6.0 Analitico

This document contains a table outlining the monthly and hourly remuneration rates for different personnel roles for a construction project in 2023. It includes roles like general laborer, foreman, surveyor, and technical roles. For each role it lists the basic salary, benefits like vacations and bonuses, and the total monthly and hourly remuneration in Peruvian Soles. A second table at the bottom summarizes the total daily remuneration for each role in new Peruvian Soles.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
24 views15 pages

6.0 Analitico

This document contains a table outlining the monthly and hourly remuneration rates for different personnel roles for a construction project in 2023. It includes roles like general laborer, foreman, surveyor, and technical roles. For each role it lists the basic salary, benefits like vacations and bonuses, and the total monthly and hourly remuneration in Peruvian Soles. A second table at the bottom summarizes the total daily remuneration for each role in new Peruvian Soles.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 15

CALCULO DE REMUNERACION HORA-HOMBRE DESAGREGADO - 2023

PERSONAL DE OBRA

Aguinaldo por Escolaridad S/.


Bonificacion por Fiestas Patrias S/.
Aguinaldo por Navidad S/.

PERSONAL OBRERO JEFE DE BRIGADA SENSIBILIZADOR AUXILIAR CATASTRAL TECNICO CATASTRAL TOPOGRAFO ASISTENTE TOPOGRAFICO AUXILIAR TOPOGRA
VERIFICADOR CATASTRAL ESPECIALISTA GISASISTENTE SIG DE SISTEMAS (TECNICO
INGENIERO
II) DE SISTEMAS (TECNICO I)TECNICO DE EDICION
ESPECIALISTA CONTROL DE CALIDAD (TECNICO I)CHOFER

MENSUAL HH MENSUAL HH MENSUAL HH MENSUAL HH MENSUAL HH MENSUAL HH MENSUAL HH MENSUAL HH MENSUAL HH MENSUAL HH MENSUAL HH MENSUAL HH MENSUAL HH MENSUAL HH
1 JORNAL BASICO 3900.00 16.25 2500.00 10.42 1800.00 7.50 2939.56 12.25 2500.00 10.42 1800.00 7.50 1800.00 7.50 4200.00 17.50 4200.00 17.50 2200.00 9.17 3500.00 14.58 2200.00 9.17 3200.00 13.33 2200.00 9.17

2 REFRIGERIO Y MOVILIDAD 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

3 BENEFICIOS (VACACIONES) [(1)+(2)]/12 325.00 1.35 208.33 0.87 150.00 0.63 244.96 1.02 208.33 0.87 150.00 0.63 150.00 0.63 350.00 1.46 350.00 1.46 183.33 0.76 291.67 1.22 183.33 0.76 266.67 1.11 183.33 0.76
4 BENEFICIOS (POR TIEMPO DE SERVICIOS) [(1)+(2)]/12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

5 AGUINALDO: POR ESCOLARIDAD 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
6 AGUINALDO: POR FIESTAS PATRIAS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

7 AGUINALDO: POR NAVIDAD 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

8 TOTAL REMUNERACION [(1)+(2)+(3)+(4)+(5)+(6)+(7)+(8)] 4225.00 17.60 2708.33 0.00 1950.00 8.13 3184.52 13.27 2708.33 11.29 1950.00 8.13 1950.00 8.13 4550.00 18.96 4550.00 18.96 2383.33 9.93 3791.67 15.80 2383.33 9.93 3466.67 14.44 2383.33 9.93
9 TRASF. CORRIENTES: SNPS (9%) [(9)-(4)]*9% 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

10 TRASF. CORRIENTES: SCRT (1.55%) [(6)]*1.55% 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11 TOTAL [(9)+(10)+(11)+(12)] 4225.00 17.60 2708.33 0.00 1950.00 8.13 3184.52 13.27 2708.33 11.29 1950.00 8.13 1950.00 8.13 4550.00 18.96 4550.00 18.96 2383.33 9.93 3791.67 15.80 2383.33 9.93 3466.67 14.44 2383.33 9.93

PERSONAL OBRERO JEFE DE BRIGADA SENSIBILIZADOR AUXILIAR CATASTRAL TECNICO CATASTRAL TOPOGRAFO ASISTENTE TOPOGRAFICO AUXILIAR TOPOGRAFICO
VERIFICADOR CATASTRAL ESPECIALISTA GISASISTENTE SIG DE SISTEMAS (TECNICO
INGENIERO
II) DE SISTEMAS (TECNICO I)TECNICO DE EDICION
ESPECIALISTA CONTROL DE CALIDAD (TECNICO I)CHOFER
TOTAL REMUNERACION POR DIA EN NUEVOS SOLES 140.83 90.28 65.00 106.15 90.28 65.00 65.00 151.67 151.67 79.44 126.39 79.44 115.56 79.44
RESUMEN PRESUPUESTO ANALÍTICO
FTE.FTO
UNIDAD EJECUTORA : MUNICIPALIDAD DISTRITAL DE OLLANTAYTAMBO

PROYECTO :"MEJORAMIENTO DEL SERVICIO DE GESTION URBANA DE LA LOCALIDAD DE


OLLANTAYTAMBO"
DEPARTAMENTO :CUSCO
PROVINCIA : URUBAMBA
DISTRITO :OLLANTAYTAMBO

CODIGO ESPECIFICA DE GASTOS COSTO DIRECTO G. GENERALES G. SUPERV. LIQ. TEC. COSTO TOTAL

ESPECIFICA DE GASTOS
COSTO DE PROYECTO POR ADMINISTRACION DIRECTA - PERSONAL 315,490.94 83,145.34 56,634.48 12,489.89 467,760.65
COSTO DE PROYECTO POR ADMINISTRACION DIRECTA - MATERIALES 611,215.15 9,906.20 2,604.29 1,990.37 625,716.01
COSTO DE PROYECTO POR ADMINISTRACION DIRECTA - EQUIPO 132,844.09 6,974.17 14,840.75 10,189.24 164,848.25
COSTO DE PROYECTO POR ADMINISTRACION DIRECTA - SUB-CONTRATOS 1,196,525.00 8,622.75 0.00 0.00 1,205,147.75
TOTAL 2,256,075.18 108,648.46 74,079.52 24,669.50 2,463,472.67

% 100% 4.82% 3.28% 1.09%


RESUMEN PRESUPUESTO ANALÍTICO - COSTO DIRECTO
FTE.FTO
UNIDAD EJECUTORA : MUNICIPALIDAD DISTRITAL DE OLLANTAYTAMBO
PROYECTO :"MEJORAMIENTO DEL SERVICIO DE GESTION URBANA DE LA LOCALIDAD DE OLLANTAYTAMBO"
DEPARTAMENTO :CUSCO
PROVINCIA : URUBAMBA
DISTRITO :OLLANTAYTAMBO

CÓDIGO ESPECIFICA DE GASTOS C.DIRECTO


COSTO DE PROYECTO POR ADMINISTRACION DIRECTA - PERSONAL 315,490.94
COSTO DE PROYECTO POR ADMINISTRACION DIRECTA - MATERIALES 611,215.15
COSTO DE PROYECTO POR ADMINISTRACION DIRECTA - EQUIPOS 132,844.09
COSTO DE PROYECTO POR ADMINISTRACION DIRECTA - SUB CONTRATOS 1,196,525.00
TOTAL COSTO DIRECTO 2,256,075.18

