CSDII Assignment
CSDII Assignment
Cover
UNIVERSITI TUNKU ABDUL RAHMAN
ACADEMIC YEAR 2023/2024
GROUP ASSIGNMENT
Name Student ID
TERRY TAN AN YIK 1902841
ARAVINDA REDDY A/L THIAKARAJAN 2006150
ONG CHONG XIAN 2006615
SHIO ZIN-E 2004920
THONG JUN JET 1902990
Marking Guidelines
Name Student ID
TERRY TAN AN YIK 1902841
Marking Guidelines
Items Allocated Marks Scored Marks
Hand calculations - loading
analysis and design for column 15%
Design spreadsheet - loading 20%
analysis and design for column 5%
1
PART 1:
HAND CALCULATIONS FOR LOADING ANALYSIS FOR COLUMN (F/1) FROM STUMP TO
ROOF LEVEL
Appendix B
Appendix B
Appendix B
Appendix B
Appendix B
Appendix B
Appendix B
Appendix B
Appendix B
Appendix B
Appendix B
Appendix B
Appendix B
Appendix B
Appendix B
Appendix B
Appendix B
Appendix B
Appendix B
Appendix B
Appendix B
Appendix B
Appendix B
Appendix B
Appendix B
Appendix B
Appendix B
Appendix B
Appendix B
Appendix B
Appendix B
Appendix B
Appendix B
Appendix B
Appendix B
Appendix B
Appendix B
PART 2:
HAND CALCULATION FOR THE SIZE ESTIMATION OF A PAD FOOTINGS FULFILLING
THE SERVICEABILITY REQUIREMENTS
Appendix B
Appendix B
PART 3:
HAND CALCULATIONS FOR DESIGNING PAD FOOTINGS & DESIGN SPREADSHEET FOR
PAD FOOTINGS WITH SOIL BEARING CAPACITY = 200 kN/m2
Appendix B
Appendix B
Appendix B
Appendix B
Appendix B
Appendix B
Appendix B
Appendix B
1
PART 1:
HAND CALCULATIONS FOR LOADING ANALYSIS FOR COLUMN (E/1) FROM STUMP TO
ROOF LEVEL
CamScanner
CamScanner
CamScanner
CamScanner
CamScanner
CamScanner
CamScanner
CamScanner
CamScanner
CamScanner
CamScanner
CamScanner
CamScanner
CamScanner
CamScanner
CamScanner
CamScanner
CamScanner
CamScanner
CamScanner
CamScanner
CamScanner
CamScanner
CamScanner
CamScanner
CamScanner
CamScanner
CamScanner
CamScanner
CamScanner
CamScanner
Y
1500
H12-250-BT
750
225
SECTION Y-Y
H12-250-BT
1500 225
400
750
H12-250-BB
X H12-250-BB X
300
Y
750 750
400
Name Student ID
THONG JUN JET 1902990
Marking Guidelines
Items Allocated Marks Scored Marks
Hand calculations - loading
analysis and design for column 15%
Design spreadsheet - loading 20%
analysis and design for column 5%
1
PART 1:
HAND CALCULATIONS FOR LOADING ANALYSIS FOR COLUMN (F/1) FROM STUMP TO
ROOF LEVEL
Appendix B
life:50
Design years
class:X C3
Exposure
size of 20mm
=
aggregates
concrete strength, Jck > superstructure 25N mm"
=
substructure 30N
=
mm"
s lab
A
slab 1 50
thickness: mm
slab
assume
non-suspended
Gp, finishes 10
=
kN m2
floor:2.0kN m"
Ok,
2.5 kN m2
Qu, stairs:
GK, finishes:1.5 kN m2
Qk =
2.0kN m2
B B rick wall
G1, Wall=2.6 kN m2
C Beam
D Column
column DI
Roof floor
14 >2A? >3A
2810 1786
slab
analysis
RS 2
2810
Ly 4596
I
- 1.84 2 (two way slabs
↳x 2500
17003400
2
tan 45°=
1250
RS 3
=
x 1270 mm
12502508
RS 3
RS 2
4596
3400
Ly - - 1.2 <2 (two way slab) illustration
Lu 2810
x
tan 450 =
1700
R -
1700 mm
Appendix B
RS2
I 0.018kN m
m)
1000
I
0.031kN m
kN m2
1.250m
x
I
0.375 kN m
m3
m3
GK, beam:25kN 0.225m
x 0.3
x m
- 1.69 kN m
I
4.69 kN
m
m2
1.88
=
kN m
Appendix B
RS 3
m2 x
1.7 m
I
0.024 kN m
m)
1000
I
0.031kN m
kN m2
x m
=0.51 kN m
m3
m3
GK, beam:25kN 0.225m
x 0.3
x m
-
1.69 kN m
=6.38 kN
m
m2
2.55
=
kN m
Appendix B
variable load
RS 2
x 1.25m
I
2.81 kN m
maintenance
=
0.25 kN m2)
I 0.31 kN m
m2 x 1.25
m
=2.5 kN m
RS 3
x 1.7 m
I
1.11 kN m
maintenance 0.25
=
kN m2)
I
0.43 kN m
m2 x 1.7 m
=3.4 kN m
Appendix B
Action
analysis
Beam RBD1- 2
=
+
+ + + +
0.51 6.38
+
2.55)kNm
+
- 18. 18 kN m
IQ, (2.81
=
+
0.31 +
2.5 + 1.11 0.43
+
3.4)
+ kN m
10.56 kN
=
Wa 1.35 (18.18)
=
1.5(10.56)
+
- 40.38 kN m
WL
shear=
2
- 40.38 kN m 2.81
x m
56.73
=
kN
wL"
Moment:
12
=40.38 kN m x (2.81 m)
=
159.42 kNm
40.38kNm
159.42
-
~v
↓ 159.42 RB D 1 -
2
2.Y
-
2
X A
56.73 56.73
Appendix B
Beam RB 1 D-E
m
=
8.68
=
kN m
IQk =
(0.81 + 0.31 2.5)
+
kN m
-
3.62 kN m
1.35(8.68) 1.5(3.62)
Wa
I +
-
17. 15kN m
wL
Shear=
2
17. 15 2.5
x
-
-
21.44 kN
2
WL
Moment:
12
=17.15 x 2.52
12
I 8.93 kNm
1.15kN m
8.93
-x2V2.5
-
↓
a
8.93 RB 1 D -
21.44 21.44
Appendix B
Beam RB 1 2- D
[Gk (0.024 =
+
0.031 0.51
+
1.69
+
+
6.38 +
2.55) kN m
- 11. 19 kN m
IQ, (2.81 =
+ 0.31 2.5)
+
kN m
- 5.62 kN m
- 23.54kN m
wL
Shear=
2
23 54 x 3.4
-
-
40.02 kN
2
WL
Moment:
12
- 23.54x 3.42
12
22.68 kNm
=
22 -
68
~
23.54KNm↓
xv v
A
2
22.68 RB 1 c -
D
3.4
40.02 40.02
Member -
stiffness
i) minor ax is
-
x
54 K beam
= 0.5 x bh
2 122
2810
0.3
E 2568 3150
=
0.5 x
0.225 X
12 X 2. 81
3
9.01
= 10-5
x m
b43
kcolumn =
12L
column clear
height 3150mm -300mm 0.43
=
0.2 2 5 x
=
12 2.85
x
=2850 mm
4.21 10-4m
=
Ik 9.01
=
x 10-5 +
4.21 x 10
-
4
-
5.11 10-4m
x
I1
5. 10-4 m
x
0.8 2
=
Appendix B
26.57 kN
=
column moment, RF =
0.8 2 (26.57 kNM)
=21. 79 kNm
ii mayor axis
K beam
= 0.5 x bh
122
3400
2
D
=
0.225 X
0.3
0.5 x
2810
12 X 3 4
2568
·
E
3150
- 7.44 10-5
x m3
K beam bh?
