FOB Superstructure South FOB
FOB Superstructure South FOB
1. Regular
diposal of
unwanted
construction 1. Regular
material/ disposal of
scrap from unwanted
existing material from
SFOB, SFOB &
grounded working area
caissons & over mass
1. Slip injury/ hit working area concrete being
1. Improper
injury/ fatal over mass carried out.
material
concrete and
stacking on
Housekee 2. Fall from maintain good 2. Proper
existing south
ping of the height . houskeeping planning for Regular Tool box Site SIC/store
FOB N 3 3 9 M X X X √ X 2 2 4 L
work area regularly. required talk and Admin
3. Property material is
2. Inadequate
damage 2. Preplan the being done
space
activity and and only
only minimum required items
material shall materials are
be kept at stacked at
work location work location.
as per
requirement 3. Dustbin
provided at all
3. Provide location
dustbin in
every
location .
1. All usable
1. All usable combustible
combustible matérials are
matérials shall being stacked
be stacked in properly.
a proper
manner. 2. All
1. Burn injury workmen’s
2. Ensure no including
Fire 1
2. Property Y 4 3 H √ X √ √ √ workmen’s visitor are 2 2 4 L SIC/Admin/HSE
2
damage smoke at trained during
works place. induction not
to smoke at
3. Allocate site premises
smoking zone
at site 3.Smoking
prémisses zone allocated
* Incase of legal requirement ‘Y’ shall be mentioned in the column of legal & base risk level shall be considered “High” irrespective of score of risk assessment. ERL & ARR shall be indicated with the word “Legal” to indicate the importance
of legal requirement.
** After every incident HIRAC of the particular activity shall be revised.
Format No.: HCC F 01 15 01, Rev. 05, Rev. date: 10.02.09 Page 2 of 19
OH & S MANAGEMENT SYSTEM
HAZARD IDENTIFICATION, RISK ASSESSMENT & DETERMINING CONTROL
1. Rigid
1.Provide barricade
rigid barricade provided
* Incase of legal requirement ‘Y’ shall be mentioned in the column of legal & base risk level shall be considered “High” irrespective of score of risk assessment. ERL & ARR shall be indicated with the word “Legal” to indicate the importance
of legal requirement.
** After every incident HIRAC of the particular activity shall be revised.
Format No.: HCC F 01 15 01, Rev. 05, Rev. date: 10.02.09 Page 3 of 19
OH & S MANAGEMENT SYSTEM
HAZARD IDENTIFICATION, RISK ASSESSMENT & DETERMINING CONTROL
1.Ensure 1.Uniformity of
uniformity & gruond is being
stability of checked before
ground deploying
before workmen.
Improper
working deploying 2.Effective
Platform / workmens. signage is being Survey In-
Minor Injuries/
grounds for N 3 3 9 M 3 x 3 3 3 2. Use 3 2 6 L charge/Concern
LTI used
survey SIC
operation on effective 3.Proper PPE’s
land
warning / are being used.
caution
signages if
required .
3.Use proper
PPEs
* Incase of legal requirement ‘Y’ shall be mentioned in the column of legal & base risk level shall be considered “High” irrespective of score of risk assessment. ERL & ARR shall be indicated with the word “Legal” to indicate the importance
of legal requirement.
** After every incident HIRAC of the particular activity shall be revised.
Format No.: HCC F 01 15 01, Rev. 05, Rev. date: 10.02.09 Page 5 of 19
OH & S MANAGEMENT SYSTEM
HAZARD IDENTIFICATION, RISK ASSESSMENT & DETERMINING CONTROL
1. Secured
platform 1. Firm Platform
with is being used.
adequate
width should 2. Safety belts
Improper be provided. and life jacket
1. Drowning if
/inadequate are being used
working over 2.Use of life by the survey
working area SIC/Survey
water N 3 3 9 M 3 x 3 3 3 jackets and team. 3 2 6 L
for survey safety belt Incharge/HSE
2.Property while 3. Ring buoys
operation at
damage working with rope are
offshore above water. being provided
at all prominent
3. Provide marine location.
lifebuoys
with rope.
1.Use proer 1.Proper PPE’s
PPE’s Like like gumboot,
gumboot, ruber
ruber hand handgloves etc
gloves etc are being used.
Water logged/
1.Physical 2.Fogging/ 2.Fogging/pest Survey In
accumulated N 3 3 9 M 3 X 3 3 X 3 2 6 L
injury pest control control is being charge /Admin
areas
in the water done to avoid
logged area mosquitoes
to control breeding.
mosquitoe
breeding.