DESAGREGADO DEL PRESUPUESTO ANALÍTICO

COSTO DIRECTO

COSTO DE PROYECTO POR ADMINISTRACION DIRECTA - PERSONAL S/. 315,490.94

A RETRIBUCIONES COMPLEMENTARIAS-CONTRATOS A PLAZO FIJO S/. 315,490.94


01 JORNAL

DEL EMPLEADO EVENTUAL

CARGO UNID. P.U. CANTIDAD SUB TOTAL


JEFE DE BRIGADA HH 15.18 3,329.43 50,540.75
SENSIBILIZADOR HH 9.28 7,416.00 68,820.48
AUXILIAR CATASTRAL HH 6.60 5,142.16 33,938.26
TECNICO CATASTRAL HH 11.45 2,334.20 26,726.59
TOPOGRAFO HH 8.99 721.96 6,490.42
ASISTENTE TOPOGRAFICO HH 6.59 721.93 4,757.52
AUXILIAR TOPOGRAFICO HH 6.59 1,041.20 6,861.51
VERIFICADOR CATASTRAL HH 15.69 350.44 5,498.40
ESPECIALISTA GIS HH 15.69 2,097.61 32,911.50
ASISTENTE SIG DE SISTEMAS (TECNICO II) HH 9.00 3,420.00 30,780.00
INGENIERO DE SISTEMAS (TECNICO I) HH 7.94 154.67 1,228.08
TECNICO DE EDICION HH 8.29 45.37 376.12
ESPECIALISTA CONTROL DE CALIDAD (TECNICO HH 11.99 754.99 9,052.33
CHOFER HH 8.19 1,440.00 11,793.60
TOTAL 289,775.55

2 BENEFICIOS (VACACIONES)

DEL EMPLEADO EVENTUAL

CARGO UNID. P.U. CANTIDAD SUB TOTAL


JEFE DE BRIGADA HH 1.35 3,329.43 4,494.73
SENSIBILIZADOR HH 0.87 7,416.00 6,451.92
AUXILIAR CATASTRAL HH 0.63 5,142.16 3,239.56
TECNICO CATASTRAL HH 0.63 2,334.20 1,470.55
TOPOGRAFO HH 0.87 721.96 628.11
ASISTENTE TOPOGRAFICO HH 0.63 721.93 454.82
AUXILIAR TOPOGRAFICO HH 0.63 1,041.20 655.96
VERIFICADOR CATASTRAL HH 1.46 350.44 511.64
ESPECIALISTA GIS HH 1.46 2,097.61 3,062.51
ASISTENTE SIG DE SISTEMAS (TECNICO II) HH 0.76 3,420.00 2,599.20
INGENIERO DE SISTEMAS (TECNICO I) HH 1.22 154.67 188.70
TECNICO DE EDICION HH 0.76 45.37 34.48
ESPECIALISTA CONTROL DE CALIDAD (TECNICO HH 1.11 754.99 838.04
CHOFER HH 0.76 1,440.00 1,094.40
TOTAL 25,724.60
RESUMEN PRESUPUESTO ANALÍTICO - COSTO DIRECTO
FTE.FTO
UNIDAD EJECUTORA : MUNICIPALIDAD DISTRITAL DE OLLANTAYTAMBO
PROYECTO :"MEJORAMIENTO DEL SERVICIO DE GESTION URBANA DE LA LOCALIDAD DE OLLANTAYTAMBO"
DEPARTAMENTO :CUSCO
PROVINCIA : URUBAMBA
DISTRITO :OLLANTAYTAMBO