0.5 X
=
2 122
column clear
height 3150mm
=
-300mm =
0.5
0.225 0.33
x
X
=2850 12 X 2.5
mm
1.01
=
x 10-4 m3
b43
kcolumn =
12L
=0.4 0
x -
2253
12 2.85
x
1.33 4
m
-
I
X
10
Ik = 7.44 10-5
x 1.01
+
x 10-4 + 1.33x104
3.08
=
x10-4 m
1.33 x 10-4m3
DFof column =
10-4
3.08 x m
- 0.43
moment
0.43(22.68 -8.93)
=
-
5.91 kN m
NEd, btm
118.
=
19 kN
Appendix B
First floor
14 S2A) 3A
2810 1786
slab
analysis
IS 3
Ly 4596
I
- 1.84 2 (two way slabs
↳x 2500
2
tan 45°=
1250
2810
=
x 1270 mm
17003400
Fs 4
3400 Fs4
Ly - - 1.2 <2 (two way slab)
Lu 2810
12502508
x
tan 450 - FS3
1700
4596
R =1700mm illustration
Appendix B
FS 3
m3
1.69 kN
=
m3
4.69 kN
=
m2)
=1.88 kN m
FS 4
m3
1.69 kN
=
m3
6.38 kN
=
m2)
- 2.55 kN m
FS3
m2)
=2.5 kN m
FS 4
m2)
=3.4 kN m
Beam D 1-2
IG,
+
+
+
=
24.6
=
kN m
2.5kN 3.4 kN
IQ1 m + m
=
5.9
=
kN m
Wp 1.35(24.6)
= 1.5(5.9)
+
-
42.06 kN m
4 2.06
shear: X 2.81
- 59.09 kN M
42.00 x 2.812
Moment
=
12
-
27.68 kNm
en
27.68
~to↓ a
27.68
RB D 1 -
2
59.09 59.09
Appendix B
FB 1 D -
IGp =
1.69 +
4.69 +
1.88 7.41
+
= 15.67 kN m
IQ1 2.5kN
=
m
I 2.5 kN m
- 24.9 Nm
24.9
shear: X 2.5
- 31.13 kN M
24.9 x
2.52
Moment I
12
-
12.97 kNM
~24.9K↓
e
12.97 12.97 RB I
D- E
2
A
2500
31.13 31.13
Appendix B
FB 1c -
D
Gr
& 1.69
=
+
6.38 2.55
+
+ 7.41
18.03 kN
=
3.4kN
IQ1
=
Wp 1.35(18.03)
= 1.5(3.4)
+
=29.44 kN m
29.44
shear: X 3 ·
50.05kN
=
28.36
= kNM
NkN m
28.36
-
X
↓
A
2
28.36 RB Ic -
D
3400
50.05 50.05
Appendix B
Member stiffness
i) minor axis
3150 -
D 3400 K beam
bh
= 0.5 x
2 122
2810
0.3
E 2568 3150
=
0.5 x
0.225 X
12 X 2. 81
3
9.01
= 10-5
x m
b4
Kcolumn, top: 12L
0.2 2 5 x
=
=2850 12 2.85
x
mm
3
4.21 10-4
=
x M
5
10-4
-
Ik 9.01 10 4.21 bh
x2
Kcolumn,
x x
+
bottom:
=
12L
9.32
=
x 10-4m
=
0.2 2 5 0.4
x
9.32 x
10-4 m
3
4.21 10-4m
=
-
x
0.45
9.32 x
10-4 m
-
0.45
42.06 X 2. 812
moment
12
27.68
kN
=
- 12.46 kNm
column moment, IF
bottom
0.45 =
(27.68 kNM)
- 12.46 kNm
Appendix B
ii major axis
L
3150 K beam
= 0.5 x bh
122
3400
2
D
=
0.225 X
0.3
0.5 x
2810
12 X 3 4
2568
·
E
3150 5
7.44 m
-
- 10
x
K beam
= 0.5 x bh
2 122
column clear
height 3150mm
=
-300mm =
0.5 x
0.225 0.33
x
=2850 12 X 2.5
mm
1.01
= 10-4
x m
1.33
=
x
10-4m
Ik 7.44
=
x 10-5 1.01
+
x 10
-
4
2(1.33 154
+
x
4
-
4.4 1
-
10
x
1.33 10-4m3
DFof column, top=
x
4. 10-4 m
41 x
-
0.30
1.33 10-4m3
DFof column bot to m -
x
S
4. 10-4 m
41 x
-
0.30
moment -
12.97 kN m
D-E
moment
-
28.36 kNm
c-D
column moment
top-column moment
bottom
=0.3(28.36-
12.97)
=
4.62 kNm
GK, IF 1.35
column: (25 kN m2
x
0.225mx 0.4m)
x
3.15m
x
=
9.57 kN
118.19 + 9.57
=
-
127.76 kN
IF, NEd, bottom 127.76
=
59.09
+ 31.13
+
+
50.05 268.03 kN
=
Appendix B
Ground floor
14 S2A) 3A
2810 1786
slab
analysis
GS 3
Ly 4596
I
=1.84 2 (two way slabs
↳x 2500
2
tan 45°=
1250
2810
=
x 1270 mm
17003400
GS4
3400 Gs4
Ly - - 1.2 <2 (two way slab)
Lu 2810
1250
2500
x
tan 450 =
GS 3
1700
4596
R -
1700 mm
illustration
Appendix B
permanent load
GS 3
m3
1.69 kN
=
m3, non-suspended)
GK, slab
0
=
kN m
GS 4
m3
1.69 kN
=
m3, non-suspended)
kN
GK, slab
0
=
m
at
riable
Imposed load, slab (non-suspended slab)
Ok, slab 0 kN
=
Beam GB D 1-2
IGp =
1.69 +
7.41
9.10
=
kN m
IQ, 0
=
kN m
Wa 1.35(9.10)
=
+
1.5 (0)
12.29 kN
=
12.29 x 2.81
shear:
2
=
17.27 kN
2
1 2.2 9 2.81
x
Moment:
12
-
8.89 kN m
&12.29kN m
8. O9
- 2
-
X
~zso
↓
A
2
8.09 GB D1 -
2
17.27 17.27
Appendix B
IGp 1.69
=
7.41
+
9.10
=
kN m
IQ, 0
=
kN m
Wa 1.35(9.10)
=
+
1.5 (0)
12.29 kN
=
2.5
12.29 x
shear:
2
I
15.36 kN
1 2.2 9 2.52
x
Moment:
12
- 6.40 kN m
12.29↓
e
6.40 6.40 1 D- E
GB
- 2
-
A
2500
15.3b
15.36
Beam GB I C -
D
IGp 1.69
= +
7.41
9.10
=
kN m
IQ, = 0 kN m
Wa 1.35(9.10)
=
1.5
+
(0)
12.29 kN
=
12.29 x 3.4
shear:
2
20.89
=
kN
12
- 11.84 kN M
=12.29↓
e
11.84 11.84 Ic
GB -
D
-
-
X a
20.89 20.89
Appendix B
ber
# stiffness
minor axis
0.3
I
K
beam
0.50.225
= X
x
12 x 2.81
3150
9.01
=
10-5m3
x
2818
1250
0.225 0.4
x
stump K
column, top=
12 2.85
x
4.21
=
10-4m
x
K 0.225 0.4
x
column, bottom
=
12 0.9
x
-
3 3
I
1.33 10
x M
-> k 9.01x10-5
=
4.21
+
=
1.84 10
x
- 3
m
4
4.21
-
10
x
DF
column, top=
1.84 x 10-3
0.23
=
1.33 x 10-3
DE
column, bottom =
3
1.84
-
10
x
-
0.72
12.29 2.812
