Cluster - 1 - Sta# 2

The document provides details of the scope of works for renovating 14 walk-in hotel rooms, including general requirements, architectural dry works, and itemized costs. Major renovation works include ceiling and wall finishes, doors, wood trims, flooring, and painting. The total cost is estimated to be over PHP 500,000 for one premium room.

Uploaded by

Justine Pechay
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
36 views

Cluster - 1 - Sta# 2

The document provides details of the scope of works for renovating 14 walk-in hotel rooms, including general requirements, architectural dry works, and itemized costs. Major renovation works include ceiling and wall finishes, doors, wood trims, flooring, and painting. The total cost is estimated to be over PHP 500,000 for one premium room.

Uploaded by

Justine Pechay
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 27

CORPORATE ENGINEERING DEPARTMENT

Project: Hotel Sogo Sta. Mesa


Subject: Scope of Works for Renovation of 87 Walk-in Rooms - Cluster 1 (14 Rooms)
Date: 23-Sep-22

Accom. MCTI EVALUTAION # 2


Item No. Description Unit Qty Unit Labor Total Amount Wt. % Accom. Wt %
Amount WT% Accom Amout
A. GENERAL REQUIREMENTS 200,000 63,750.00
1.0 Barracks rental months 3.00 25,000 75,000 5.912600209 2.365040083 30,000.00 35% 26,250
2.0 Materials handling / Hauling lot 1.00 100,000 100,000 7.883466945 2.759213431 35,000.00 30% 30,000
3.0 House Keeping lot 1.00 25,000 25,000 1.970866736 0.886890031 11,250.00 30% 7,500
B. ARCHITECTURAL DRY WORKS 1,012,477 254,715
Design A - Casas Design 7 511,974 138,590
Premium Room 3 161,021.82 42,390
1 Premium Room # 612 - Bronze 1 66,004 5.203414874 1.561024462 19,801.24 29% 19,950.69
1.0 Main Room -
Ceiling Finishes -
Pendant Lamp in Black (dresser - 1 pc) - 4W LED Light (daylight)
1.0 set/s 1.00 260 260 -

9mm thk gypsum board on metal frame due to dismantling of dropped


2.0 sqm 2.88 750 2,160 60% 1,296
ceiling
3.0 Cove Light lm 2.91 900 2,619 20% 524
- -
Wall Finishes - -
Surface Preparation for Leatherette, Wall Mirror, dresser mirror and
1.0 sqm 5.54 550 3,047 30% 914
headboard
6mm thk Reflected grey Mirror Glass with 1/4" thk plywood backing and
2.0 sqm 0.64 500 320 50% 160
10mm groove on u channel metal inlay painted in black
6mm thk Reflected clear Mirror Glass with 1/4" thk plywood backing
3.0 sqm 0.64 500 320 50% 160
and 10mm groove on u channel metal inlay painted in black

4.0 1 1/4" thk foam with leatherette with 3/4" thk plywood backing sqm 2.03 500 1,015 30% 305

5.0 Headboard Wall accent on 1/2 thk plywood on paint finish sqm 2.20 1,200 2,634 50% 1,317

Reading Light
6.0 set/s 1.00 128 128 -

- -
Door and Jambs - -
PVC Door White w/ louver incl accessories, incl. 304 Hinges and S/S
1.0 set/s 1.00 350 350 30% 105
screws (Upson)
- -
Door Hardwares - -
1.0 Replacement of S.S Screw of Butterfly hinges set/s 6.00 150 900 -
- -
Wood Mouldings & Sash Works - -
1.0 Baseboards using 3/4 thk ficem board lm 12.38 350 4,333 30% 1,300
2.0 White PVC Cornice at T&B lm 5.76 150 864 -
4.0 ACU Moulding set/s 1.00 700 700 20% 140
- -
Floor Finishes - -
1.0 Floor Tiles 600x600mm, Arkitek white V6500 sqm 4.86 270 1,312 40% 525