COSTO DE PROYECTO POR ADMINISTRACION DIRECTA - MATERIALES S/. 611,215.15

01 MATERIALES S/. 611,215.15

DESCRIPCION UNIDAD P.U. CANTIDAD TOTAL


IMPRESION DE AFICHES und 320.01 1.00 320.01
LAPICERO und 343.00 1.00 343.00
CUADERNILLO ESPIRALADO und 210.00 4.50 945.00
ACCESS POINT - 3 ANTENAS DE DIPOLO BANDA DUAL und 2.00 390.00 780.00
CAMARA FOTOGRAFICA DIGITAL und 2.00 890.00 1780.00
CARGADOR DE PILAS INCLUYE 4 PILAS und 6.00 180.00 1080.00
CONECTOR RJ45 100UND. CAT6 und 200.00 3.00 600.00
DISCO DURO PARA SERVIDOR und 5.00 2178.00 10890.00
EQUIPO DE COMPUTO DE ALTO RENDIMIENTO und 5.00 5940.00 29700.00
ESTACION TOTAL INCLUYE ACCESORIOS BASTION und 2.00 37170.00 74340.00
PRISMA
FUENTE PORFA PRISMAATX
DE PODER Y TRIPODE
REAL und 10.00 360.00 3600.00
GABINETE KIT COMPLETO und 1.00 2181.00 2181.00
GPS NAVEGADOR CONSTELACION GPS Y GLONNAS und 6.00 1734.60 10407.60
GPS DIFERENCIAL und 1.00 94730.00 94730.00
JACK HEMBRA CAT 6 - COLOR AZUL und 60.00 18.00 1080.00
JACK HEMBRA CAT 6 - COLOR ROJO und 60.00 17.00 1020.00
KIT DE RADIOS und 15.38 740.00 11381.20
LAPIZ TACTIL PARA CELULAR und 6.00 130.00 780.00
LAPTOP CORE I7 10MA GEN und 2.00 7500.00 15000.00
MONITOR COLOR 29" und 1.00 1261.66 1261.66
ORDENADORES PARA CABLE DE RED und 4.00 57.00 228.00
PATCH CORD 1M ROJO und 50.00 18.00 900.00
PATCH CORD 3M AZUL und 50.00 35.00 1750.00
PATCH PANEL 24 PORT und 4.00 155.00 620.00
ROLL SCREEN und 1.00 200.00 200.00
SERVIDOR RACK und 1.00 44000.00 44000.00
TARJETAS DE RED INHALAMBRICA und 40.00 35.00 1400.00
TARJETAS DE VIDEO und 1.00 2600.00 2600.00
TECLADO + MOUSE glb 1.00 55.01 55.01
UPS-500AV und 10.00 283.00 2830.00
UPS 3000VA und 1.00 6820.00 6820.00
WORKSTATION und 2.00 10780.00 21560.00
CABLE SOLIDO UTP CAT 6 GRIS X ROLLO PARA PARED und 1.00 577.06 577.06
MODEM und 1.00 550.00 550.00
SWITCH, 24PT-10//100/1000, ADAPTADOR 220V, und 1.00 3850.00 3850.00
PRESENTACION
PLOTTER DE PLANOSEN CAJA A0
TAMAÑO und 1.00 12411.61 12411.61
CARTUCHOS PARA TINTA DE PLOTER und 6.00 400.00 2400.00
IMPRESORA MULTIFUNCIONAL DE TINTA ECOTANK WI- und 1.00 1078.80 1078.80
FI/USB/ETHERNET
TINTA PARA IMPRESORA MULTIFUNCIONAL ECOTANK und 4.00 47.00 188.00
SERVIDOR DE BASE DE DATOS 2TB 8GB und 1.00 11660.00 11660.00
COMPUTADORA PORTATIL PROCESADOR INTEL CORE und 1.00 6790.00 6790.00
I7 MINIMO 10 MA GENERACION
PROYECTOR MEMORIA RAM 16 GB
MULTIMEDIA und 1.00 4190.00 4190.00
ECRAN CON TRIPODEMINIMO 2.10M X 1.43M und 1.00 250.00 250.00
DISTANCIOMETRO 100M DE ALCANCE und 6.00 1392.40 8354.40
VOLANTES mil 1.30 100.00 130.00
CUADERNILLOS CON LOGO mil 1.60 3500.00 5600.00
LAPICERO CON LOGO mil 1.60 2500.00 4000.00
PAPEL BOND A4 - 80 GR(PAQUETE 500 HOJAS) pqt 3.33 25.00 83.20
ROLLO DE PAPEL A0 rll 173.73 85.00 14766.68
CORRECTOR LIQUIDO TIPO LAPICERO und 0.64 4.17 2.66
ESTACAS FIERRO CORRUGADO Ø 1/2" X 0.50m und 0.35 7.50 2.66
PINTURA ESMALTE lat 67.00 26.00 1741.97
LAPIZ HB caj 13.31 5.00 66.56
CLAVO DE CALAMINA kg 1.33 6.00 7.98
LIBRETA DE CAMPO und 11.01 40.00 440.24
LAPICEROS BORRABLES CAJA DE 12 UNIDADES caj 34.00 85.00 2890.00
TABLEROS DE MADERA CON SUJETADOR DE HOJAS und 12.75 8.00 102.00
FOLDER ELEGANTE und 123.64 1.10 136.00
FASTENER CAJA DE 50 UNIDADES cja 117.59 5.06 595.00
VOLANTES mil 1.00 200.00 200.00
PAPEL BOND A4 - 80 GR(PAQUETE 500 HOJAS) pqt 1.00 17.30 17.33
PAPEL BOND A3 mil 0.72 36.50 26.28
LAPICEROS BORRABLES CAJA DE 12 UNIDADES caj 24.00 72.00 1728.00
PLUMONES PARA PIZARRA Doc 1.20 27.00 32.40
MOTA PARA PIZARRA und 3.00 2.50 7.50
RESUMEN PRESUPUESTO ANALÍTICO - COSTO DIRECTO
FTE.FTO
UNIDAD EJECUTORA : MUNICIPALIDAD DISTRITAL DE OLLANTAYTAMBO
PROYECTO :"MEJORAMIENTO DEL SERVICIO DE GESTION URBANA DE LA LOCALIDAD DE OLLANTAYTAMBO"
DEPARTAMENTO :CUSCO
PROVINCIA : URUBAMBA
DISTRITO :OLLANTAYTAMBO
ARCHIVADORES TIPO CREDENSA und 6.00 580.00 3480.00
CARPA O TOLDO und 1.00 500.00 500.00
ESCRITORIOS und 9.00 620.00 5580.00
ESTANTES PARA ARCHIVAR DOCUMENTOS und 1.00 1200.00 1200.00
MESA DE TRABAJO CON 8 SILLAS und 1.00 1500.00 1500.00
PAPELOGRAFOS und 20.00 0.50 10.00
SILLA DE PLASTICO und 10.00 30.00 300.00
SILLAS GIRATORIAS ERGONOMICAS und 4.00 550.00 2200.00
PIZARRA ACRILICA (2.50M X 1.50M) und 1.00 250.00 250.00
ANTIVIRUS und 4.00 160.00 640.00
LICENCIA PARA AUTOCAD CIVIL 3D und 3.00 3100.00 9300.00
LICENCIA DE WINDOW SERVER STANDAR und 1.00 16000.00 16000.00
LICENCIA DE ARCGIS und 1.00 14000.00 14000.00
SOFTWARE DE SISTEMA INFORMATICO und 1.00 48000.00 48000.00
ESPECIALIZADO
LICENCIA DE CATASTRO
PARA AUTOCAD MAP 3D und 1.00 16000.00 16000.00
COMUNICADOS mil 1.00 2000.00 2000.00
CORRECTOR LIQUIDO TIPO LAPICERO und 69.60 4.15 288.84
LAPICERO TINTA SECA Doc 3.00 8.00 24.00
MOTA DE PIZARRA ACRILICA und 3.00 2.80 8.40
FOLLETOS und 30.00 6.00 180.00
ARCHIVADOR DE PALANCA LOMO ANCHO und 250.00 7.00 1750.00
BORRADOR LAPIZ/LAPICERO und 60.00 1.50 90.00
CINTA MASKINGTAPE 3/4" X 30 YDS und 6.00 7.00 42.00
CINTA SCOTH MEDIANO und 12.00 3.00 36.00
CORRECTOR LIQUIDO TIPO LAPICERO und 36.00 2.00 72.00
CUCHILLA CUTTER RETRACTIL und 24.00 10.00 240.00
DISPENSADOR CINTA SCOTCH TAMAÑO MEDIANO und 24.35 45.00 1095.75
ENGRAPADOR TIPO ALICATE und 20.00 45.00 900.00
ESCALIMETRO und 20.00 7.50 150.00
FASTENER CAJA DE 50 UNIDADES cja 3.00 3.50 10.50
FOLDER MANILA A-4 25 UNIDADES pqt 92.00 5.00 460.00
FORRO DE PLASTICO OFICIO und 62.61 7.00 438.27
INDEX TABS PARA FOLDER COLGANTE X 25 UNIDADES pqt 22.00 5.00 110.00
LIBRETA DE CAMPO und 12.31 10.00 123.06
MARCADOR PARA PIZARRA ACRILICA VARIOS und 80.99 4.50 364.46
MICAS COLORES
A4 X 100 UND und 284.52 32.00 9104.64
PAPEL BOND 80 GRS-A4 MILLAR und 40.00 24.00 960.00
PAPEL LUSTRE PLIEGO DE COLORES und 20.00 0.50 10.00
PERFORADOR DE PAPEL und 20.00 17.00 340.00
PERFORADOR SEMI INDUSTRIAL und 4.00 85.00 340.00
PLUMON DELGADO X 12 UNIDADES est 4.00 8.00 32.00
SOBRE MANILA A4 mil 3.00 215.00 645.00
TABLEROS und 20.00 8.00 160.00
TAJADOR DE LAPIZ und 20.00 3.00 60.00
FOLDER COLGANTE cto 36.53 180.00 6575.40
LAPICEROS POR CAJA DE 50 UNIDADES cja 3.00 50.00 150.00
POS IT DE COLORES cnt 30.00 9.00 270.00
LAPIZ 2B X 12 UNIDADES cja 6.00 4.50 27.00
PAPEL BOND A3 mil 20.00 35.00 700.00
PAPEL CANSON- A4 X 100 UND Pqt 10.00 25.00 250.00
TRIPTICOS mil 0.30 1200.00 360.00
CINTA DE EMBALAJE TRANSPARENTE 2" X 110YD und 6.00 13.00 78.00
CINTA MASKINGTAPE 3/4" X 30 YDS und 12.00 1.51 18.12
COMBUSTIBLE gal 1000.00 13.49 13490.00
ARCHIVADORES TIPO CREDENSA und 2.00 6.00 12.00
HOJA DE COLORES cnt 0.20 15.00 3.00
INDEX TABS PARA FOLDER COLGANTE X 25 UNIDADES pqt 1.00 8.00 8.00
CD X 50 UND Pqt 0.08 100.00 8.00
GOMA EN BARRA X 40GR und 1.00 6.00 6.00
EXTENSION ELECTRICO 15 M und 5.00 22.00 110.00
EXTINTOR PQS, CO2 und 3.00 120.00 360.00
SEÑALES DE SEGURIDAD pqt 8.00 22.00 176.00
WINCHA DE 200 M und 5.00 120.00 600.00
WINCHA METALICA DE 8.00 M und 5.00 40.00 200.00
FICHA CATASTRAL URBANA INDIVIDUAL mll 1.50 233.33 350.00
FICHA CATASTRAL URBANA COTITULARIDAD mll 0.50 320.00 160.00
FICHA CATASTRAL URBANA BIENES COMUNES mll 0.50 320.00 160.00
FICHA CATASTRAL URBANA ACTIVIDAD ECONOMICA mll 0.50 260.00 130.00
FICHA CATASTRAL BIENES CULTURALES mll 0.50 320.00 160.00
VOLANTES mil 2.00 300.00 600.00
TRIPTICOS mil 2.00 300.00 600.00
COMUNICADOS mil 2.00 2500.00 5000.00
RESUMEN PRESUPUESTO ANALÍTICO - COSTO DIRECTO
FTE.FTO
UNIDAD EJECUTORA : MUNICIPALIDAD DISTRITAL DE OLLANTAYTAMBO
PROYECTO :"MEJORAMIENTO DEL SERVICIO DE GESTION URBANA DE LA LOCALIDAD DE OLLANTAYTAMBO"
DEPARTAMENTO :CUSCO
PROVINCIA : URUBAMBA
DISTRITO :OLLANTAYTAMBO
CUADERNILLOS CON LOGO mil 2.00 4000.00 8000.00
LAPICERO CON LOGO mil 2.00 1500.00 3000.00
BANNER und 2.00 300.00 600.00