x
Moment=
12
-
8.09 kNm
1.86
=
5.82
=
Appendix B
i)major axis
x
54 K beam
2
= 0.5 x bh
122
=
0.225 X
0.3
0.5 x
2810
12 X 3.4
E 2568 3150 5 3
7.44
-
- 10
x m
K beam
= 0.5 x bh
2 122
column clear
height 3150mm
=
-300mm =
0.5 x
0.225 0.33
x
=2850 12 X 2.5
mm
1.01
= 10-4
x m3
12 2.85
x
3
4
1.33 x
-
I 10 m
K 0.4 x 0.2253
column, bottom =
12 0.9
x
I 10-4
4.22 x m
Ik 7.44x10-5
=
1.01x10
+
-
4
+
1.33x10-4 +
4.22
-
4
x 10
=
7.30 x 10-4m
1.33 10-4 m3
DFof column, top=
x
7.30 x 10- 4m
-
0.18
4.22 10
-
4
m
DFof column, bottom:
x
10 4
7.30 x m
-
-
0.58
moment
p-E -
6.40 kN m
moment
-
11.84 kNm
c-D
column moment
top 0.18(11.84
= -
6.40)
0.98
=
column moment
bottom 0.58
=
(11.84 -6.40)
3.16
=
I
4.62 kNm
GK, GF
1.35
column: (25 kN m2
x
0.225mx 0.4m)
x
3.15m
x
=
9.57 kN
Appendix B
IF
+ GK, GF column
268.03 9.57
=
+
= 277.6 kN
GF, NEd, bottom 277.6
=
+
17.27
+
15.36 20.89
+
331.12
=
kN
Loading analysis
=
3.65 kN
331.12 3.65
Top stump
=
+
- 334.77 kN
Results
Moment (kNm)
Floor
Ned (kN) Minor
Major
1 118. 19 5.91
bottom
RF 26.57
2.
IF 12.46
top 127.76 4.62
3. 268.03
IF
b ottom 4.62 12.46
4. 1.86
GF top 277.60 0.98
5.
GF
bottom 331-12 4.62 5.82
6.
Stump top
334.77
D 0
S FD BMD;major BMD;minor
3.15
268.03 4- 62
4 62
-
X 12.46
127.76 12.46
3.15
331.12
4.62 0.98 5.82
X 1.86
277.60
1.2
Mmajor
M
kNm
=
334.77
Mminor kNm
=
Ned (kN)
PART 2:
HAND CALCULATION FOR THE SIZE ESTIMATION OF A PAD FOOTINGS FULFILLING
THE SERVICEABILITY REQUIREMENTS
PART 3:
HAND CALCULATIONS FOR DESIGNING PAD FOOTINGS & DESIGN SPREADSHEET FOR
PAD FOOTINGS WITH SOIL BEARING CAPACITY = 200 kN/m2
Appendix B
Classification of column D1
RF > IF
minor axis
225 300
beam= x mm
column 225
= x 400 mm
clear 300mm
height 3150mm
=
-
2850mm
major axis
225 300
beam= x mm
column 400
= x 225 mm
clear -300mm
height 3150mm
=
=2850 mm
of and beam
ii) moment of inertia column
column
Iz
bh
=
12
-
400 225
x
12
8
-
3.8 10
x
=bh
Iy 12
-
225x 400
12
1.2 109
=x
beam
3003
225x
Iz
12
-
5.1 108
x
Appendix B
K
iii) stiffness,
column
8
3.8 10
x
kzz =
2858
5
- 1.33 x 10
9
1.2 10
x
Kyy
-
2850
-
4.21 105
x
beam
8
5. 1 10
x
k -
22,
3400
-
1.5
x 105
5.1 108
x
kzzz
=
2500
- 2.04x 105
8
5.1 10
x
Kyy =
2810
- 1.81 x 105
2-2 ax is
1.33 105
x
k I
-
0.19
is
y y ax
-
k =
4.21 x 105
2(1.81x105)
-
1.2
Appendix B
10,2 0.5(2850)
(1+ 0.457) C'to. 518-19)
=
=1800mm
1.2
lo,y 0.5(2850)
(1+0.45 1.2) (to.4.2)
=
=2500mm
vi)Radius of
gyration, I
izz (E)0.5
=
8
3.8 10 0.5
=)
x
225x400
S
I 65
(FY)
0.5
izy
=
109 0.5
=(
1.2
C
x
225 400
x
-
120
I
28
X 2500
act, y -
120
-
21
Appendix B
X
viii) Slenderness limit, lim
200 ABC
Nim=
M
A
=
0.7, B 1 =
-
1 =1.7 -rm
c
Y5d
=
-
127.76x103
-
0.1
0.85 Jck
Jad I
Wa
- 0.85x25
1.5
I
14. 17 N mm
5.91 kNm
-
6.95 kNm
4.62 kNm
12.46 kNm
2- Z moment
moment
y-y
4.62 6.95
rmz
Wmy=
=
5.91 12.46
=
0.78 -
0.56
-
C2 Cy
=
2.48 2.26
=
Xact
it is a short column
Appendix B
RF > IF
minor axis
225 300
beam= x mm
column 225
= x 400 mm
clear 300mm
height 3150mm
=
-
2850mm
major axis
225 300
beam= x mm
column 400
= x 225 mm
clear -300mm
height 3150mm
=
=2850 mm
of and beam
ii) moment of inertia column
column
Iz
bh
=
12
- 400 225
x
12
8
38
-
-
10
x
bu
Iy =
12
-
225 40
x o
12
9
=1.2 10
x
beam
225 3003
x
Iz
12
5.1
= x 108
Appendix B
K
iii) stiffness,
column
8
3.8 10
x
kzz =
2858
5
- 1.33 x 10
9
1.2 10
x
Kyy
-
2850
-
4.21 105
x
beam
8
5. 1 10
x
k -
22,
3400
-
1.5
x 105
5.1 108
x
kzzz
=
2500
- 2.04x 105
8
5.1 10
x
Kyy =
2810
- 1.81 x 105
2-2 ax is
1.33 105
x
k I
-
0.19
is
y y ax
-
k =
4.21 x 105
2(1.81x105)
-
1.2
Appendix B
10,2 0.5(2850)
(1+ 0.457) C'to. 518-19)
=
=1800mm
1.2
lo,y 0.5(2850)
(1+0.45 1.2) (to.4.2)
=
=2500mm
vi)Radius of
gyration, I
izz (E)0.5
=
8
3.8 10 0.5
=)
x
225x400
S
I 65
(FY)
0.5
izy
=
109 0.5
=(
1.2
C
x
225 400
x
-
120
I
28
X 2500
act, y -
120
-
21
Appendix B
X
viii) Slenderness limit, lim
200 ABC
Nim=
M
A
=
0.7, B 1 =
-
1 =1.7 -rm
c
Y5d
=
-
277.6x103
(225 400)
x 14.17
-
0.22
0.85 Jck
Jad I
Wa
- 0.85x25
1.5
I
14. 17 N mm
-
4.62kNm
-
12.46kNm
0.98 kNm
1.86 kNm
2- Z moment
moment
y-y
0.98 1.86
(mz
4.62 Wmy=
=
12.46
=-
0.21 -
0.56
Cz -
1.91 cy 2.26
=
...