2.0 Floor Tiles 600x600mm T&B, arkitek white CL03 sqm 1.80 270 486 40% 194
- -
Painting Works - -

1.00 Doors and Jambs - Spray finished (lacquer type) set/s 1.00 1,100 1,100 40% 440

2.00 Ceilings (main) sqm 7.66 280 2,145 30% 643

3.00 Baseboard (painted on boysen - 0169 fossil tan gloss automotive finish) lm 9.50 180 1,710 20% 342

5.00 Cornice at T&B lm 5.48 180 986 -

Wall painting (Non-Accent and Accent Walls) including surface


6.0 sqm 23.66 220 5,206 50% 2,603
preparation

7.0 Cornice lm 12.38 180 2,228 -

ACU Moulding (painted on boysen - 0169 fossil tan gloss automotive


8.0 set/s 1.00 350 350 70
finish) 20%
- -
Amenities - -
Refurbishing & Repainting of Bedbox (incldg addtl framing - used existing
1.0 set/s 1.00 2,500 2,500 30% 750
framing at the dismantle headboard)
Refurbishing & Repainting of Dresser Table Replacement of Laminate & Edging
2.0 set/s 1.00 2,500 2,500 20% 500
(aluminum)
Repainting and refurbishing including replacement of laminates and edging
3.0 set/s 1.00 2,000 2,000 -
aluminum of side table
500mm x 750mm x 6mm Reflected Mirror with 1" thk beveled all sides-
4.0 set/s 1.00 2,200 2,200 -
Vanity Mirror

5.0 Concrete Threshold set/s 1.00 1,500 1,500 -

- -
2.0 T&B - -

1.0 Ceiling Repainting @ T&B sqm 1.80 220 396 -

2.0 600mm x 600mm Main Wall Tiles V00 sqm 7.00 500 3,501 30% 1,050

3.0 600mm x 600mm Accent Wall Tiles M6010 sqm 4.68 500 2,340 30% 702

400mm x 800mm x 6mm Reflected Mirror with 2" frosted glass both
4.0 set/s 1.00 250 250 -
sides (OSM-Labor Only)

Waterproofing works,elastomeric (2 coats primer & 4 coats rubberize


5.0 sqm 1.80 750 1,350 -
membrane with sealer (3 years warranty) - campbridge manufacturer

soap niche 1000 mm x 300 mm x 3" depth in 600 mm x 600 mm matt


6.0 set/s 1.00 750 750 -
ceramic tile m gress 400 beige

7.0 Replacement of Water closet incl. Accessories (OSM-Labor Only) set/s 1.00 550 550 -
8.0 Lavatory Faucet (OSM-Labor Only) sets 1.00 550 550 -

9.0 Replacement of Shower Head, Mixer, Spout (OSM-Labor Only) sets 1.00 550 550 100% 550

10.0 Replacement of Floor Drain(OSM-Labor Only) sets 1.00 150 150 -

- -
3.0 Dismantling & Chipping Works - -
1.00 Dismantling of Existing Main Room and T&B Floor Tiles sqm 6.66 300 1,998 100% 1,998
2.00 Dismantling of Existing Wall Tiles @ T&B sqm 4.68 350 1,638 40% 655
3.00 Dismantling of Existing Door (T&B) set/s 1.00 250 250 -
4.00 Dismantling of Existing Dresser Mirror w/ Frame set/s 1.00 250 250 -
5.00 Dismantling of Existing Headboard set/s 1.00 1,250 1,250 -
6.00 Dismantling of Drop Ceiling set/s 1.00 1,500 1,500 -
7.00 Dismantling of Baseboard lm 12.38 150 1,857 100% 1,857
8.00 Dismantling of ACU Molding set/s 1.00 150 150 100% 150
9.00 Dismantling of Grab Bar set/s 1.00 150 150 100% 150
10.00 Dismantling of Watercloset set/s 1.00 550 550 100% 550
11.00 Dismatling of Floor drain set/s 1.00 150 150 -
- -
2 Premium Room # 619 - Grey 1 52,171 4.112853898 1.233856169 15,651.19 19% 11,393
1.0 Main Room - -
Ceiling Finishes - -
1.0 Pendant Lamp in Black (dresser - 1 pc) - 4W LED Light (daylight) set/s 1.00 260 260 -
2.0 9mm thk gypsum board on metal frame due to dismantling of dropped sqm 2.88 750 2,160 60% 1,296
ceilingLight
3.0 Cove lm 2.01 900 1,813 20% 363
- -
Wall Finishes - -
Surface Preparation for Leatherette, Wall Mirror, dresser mirror and
1.0 sqm 5.54 550 3,047 30% 914
headboard
6mm thk Reflected grey Mirror Glass with 1/4" thk plywood backing and
2.0 sqm 0.64 500 320 50% 160
10mm groove on u channel metal inlay painted in black
6mm thk Reflected clear Mirror Glass with 1/4" thk plywood backing
3.0 sqm 0.64 500 320 50% 160
and 10mm groove on u channel metal inlay painted in black

4.0 1 1/4" thk foam with leatherette with 3/4" thk plywood backing sqm 2.03 500 1,015 30% 305