COSTO DE PROYECTO POR ADMINISTRACION DIRECTA - EQUIPOS S/. 132,844.09

EQUIPOS S/. 132,844.09

DESCRIPCION UNIDAD P.U. CANTIDAD TOTAL


SERVIDOR 1.00 20000.00 20000.00
WORKSTATION 2.00 17500.00 35000.00
IMPRESORA MULTIFUNCIONAL A3 1.00 4254.07 4254.07
IMPRESORA MULTIFUNCIONAL A4 SISTEMA CONTINUO 1.00 2450.00 2450.00
PLOTTER SCANNER FORMATO GRANDE 1.00 18500.02 18500.02
COMPUTADORAS COMPLETAS DE ESCRITORIOS 7.00 4450.00 31150.00
SWITCH (16) PUERTOS 1.00 390.00 390.00
UPS=3000 V RACKEBLE PARA SERVIDOR 1.00 2500.00 2500.00
PROYECTOR MULTIMEDIA - ECRAM 1.00 3400.00 3400.00
ESTABILIZADOR DE 8 ENTRADAS CUADRADO 10.00 120.00 1200.00
FOTOCOPIADORA A COLOR 1.00 14000.00 14000.00

COSTO DE PROYECTO POR ADMINISTRACION DIRECTA - SUB CONTRATOS S/. 1,196,525.00

SUB-CONTRATOS S/. 1,196,525.00

DESCRIPCION UNIDAD P.U. CANTIDAD TOTAL


SERVICIO DE ESPECIALISTA DE CAPACITACION und 1.00 6360.00 6360.00
REFRIGERIO und 560.00 8.00 4480.00
ALQUILER DE LOCAL PARA OFICINA und 6.00 3500.00 21000.00
REFRIGERIO und 300.00 5.00 1500.00
SC. FICHA INDIVIDUAL SEGUN SNCP mll 0.85 300.00 255.00
SC. FICHA COTITULAR SEGUN SNCP mll 0.85 300.00 255.00
SC. FICHA ECONOMICA SEGUN SNCP mll 0.85 300.00 255.00
SC. FICHA BIENES COMUNES SEGUN SNCP mll 0.85 300.00 255.00
SC. FICHA BIENES CULTURALES SEGUN SNCP mll 0.85 300.00 255.00
SERVICIO DE VUELO FOTOGRAMETRICO - ORTOFOTO und 1.00 20000.00 20000.00
DEL AREA URBANA DE OLLANTAYTAMBO

SERVICIO PARA LA ELABORACION DE PLAN DE Ser 1.00 950000.00 950000.00


DESARROLLO URBANO
SERVICIO DE ESPECIALISTA DE CAPACITACION und 1.00 5150.00 5150.00
SERVICIO DE AGUA POTABLE mes 6.00 150.00 900.00
SC ESTABLECIMIENTO Y MONUMENTACION DE und 6.00 2200.00 13200.00
PUNTOS DE ORDEN "C" VALIDADOS
SERVICIO DE ESPECIALISTA DE CAPACITACION und 1.00 7650.00 7650.00
SERVICIO DE ELECTRICIDAD mes 6.00 250.00 1500.00
SERVICIO PARA LA ELABORACION DE PLACA DE 0.20 x Ser 1.00 50000.00 50000.00
0.10 M EN METAL Y COLOCACION
ALQUILER DE CAMIONETA mes 5.00 4500.00 22500.00
SERVICIO DE ESPECIALISTA DE CAPACITACION und 1.00 6700.00 6700.00
SERVICIO DE TELEFONIA E INTERNET mes 6.00 200.00 1200.00
PUBLICACION EN EL DIARIO EL PERUANO LA Ser 1.00 2500.00 2500.00
DECLARACION
SERVICIO DE COURIER Ser 1.00 350.00 350.00
DIFUSION POR MEDIOS DE COMUNICACIÓN Ser 1.00 2500.00 2500.00
SERVICIO DE ESPECIALISTA DE CAPACITACION und 1.00 4160.00 4160.00
ACONDICIONAMIENTO DE INSTALACIONES und 1.00 2520.00 2520.00
ELECTRICAS
ACONDICIONAMIENTO E INSTALACION DE REDES und 1.00 2380.00 2380.00
INFORMATICAS Y CABLEADO
INSTALACION DE SERVICIO DE TELEFONIA E INTERNET und 1.00 200.00 200.00

SERVICIO ELABORACION DE REVISTA INFORMATIVA Ser 1.00 12000.00 12000.00

RECOPILACION DE INFORMACION EXISTENTE LEGAL Ser 1.00 18500.00 18500.00


(HABILITACIONES URBANAS, SUBDIVISIONES,
NUMERACION, AUTOVALUO)
CONFORMACION DE INFORMACION PRELIMINAR BASE- Ser 1.00 38000.00 38000.00
PLANO Y CODIFICACIONES
RESUMEN PRESUPUESTO ANALÍTICO - COSTO DIRECTO
FTE.FTO
UNIDAD EJECUTORA : MUNICIPALIDAD DISTRITAL DE OLLANTAYTAMBO
PROYECTO :"MEJORAMIENTO DEL SERVICIO DE GESTION URBANA DE LA LOCALIDAD DE OLLANTAYTAMBO"
DEPARTAMENTO :CUSCO
PROVINCIA : URUBAMBA
DISTRITO :OLLANTAYTAMBO
COSTO DIRECTO TOTAL S/. 2,256,075.18
RESUMEN PRESUPUESTO ANALÍTICO - GASTOS GENERALES
UNIDAD EJECUTORA : MUNICIPALIDAD DISTRITAL DE OLLANTAYTAMBO
PROYECTO :"MEJORAMIENTO DEL SERVICIO DE GESTION URBANA DE LA LOCALIDAD DE OLLANTAYTAMBO"
DEPARTAMENTO :CUSCO
PROVINCIA : URUBAMBA
DISTRITO :OLLANTAYTAMBO

CÓDIGO ESPECIFICA DE GASTOS G. GRALES


COSTO DE PROYECTO POR ADMINISTARCION DIRECTA PERSONAL 83,145.34
COSTO DE PROYECTO POR ADMINISTRACION DIRECTA - EQUIPAMIENTO Y BIENES 9,906.20
COSTO DE PROYECTO POR ADMINISTRACION DIRECTA - SERVICIOS 6,974.17
COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA - OTROS 8,622.75
TOTAL GASTOS GENERALES 108,648.46

DESAGREGADO DEL PRESUPUESTO ANALÍTICO

GASTOS GENERALES
COSTO DE PROYECTO POR ADMINISTARCION DIRECTA PERSONAL S/. 83,145.34

A RETRIBUCIONES COMPLEMENTARIAS-CONTRATOS A PLAZO FIJO S/. 73,450.00

01 JORNAL S/. 67,800.00

DEL EMPLEADO EVENTUAL


CARGO N° DE PERSONAS MESES COSTO SUB TOTAL
RESIDENTE DE OBRA 1.00 6.00 5,000.00 30,000.00
ASISTENTE TECNICO 1.00 6.00 2,500.00 15,000.00
ASISTENTE ADMINISTRATIVO 1.00 6.00 2,000.00 12,000.00
GUARDIAN 1.00 6.00 1,800.00 10,800.00
TOTAL 67,800.00