Xim,z - 63 > Nact:Nim, y 74> Xact =
it is a short column
Appendix B
life:50
Design years
class:X C3
Exposure
size of 20mm
=
aggregates
concrete strength, Jck > superstructure 25N mm"
=
substructure 30N
=
mm"
NEd 334.77
=
kN
Footing sizing
NEd (ULS) 334.77
=
kN
1.35 1.5 +
=
234.93 kN
(234.93kN)
Estimating footing self-weight 10%
=
-
23.49 kN
SLS
loading 234.93
=
Total +
23.49
=258.42 kN
ISLs
Area of
footing required: loading
soil
capacity
=258.42kN
200kN m2
=1.29m2
d NEd
Effective depth, =
Vrd, max
x Uo
NEd, r2S
334.77 kN
=
40 (225mm 400mm)
=
2 +
=1250mm
Appendix B
334.77 103
x
↓ min
-
5.28 x 1250
50.72 mm
(nom + 0.50
bar
50.72
=
40
+ +
0.5(12)
I
96.72 mm
1.5m 1.5m
Hence, try x 0.3m
x
25 kN m
16.88 kN 23.49kN
=
<
(1.5m)
Footing area =
=2.25m2
4.62
moment:
SLS design 1.35 1.5
+
-
3.24 kN m
y 0.5h
=
0.5(1.5m)
=
=0.75m
I
bh3
=
12
3
-
1.5 (1.5)
12
-
0.42 m4
P ISLS
My
=
+
area I
258.42 3.24(0.75)
-
I
2.25 0.42
=120.64kN m2 ( soil
bearing capacity 200kN
m2
=
Load Analysis
334.77 kN
NEd (ULS)
=
NEd(ULS)
soil
pressure (ULS) =
Area
-
334.77kN
m2
2.25
=148.79 kN m2
=148.79kN metre
per length
Appendix B
a ⑭
750 750
I
L x 7
↑*
I so
!.. t
750
Umax 148.79
=
x 0.75m Umax 148.79
=
x 0.75m
=
I11.59 kN kN
m =
I11.59 m
Vcol face
=
148.79 0.6375
x Vcol face 148.79
=
X 0.55
-
94.85 kN m - 81.83 kN m
Il Il
750 750 750 750
L x 7 L x 7
30.23 ⑤ ⑤
M
1441.850.75 X
14879x 0.7582
max= Mmax -
2 2
41.85
=
kNm - 41.85 kNm
0.63752 552
Mcol-face 148.79
= x
Mcol-face 148.79
=
0.
x
2 2
30.23
=
C 0
min, b
=
main
-
12 mm
Cdev= 10 mm
(nom=Cmin, dur+Cdev
=
25mm +
10 mm
=35mm
:. (nom 40mm
=
main reinforcement
(bending)
·bar= 12 mm
=254mm
M 30.23 106
x
k =
-
<kmax
-
0.016 0.167
=
:. no
compression steel needed
2 d(0.5
=
+
0.2 5 -
0.016
(
1.134
:. use 2 0.95d
=
0.95x254
=
241.3
-
mm
As, reg= M
0.87 fyk 2
- 30.23 x106
0.87 500
x 241.3
x
- 288mm2 m
fatm -
0.3 x fck"3
I
0.3 x 303
- 2.90
2.9
A s, min= 0.26 ( 500) bd
=0.0015(1000) (254)
- 38 1mm2 m
Appendix B
As, 0.04Ac
=
max
0.04(1000 x300)
-
12,000 mm2
=
shear reinforcement
i) vertical shear:I d
away
from column face
x0.254)
-
57.06 kN m
(100, Jcx)'s bd
k 1
=
200
+
1 + 200
254
=
1.89 < 2.0
As, prov
1, =
bd
I 452
1000 254
x
=0.0018(< 0.0015,<0.02)
Vrd,c 0.1 2
=
1.89
x x (100 0.0018
x x 30)'s 1000
x x0.254
I
95.11 kN
126.52 kN
=
Therefore,
Urd,c 126.52kN
=
> 57.06 kN
Appendix B
d:300
Average depth, 40-12
-
248
=
mm
2d 2
=
(248)
=
496mm
control
perimeter, n 2
=
(225 400) +
2x(496)
+
= 4366.46mm
area within
perimeter, A (225
=
x
400) 2(225 x496) 2(400 x490)
+ +
π(496)2
=
1482882.06 mm"
-
1.48 m2
-
114.57 kN
114.57 x103
VRd =
4366.46x248
=
0.11 N mm2
shear resistance:
punching
Urd= 0.18
1.5
I
(100p, fcx)'s, I
but Vmin 0.035k fck'
=
=0.40N
mm2, Vmin= 0.5N mm2
:.
Vrb 0.5
=
mm2
h 300mm
=
> 200mm
action GK+0.3 QK
quasi-permanent
=
Gk ①k (Gx 0.3Qx)
+
-
Ned (kN)
2.81
19-13 X - 30.00
18.18 10.56 x 0.3 2
0.3
3.4
11. 19 5.62 x 11.70 X =
21.89
2
Gk ①k
+
18.03 3.4
0.3
x 32.39
Gk ①k (Gx 0.3Qx)
+
-
Ned (kN)
9.10 0 12.79
9.10 0 11.38
9.10 0 15.47
GK, 9.57
-
column GF-RE
Total 216.5 kN
=
Appendix B
fyk As,
+, reg Quasi-permanent
Us
=
X X
=179.16 Nmm2
allowable bar
spacing:250mm
max
2(2)
=238mm <250mm
UNIVERSITI TUNKU ABDUL RAHMAN ACADEMIC YEAR 2022
UEMX 2363 REINFORCED CONCRETE DESIGN II GROUP ASSIGNMENT
Name Student ID
ONG CHONG XIAN 2006615
Marking Guidelines
Items Allocated Marks Scored Marks
Hand calculations - loading
analysis and design for column 15%
Design spreadsheet - loading 20%
analysis and design for column 5%
1
PART 1:
HAND CALCULATIONS FOR LOADING ANALYSIS FOR COLUMN (D/4) FROM STUMP TO
ROOF LEVEL
Appendix B
Specification
column D4
Design :
Life 50 years
Design
:
class : ✗ c3
Exposure
Fine resistance
:
1260
20mm
Aggregate
:
size
'
Characteristic strength of
,
of concrete(sub structure),fck=}oNimmi
strength
-
characteristic
of steel fyk -500 Nimmi
characteristic strength
-
Assumption
: -
Beam size
: D= 225mm h= 300mm
sunken
soil
Assume ground floor is supported by .
stump height
=
900mm
Appendix B
EN 1991-1-1 T
) First floor & Ground floor slab :
table 6.2
↳ Gk finishes = to kN /m2
.