5.0 Headboard Wall accent on 1/2 thk plywood on paint finish sqm 2.20 1,200 2,634 50% 1,317

Reading Light
6.0 set/s 1.00 120 120 -

- -
Door and Jambs - -
PVC Door White w/ louver incl accessories, incl. 304 Hinges and S/S
1.0 set/s 1.00 350 350 30% 105
screws (Upson)
Federal Moulded Doors HDF (40mm x 800mm x 2100mm) -Pateco
2.0 set/s 1.00 350 350 20% 70
Brand
- -
Door Hardwares - -
1.0 Replacement of S.S Screw of Butterfly hinges set/s 3.00 - -
- -
Wood Mouldings & Sash Works - -
1.0 White PVC Cornice at T&B lm 5.44 150 816 -
4.0 ACU Moulding set/s 1.00 700 700 20% 140
- -
Floor Finishes - -
1.0 Regrouting of Main Floor Tiles sqm 5.83 150 875 -
2.0 Regrouting of Floor Tiles @ T&B sqm 1.78 150 267 -
3.0 Replacement of Existing Floor Tiles (40x40 cm Tiles w/ cracks) sqm 0.64 270 173 -
- -
Painting Works - -
1.00 Doors and Jambs - Spray finished (lacquer type) set/s 1.00 1,100 1,100 40% 440
2.00 Ceilings (main) sqm 8.63 280 2,416 30% 725

3.00 Baseboard (painted on boysen - 0169 fossil tan gloss automotive finish) lm 11.90 180 2,142 20% 428

5.00 Cornice at T&B lm 5.44 180 979 -

Wall painting (Non-Accent and Accent Walls) including surface


6.0 sqm 25.46 220 5,601 50% 2,800
preparation

7.0 Cornice lm 11.90 180 2,142 -

ACU Moulding l (painted on boysen - 0169 fossil tan gloss automotive


8.0 set/s 1.00 350 350 70
finish) 20%
- -
Amenities - -
Refurbishing & Repainting of Bedbox (incldg addtl framing - used existing
1.0 set/s 1.00 2,500 2,500 30% 750
framing at the dismantle headboard)
Refurbishing & Repainting of Dresser Table Replacement of Laminate & Edging
2.0 set/s 1.00 2,500 2,500 20% 500
(aluminum)
Repainting and refurbishing including replacement of laminates and edging
3.0 set/s 1.00 2,000 2,000 -
aluminum of side table
500mm x 750mm x 6mm Reflected Mirror with 1" thk beveled all sides-
4.0 set/s 1.00 2,200 2,200 -
Vanity Mirror

5.0 Concrete Threshold set/s 1.00 1,500 1,500 -

- -
2.0 T&B - -
1.0 Ceiling Repainting @ T&B sqm 1.78 220 392 -
2.0 Regrouting of Wall Tiles sqm 6.91 150 1,036 -
3.0 Accent Wall Tiles M6010 sqm 4.68 270 1,264 -
4.0 Replacement of Water closet incl. Accessories (OSM-Labor Only) set/s 1.00 550 550 -
5.0 Replacement of Lavatory incl Accessories (OSM-Labor Only) set/s 1.00 550 550 -
6.0 Lavatory Faucet (OSM-Labor Only) sets 1.00 550 550 -
7.0 Replacement of Shower Head, Mixer, Spout (OSM-Labor Only) sets 1.00 550 550 -
8.0 Replacement of Floor Drain(OSM-Labor Only) sets 1.00 150 150 -
- -
3.0 Dismantling & Chipping Works - -
1.00 Dismantling of Existing Main Room Floor Tiles sqm 0.64 300 192 -
2.00 Dismantling of Existing Wall Tiles @ T&B sqm 4.68 350 1,638 -
3.00 Dismantling of Existing Door (T&B) set/s 1.00 250 250 -
4.00 Dismantling of Existing Dresser Mirror w/ Frame set/s 1.00 250 250 -
5.00 Dismantling of Existing Headboard set/s 1.00 1,250 1,250 -
6.00 Dismantling of Drop Ceiling set/s 1.00 1,500 1,500 -
7.00 Dismantling of Existing Door ( Main Room) set/s 1.00 250 250 -
8.00 Dismantling of ACU Molding set/s 1.00 150 150 100% 150
9.00 Dismantling of Grab Bar set/s 1.00 150 150 100% 150
10.00 Dismantling of Water closet set/s 1.00 550 550 100% 550
11.00 Dismantling of Lavatory set/s 1.00 150 150 -
11.00 Dismatling of Floor drain set/s 1.00 150 150 -
-
3 Premium Room # 621 - Bronze 1 42,847 3.377833497 1.013350049 12,854.12 22% 11,046
1.0 Main Room -
Ceiling Finishes -
1.0 9mm thk gypsum board on metal frame due to dismantling of dropped sqm 2.88 750 2,160 60% 1,296
ceiling Lamp in Black (dresser - 1 pc) - 4W LED Light (daylight)
2.0 Pendant set/s 1.00 260 260 -
3.0 Cove Light lm 2.12 900 1,908 20% 382
- -
Wall Finishes - -
Surface Preparation for Leatherette, Wall Mirror, dresser mirror and
1.0 sqm 5.54 550 3,047 30% 914
headboard
6mm thk Reflected grey Mirror Glass with 1/4" thk plywood backing and
2.0 sqm 0.64 500 320 50% 160
10mm groove on u channel metal inlay painted in black
6mm thk Reflected clear Mirror Glass with 1/4" thk plywood backing
3.0 sqm 0.64 500 320 50% 160
and 10mm groove on u channel metal inlay painted in black