5. Material/ EquiPEHnt /Tools and tackles /Machinery shifting to and from location
1) Proper 1) Proper
leveled road leveled road
free from pot free from pot
holes. holes are being
2) Proper maintained.
Trailer Poor Road Vehicle PEH/ PCH /
N 3 3 9 M x x 3 3 x drainage 2 2 4 L
operation Condition toppling SIC/ Site Eng/
system to 2) Drainage
prevent system
water maintained
stagnation
on road.
* Incase of legal requirement ‘Y’ shall be mentioned in the column of legal & base risk level shall be considered “High” irrespective of score of risk assessment. ERL & ARR shall be indicated with the word “Legal” to indicate the importance
of legal requirement.
** After every incident HIRAC of the particular activity shall be revised.
Format No.: HCC F 01 15 01, Rev. 05, Rev. date: 10.02.09 Page 6 of 19
OH & S MANAGEMENT SYSTEM
HAZARD IDENTIFICATION, RISK ASSESSMENT & DETERMINING CONTROL
* Incase of legal requirement ‘Y’ shall be mentioned in the column of legal & base risk level shall be considered “High” irrespective of score of risk assessment. ERL & ARR shall be indicated with the word “Legal” to indicate the importance
of legal requirement.
** After every incident HIRAC of the particular activity shall be revised.
Format No.: HCC F 01 15 01, Rev. 05, Rev. date: 10.02.09 Page 7 of 19
OH & S MANAGEMENT SYSTEM
HAZARD IDENTIFICATION, RISK ASSESSMENT & DETERMINING CONTROL
Crawler
Only
crane Hit injury / Fall Green card
authorized
opération of material holder
Unauthorized operator PEH/ SIC/ Site
for Y 5 3 15 H 3 X X 3 X operators are 3 1 3 L
Operation allowed to Engineer/PD
matériel Uncontrolled operating the
operate the
handling operation crane.
crane.
1. Verify 1. Weight of an
weight of an object is being
object to be verified.
lifted against
safe working 2. Load chart
Fall of material load. displayed. PEH/PCH/ SIC/
Overloading Y 5 3 15 H 3 X 3 3 X 3 2 6 L
/ hit injury 2. Display Site Engineer
the load
chart in
operator
Cabin.
* Incase of legal requirement ‘Y’ shall be mentioned in the column of legal & base risk level shall be considered “High” irrespective of score of risk assessment. ERL & ARR shall be indicated with the word “Legal” to indicate the importance
of legal requirement.
** After every incident HIRAC of the particular activity shall be revised.
Format No.: HCC F 01 15 01, Rev. 05, Rev. date: 10.02.09 Page 8 of 19
OH & S MANAGEMENT SYSTEM
HAZARD IDENTIFICATION, RISK ASSESSMENT & DETERMINING CONTROL
1. Depute 1. Deputed
trained & trained &
competent competent
signal man. signal man.
* Incase of legal requirement ‘Y’ shall be mentioned in the column of legal & base risk level shall be considered “High” irrespective of score of risk assessment. ERL & ARR shall be indicated with the word “Legal” to indicate the importance
of legal requirement.
** After every incident HIRAC of the particular activity shall be revised.
Format No.: HCC F 01 15 01, Rev. 05, Rev. date: 10.02.09 Page 9 of 19
OH & S MANAGEMENT SYSTEM
HAZARD IDENTIFICATION, RISK ASSESSMENT & DETERMINING CONTROL
8. Dewatering operation
Adequate
height of
flushing pipe
should be L Shape PCH/ PEH /SIC/
Slippery work
1. Personnel maintained flushing pipe of Electrical dept./
location.
Injury. such that it adequate height Concern
N 3 2 6 M x x 3 3 x 3 1 3 L
2. Property doesnot block is being used for Engineer
Damage the access dewatering
and spillage activity.
of slush on
existing FOB
deck .
* Incase of legal requirement ‘Y’ shall be mentioned in the column of legal & base risk level shall be considered “High” irrespective of score of risk assessment. ERL & ARR shall be indicated with the word “Legal” to indicate the importance
of legal requirement.
** After every incident HIRAC of the particular activity shall be revised.
Format No.: HCC F 01 15 01, Rev. 05, Rev. date: 10.02.09 Page 10 of 19
OH & S MANAGEMENT SYSTEM
HAZARD IDENTIFICATION, RISK ASSESSMENT & DETERMINING CONTROL
* Incase of legal requirement ‘Y’ shall be mentioned in the column of legal & base risk level shall be considered “High” irrespective of score of risk assessment. ERL & ARR shall be indicated with the word “Legal” to indicate the importance
of legal requirement.
