciplinary teams in
a global environment. Encourage the promotion of, and compliance with, quality, safety and environmental systems.
Assist in the development, promotion and implementation of company technical strategies. Interface with clients on
project technical, commercial and progress matters. Ensure capture of key project and technical knowledge. Execution

CV of Sanjay Kumar        Page 9/12


as per modern methods of construction design standards. Checking of adequate safety provided before commencement
of any work with all sign boards as required. Optimum utilization of the material allocated supplemented by effective
coordination skills with clients and staff. Checking of quantities for various items of the ongoing work. Evolve MIS and
provide it to the NHAI. To direct the Concessionaire in all matters concerning construction safety and care of the works
and if required, to request the concessionaire to provide any necessary lights, guard, fencing etc. Responsible for
supervision & monitoring the progress of bridge work, supervision, scrutiny, approving the final setting out by the
contractor, reviewing drawings, review of Contractors methodology of construction, All other activities as per
provisions of the Concessionaire Agreement.& also responsible for construction of Road Works as per MOST &IRC
specifications. Day to day coordination with client for execution, material testing and quality Control, setting up of
testing laboratory at site, Management of manpower, material and equipment; Making of work methodology for various
construction activities for the above project for minimum. Use of manpower material and equipment. During the
project the other activities like Earthwork, GSB, WMM, and MSS, BM, DBM, BC are executed. Executed up-to Grade
of concrete M-50 & Work is used in is CRMB-60 & PMB-40 for the Bituminous Work.

(7) Employment Record: M/S ARTEFACT PROJECTS LTD. NAGPUR (Maharashtra)


Period : MARCH-2008 to 24th.April 2011
Post Held : DEPUTY MANAGER (A.H.E)
Project: - Independent Consultancy Services for Rehabitation and up gradation to 4/6 Lane of
Chhattisgarh/Maharashtra border-Wainganga Bridge Section from KM405.000 To 485.055 of NH-06.
Client : National Highways Authority of India
Consultant : Zaidun-Leeng Sdn. Bhd. (Malaysia) – Artefact Projects Ltd. (JV) Nagpur.
Concessionaire : ASHOKA HIGHWAY (BHANDARA) LTD.
Cost : 424.00 Crores.
EPC Cost : 554.00 Crores.
EPC Contractor : Ashoka Buildcon Ltd. (Nashik)
JOB RESPONSIBILITY : - I am responsible for construction of Road Works as per MOST &IRC Specifications.
Day to day coordination with client for execution, material testing and quality Control, Setting up of testing laboratory
at site, Management of manpower, material and equipment. Making of Work methodology for various construction
Activities for the above project for minimum. Use of Manpower material and equipment. During the project the other
activities like Earthwork, GSB, WMM, and MSS, BM, DBM, BC are executed. Executed upto Grade of concrete M-40:
BC Work is used in is CRMB-60 .Our project achieved in need mile stone.

Duties & Responsibility;-Supervise the works on day to day basis and to do check the material and workmanship of the
works. Inspection Daily activity describe in R.F.I every day. Provision towards quality assurance and carry out quality
control tests. Identify Construction delays and recommend to the NHAI the remedial measures to expedite the progress.
Verify the safety measures provided for the traffic and project workers. Evolve MIS and provide it to the NHAI .To
direct the Concessionaire in all matters concerning construction safety and care of the works and if required, to request
the concessionaire to provide any necessary lights, guard, fencing etc.Responsible for supervision & monitoring the
progress of bridge work, supervision, scrutiny, approving the final setting out by the contractor, reviewing drawings,
review of Contractors methodology of construction, All other activities as per provisions of the Concessionaire
Agreement.

(8)FROM OCT 2007 TO MARCH 2008


EMPLOYER :-M/S I.C.T PVT. LTD. (NEW DELHI)
POSITION HELD : -DEPUTY MANAGER (A.H.E)
CLIENT : -NHAI

CV of Sanjay Kumar        Page 10/12


PROJECT NAME :-INDEPENDENT CONSULTANCY SERVICES FOR REHABILITATION AND UP
GRADATION TO 4-LANE OF JHANSI – LALITPUR SECTION FROM KM 0.000 TO KM 49.700 OF NH-
25/26.
PROJECT COST : 345 CRORES
ROAD LENGTH : 50 KMS
JOB RESPONSIBILITY : - I am responsible for construction of Road Works as per MOST &IRC
Specifications. Day to day coordination with client for execution, material testing and quality Control,
Setting up of testing laboratory at site, Management of manpower, material and equipment; Making of
Work methodology for various construction activities for the above project for minimum. Use of
Manpower material and equipment.During the project the other activities like Earthwork, GSB, WMM
&MSS, BM, DBM, BC are executed. Executed up-to Grade of concrete M-40: BC Work is used in is
CRMB-60 .Our project achieved in need mile stone.