4.0 1 1/4" thk foam with leatherette with 3/4" thk plywood backing sqm 2.03 500 1,015 30% 305

5.0 Headboard Wall accent on 1/2 thk plywood on paint finish sqm 2.20 1,200 2,634 50% 1,317

Reading Light
6.0 set/s 1.00 120 120 -

- -
Door and Jambs - -
PVC Door White w/ louver incl accessories, incl. 304 Hinges and S/S
1.0 set/s 1.00 350 350 30% 105
screws (Upson)
- -
Wood Mouldings & Sash Works - -
1.0 White PVC Cornice at T&B lm 5.76 150 864 -
4.0 ACU Moulding set/s 1.00 700 700 20% 140
- -
Floor Finishes - -
1.0 Floor Tiles 600x600mm, Arkitek white V6500 sqm 4.86 270 1,312 40% 525
2.0 Regrouting of T&B Floor Tiles sqm 1.80 150 270 -

3.0 Replacement of tile 10 pcs frm other rrom sqm 1.60 270 432 -

- -
Painting Works - -
1.00 Doors and Jambs - Spray finished (lacquer type) set/s 1.00 1,100 1,100 40% 440
2.00 Ceilings (main) sqm 7.66 280 2,145 30% 643
3.00 Baseboard (painted on boysen - 0169 fossil tan gloss automotive finish) lm 9.50 180 1,710 20% 342
5.00 Cornice at T&B lm 5.48 180 986 -
Wall painting (Non-Accent and Accent Walls) including surface
6.0 sqm 23.66 228 5,395 50% 2,698
preparation
ACU Moulding (painted on boysen - 0169 fossil tan gloss automotive
8.0 set/s 1.00 350 350 20% 70
finish)
- -
Amenities - -
1.0 Refurbishing & Repainting of Bedbox (incldg addtl framing - used existing set/s 1.00 2,500 2,500 30% 750
2.0 Refurbishing & Repainting of Dresser Table Replacement of Laminate & Edging set/s 1.00 2,500 2,500 20% 500
3.0 Repainting and refurbishing including replacement of laminates and edging set/s 1.00 2,000 2,000 -
4.0 Repainting of Dresser Mirror Frame set/s 1.00 - -
- -
2.0 T&B - -
1.0 Ceiling Repainting @ T&B sqm 1.80 220 396 -
2.0 6mm thk. hardiflex sqm 1.80 280 504 -
3.0 Regrouting of Main Wall Tiles sqm 7.00 - -
4.0 Accent Wall Tiles M6010 sqm 4.68 150 702 -
5.0 Replacement of Shower Head, Mixer, Spout (OSM-Labor Only) sets 1.00 550 550 -
6.0 Replacement of Floor Drain(OSM-Labor Only) sets 1.00 150 150 -
- -
3.0 Dismantling & Chipping Works - -
1.00 Dismantling of Existing Main Room Floor Tiles sqm 4.86 300 1,458 -
2.00 Dismantling of Existing Wall Tiles @ T&B sqm 4.68 350 1,638 -
3.00 Dismantling of Existing Door (T&B) set/s 1.00 250 250 -
4.00 Dismantling of Existing Headboard set/s 1.00 1,000 1,000 -
5.00 Dismantling of Drop Ceiling set/s 1.00 1,500 1,500 -
8.00 Dismantling of ACU Molding set/s 1.00 150 150 100% 150
9.00 Dismantling of Grab Bar set/s 1.00 150 150 100% 150
-
Deluxe Room 1 88,805 22,484
4 Deluxe Room # 610 - Bronze 1 88,805 7.000911244 2.100273373 26,641.49 24% 22,484
1.0 Main Room -
Ceiling Finishes -
1.0 9mm thk gypsum board on metal frame due to dismantling of dropped sqm 2.88 758 2,183 60% 1,310
2.0 ceiling
Pendant Lamp in Black (dresser - 1 pc) - 4W LED Light (daylight) set/s 1.00 260 260 -
3.0 Cove Light lm 2.20 900 1,980 20% 396
- -
Wall Finishes - -
Surface Preparation for Leatherette, Wall Mirror, dresser mirror and