↳ QK 2.0kW /m2
floor ,
=
'
↳ QK stair = 2.5kW /m
,
↳ 1.54N /m2
G.K finishes
,
=
'
↳ QK = 2.OKNIM
Parti
LoadingAnaly 2
Roof floor
3286
↳y
< ,
n
121341
3400 1257 12516
V 121317 121336
r
/
121324
2500
RSZ 1258 RSA RSM
µ, , 121340
✓
fµÉ 1500
>
Appendix B
12582125ft
Assuming roofing are designed
as slab .
i.
slab
¥, ??¥
< 2 : 2 way
1.67
.
=
=
i. ^
42500
"
i. u
R 0.75m
4-7
=
1500
Gk roof
,
=
0.014kW/nix 0.75m
=
0.0105 KNIM
GK , purlin =
3-208kqggg9.HN/m-
=
0.031 KNIM
0.3kW /MY
iii. ) Aluminium trusses [ self weight
-
=
'
0.75m
GK trusses
,
= 0.3 KNIM ✗
= 0.225 KNIM
Appendix B
-4.688 KNIM
= 1-125 KNIM
=
2813 KNIM
of brick wall .
variabktoac.MS[
1553.2002 1) Wind Load minimum design : 0.65 KNIMZ ]
0 65 0.75
QK whet
,
= .
✗
= 0.488 KNIM
Mt
2020 Manta hence I repair ] qk = 0.25kW/ .
QK , roof =
0.25 ✗ 0.75
=
0.188 KNIM
EH 1991 Hiii ) Imposed
-
load ,
slab [ roof
= 2.0 1-Ntm
]
table 6.2 0.75
QK slab
,
= 2.0 ✗
=
1.5 KNIM
Appendix B
12572k€
Assuming roofing are designed
as slab .
i.
slab
¥× =%÷
12 i. two way
= 1.03
i.
/
v
3400
✗ = I -643m
→
3286
permenanf-Load.it
Gk roof
,
= 0.014×1-643
= 0.023 KNIM
ID Gk purlin
,
=
3?%j
= 0.031 KNIM
Iii ) Gk
,trusses
=
0.3×1.643
=
0.493 KNIM
Appendix B
N) GK , beam
= 25 (0.225110-3)
=
1.688 KNIM
V1 Gk , finishes =
1.5 ( 1.643)
= 2.465 KNIM
Vil GK Slab
.
=
2510.15) (1.643)
=
6.161 KNIM
of brick wall .
Variableload
MS 1553.2002 1) Wind Load [ minimum design : 0.65kW/m2 )
QK whet
,
= 0 65
.
× 1.643
= 1.068 KNIM
Mt
2020 Manta hence I repair ] qk = 0.25kW/ .
QK , roof =
0.25×1.643
= 0.411 KNIM
load ,
slab [ roof
= 2.0 1-Ntm
]
table 6.2 1.643
QK slab
,
= 2.0 ✗
= 3.286 KNIM
Appendix B
125241252€
Assuming roofing are designed
as slab .
i.
two
way slab
425%-0
:
¥ 1.84
= =
< 2
^
Tf ft
"
Titty / 2500
✗ =/ -25m
s >
4596
Permenontloac :
1) Gk ,
roof =
0.014×1.25
= 0.018 kN /m
Ii) Gk purlin
,
=
3Y%9
= 0.031 kN 1m
Iii) Gk trusses =
0.3×1.25
,
=
0.375 kN / m
= 1.688 KNIM
Appendix B
= 1.875 KNIM
Vi
) Gk ,
Slab =
2510.15)( 1.25)
= 4.688 KNIM
of brick wall .
Variableload
MS 1553.2002 1) Wind Load [ minimum design : 0.65kW/m2 )
QK whet ,
= 0 65
.
✗ f. 25
= 0.813 KNIM
Mt
2020 Manta hence I repair ] qk = 0.25kW/ .
QK , roof =
0.25×1.25
= 0.313 KNIM
load ,
slab [ roof
= 2.0 1-Ntm
]
table 6.2 1-25
QK slab
,
= 2.0 ×
= 2.5 KNIM
Appendix B
BeamkB4l_
-12-465+6.161)
EGK =
210.023+0.0311-0.493
+ 1-688
=
20.034 KNIM
IQK = 210-8131-0.3131-2.5)
= 7.252kW /m
Design ,
= 37.92 KNIM
37.92kW /m
ttttt.tt 2
M
M
T 3.40m T
V V
V =
37.943.40) µ
=
hÉ
13794¥45
a-
=
=
64.46kW
= 36.53 KNM
Appendix B
BeamRB6,RB24_(Secondary beam)
1-
125 -1 1-875+4.688 -10.018
{ Gk =
2.813 -1 1 .
= 12.613 KNIM
{ QK =
0.488+0-188+1.5 1- 0.8131-0.313-1
2.5
= 5.802k Nlm
nd = 1<35 (12.6131+1.515.802)
Designation ,
= 25.731 kN /m
M
25.731 KNIM
4¥E¥
"
✓
✓
✓ =
25731212.50£
=
32.16kW
M -
-
Y÷
=
1257,3121125€
= 13.4 KNM
Appendix B
B-eamfhBHQRB3.BE
Gk =
1.1251-2.8131-2.465-1
0.018-10.031 +
6.161
1-688
+ 1.875 +
4. 688 +
= 20.864 KNIM
{ QK =
2. 176+4.765-13.626
=
10.567 KNIM
=
44.02 KNIM
32-16 kN
Point load from RB 6 121324
=
32.16 kN
/
44.02kW /m
mftttvttt.IM
T 3.286m T
V v
v = 44.043.286) -132.16
a-
= 88.4 kN
M=Y¥ ¥ +
144.021,123.28b€ (3116%3186)--52.
+ 8 2µm
Appendix B
BeamRB40-IGK.ie210 .
0105-10.031 -10.225+1-125+2.813)
+ 1.688
= 10.097 KNIM
EQK = 2 (0.4881-0.188-11.5)
=
4.352 KNIM
=
20.16 kN 1m
M 20.16kW/m
¥É¥¥
"
v V
V =
(20.16*2.5)
= 25.2 kN
M=Y÷
=
(20lb¥
= 10.5 KNM
Appendix B
Member stiffness
2- 2 axis
I 3.286m 3.286m¢
/ 144336
144317 3. 15m
Kool
-
Kun .
¥ -1¥ - =
";¥¥ñ
= 4.21×10-4
KRBA =
1421336 =
II =
1b¥ (E)
=o÷÷÷× :
= 0.77 ✗ 10-4
-4
Ek =
[ 2 (0.7-7)+4.21 ] ✗ to
= 5.75×10-4
Distribution Factor ,
* of column =E÷=%?¥%¥_
= 0.732
Appendix B
y y
-
axis
3.40m 2.50m
1 ,
y 1121340
KRB 41
3.15m
f- Kool
Kool -
- =
,b¥="ii¥É,É
=/ -33×10-4
1421341 =
¥ 4¥ (E)
=
"¥÷¥-×±
= 0.74×10-4
1421340 =
⇐ =
HE (E)
=w¥¥ ✗ ±
= 1.01×10-4
Appendix B
IK =
(1.33 +
0.741-1.01) ✗ 10-4
-4
= 3 08 .
✗ to
DF of column
=E÷ ;?¥¥→ =
= 0.432
Column Moment =
0.4321
=/ 1.24kNm
= 11.24 KNM
RFLU s)
64.46 -12132.167+488.4)
-1
-
Roof ,NE¢
=
U.s
MEd -330.78kW
.