2 BENEFICIOS (VACACIONES)
S/. 5,650.00
DEL EMPLEADO EVENTUAL

CARGO N° DE PERSONAS MESES COSTO SUB TOTAL


RESIDENTE DE OBRA 1.00 6.00 416.67 2,500.00
ASISTENTE TECNICO 1.00 6.00 208.33 1,250.00
ASISTENTE ADMINISTRATIVO 1.00 6.00 166.67 1,000.00
GUARDIAN 1.00 6.00 150.00 900.00
TOTAL 5,650.00

B OBLIGACIONES DEL EMPLEADOR S/. 9,695.34

01 SISTEMA NACIONAL DE PENSIONES (9%) S/. 6,102.00

DEL EMPLEADO EVENTUAL

CARGO N° DE PERSONAS MESES COSTO SUB TOTAL


RESIDENTE DE OBRA 1.00 6.00 450.00 2,700.00
ASISTENTE TECNICO 1.00 6.00 225.00 1,350.00
ASISTENTE ADMINISTRATIVO 1.00 6.00 180.00 1,080.00
GUARDIAN 1.00 6.00 162.00 972.00
TOTAL 6,102.00
RESUMEN PRESUPUESTO ANALÍTICO - GASTOS GENERALES
UNIDAD EJECUTORA : MUNICIPALIDAD DISTRITAL DE OLLANTAYTAMBO
PROYECTO :"MEJORAMIENTO DEL SERVICIO DE GESTION URBANA DE LA LOCALIDAD DE OLLANTAYTAMBO"
DEPARTAMENTO :CUSCO
PROVINCIA : URUBAMBA
DISTRITO :OLLANTAYTAMBO

02 SOLIDARIDAD (2%) IES


S/. 1,356.00
DEL EMPLEADO EVENTUAL

CARGO N° DE PERSONAS MESES COSTO SUB TOTAL


RESIDENTE DE OBRA 1.00 6.00 100.00 600.00
ASISTENTE TECNICO 1.00 6.00 50.00 300.00
ASISTENTE ADMINISTRATIVO 1.00 6.00 40.00 240.00
GUARDIAN 1.00 6.00 36.00 216.00
TOTAL 1,356.00

3 SEGURO COMPLEMENTARIO DE TRABAJO DE RIESGO (1.53%)


S/. 1,037.34
DEL EMPLEADO EVENTUAL

CARGO N° DE PERSONAS MESES COSTO SUB TOTAL


RESIDENTE DE OBRA 1.00 6.00 76.50 459.00
ASISTENTE TECNICO 1.00 6.00 38.25 229.50
ASISTENTE ADMINISTRATIVO 1.00 6.00 30.60 183.60
GUARDIAN 1.00 6.00 27.54 165.24
TOTAL 1,037.34

C ESCOLARIDAD, AGUINALDOS Y GRATIFICACIONES S/. 1,200.00

1 AGUINALDOS POR FIESTAS PATRIAS Y NAVIDAD

DEL EMPLEADO EVENTUAL

CARGO N° DE PERSONAS MESES COSTO SUB TOTAL


RESIDENTE DE OBRA 1.00 1.00 300.00 300.00
ASISTENTE TECNICO 1.00 1.00 300.00 300.00
ASISTENTE ADMINISTRATIVO 1.00 1.00 300.00 300.00
GUARDIAN 1.00 1.00 300.00 300.00
TOTAL 1,200.00

COSTO DE PROYECTO POR ADMINISTRACION DIRECTA - EQUIPAMIENTO Y BIENES DURADEROS S/. 9,906.20
MATERIALES S/. 4,429.20

DESCRIPCIÓN UND. CANTIDAD P.U. SUB TOTAL


ARCHIVADORES LOMO ANCHO - OFICIO UND 50.00 5.50 275.00
CD CNO 2.00 70.00 140.00
DVD RW REGRADABLES CNO 2.00 70.00 140.00
CLIP WINGO PEQUEÑO 100 UND CJA 4.00 1.50 6.00
CINTA MASKING X1 - 1/2" UND 10.00 3.00 30.00
CINTA DE EMBALAJE UND 10.00 4.50 45.00
CORRECTOR LÍQUIDO TIPO BOLÍGRAFO UND 10.00 2.50 25.00
CUADERNO DE CARGO UND 10.00 9.00 90.00
CUADERNO DE RECEPCION DE DOCUMENTO UND 10.00 9.00 90.00
CUADERNO DE OBRA AUTOCOPIATIVO (1X4 HOJAS) UND 6.00 41.00 246.00
LIBRO DE ACTAS D/PAPEL BOND EMPASTADO RAYADO D/56 GR. 48.00
UND 4.00 12.00
X 100 HOJAS
CUADERNO ESPIRALADO 200 HJAS UND 10.00 16.50 165.00
PAPEL LUSTRE: COLORES VARIADOS. T:50 CM. X 65 CM. PLG 80.00 0.40 32.00
FORRO D/PLÁSTICO. T: OFICIO X 5 MT UND 5.00 10.20 51.00
MICA P/ANNILLADO TRANSPARENTE. T:A-4 UND 100.00 0.50 50.00
CUTER GRANDE UND 6.00 6.00 36.00
ENGRAPADOR METÁLICO (100%). T:30MM. X 100 UNIDADES UND 2.00 73.10 146.20
TIJERA METALICA (100%) P/COSTURA O SASTRE. T:8" UND 2.00 17.00 34.00
ENGRAPADOR METALICO (100%). C/YUNQUE GIRATORIO TIPO AL UND 2.00 29.00 58.00
NUMERADOR D/ESTRUCTURA METALICA TIPO AUTOMÁTICO C/M UND 2.00 39.00 78.00
PERFORADOR D/02 ESPIGAS C: DE 15 A 20 HOJAS UND 2.00 15.00 30.00
ESPIRAL D/PLÁSTICO. T:30MM. X 100 UNIDADES BOL 0.50 34.00 17.00
FASTENER 50 UND CJA 2.00 8.00 16.00
FOLDER MANILA A - 4 CTO 1.00 40.00 40.00
GRAPAS CJA 5.00 3.20 16.00
LAPICERO AZUL/NEGRO CJA 3.00 23.00 69.00
BOLÍGRAFO D/TINTA LIQUIDA. COLOR NEGRO/AZUL. PUNTA FINA UND 50.00 4.50 225.00
PAPEL BOND FOTOCOPIA D/80 GR. T:A-4 MLL 20.00 24.00 480.00
GOMA EN BARRA D/40 GR. UND 6.00 3.50 21.00
PLUMÓN INDELEBLE. COLORES VARIADOS UND 10.00 3.00 30.00
NOTAS ADHESIVAS. COLORES VARIADOS. T:3" X 3" O EQUIVALEN PQT 5.00 8.00 40.00
PORTAMINA C/PUNTA METÁLICA. ANCHO D/TRAZO: 0.5 MM UND 3.00 13.00 39.00
REPUESTOS PARA PORTAMINA UND 6.00 2.00 12.00
RESALTADOR UND 25.00 3.00 75.00
TONER PARA IMPRESORA UND 4.00 348.50 1,394.00
SELLOS PERSONALES UND 4.00 35.00 140.00
TOTAL 4,429.20

INSUMOS DE HIGIENE PERSONAL - PREVENCION DE INFECCIONES Y PROTECCION PERSONAL S/. 867.00

DESCRIPCIÓN UND. CANTIDAD P.U. SUB TOTAL


PAPEL TOALLA UND 12.00 3.50 42.00
ALCOHOL 96% L 4.00 20.00 80.00
JABÓN LÍQUIDO GAL 1.00 35.00 35.00
PAÑO INDUSTRIAL PARA DESINFECCIÓN X 1KILO UND 2.00 30.00 60.00
GORRA MAS PROTECTOR FACIAL CON LOGO UND 3.00 40.00 120.00
MASCARILLA DESECHABLE X 50 UND CJA 2.00 100.00 200.00
DISPENSADOR DE PAPEL TOALLA 2.50 0.00
MASCARILLA DE PROTECCION EXTERIOR (LAVABLE COLOR OSC UND 3.00 30.00 90.00
OVEROL RE - USABLE ANTIFLUIDO CON LOGO UND 3.00 80.00 240.00
TOTAL 867.00