1.0 sqm 11.60 550 6,380 30% 1,914
headboard
6mm thk Reflected Black Mirror Glass with 10mm Groove painted in
2.0 sqm 1.18 500 590 15% 89
black-Wall
6mm Mirror
thk Clear Mirror Glass with 10mm Groove painted in black-Wall
3.0 sqm 1.18 500 590 15% 89
Mirror
4.0 1 1/4" thk foam with leatherette with 3/4" thk plywood backing sqm 0.86 500 430 30% 129
5.0 Headboard Wall accent on 1/2 thk plywood on paint finish sqm 7.24 1,200 8,688 50% 4,344
6.0 Reading Light pcs 2.00 128 256 -
- -
Door and Jambs - -
PVC Door White w/ louver incl accessories, incl. 304 Hinges and S/S
1.0 set/s 1.00 350 350 30% 105
screws (Upson)
Federal Moulded Doors HDF (40mm x 800mm x 2100mm) -Pateco
2.0 set/s 2.00 350 700 20% 140
Brand
- -
Door Hardwares - -
1.0 Replacement of S.S Screw of Butterfly hinges set/s 3.00 150 450 -
- -
Wood Mouldings & Sash Works - -
1.0 White PVC Cornice at T&B lm 6.11 150 917 -
3.0 Baseboards using 3/4 thk ficem board lm 14.48 700 10,136 30% 3,041
4.0 ACU Moulding set/s 1.00 700 700 20% 140
- -
Floor Finishes - -
1.0 Floor Tiles 600x600mm, Arkitek white V6500 sqm 7.87 270 2,125 40% 850
2.0 Floor Tiles 600x600mm, Matte Tile(BTN329)- T & B CL03 sqm 2.28 270 616 40% 246
- -
Painting Works - -
1.00 Doors and Jambs - Spray finished (lacquer type) set/s 2.00 1,100 2,200 40% 880
2.00 Ceilings (main) sqm 10.67 220 2,347 30% 704
3.00 Baseboard (painted on boysen - 0169 fossil tan gloss automotive finish) lm 14.48 180 2,606 20% 521
5.00 Cornice at T&B lm 6.11 180 1,100 -
Wall painting (Non-Accent and Accent Walls) including surface
6.0 sqm 28.24 220 6,213 50% 3,107
preparation
ACU Moulding (painted on boysen - 0169 fossil tan gloss automotive
8.0 set/s 1.00 350 350 70
finish) 20%
- -
Amenities - -
Refurbishing & Repainting of Bedbox (incldg addtl framing - used existing
1.0 set/s 1.00 2,500 2,500 30% 750
framing at the dismantle headboard)
Refurbishing & Repainting of Dresser Table Replacement of Laminate & Edging
2.0 set/s 1.00 2,500 2,500 20% 500
(aluminum)
500mmx 750mm x 6mm Reflected Mirror with 1" thk Beveled all sides-
3.0 set/s 1.00 1,800 1,800 -
Vanity Mirror
Repainting and refurbishing including replacement of laminates and edging
4.0 set/s 2.00 2,000 4,000 -
aluminum of side table
Closet Cabinet with Laminated Door with side ledge & shoe rack & Luggage
5.00 set/s 1.00 2,500 2,500 30% 750
Rack in duco paint.
- -
2.0 T&B - -

1.0 Ceiling Repainting @ T&B sqm 2.28 220 502 -

2.0 Regrouting of Main Wall Tiles sqm 8.51 150 1,277 -

3.0 Accent Wall Tiles KY10 sqm 4.68 250 1,170 -

Waterproofing works,elastomeric (2 coats primer & 4 coats rubberize


4.0 sqm 3.50 750 2,627 -
membrane with sealer (3 years warranty) - campbridge manufacturer

soap niche 1000 mm x 300 mm x 3" depth in 600 mm x 600 mm matt


5.0 set/s 1.00 350 350 -
ceramic tile 2-6d6o481-J1
6.0 Replacement of Lavatory incl Accessories (OSM-Labor Only) set/s 1.00 550 550 -