-
25-2
= 330.78kW
Roof U.S. M =
Moot = Mma ✗ (Maz My y )
,
-
= 11.24 KNM
10,2=0.51 =
a)
=
0.513.15-0.31 TÉ¥¥D( i +
op
= 1- 43m
Appendix B
loif-o.5lk-¥¥¥a÷¥
l-o.ly#)(1-FIs-ka)=o.so
.
=
1.43m
RFIU.SI
Pout t.st.ME.a= Mcol + N¥÷ ME/ =/2.42kNm
3 0.tY.431-12.42KNMLoadingAna.ly#
= 11.24 1-
First flour
2
3286
↳y
' >
n
1=1347
3400 1=515
pst
V FBN 1=1342
n
/
f- 1330
¢ 1500
>
Appendix B
1=57 & FS 15
-
Permanent Load :
1) GK beam ,
=
25 (0.22576-3)
=
1-688 KNIM
Ñ) GK slab
,
=
23-(0-1534.643)
= 6.161 KNIM
Iii ) Gk finishes =
1.54.643 )
,
=
2.465 KNIM
) GK
IV
,
wall = 2.6 (4.15-0-3)
1m
=
10.01 kN
Variable Load
:
) QK
i slab = 20 (1-643)
,
= 3.286 KNIM
Appendix B
¥¥¥÷
"
1.838 C2
-
.
=
Permanent Load :
1) GK beam
,
=
25 (0.22510-3)
=
1-688 KNIM
Ñ) GK slab
,
=
23-(0.15×1.25)
= 4.688 Ktm
Iii ) Gk finishes =
1.5 ( 1.25 )
,
=
1.875 KNIM
) Gk
IV
,
wall = 2.6 (3.15-0-3)
= 7.41 kN 1m
Variable Load
:
) QK
i slab = 20 (1-25)
,
= 2.50 KNIM
Appendix B
Fairplay
slab
¥_ 2%÷
i. two
= = 1.6722 way
Permanent Load :
1) GK beam,
=
25 (0.22536-3)
=
1-688 KNIM
Ñ) GK slab
,
=
23-(0.15×0.75)
= 2.813 Ktm
Iii ) Gk finishes =
1.5 (0.1-5)
,
= 1-125 KNIM
IM GK ,
wall = 2.6 (3.15-0-3)
= 7-41 kN 1m
Variable Load
:
) QK
i stair -2.5
-
(0.7-5)
,
= 1.875 KNIM
Appendix B
BeamFB47_
191<=216-161+2-465) -17-41+1.688
= 26.35 KNIM
{ QK =
213.286 )
=
6.572 KNIM
Design Action nd ,
= 1.33-(26.3511-1.516.572)
=
45.43 kN / m
m 45.43kWh
trtttttlutt am
T 3.40m T
V V
v
-45.4321340£ M=W¥
-
45.43/3-405 =
= 77.23kW I
= 43.76 KNM
Appendix B
{ QK =
2.51-1.875
= 4.375 KNIM
nd =L -35119.6 ) -11.514375)
Design action ,
- 33.02 KNIM
m
33.02 KNIM
trtttttlutt am
T 2.50 M T
V V
'
✓ =
330,42-50
) m=
(33-0,4-2.50)
41.28kW = 17.2 KNM
=
Appendix B
beamt-B20-FBLZ-IEGK-8.to
26+6.563 -13.938 -11.688
-1
7.41
=
28.23 KNIM
{ QK = 3.286 -12.51-1.875
= 7-661 KNIM
Design action , nd
=
1-33-(28.237-11.517.661)
= 49-6 KMM
17330=41.28 kN
Point Load from FBS &
41.28kW
M
v
-49.613.18261-1-41.18
-
µ
-141%2815+(41.28*186)
=
102.13 kN
=
61.59 KNM
Appendix B
Beamfpitb
EGk=2( 3.9381+1.688-17.41
= 16.97kWh
LAK -211.875)
=3 .75kN1m
M 28.53 KNIM
trtttttlutt am
T 2.5m T
V V
✓ =
28.532125£ M
-28.5%2--55
-
= 35.66kW =/ 4. 86kNm
Appendix B
Memberstittness
2- 2 axis
3.1%1401
13.286m
3.286m
,
n t
KFBZO 3.15m KFBYZ
Kai -_b¥=T¥¥¥%÷ ,
= 4.21×10-4
14--1320--14-4342=41-(1-2)
=
"¥,÷÷,× :
=
0.77×10-4
Ek
-
[210.771+214.211]×10-4
= 9.96×10-4
Appendix B
DF of column
=
kg÷
"
= 4.21-a0
9.96×10-4
=
0.423
0.423/61.59-61.59) Mz-21
Column Moment =
t.si/U.s-)--OkNm
OKNM
(
=
y-ya
,
3.15m Kcol
←
2.50m
13.40mn t
,
KFBFT 14=1346
gym
Koi -_b¥=_"¥%¥÷,
=
1.33×10-4
Appendix B
14=1347--4%(1-2)
=i÷÷:÷×±
=
0.77×10-4
144346
4¥ (E)
=
=L
"Y¥?÷ ✗ ±
=
1.01×10-4
EK -124.33 )
-
+ 0.77 -11-011×10-4
= 4.44×10-4
PF of column
=
É¥
=
1. 33×10-4
4.44×10--4
=
0.3
Appendix B
y
⇐ s / U.s ) .
=
f. ft KNM =
8.671dm
Gk column
,
= 1.3510-225/(0-4) (3.15×25)
=
9.57 kN
F. F. (t.SI
First floor -1.5 NED = 330.7-8 + 9.57
Ned 340 .HN
. -
= 340.35kW
340.35-177.231-35.66 F. F. Last
First floor U.s -
Ned =
= 657.3kW
Mcd =
Mmax ( Miz My ,
-
g)
=
8.67kW m
loip-o.se#!4s+--o.E+T---
)¥";¥¥*H+¥f¥¥÷
0.513.15-0.3
= 1- 43m
Appendix B
lovvr-o.se#t!y-F-o!FkT---
)¥"¥¥*H+¥¥
0.513.15-0.3
=
1.43m
Ffcts )
8.671-344%(0-143)=9.87
.
Med .es =
KNM 9.874mm
MEd
.
FFCU.si
Med .us 8.67 + = 11-02 KNM Mean
.cn/cNmLoadingAnalysrs-
-_
.
Ground floor 2
3286
↳y
' >
n
3400
GS8 GBH GSI}
v
GBH 61344
r
/
"
(F) 1500
>
Appendix B
958£13
¥× 3342¥ way slab
: two
=
=
1.03 C2
Permanent Load :
1) GK beam ,
=
25 (0.22510-3)
=
1-688 KNIM
Ñ) GK slab
,
=
23-(0-1534.643)
= 6.161 Ktm
Iii ) Gk finishes =
1.54.643 )
,
=
2.465 KNIM
) GK
IV
,
wall = 2.6 (3.15-0-3)
= 7.41 kN 1m
Variable Load
:
) QK
i slab = 20 (1-643)
,
= 3.286 kN 1m
Appendix B
:÷÷÷→
two way slab
-
1.838 C2
-
.