BIENES DURADEROS S/. 4,610.00


RESUMEN PRESUPUESTO ANALÍTICO - GASTOS GENERALES
UNIDAD EJECUTORA : MUNICIPALIDAD DISTRITAL DE OLLANTAYTAMBO
PROYECTO :"MEJORAMIENTO DEL SERVICIO DE GESTION URBANA DE LA LOCALIDAD DE OLLANTAYTAMBO"
DEPARTAMENTO :CUSCO
PROVINCIA : URUBAMBA
DISTRITO :OLLANTAYTAMBO

DESCRIPCIÓN UND. CANTIDAD P.U. SUB TOTAL


COMPUTADORA PORTATIL, CORE I7 UND 1.00 4,450.00 4,450.00
SOFTWARE ANTIVIRUS UND 1.00 160.00 160.00
TOTAL 4,610.00

COSTO DE PROYECTO POR ADMINISTRACION DIRECTA - SERVICIOS S/. 6,974.17


SERVICIOS S/. 6,974.17

DESCRIPCIÓN UND. CANTIDAD P.U. SUB TOTAL


GASTOS VARIOS PROCESOS DE ADQUISICIONES UND 7.00 520.60 3,644.17
LEGALIZACIÓN DE CUADERNO DE OBRA UND 30.00 35.00 1,050.00
TRASPORTE DIA 120.00 19.00 2,280.00
TOTAL 6,974.17

2.6.22.36 COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA - OTROS S/. 8,622.75

01 MATERIALES DE ESCRITORIO

DESCRIPCIÓN UND. CANTIDAD P.U. SUB TOTAL


TONER PARA IMPRESORA UND 2.00 240.00 480.00
IMPRESORA LASER UND 1.00 750.00 750.00
LAPTOP CORE I7 UND 1.00 3,500.00 3,500.00
PAPEL BOND DE 80 GR A-4 PQT 40.00 20.00 800.00
CUADERNO 50 HJAS UND 10.00 6.00 60.00
CUADERNO DE OBRA X 100 HOJAS UND 6.00 60.00 360.00
BITÁCORAS UND 4.00 20.00 80.00
LIBRETA TOPOGRÁFICA FIELD BOOK UND 6.00 8.00 48.00
FILES COLOR AMARILLO CTO 3.00 15.00 45.00
FASTENER DE 50 UND CAJA 2.00 8.00 16.00
SOBRES MANILA CTO 1.00 20.00 20.00
PAPEL CARBON AZUL CJA 1.00 20.00 20.00
ARCHIVADOR DE PALANCA UND 10.00 10.00 100.00
SELLO DE OBRA UND 4.00 30.00 120.00
TALONARIO DE PARTES DIARIOS BLOCK 10.00 20.00 200.00
TALONARIO DE NOTAS DE ENTRADA BLOCK 10.00 20.00 200.00
TALONARIO DE NOTAS DE SALIDA BLOCK 10.00 20.00 200.00
MEMORIA USB 30GB UND 2.00 50.00 100.00
BORRADOR DE LÁPIZ FABER CASTELL CAJA 2.00 5.00 10.00
CARTULINA CANSON PLGO 2.00 4.50 9.00
ESCRITORIO DE MADERA AGUANO UND 1.00 450.00 450.00
RESUMEN PRESUPUESTO ANALÍTICO - GASTOS GENERALES
UNIDAD EJECUTORA : MUNICIPALIDAD DISTRITAL DE OLLANTAYTAMBO
PROYECTO :"MEJORAMIENTO DEL SERVICIO DE GESTION URBANA DE LA LOCALIDAD DE OLLANTAYTAMBO"
DEPARTAMENTO :CUSCO
PROVINCIA : URUBAMBA
DISTRITO :OLLANTAYTAMBO
CINTA MASKINTEY 1/2" RLLO 2.00 7.00 14.00
CINTA DE EMBALAJE RLLO 2.00 6.00 12.00
CLIPS PEQUEÑOS CJA 2.00 1.50 3.00
CLIPS TIPO MARIPOSA CJA 1.00 1.50 1.50
RESALTADORES UND 6.00 5.00 30.00
PERFORADOR UND 1.00 25.00 25.00
ENGRAMPADOR UND 1.00 28.00 28.00
TINTA PARA TAMPON UND 1.00 15.00 15.00
WINCHA DE 8 M STANLEY UND 10.00 18.00 180.00
ESPRIRALES DE 1/2" CIENTO 1.00 20.00 20.00
MICAS TRANSPARENTES CIENTO 1.00 40.00 40.00
WINCHA DE 50M UND 2.00 90.00 180.00
CHINCHES CJA 1.00 5.43 5.43
GRAPAS CJA 2.00 8.00 16.00
TOTAL 8,137.93

03 BOTIQUIN DE PRIMEROS AUXILIOS

DESCRIPCIÓN UND. CANTIDAD P.U. SUB TOTAL


AGUA OXIGENADA DE 1/2 LT FRASCO 4.00 10.00 40.00
ALCOHOL MEDICINAL DE 01 LT FRASCO 4.00 10.00 40.00
ALGODON X 50 GR. PQTE 6.00 5.00 30.00
CAPSULAS PARA RESFRIOS UND 65.00 1.00 65.00
PANADOL ANTIGRIPAL UND 50.00 2.00 100.00
GASA FRACCIONADA X 10 PZAS. PQTE 5.00 5.00 25.00
YODO MEDICINAL LTS 1.00 20.00 20.00
BOTIQUIN DE MADERA UND 1.00 80.00 80.00
0TROS GLB 1.00 84.33 84.33
TOTAL 484.82

TOTAL GASTOS GENERALES S/. 108,648.46


RESUMEN PRESUPUESTO ANALITICO - SUPERVISION
UNIDAD EJECUTORA : MUNICIPALIDAD DISTRITAL DE OLLANTAYTAMBO
PROYECTO :"MEJORAMIENTO DEL SERVICIO DE GESTION URBANA DE LA LOCALIDAD DE OLLANTAYTAMBO"
DEPARTAMENTO :CUSCO
PROVINCIA : URUBAMBA
DISTRITO :OLLANTAYTAMBO

CODIGO ESPECIFICA DE GASTOS G.SUPER.


COSTO DE PROYECTO POR ADMINISTRACION DIRECTA - PERSONAL 56,634.48
COSTO DE PROYECTO POR ADMINISTRACION DIRECTA - EQUIPAMIENTO Y BIENES 2,604.29
COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA - SERVICIOS 14,840.75
TOTAL GASTOS SUPERVISION Y LIQUIDACION 74,079.52

DESAGREGADO DEL PRESUPUESTO ANALÍTICO

GASTOS DE SUPERVISOR

COSTO DE PROYECTO POR ADMINISTARCION DIRECTA PERSONAL S/. 56,634.48

A RETRIBUCIONES COMPLEMENTARIAS-CONTRATOS A PLAZO FIJO S/. 49,920.00

01 JORNAL

DEL EMPLEADO EVENTUAL

CARGO N° DE PERSONAS MESES COSTO SUB TOTAL


SUPERVISOR DE OBRA 1.00 6.00 5,500.00 33,000.00
ASISTENTE DE SUPERVISOR DE OBRA 1.00 6.00 2,500.00 15,000.00
TOTAL 48,000.00