7.0 Replacement of Shower Head, Mixer, Spout (OSM-Labor Only) sets 1.00 550 550 -

8.0 Replacement of Floor Drain(OSM-Labor Only) sets 1.00 150 150 -

9.0 pc/s 1.00 250 250 -


Ceiling Exhaust (OSM-labor Only)
- -
3.0 Dismantling & Chipping Works - -
1.00 Dismantling of Existing Main Room and T&B Floor Tiles sqm 10.15 300 3,045 -
2.00 Dismantling of Existing Wall Tiles @ T&B sqm 13.19 350 4,618 -
3.00 Dismantling of Existing Door (T&B) set/s 1.00 250 250 -
4.00 Dismantling of Existing Dresser Mirror w/ Frame set/s 1.00 300 300 -
5.00 Dismantling of Existing Headboard set/s 1.00 1,000 1,000 -
6.00 Dismantling of Drop Ceiling set/s 1.00 1,500 1,500 -
Demolitionof wall for the new opening of new ante cabinet and relocation
7.00 set/s 1.00 1,800 1,800 100% 1,800
of SDB
8.00 Dismantling of Existing Door ( Main Room) set/s 2.00 1,100 2,200 -
9.00 Wall Mirror w/ Frame set/s 1 200 200 80% 160
8.00 Dismantling of ACU Molding set/s 1.00 150 150 100% 150
9.00 Dismantling of Grab Bar set/s 1.00 150 150 100% 150
10.00 Dismantling of Lavatory set/s 1.00 550 550 -
11.00 Dismantling of Floor drain set/s 1.00 150 150 100% 150
-
Executive Room 1 79,687 23,070
5 Executive Room # 616 - Bronze 1 79,687 6.282080961 1.884624288 23,906.03 28% 23,070
1.0 Main Room -
Ceiling Finishes -
1.0 9mm thk gypsum board on metal frame due to dismantling of dropped sqm 2.88 750 2,160 60% 1,296
2.0 ceiling Lamp in Black (dresser - 1 pc) - 7W LED Light (daylight)
Pendant set/s 2.00 260 520 -
3.0 Cove Light lm 4.50 900 4,050 20% 810
- -
Wall Finishes - -
Surface Preparation for Leatherette, Wall Mirror, dresser mirror and
1.0 sqm 3.17 550 1,744 30% 523
headboard
6mm thk Reflected copper free clear/silver mirror glass with 1/4" thk
2.0 sqm 1.62 500 810 50% 405
plywood
6mm thk backing with
Reflected 10mm
copper groove
free dark grey mirror glass with 1/4" thk
3.0 sqm 1.18 500 590 50% 295
plywood backing and 10 mm groove 10mm Groove
4.0 2 3/4" thk foam with leatherette with 3/4" thk plywood backing sqm 0.85 650 553 30% 166
5.0 Headboard Wall accent on 1/2 thk plywood on paint finish sqm 7.00 1,200 8,400 50% 4,200
6.0 Reading Light pcs 2.00 120 240 -
- -
Door and Jambs - -
PVC Door White w/ louver incl accessories, incl. 304 Hinges and S/S
1.0 set/s 1.00 350 350 30% 105
screws (Upson)
Federal Moulded Doors HDF (40mm x 800mm x 2100mm) -Pateco
2.0 set/s 1.00 350 350 20% 70
Brand
- -
Door Hardwares - -
1.0 Replacement of S.S Screw of Butterfly hinges set/s 3.00 150 450 -
- -
Wood Mouldings & Sash Works - -
1.0 Baseboards using 3/4 thk ficem board lm 5.00 700 3,500 30% 1,050
2.0 White PVC Cornice at T&B lm 6.02 150 903 -
4.0 ACU Moulding set/s 1.00 700 700 20% 140
- -
Floor Finishes - -
1.0 Floor Tiles homogeneous tiles, arkitek white V6500 sqm 2.56 270 691 40% 276
2.0 Floor Tiles 600x600mm, arkitek white CL03 sqm 2.18 270 589 40% 235
3.0 Regrouting of Main Floor Tiles sqm 10.66 150 1,599 -
- -
Painting Works - -
1.00 Doors and Jambs - Spray finished (lacquer type) set/s 2.00 1,100 2,200 40% 880
2.00 Ceilings (main) sqm 13.46 280 3,769 30% 1,131