=
Permanent Load :
1) GK beam
,
=
25 (0.22536-3)
=
1-688 KNIM
Ñ) GK slab
,
=
23-(0.15×1.25)
= 4.688 Ktm
Iii ) Gk finishes =
1.5 ( 1.25 )
,
=
1.875 KNIM
) GK
IV
,
wall = 2.6 (3.15-0-3)
= 7.41 KNIM
Variable Load
:
) QK
i slab = 20 (1-25)
,
= 2.50 KNIM
Appendix B
É
slab
¥_ 2%÷
i. two
= = 1.6712 way
Permanent Load :
1) GK beam,
=
25 (0.22510-3)
=
1-688 KNIM
Ñ) GK slab
,
=
23-(0.15×0.75)
= 2.813 Ktm
Iii ) Gk finishes =
1.5 (0.1-5)
,
= 1-125 KNIM
IM GK ,
wall = 2.6 (3.15-0-3)
= 7-41 kN 1m
Variable Load
:
) QK
i slab -2-0
-
(0.7-5)
,
= 1.50 KNIM
Appendix B
BeamGB49_
I -688 -17-41
{ Gk = 218.626) -1
= 26.35 KNIM
EQK = 2 ( 3.286)
= 6.5724N / M
nd 1.35 (26.3571-1.516.572)
Design
=
action ,
= 45 43 KNIM
.
m 45.43 KNIM
Glut I t.tt It am
T 3.40m T
V V
v
-45.431340£
-
M =
W¥
= 77.23kW
=
45-4,3*-405
= 43.76 KNM
Appendix B
EGK =
4.688 -11.875+2813+1.125-1
1.6881-7.41
=
19.6 KNIM
Elek =
25+1-5
=
4.0 kN 1m
= 32.46 KNIM
32.46 KNIM
m
trtttttlutt am
T 2.50 m T
V V
V =
32.4%2-507 M=
132.46/{2-50}
= 40.58kW = 16.91 KNM
Appendix B
7.41
=
28.23 KNIM
= 7-286 kN 1m
Action nd 1.35-(28.237+1.517.286)
Design
=
=
49.04 KNIM
40.58kW
Point load from 4139 & GBH =
40.58 kN
flutter dat I
/ 49.041ohm
am
T 3.286 m T
V V
49.04/3.28261+40.58-14=49.0413^2865+40.58*286
)
✓=
I
= 60.8 KNM
=
100.86 kN
Appendix B
teamc
EGk=2( 3.9381+1.688-17.41
= 16.97kWh
LAK -211.51
-
=
3.00 KNIM
m
27.41 KNIM
trttttdlutt am
T 2.50m T
V V
"
V
-27.2111-2.57
M :(
274¥25
= 34.26kW = 14.28 KNM
Appendix B
3.286m 3.286m
y ,
n t
KGB21 0 -9m KGB 44
Kool ,up=b¥u=YEY¥¥ ,
= 4-21×10-4
aol.am -1b¥
-
=
Y!% =
1-33×10-4
KGB21 = KGB44 =
4%-11-2)
=
"¥;:÷,× :
=
0.77×10-4
10-4
8k =
[210.771+4.411-1.33] ✗
= 7.28×10-4
Appendix B
kg
P
coliup
"
DF =
pt-al.am =
1.33×10-4
4.21-1/10-4
=
= 7.28×-10-4
7. 28×10-4
=
0.578 = 0-183
Matts)
Column Moment , -4 =
0.578/60.8-60.8 ) =
OKNM
=
OKNM
Mallu S )
(60.8-60.8)
-
0,183
Column Moment ,
us =
= OKNM
= OKNM
y-ya
,
3.15m Kcol
←
3.40m 2.50m
1 ,
n t
KGB49 0 -9M KGB48
kcotup-iz-70.LY??f?f-.s,
bh}
=
1.33×10-4
Appendix B
koi.am
1¥ "¥;?÷
l
-
= -
= 5.79×10-4
14=1347 =
b¥z ,
(E)
=i÷÷: ✗ ±
-4
=
0.77 ✗ to
144346
4¥ (1-2)
=
10
.Y¥?÷
=
✗ ±
=
1.01 ✗ 10-4
-4
E K =/
1 33 +
.
0.77 1- I -01+5.79 ] ✗ to
= 8.90×10-4
Appendix B
PF 61 , up
=
É¥uP
=
:÷i÷ .
=
0.149
DF cot ,
down =
k%a
=÷÷::→
= 0.651
= 4.39 KNM
MY YIU H
(43.1-6-14.28)
-
-
,
=/9.
= 19.19 KNM
Appendix B
GF (t.SI , Ned =
657.3+9.57 GT-t.si
NED -666.87kW
666.87kW
-
GFC " s ?
GF( U.S )
-
,
Ned =
666,87+77.23-1
NED -980.08kW
2400-867+34,26
=
980.08kW
Gk / stump =
1.35125)( 0.225/(0.4%-9)
= 2.73kW
NED stump
NED stump hits ) = 980.08-12.73 ,
982.81kW
.
,
=
= 982.81 kN
= 19.19 KNM
lolt.si/--o.s-(Hs--o.D--i:-::;;;-:I.I)
=
1.43m
locus ) .
-
-
o.s-co.at#:::+::Yg-:I.I)
= 0.45m
Appendix B
6 6-8tf .tl#GFC"°%%°
e.s)MEd=2.38kNm=2.38kNmG.FCus
Med -1.5=0
,
+
)
Megas .
__
19.19-1
Med
.si#Nm--22.69kNmSummary-
|
" °" " " "" "" """
RFUS -
330.78 12.42
FF -6s .
340.35 9.87
Gftis .
666.87 2.38
GF us .
980.08 22.69
stump -1s .
982.81 0
Appendix B
315
657.3 "
?
l
✗
GFFF
- -
- - -
jiwjg
-
- - - -
g.
3.15
?? !GF
2169
980.08
×
-
- -
0.9
982.81 0
✓
Stump
PART 2:
HAND CALCULATION FOR THE SIZE ESTIMATION OF A PAD FOOTINGS FULFILLING
THE SERVICEABILITY REQUIREMENTS
Appendix B
Parl-2isizeestrmatnnotpadfoutingdesig.in
Column : P4
Specification
-
900mm
Stump height
=
'
fck 25N 1mm
superstructure
:
Characteristic strength of ,
'
fck 30h11min
strength of substructure
:
.
characteristic
strength of of bar ifykofyw
=
500N / mm2
characteristic
zoo kN/m2
bearing capacity
:
Soil
life 50 years
Design
:
✗ c3
Exposure class
:
: 20mm
Size of aggregate
Rbo fire resistance
of bar
=
12mm
Diameter
"°Mha/co#
main
= 12mm
12mm
Ecz Cmm , b =
¢ main
=
table 4.2 54 )
Cminidur = 25mm ( structural
table NA3
ce ☐ Eder = 10mm
4.4.1.3
ce 10 =
35 < 40mm
Chom = 25 +
4.4.1.112)
Cl
4.4.1.314)
Cnomimin ( cast against prepared ground)
=
40mm
i. Use Cnom =
40mm
Appendix B
Footing sizing
service Load =
981¥ = 702.01kW
=
10%(7-02.01)
=
70.2 kN
1- 70,2
702.01
825 Loading =
= 772.21 KN
SLS loading
Area of footing required
:
=I÷
=
3.861 m2
Estimate size =
%
=
1.96 m
Appendix B
HEI
D=
Uo
VRD ,
Max
NED = 982.81 kN
VRD , Max
=
0.5 Vfcd = 0.5 [0.6 ( I -
fz¥) ) [ f¥, )
=
0.510.611-2%-7113%-1
2
= 5.28 N /mm
21225+400 )
Uo =
column perimeter =
= 1250 mm
di .÷÷ ÷::÷
-
-
=
148.9mm
h dtcnomttilbar
Estimated thickness =
,
1212
h = 148.9 + 40 +
= 194.9 mm
0 5m
Hence 2.0 m ✗
2.0
-
try m ✗
,
Pad footing .