BRIDGE WORK:-Supervise the works on day to day basis and to do check the material and workmanship of the
works. Inspection Daily activity describe in R.F.I every day. Provision towards quality assurance and carry out quality
control tests. Identify Construction delays and recommend to the NHAI the remedial measures to expedite the progress.
Evolve MIS and provide it to the NHAI .To direct the Concessionaire in all matters concerning construction safety and
care of the works and if required, to request the concessionaire to provide any necessary lights, guard, fencing etc.As
A.H.E, responsible for supervision & monitoring the progress of bridge work, supervision, scrutiny, approving the final
setting out by the contractor, reviewing drawings, setting up quantity control procedures & review of Contractors
methodology of construction, measurement of completed works & maintaining construction records, checking
contractor’s Batching plant, Crusher & other equipment needed for bridges. All other activities as per provisions of the
Concessionaire Agreement.
(9) From JUNE, 2006 to Oct. 2007
Employer :- M/S Scottwilson Kirkpatrick (IND) Pvt Ltd. New Delhi
Position Held :- FIELD ENGINEER
CLIENT :- RIDCOR Funded by IL&FS Transport Network Ltd.
PROJECT NAME :- Consultancy services for Maintenance for –HK-2 of Kishangarh to
Ratangarh Mega Highway Project in the state of Rajasthan.
PROJECT COST :- INR 233crores
ROAD LENGTH :- 206 KMS
JOB RESPONSIBILITY :- As A FIELD ENGINEER, I am responsible for construction of Road
Works as per MOST & IRC specifications. Day to day coordination with client for execution, material testing and
quality control, setting up of testing laboratory at site, Management of manpower, material and equipment; Making of
work methodology for various construction activities for the above project for minimum use of manpower material and
equipment. During the project the other activities like Earthwork, GSB, WBM, and DBM, BC are executed.

BRIDGE &ROB WORK:-Controlling all the aspects of construction of bridge section & Highway Section.
Maintaining the utilities record, permanent and temporary obstructions record and monitor their proper stock-yard.
Reporting to the PM in respect of all the Structure & Highway activities in requisite format on daily basis. Entry into the
measurement book on weekly basis and cross checking the bill submitted by the contractor. Organizing the construction
team at site in a systematic manner efficiently. Marking the alignment and fixing the centerlines and diagonals of
structure. Checking the foundation depths, width, length and type of soil .Allotting the works to subcontractors based on
performance and quality. Maintaining cement register, daily site order records and measurement book. Checking the
quality of works like maintaining water cement ratio, concrete mixing machine, vibrators for compaction, checking the
slumps, reinforcement details, etc.Preparing bill as per execution and agreement.

(10)FROM SEPT 2004 TO MAY.2006


EMPLOYER :- M/S ARTEFACT PROJECTS LTD., NAGPUR
POSITION HELD :- FIELD ENGINEER
CLIENT :- MPRRDA, PMGSY (PIU-MANDLA)
PROJECT NAME :- Implementation of civil work for Development of Road

CV of Sanjay Kumar        Page 11/12


Sector of Madhya Pradesh state.
FUNDING AGENCY :- ADB FUNDED
PROJECT COST :- 60, CRORES

JOB RESPONSIBILITY : - As a field Engineer Responsible for execution of Work as per drawing and
specification. Monitoring day to day activities & Condition of field test as per codel stipulation and Bill Preparation.
Assisting the team leader with final reporting, responsible for identity of borrow area conducting test on material. To
check there suitability for construction, ensure and implant QA/QC procedure. Maintain all the records to the test
Condition responsible for the maintenance of weekly progress records, deployment of plant and machinery, giving
Layout of works and levels required at every stage of work. Controlling all the aspects of construction of bridge section
& Highway Section.Maintaining the utilities record, permanent and temporary obstructions record and monitor their
proper stock-yard. Reporting to the PM in respect of all the Structure & Highway activities in requisite format on daily
basis. Entry into the measurement book on weekly basis and cross checking the bill submitted by the contractor.
Organizing the construction team at site in a systematic manner efficiently Marking the alignment and fixing the
centerlines and diagonals of structure. Checking the foundation depths, width, length and type of soil .Allotting the
works to subcontractors based on performance and quality. Maintaining cement register, daily site order records and
measurement book. Checking the quality of works like maintaining water: cement ratio, concrete mixing machine,
vibrators for compaction, checking the slumps, reinforcement details, etc.Preparing bill as per execution and agreement.

{11.} FROM SEPT 2002 TO AUG. 2004


EMPLOYER :- M/S I.C.S. ENGINEERING PVT. LTD. CHENNAI
POSITION HELD :- FIELD ENGINEER
FUNDING AGENCY :- MPRSNN LTD.
                                                           (Madhya Pradesh Rajya Setu Nirman Nigam Limited.)
CONCESSIONAIRE :- REWA TOLL WAY PVT. LTD.
PROJECT NAME :- REWA SHAHDOL AMARKANTAK SH- 9 IN MP
PROJECT COST :- 110CRORES
ROAD LENGTH :- 246 KMS
JOB RESPONSIBILITY : - As a FIELD Engineer I came across almost all concerning .Activities to the
road works like Earthwork in Embankment & Sub-grade, WMM, DBM, BC, Retaining structures as per MOST
specification. I got s executed the massive stone masonry work. I was also responsible for final Preparation of monthly
bills. Worked as site Engineer for execution of mark as per drawing and Specification of MOST such as Laying of
Bituminous work by the Mechanical Paver and also Construction of Culverts & Minor Bridges. Survey related works
irrespective of execution of Excavation, Concrete works, and culvert works, Bridges. Curve set out, OGL for L-Section
& X-Section, TBM Level Center Line Marking, Retaining wall marking, and Layout of Junction. Monitor and control
sub Contractor Work progress. Reporting daily work progress report to Project Manager.
CERTIFICATION
I, undersigned, the best of my knowledge and belief, these data correctly describe my qualifications, my
experience and myself.

Place: - Lucknow (U.P) Signature


Date: -1st .April.2022 (SANJAY KUMAR)
Email  id:[email protected]
[email protected]
Mobile No: - +91-7549782872

CV of Sanjay Kumar        Page 12/12

You might also like