02 REFRIGERIO Y MOVILIDAD

DEL EMPLEADO EVENTUAL

CARGO N° DE PERSONAS MESES COSTO SUB TOTAL


SUPERVISOR DE OBRA 1.00 6.00 220.00 1,320.00
ASISTENTE DE SUPERVISOR DE OBRA 1.00 6.00 100.00 600.00
TOTAL 1,920.00

B OBLIGACIONES DEL EMPLEADOR S/. 6,014.40

01 SISTEMA NACIONAL DE PENSIONES (9%)

DEL EMPLEADO EVENTUAL


CARGO N° DE PERSONAS MESES COSTO SUB TOTAL
SUPERVISOR DE OBRA 1.00 6.00 495.00 2,970.00
ASISTENTE DE SUPERVISOR DE OBRA 1.00 6.00 225.00 1,350.00
TOTAL 4,320.00

02 SOLIDARIDAD (2%) IES

DEL EMPLEADO EVENTUAL

CARGO N° DE PERSONAS MESES COSTO SUB TOTAL


SUPERVISOR DE OBRA 1.00 6.00 110.00 660.00
ASISTENTE DE SUPERVISOR DE OBRA 1.00 6.00 50.00 300.00
TOTAL 960.00
03 SEGURO COMPLEMENTARIO DE TRABAJO DE RIESGO (1.53%)

DEL EMPLEADO EVENTUAL


CARGO N° DE PERSONAS MESES COSTO SUB TOTAL
SUPERVISOR DE OBRA 1.00 6.00 84.15 504.90
ASISTENTE DE SUPERVISOR DE OBRA 1.00 6.00 38.25 229.50
TOTAL 734.40

C ESCOLARIDAD, AGUINALDOS Y GRATIFICACIONES S/. 700.08

01 AGUINALDOS POR ESCOLARIDAD


DEL EMPLEADO EVENTUAL
CARGO N° DE PERSONAS MESES COSTO SUB TOTAL
SUPERVISOR DE OBRA 1.00 6.00 25.00 150.00
ASISTENTE DE SUPERVISOR DE OBRA 1.00 6.00 25.00 150.00
TOTAL 300.00
RESUMEN PRESUPUESTO ANALITICO - SUPERVISION
UNIDAD EJECUTORA : MUNICIPALIDAD DISTRITAL DE OLLANTAYTAMBO
PROYECTO :"MEJORAMIENTO DEL SERVICIO DE GESTION URBANA DE LA LOCALIDAD DE OLLANTAYTAMBO"
DEPARTAMENTO :CUSCO
PROVINCIA : URUBAMBA
DISTRITO :OLLANTAYTAMBO
02 AGUINALDOS POR FIESTAS PATRIAS
DEL EMPLEADO EVENTUAL
CARGO N° DE PERSONAS MESES COSTO SUB TOTAL
SUPERVISOR DE OBRA 1.00 6.00 16.67 100.02
ASISTENTE DE SUPERVISOR DE OBRA 1.00 6.00 16.67 100.02
TOTAL 200.04

03 AGUINALDOS NAVIDAD
DEL EMPLEADO EVENTUAL
CARGO N° DE PERSONAS MESES COSTO SUB TOTAL
SUPERVISOR DE OBRA 1.00 6.00 16.67 100.02
ASISTENTE DE SUPERVISOR DE OBRA 1.00 6.00 16.67 100.02
TOTAL 200.04

COSTO DE PROYECTO POR ADMINISTRACION DIRECTA - EQUIPAMIENTO Y BIENES DURADEROS S/. 2,604.29

MATERIALES S/. 940.00


DESCRIPCION UND CANTIDAD P.U. SUB TOTAL
ARCHIVADORES LOMO ANCHO PARA FORMATO A-4 UND 8.00 5.50 44.00
DVD RW REGRADABLES UND 30.00 3.70 111.00
CLIP WINGO PEQUEÑO X 100 UND CJA 5.00 1.50 7.50
CUADERNO ESPIRALADO 200 HJAS UND 3.00 16.50 49.50
MICA P/ANILLADO TRANSPARENTE. T: A-4 UND 25.00 0.30 7.50
ESPIRAL D/PLÁSTICO. T:3 30MM. X 100 UND BOL 1.00 49.00 49.00
LAPICERO AZUL/NEGRO CJA 2.00 37.00 74.00
BOLÍGRAFO D/TINTA LIQUIDA. COLOR NEGRO/AZUL. PUNTA 45.00
UND 10.00 4.50
FINA
PAPEL BOND FOTOCOPIA D/80 GR. T: A-4 MLL 15.00 24.00 360.00
GOMA EN BARRA D/40 GR UND 7.00 3.50 24.50
NOTAS ADHESIVAS, COLORES VARIADOS. T: 3" X 3" O 56.00
PQT 7.00 8.00
EQUIVALENTE
PORTAMINA C/PUNTA METÁLICA, ANCHO D/TRAZO: 0.5 MM UND 5.00 13.00 65.00
REPUESTOS PARA PORTAMINA CJA 1.00 29.00 29.00
RESALTADOR UND 6.00 3.00 18.00
TOTAL 940.00

INSUMOS DE HIGIENE PERSONAL - PREVENCION DE INFECCIONES Y PROTECCION PERSONAL S/. 368.99


DESCRIPCION UND CANTIDAD P.U. SUB TOTAL
PAPEL TOALLA UND 4.00 3.50 14.00
ALCOHOL 96% L 2.00 20.00 40.00
JABÓN LÍQUIDO GAL 1.00 34.99 34.99
PAÑO INDUSTRIAL PARA DESINFECCIÓN X 1KILO UND 1.00 30.00 30.00
GORRA MAS PROTECTOR FACIAL CON LOGO UND 1.00 40.00 40.00
MASCARILLA DESECHABLE X 50 UND CJA 1.00 100.00 100.00
DISPENSADOR DE PAPEL TOALLA 2.50 0.00
MASCARILLA DE PROTECCION EXTERIOR (LAVABLE COLOR O UND 1.00 30.00 30.00
OVEROL RE - USABLE ANTIFLUIDO CON LOGO UND 1.00 80.00 80.00
TOTAL 368.99

COSTO DE PROYECTO POR ADMINISTRACION DIRECTA - OTROS S/. 1,295.30

01 MATERIALES DE ESCRITORIO
DESCRIPCIÓN UND. CANTIDAD P.U. SUB TOTAL
TONER PARA IMPRESORA UND 2.00 240.00 480.00
PAPEL BOND DE 80 GR A-4 MLL 4.00 50.00 200.00
CUADERNO 50 HJAS UND 3.00 5.00 15.00
BITÁCORAS UND 2.00 20.00 40.00
LIBRETA TOPOGRÁFICA FIELD BOOK UND 2.00 8.00 16.00
FILES COLOR AMARILLO CTO 3.00 15.00 45.00
FASTENER DE 50 UND CAJA 1.00 8.00 8.00
SOBRES MANILA CTO 1.00 20.00 20.00
PAPEL CARBON AZUL CJA 1.00 20.00 20.00
ARCHIVADOR DE PALANCA UND 8.00 10.00 80.00
SELLO DE OBRA UND 1.00 30.00 30.00
MEMORIA USB 1GB UND 1.00 50.00 50.00
BORRADOR DE LÁPIZ FABER CASTELL CAJA 2.00 5.00 10.00
CARTULINA CANSON PLGO 1.00 4.50 4.50
CINTA MASKINTEY 1/2" RLLO 1.00 7.56 7.56
CLIPS PEQUEÑOS CJA 1.00 1.50 1.50
CLIPS TIPO MARIPOSA CJA 1.00 1.50 1.50
RESALTADORES UND 4.00 5.00 20.00
PERFORADOR UND 1.00 25.00 25.00
ENGRAMPADOR UND 1.00 28.00 28.00
TINTA PARA TAMPON UND 1.00 15.00 15.00
WINCHA DE 8 M STANLEY UND 1.00 18.00 18.00
ESPRIRALES DE 1/2" CIENTO 1.00 20.00 20.00
MICAS TRANSPARENTES CIENTO 1.00 40.00 40.00
WINCHA DE 50M UND 1.00 90.00 90.00
CHINCHES CJA 1.00 2.00 2.00
GRAPAS CJA 1.00 8.00 8.00
TOTAL 1,295.30