PART 3:
HAND CALCULATIONS FOR DESIGNING PAD FOOTINGS & DESIGN SPREADSHEET FOR
PAD FOOTINGS WITH SOIL BEARING CAPACITY = 200 kN/m2
Appendix B
0-5 × 25
2- 0 ✗ 2,0 ✗
= 50.0 kN 470.2kW . :O K!
Part 3 :
Design pad footing
LoadngAnalysB_
982.81 kN
Loading Ned
=
VLS ,
= 982£
2.0 ✗2-0
= 245.7 KNIM
per length
Appendix B
M=WzI
225mm ✗ 400mm
Column
=
size
2m ✗ 2m ✗ 0.5
m
Pad footing size =
| || |
g g, , < g, >
| |
"° "
> ""
"
< > <
TT TT TTT TTT
245 7- KNIM
.
245 7- KNIM
.
Appendix B
SFD :
I 1 "f÷ If:|
"
196.56 kN •
218.06kW •
| | of 245.•7kN
,gµµ
| | f.
24597kW
us . #
BM
0.80m
0.80mg, 0.4m > 0.8875m
1<0.8 75
0.225m
my
y y
, < ><
y
111
78.621dm
111↳ g
.
122.85µm
" " ""
my µ ,zkNm
?⃝
?⃝?⃝
?⃝
Appendix B
Nominal cover
main
= 12mm
12mm
EU Cmn , b =
¢ main
=
table 4.2 54 )
Cminidur = 25mm ( structural
table NA3
☐ Eder = 10mm
4.4.1.3
10 =
35 < 40mm
Chom = 25 +
4.4.1.112)
4.4.1.314)
Cnomimin ( cast against prepared ground)
=
40mm
i. Use Cnom =
40mm
Main reinforcement
0bar =
12mm
D= h Chom -0.50bar
depth
-
effective ,
= 500 -
40 -0.5112)
= 454mm
K=b¥fI
=
%%¥s¥÷
=
0.02 < 0.167
i.
Compression bar is not required .
Appendix B
2- -
d Cost ¥u ]
=d[ 0.5 -1
]
= 0.994 > 0.954
As
.mu?stf-kz- o.E?IoI?o.-sxys-y=5l5.76mmYm
EEZ :D fck% 0.30×302/3
fam 0.30
: =
= ✗
table 3.1
= 2.896
fort 28 days
compression strength
=
i. Mean
As 1mm
Cfctmffgkbd
-_
9-2-1-1
= 0.26 (2-8%8-7400071454)
= 683.80 mm
'
/m > 0.0015b¢
0.0015 bd =
0.0015-(1000×454)
= 681 mm4m
As
0,04×1000×500 Max =
0.04 Ac
,
As , Max = =
20000mm4m
= 20000 mmym
Appendix B
Propose :
Man ,
bar 1-112-150
Mam and secondary =
secondary
bar =
1-112-150
As prov = 754 mm -1m
,
Sheared
:O i
) vertical shear : critical at 1-04 from
6.2-2 column face
VED = 218.06-(245.7×0.454)
= 106.51 kN per m length
resistance
Design
[012 k( loop fate)% ]
bd
✓ = ,
Rd, c
k= I -1T¥ = I
+1T¥ ,
= I -
66 < 2.0
Appendix B
p , =A";÷ =
,Y¥
= 0 -0017
0.0015 < P, L b. 02
"
✓
Rd , c
=
[0.1211-66] (100×0.0017×30) 3) ✗
(1000×442)
= 154.81 KN
✓min =
[0.03518/2*2] bd
=
(0-03511.66)%(3071/21400031457)
= 186.77 kN
kN i. OK
✓Rd, c = 154.81 kN > VED =/ 06.51
2d
F) Punching shear at perimeter
ECZ :a :
depth
Proposed
-
depth
=
Average
6.4.414 nominal cover
-
bar size
448mm
darg 500-40-12 =
=
Appendix B
Column G & C2
C) =
225mm ,
Cz =
400mm
Control perimeter ,
n = 24 +
G) +21T (2d)
=
2 (225+400)+27/896)
= 6880 mm
2
4- (2d)
4225×896) -12(400×896)
-1
=
(225×400) +
4- ( 89112
2
= 3.73 m
shear force :
Punching
✓Ed = 245.7 (2-02-3.73)
= 66.34 FN
Ved
"÷ =%;}¥¥→
=
= 0 .
02
Appendix B
✓Rd =
=(Y¥)(1.671400×0.00154×301×3
=
0.334
✓min = 0.035 k%fckk
=
0.035 ( 1.61-7%130/12
= 0.041
Ok
-
0.022
. .
✓Rd =
0 .
334 > VED =
resistance
iii) Maximum punching shear
at column perimeter
ECZ ✓ Rd / Max = 0 -5yd [0.64-1%-7] ,f¥
6,5
eqn &
.
Uo =
21Gt G) =2(225-1400)
egn 6.6N = 1250mm
✓Rd / Max =
0.54250×448)[0.64
-
3¥07 ]( ¥5)
= 2956.8 kN > VLS loading -
'
10K
=
982.81kW
Appendix B
Cracking
EC : 4 500mm > 200mm
'
h
-
7. 3.3
quasi permanent
action :
under
-
steel stress
Gk -3 QK
permanent action
=
Quasi - to
%) [ 12-613-1
iii) [ 20.864 to .3( 10.5671 ]
✗ 3.2¥ =
39.49kW
14.25 KN
[ 10.097 -1 0.3 ( 4.3521 ] ✗
=
IY
first floor
:
for
Loading
D [ 26.35 + 0.36.572) ) ✗ ¥ = 98.154N
2¥ 26.14kW
0.314.375) )
=
Ii) [ 19.6 + ✗
3.15
Column S W
- .
= 25×17.225×0.4 ×
= 7.09 kN
Appendix B
48.15kW
1) [26.35+0.316.5727] 3¥
=
✗
kN
Ii) [ 19.6 -1 0.3 ( 4.01 ) ) 2¥ 26.0 ✗
=
49.97kW
3.2¥
=
iii)
[28-23+0.317.2861] ✗
22.34 KN
ill [ 16.97 0.313.0) )
+ ✗
2.2-5 =
= 7.09 KN
= 2.025kW
Strat Action
=
419.18kW
a- ¥÷×¥÷m×E÷::÷7
=
;÷×¥"×Y÷÷ 754 ,
= 126.85 Nimmi
Appendix B
table 7.3N
Actual max bar spacing =
spacing -210.54bar)
= 250-210.5×14
i. OK
= 238mm < 250mm
,
Detailing of Pad footing
Y
2000
H12-150-BB
SECTION Y-Y
400
H12-150-BT
2000
225
225
2000
H12-150-BT
X H12-150-BB X
500
Y
400
Scale : 1:30
500
H12-150-BT H12-150-BB
2000
SECTION X-X
ARAVINDA REDDY A/L THIAKARAJAN
SHIO ZIN-E 2006150
2004920
UNIVERSITI TUNKU ABDUL RAHMAN ACADEMIC YEAR 2023
UEMX 2363 REINFORCED CONCRETE DESIGN II GROUP ASSIGNMENT
1
PART 1:
HAND CALCULATIONS FOR LOADING ANALYSIS FOR COLUMN (F/4) FROM STUMP TO
ROOF LEVEL