** After every incident HIRAC of the particular activity shall be revised.
Format No.: HCC F 01 15 01, Rev. 05, Rev. date: 10.02.09 Page 11 of 19
OH & S MANAGEMENT SYSTEM
HAZARD IDENTIFICATION, RISK ASSESSMENT & DETERMINING CONTROL
1. Adequate
1) Adequate
support shall
support is being
be provided on
provided by
both side of
using turnbuckle
wall.
2)Awareness to
2. Bottom
workers
reinforcement
provided not to
bars shall be
dismantle
cut only after
bottom portion
dismantling of
of wall
wall.
reinforcement till
Press between 3) caisson wall
completion of
the object / shall be to be
Fall of breaking dismantling. PCH /
property N 4 3 12 M 3 X 3 3 3 dismantled in 3 2 6 L Tool Box talk
wall 3) caisson walls SIC/PEH /HSE
damage / hit parts.
are being
by injury 4) Adequate
dismantled in
Hook point
parts.
shall be
4) Hook points
provide for
are being
lifting of wall.
provided.
5) Demolition
5) Demolition
activity shall be
activity is carried
carried out
out under
strictly under
supervision of
the supervision
component
of competent
person.
person.
10. Cleaning of mass concrete top and existing FOB RCC structure
* Incase of legal requirement ‘Y’ shall be mentioned in the column of legal & base risk level shall be considered “High” irrespective of score of risk assessment. ERL & ARR shall be indicated with the word “Legal” to indicate the importance
of legal requirement.
** After every incident HIRAC of the particular activity shall be revised.
Format No.: HCC F 01 15 01, Rev. 05, Rev. date: 10.02.09 Page 12 of 19
OH & S MANAGEMENT SYSTEM
HAZARD IDENTIFICATION, RISK ASSESSMENT & DETERMINING CONTROL
1.Trained 1.Trained
personnel persons are
should be being deployed
deployed. for the job.
Cleaning 2.PPEs like 2. Required
of mass googles, nose PPE like
1. Mishandling mask, ear googles, nose
concrete Tool box talks on
of high plug . dangri mask, ear plug . PCH/ PEH /SIC/
top etc should be dangri etc are safe operation of
pressure 1.Eye and Site Engineer
surface by N 3 3 9 M X X 9 9 9 used. being used. 2 2 4 L high pressure water
water body injury /HSE/ Electrical
using high 3. High 3. High jet.
hoses. Dept
pressure pressure pressure water .
water jets jets are being
pump and must not be operated by
water jet aimed trained people.
towards any
person or
delicate
instrument
* Incase of legal requirement ‘Y’ shall be mentioned in the column of legal & base risk level shall be considered “High” irrespective of score of risk assessment. ERL & ARR shall be indicated with the word “Legal” to indicate the importance
of legal requirement.
** After every incident HIRAC of the particular activity shall be revised.
Format No.: HCC F 01 15 01, Rev. 05, Rev. date: 10.02.09 Page 13 of 19
OH & S MANAGEMENT SYSTEM
HAZARD IDENTIFICATION, RISK ASSESSMENT & DETERMINING CONTROL
* Incase of legal requirement ‘Y’ shall be mentioned in the column of legal & base risk level shall be considered “High” irrespective of score of risk assessment. ERL & ARR shall be indicated with the word “Legal” to indicate the importance
of legal requirement.
** After every incident HIRAC of the particular activity shall be revised.
Format No.: HCC F 01 15 01, Rev. 05, Rev. date: 10.02.09 Page 14 of 19
OH & S MANAGEMENT SYSTEM
HAZARD IDENTIFICATION, RISK ASSESSMENT & DETERMINING CONTROL
* Incase of legal requirement ‘Y’ shall be mentioned in the column of legal & base risk level shall be considered “High” irrespective of score of risk assessment. ERL & ARR shall be indicated with the word “Legal” to indicate the importance
of legal requirement.
** After every incident HIRAC of the particular activity shall be revised.
Format No.: HCC F 01 15 01, Rev. 05, Rev. date: 10.02.09 Page 15 of 19
OH & S MANAGEMENT SYSTEM
HAZARD IDENTIFICATION, RISK ASSESSMENT & DETERMINING CONTROL
1. Stack 1. Fabricated
fabricated rebar are
rebar stacked by its
Stacking
according to dia and length . PCH/ SIC/ Site
of Improper 1. Tool Box talks.
its length and Engineer/ site
fabricated stacking of Trips, Fall & 2. Improvement
N 3 3 9 M X X 3 3 X dia wise. 2.. Regularly 2 2 4 L super visor
rebar at fabricated Hit Injury. in stacking of
2. Regular housekeeping is /HSE
interface rebar . rebars
housekeeping being carried
area
of the area. out in the work
area.