3.00 Baseboard (painted on boysen - 0169 fossil tan gloss automotive finish) lm 5.00 180 900 20% 180

5.00 Cornice at T&B lm 6.02 180 1,084 -


Wall painting (Non-Accent and Accent Walls) including surface
6.0 sqm 40.79 220 8,975 50% 4,487
preparation
ACU Moulding (painted on boysen - 0169 fossil tan gloss automotive
8.0 set/s 1.00 350 350 70
finish) 20%
- -
Amenities - -
Refurbishing & Repainting of Bedbox (incldg addtl framing - used existing
1.0 set/s 1.00 2,500 2,500 30% 750
framing at the dismantle headboard)

2.0 Refurbishing and Repainting of Dinette Table set/s 1.00 2,500 2,500 20% 500

500mmx 750mm x 6mm Reflected Mirror with 1" thk Beveled all sides-
3.0 set/s 1.00 1,800 1,800 -
Vanity Mirror

60mm thk TV Ledge (200mmx900mm) laminated top ledge (grey oak


4.0 set/s 1.00 1,500 1,500 -
wood ) in gloss automotive paint

Closet Cabinet with Laminated Door with side ledge & shoe rack & Luggage
5.0 set/s 1.00 2,400 2,400 30% 720
Rack in duco paint.

Refurbishing & Repainting of Dresser Table Replacement of Laminate & Edging


6.0 set/s 1.00 1,800 1,800 20% 360
(aluminum)

Repainting and refurbishing including replacement of laminates and edging


7.0 set/s 2.00 2,500 5,000 -
aluminum of side table
- -
2.0 T&B - -

1.0 Ceiling Repainting @ T&B sqm 2.18 220 480 -

2.0 Regrouting of Main Wall Tiles sqm 8.32 150 1,248 -

3.0 Accent Wall Tiles MP6351 sqm 4.68 250 1,170 100% 1,170

400mm x 800mm x 6mm Reflected Mirror with 2" frosted glass both
4.0 set/s 1.00 250 250 -
sides (OSM-Labor Only)

Waterproofing works,elastomeric (2 coats primer & 4 coats rubberize


5.0 sqm 3.38 750 2,538 -
membrane with sealer (3 years warranty) - campbridge manufacturer

soap niche 1000 mm x 300 mm x 3" depth in 600 mm x 600 mm matt


6.0 set/s 1.00 250 250 -
ceramic tile mp6351

7.0 Replacement of Shower Head, Mixer, Spout (OSM-Labor Only) sets 1.00 550 550 -

8.0 Replacement of Floor Drain(OSM-Labor Only) sets 1.00 150 150 -

9.0 Ceiling Exhaust (OSM-labor Only) pc/s 1.00 250 250 -


- -
3.0 Dismantling & Chipping Works - -
1.00 Dismantling of Existing Main Room and T&B Floor Tiles sqm 4.74 300 1,422 -
2.00 Dismantling of Existing Wall Tiles @ T&B sqm 4.68 300 1,404 -
3.00 Dismantling of Existing Door (T&B) set/s 1.00 250 250 -
4.00 Dismantling of Existing Headboard set/s 1.00 250 250 -
5.00 Wall Mirror w/ Frame set/s 1.00 1,000 1,000 80% 800
6.00 Dismantling of Drop Ceiling set/s 1.00 1,500 1,500 -