2.6.22.35 COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA - SERVICIOS S/. 14,840.75


DESCRIPCION CANT CANT MONTO SUB TOTAL
ALQUILER DE CAMIONETA MAQUINA SECA MES 4.00 3,000.00 12,000.00
RUPTURA DE BRIQUETAS SERV 10.00 30.00 300.00
LEVANTAMIENTO TOPOGRAFICO SERV 2.00 500.00 1,000.00
FOTOCOPIAS SUPERVISION GLB 1.00 40.75 40.75
ALQUILER DE OFICINA (RESIDENCIA DE OBRA) MES 6.00 250.00 1,500.00
TOTAL 14,840.75

TOTAL GASTOS DE SUPERVISOR 74,079.52


RESUMEN PRESUPUESTO ANALITICO - LIQUIDACION TECNICA FINANCIERA
UNIDAD EJECUTORA : MUNICIPALIDAD DISTRITAL DE OLLANTAYTAMBO
:"MEJORAMIENTO DEL SERVICIO DE GESTION URBANA DE LA LOCALIDAD DE
PROYECTO
OLLANTAYTAMBO"
DEPARTAMENTO :CUSCO
PROVINCIA : URUBAMBA
DISTRITO :OLLANTAYTAMBO

CODIGO ESPECIFICA DE GASTOS G.SUPER.


0 COSTO DE CONSTRUCCION POR ADMINISTARCION DIRECTA P 12,489.89
0 COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA - B 1,990.37
0 COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA - S 10,189.24
TOTAL GASTOS SUPERVISION Y LIQUIDACION 24,669.50

DESAGREGADO DEL PRESUPUESTO ANALÍTICO

GASTOS DE LIQUIDACION TECNICA FINANCIERA

2.6.22.33 COSTO DE CONSTRUCCION POR ADMINISTARCION DIRECTA PERSONAL S/. 12,489.89

A RETRIBUCIONES COMPLEMENTARIAS-CONTRATOS A PLAZO FIJO S/. 11,300.00

01 JORNAL

DEL EMPLEADO EVENTUAL

CARGO N° DE PERSONAS MESES COSTO SUB TOTAL


INGº CIVIL/ARQTO PARA LIQUIDACION (15 DIAS) 1.00 1.00 5,500.00 5,500.00
CONTADORA (15 DIAS) 1.00 1.00 3,000.00 3,000.00
DIBUJANTE DE PLANOS 1.00 1.00 2,000.00 2,000.00
PERSONAL DE APOYO (05 DIAS) 1.00 1.00 800.00 800.00
TOTAL 11,300.00

B OBLIGACIONES DEL EMPLEADOR S/. 1,189.89

01 SISTEMA NACIONAL DE PENSIONES (9%)

DEL EMPLEADO EVENTUAL


CARGO N° DE PERSONAS MESES COSTO SUB TOTAL
INGº CIVIL/ARQTO PARA LIQUIDACION (15 DIAS) 1.00 1.00 495.00 495.00
CONTADORA (15 DIAS) 1.00 1.00 270.00 270.00
DIBUJANTE DE PLANOS 1.00 1.00 180.00 180.00
PERSONAL DE APOYO (05 DIAS) 1.00 1.00 72.00 72.00
TOTAL 1,017.00

03 SEGURO COMPLEMENTARIO DE TRABAJO DE RIESGO (1.53%)

DEL EMPLEADO EVENTUAL


CARGO N° DE PERSONAS MESES COSTO SUB TOTAL
INGº CIVIL/ARQTO PARA LIQUIDACION (15 DIAS) 1.00 1.00 84.15 84.15
CONTADORA (15 DIAS) 1.00 1.00 45.90 45.90
DIBUJANTE DE PLANOS 1.00 1.00 30.60 30.60
PERSONAL DE APOYO (05 DIAS) 1.00 1.00 12.24 12.24
TOTAL 172.89

2.6.22.34 COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA - BIENES S/. 1,990.37


COMBUSTIBLES , CARBURANTES Y LUBRICANTES S/. 980.00
DESCRIPCION UND CANTIDAD P.U. SUB TOTAL
PETROLEO GLN 70.00 14.00 980.00
TOTAL 980.00
RESUMEN PRESUPUESTO ANALITICO - LIQUIDACION TECNICA FINANCIERA
UNIDAD EJECUTORA : MUNICIPALIDAD DISTRITAL DE OLLANTAYTAMBO
:"MEJORAMIENTO DEL SERVICIO DE GESTION URBANA DE LA LOCALIDAD DE
PROYECTO
OLLANTAYTAMBO"
DEPARTAMENTO :CUSCO
PROVINCIA : URUBAMBA
DISTRITO :OLLANTAYTAMBO

2.6.22.36 COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA - OTROS S/. 641.38

01 MATERIALES DE ESCRITORIO
DESCRIPCIÓN UND. CANTIDAD P.U. SUB TOTAL
TONER PARA IMPRESORA UND 1.00 240.00 240.00
PAPEL BOND DE 80 GR A-4 MLL 2.00 50.00 100.00
ARCHIVADOR DE PALANCA UND 2.00 10.00 20.00
SELLO DE OBRA UND 2.00 30.00 60.00
MEMORIA USB 1GB UND 1.00 50.00 50.00
TINTA PARA TAMPON UND 1.00 3.14 3.14
ESPRIRALES DE 1/2" CIENTO 1.00 20.00 20.00
MICAS TRANSPARENTES CIENTO 1.00 40.00 40.00
WINCHA DE 50M UND 1.00 90.00 90.00
CHINCHES CJA 1.00 2.00 2.00
GRAPAS CJA 1.00 8.00 8.00
TOTAL 641.38

INSUMOS DE HIGIENE PERSONAL - PREVENCION DE INFECCIONES Y PROTECCION PERSONAL S/. 368.99


DESCRIPCION UND CANTIDAD P.U. SUB TOTAL
PAPEL TOALLA UND 4.00 3.50 14.00
ALCOHOL 96% L 2.00 20.00 40.00
JABÓN LÍQUIDO GAL 1.00 34.99 34.99
PAÑO INDUSTRIAL PARA DESINFECCIÓN X 1KILO UND 1.00 30.00 30.00
GORRA MAS PROTECTOR FACIAL CON LOGO UND 1.00 40.00 40.00
MASCARILLA DESECHABLE X 50 UND CJA 1.00 100.00 100.00
DISPENSADOR DE PAPEL TOALLA 2.50 0.00
MASCARILLA DE PROTECCION EXTERIOR (LAVABLE COLOR O UND 1.00 30.00 30.00
OVEROL RE - USABLE ANTIFLUIDO CON LOGO UND 1.00 80.00 80.00
TOTAL 368.99

2.6.22.35 COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA - SERVICIOS S/. 10,189.24


DESCRIPCION CANT CANT MONTO SUB TOTAL
ALQUILER DE CAMIONETA MAQUINA SERVIDA VIAJE 2.00 5,000.00 10,000.00
PASAJES Y OTROS GASTOS MES 0.00 800.00 0.00
FOTOCOPIAS Y OTROS GASTOS SERV 1.00 189.24 189.24
ALQUILER DE CAMIONETA MAQUINA SECA SUPERVI VIAJE 0.00 200.00 0.00
TOTAL 10,189.24

TOTAL GASTOS DE LIQUIDACION 24,669.50

You might also like