1. Ensured
1. Ensure
reinforcement
proper tying.
binding and its
alignment as
2. Give proper
per check list.
instructions to
the workmen.
2. Deployed
trained and
3. Deploy
experienced
trained &
workforce for
experienced
the activity.
workforce for
the activity.
1. Loose 3 Tool box talk
1. Slippage of
binding of is being
tied rebar’s. 4.. Ensure
Manual Reinforcement conducted
proper co-
placement regularly.
2. Personnel ordination and Usage of cotton Concern Site
of 2. Improper co- N 3 3 9 M X X X 3 3 2 2 4 L
injury communicatio hand gloves Eng /HSE
rebar ,cov ordination 4. Proper
n among the
er block coordination
3. Structure crew.
3.Inexperienced maintained
Damage
persons between the
5. Ensure
worker
sharp edges
of binding
4. Ensured
wire ends do
sharp edges of
not damage
binding wire are
the body
Kept bend
downward.
5. Use cotton
5. cotton hand
hand gloves,
gloves and
safety shoes
safety shoes
etc.
are being used
by workmen
13 Concreting
* Incase of legal requirement ‘Y’ shall be mentioned in the column of legal & base risk level shall be considered “High” irrespective of score of risk assessment. ERL & ARR shall be indicated with the word “Legal” to indicate the importance
of legal requirement.
** After every incident HIRAC of the particular activity shall be revised.
Format No.: HCC F 01 15 01, Rev. 05, Rev. date: 10.02.09 Page 16 of 19
OH & S MANAGEMENT SYSTEM
HAZARD IDENTIFICATION, RISK ASSESSMENT & DETERMINING CONTROL
1) Proper 1) equipment
positioning of are being
the equipment placed on
on stable & leveled & stable
leveled ground ground surface
surface 2) Periodic
2) Inspection of Inspection are
all equipment & being carried
implementing out for various
green tag checks & green
Boom system. tag system
Toppling of
placer 3) Depute implemented.
equipment
/Transit authorized/exp 3) Deputed PEH /SIC/
Toppling of may cause hit
Mixer & N 4 3 12 M 3 x 3 3 X erienced authorized 3 2 6 L Concern
equipment to person &
Concrete operator. operator. Engineer
property
pump 4) Depute 4) Deputed
damage
operation experienced experienced
signal man. signal man.
5) Barricade 5) Entry of any
the working unauthorized
area to person in work
Prohibit entry premises
of any prohibited.
unauthorized 6) Wharves &
person in working area to
working be barricaded.
premises.
1.Proper
1) Proper
signaling
signaling
between
maintain
Hitting operator & pipe
between
personnel with handling
operator & pipe SIC/ Concern
concrete Serious injury N 4 2 8 M 3 X 3 9 9 persons. 3 2 6 L
handling Engineer
discharge pipe 2.Provide
persons.
(Swinging) safety helmet
2) Safety
for preventing
helmet are
any head
being used.
injury.
1) Provide
hand gloves,
gumboots, 1) Hand gloves,
goggles, dust gumboots, dust
Skin disease & mask etc. mask, goggles
Concrete eyes injury & 2) Schedule are being used.
PCH/SIC/
contact with respiratory the time to 2) workforce
N 4 2 8 M X X 3 9 9 3 1 3 L Concern
skin, eye and problems change are deployed in
Engineer/PD
inhalation due to workforce to shifts to
concrete minimize the minimize the
skin, eye concrete
contact & exposure.
inhalation due
to concrete.
* Incase of legal requirement ‘Y’ shall be mentioned in the column of legal & base risk level shall be considered “High” irrespective of score of risk assessment. ERL & ARR shall be indicated with the word “Legal” to indicate the importance
of legal requirement.
** After every incident HIRAC of the particular activity shall be revised.
Format No.: HCC F 01 15 01, Rev. 05, Rev. date: 10.02.09 Page 17 of 19
OH & S MANAGEMENT SYSTEM
HAZARD IDENTIFICATION, RISK ASSESSMENT & DETERMINING CONTROL
1.Provide/ 1. Safety
Wear safety goggles,
goggles, gumboots,
gumboots, rubber gloves
rubber gloves and helmet
and helmet.etc provided to all
1.splashing of
2. Deploy non workmen’s.
concrete on
allergic 2. Non allergic
body
1.Eye injury employees in employees are
2. Concrete
2.Skin injury concrete engaged for PCH/ SIC/ Site
Placement allergy
3.white finger N 2 2 4 L X X 9 9 9 leveling concreting. 1 2 2 L Engineer/ Site
of concrete 3. Use of un
4. property 3. Use serviced 3.Serviced Supervisor
serviced
damage vibrator, vibrator with
vibrator
provide proper guarding
4. Health
withguard on of vibrator are
hazard
rotating parts being used
while moving. 4.workmen are
4. Allow the being deployed
workmen to on hourly basis
work on hourly
rotation basis
1. Provide 1.Proper
proper access Ladder /working
& egress. platform being
2.Use provided
appropriate 2.Proper PPE's
1.Fall of PPEs like double 1. Toolbox talk
Curing by PCH/ SIC/ Site
Person from 3.Training & body harness,
water/ Engineer/ Site
height 1. Sever injury. N 2 2 4 L X X 9 9 9 awareness to goggles , 1 2 2 L 2. Use of double
curing Supervisor /
2.skin infection workers rubber hand lanyard full
compound HSE.
/allergy gloves body harness
are being used.
3.Trained
workers
deployed for the
job.
1.Provide 1.Guard
proper guards provided for
1. Cut by
& good quality grinding wheel
grinding
of wheels for and good 1 Training and
wheel
grinding works. quality wheel awareness
1.Serious
being used for programs for PEE/PCH/ SIC/
Repair of 2. Electrocuti injury
2.Used the work. safe work practice Site Engineer/
concrete on N 2 2 4 L X X 9 9 9 1 2 2 L
appropriate 2.Proper PPE's 2. Use of double Foreman
surface. 2.Electrocution
PPES as per like face lanyard safety belt
3. Cement
specific shield ,helmet to be
powder
requirement are used implemented.
flash in
.
eye
* Incase of legal requirement ‘Y’ shall be mentioned in the column of legal & base risk level shall be considered “High” irrespective of score of risk assessment. ERL & ARR shall be indicated with the word “Legal” to indicate the importance
of legal requirement.
** After every incident HIRAC of the particular activity shall be revised.
Format No.: HCC F 01 15 01, Rev. 05, Rev. date: 10.02.09 Page 18 of 19
OH & S MANAGEMENT SYSTEM
HAZARD IDENTIFICATION, RISK ASSESSMENT & DETERMINING CONTROL
Proper lighting
arrangements to
Adequate
be done during
Improper Hit Injury/ Illumination of PEE
night time, and
illumination Property N 4 3 12 H X X √ √ Y is being 3 2 6 L Tool box talk /PCH / Concern
check the
damage/ provided. Engineer
electrical cables
condition
1.Deputing 1.Deputed
qualified & qualified &
experienced, experienced,
authorized authorized
Electrician with Electrician
valid license. with valid
2.Provide license.
proper earthling 2. Provided
connection of proper
wires with good earthling
condition connection of
3.Inspect & wires with
check electrical good
equiPEHnt condition.
before use. 3.Electrical
4.Cable shift at EquiPEHnts
height or from are Inspected
the movement & checked
Improper
Electrical short area to avoid before use.
electrical
circuit, obstruction & 4.Cable
connection,
Shock, fall of person. shifted at Placing of Caution PEE
Damage,
Serious injury, Y 5 3 15 H X X 9 9 9 5.Caution board height or from 3 3 9 M board on /PCH / Concern
ruptured wire
Fall by “Danger, 440v” the movement equiPEHnt. Engineer
used,
obstruction of to be placed on area to avoid
Laying of
wire. equiPEHnt obstruction.
cables
6.Provide ELCB 5.Provide d
for electrical ELCB for
distribution box electrical
& electrical distribution
equiPEHnt box &
7.Provide PPE. electrical
equiPEHnt
and regular
inspection of
the same is
ensured .
6.PPEs like
safety shoes,
electrical high
duty rubber
hand gloves
etc are being
used.
* Incase of legal requirement ‘Y’ shall be mentioned in the column of legal & base risk level shall be considered “High” irrespective of score of risk assessment. ERL & ARR shall be indicated with the word “Legal” to indicate the importance
of legal requirement.
** After every incident HIRAC of the particular activity shall be revised.
Format No.: HCC F 01 15 01, Rev. 05, Rev. date: 10.02.09 Page 19 of 19