Demolitionof wall for the new opening of new ante cabinet and relocation
7.00 set/s 1.00 1,250 1,250 100% 1,250
of SDB
8.00 Dismantling of Existing Door ( Main Room) set/s 1.00 1,100 1,100 -
9.00 Dismantling of Existing Dresser Mirror w/ Frame set/s 1.00 200 200 -
10.00 Dismantling of Baseboard lm 5.00 150 750 100% 750
11.00 Dismantling of Existing Accent Wall at Dinette set/s 1.00 250 250 -
8.00 Dismantling of ACU Molding set/s 1.00 150 150 100% 150
9.00 Dismantling of Grab Bar set/s 1.00 150 150 100% 150
10.00 Dismantling of Floor drain set/s 1.00 150 150 100% 150
-
Regency Room 2 182,460 50,646
6 Regency 1 Room # 615 - Grey 1 80,375 6.336353901 1.90090617 24,112.57 25% 21,291
1.0 Main Room -
Ceiling Finishes -
1.0 9mm thk gypsum board on metal frame due to dismantling of dropped sqm 5.76 750 4,320 60% 2,592
2.0 ceiling Lamp in Black (dresser - 1 pc) - 7W LED Light (daylight)
Pendant set/s 2.00 260 520 -
3.0 LED Striplight (4.8W - Red) with power supply lm 3.00 260 780 -
4.0 Cove Light lm 3.80 900 3,420 20% 684
- -
Wall Finishes - -
Surface Preparation for Leatherette, Wall Mirror, dresser mirror and
1.0 sqm 3.17 550 1,744 30% 523
headboard
6mm thk Reflected copper free clear/silver mirror glass with 1/4" thk
2.0 sqm 1.62 500 810 50% 405
plywood
6mm thk backing with
Reflected 10mm
copper groove
free dark grey mirror glass with 1/4" thk
3.0 sqm 1.18 500 590 50% 295
plywood backing and 10 mm groove 10mm Groove
4.0 2 3/4" thk foam with leatherette with 3/4" thk plywood backing sqm 0.85 650 553 30% 166
5.0 Headboard Wall accent on 1/2 thk plywood on paint finish sqm 7.00 1,200 8,400 50% 4,200
6.0 Reading Light pcs 2.00 120 240 -
- -
Door and Jambs - -
PVC Door White w/ louver incl accessories, incl. 304 Hinges and S/S
1.0 set/s 1.00 350 350 30% 105
screws (Upson)
2.0 Refurbish Door and Jamb set/s 1.00 350 350 50% 175
- -
Door Hardwares - -
1.0 Replacement of S.S Screw of Butterfly hinges set/s 3.00 - -
- -
Wood Mouldings & Sash Works - -
1.0 Baseboards using 3/4 thk ficem board lm 2.00 700 1,400 30% 420
2.0 White PVC Cornice at T&B lm 6.94 150 1,041 -
4.0 ACU Moulding set/s 1.00 700 700 20% 140
- -
Floor Finishes - -
1.0 Replacement of Existing Floor Tiles (40x40cm) sqm 1.12 270 302 -
2.0 Regrouting of Floor Tiles @ T&B sqm 2.95 150 443 -
3.0 Regrouting of Main Wall Tiles sqm 12.37 150 1,856 -
- -
Painting Works - -
1.00 Doors and Jambs - Spray finished (lacquer type) set/s 1.00 1,100 1,100 40% 440
2.00 Ceilings (main) sqm 14.97 280 4,192 30% 1,257

3.00 Baseboard (painted on boysen - 0169 fossil tan gloss automotive finish) lm 14.53 180 2,615 20% 523

5.00 Cornice at T&B lm 6.94 180 1,249 -


Wall painting (Non-Accent and Accent Walls) including surface
6.0 sqm 35.20 220 7,744 50% 3,872
preparation
ACU Moulding (painted on boysen - 0169 fossil tan gloss automotive
8.0 set/s 1.00 350 350 70
finish) 20%
- -
Amenities - -
Refurbishing & Repainting of Bedbox (incldg addtl framing - used existing
1.0 set/s 1.00 2,500 2,500 30% 750
framing at the dismantle headboard)

2.0 Refurbishing and Repainting of Dinette Table set/s 1.00 2,500 2,500 20% 500

3.0 Repainting of Dresser Mirror Frame set/s 1.00 2,400 2,400 -

Closet Cabinet with Laminated Door with side ledge & shoe rack & Luggage
4.0 set/s 1.00 2,400 2,400 30% 720
Rack in duco paint.

Refurbishing & Repainting of Dresser Table Replacement of Laminate & Edging


5.0 set/s 1.00 1,800 1,800 20% 360
(aluminum)

Repainting and refurbishing including replacement of laminates and edging


6.0 set/s 2.00 2,500 5,000 -
aluminum of side table
- -
2.0 T&B - -
1.0 Ceiling Repainting @ T&B sqm 2.95 220 649 -
2.0 600mm x 600mm Main Wall Tiles, double loaded - matrix white V00 sqm 12.90 280 3,611 30% 1,083
3.0 Accent Wall Tiles MP6351 sqm 5.04 270 1,361 -

Waterproofing works,elastomeric (2 coats primer & 4 coats rubberize


4.0 sqm 4.34 750 3,254 -
membrane with sealer (3 years warranty) - campbridge manufacturer

soap niche 1000 mm x 300 mm x 3" depth in 600 mm x 600 mm matt


5.0 set/s 1.00 250 250 -
ceramic tile mp6351

6.0 Replacement of Shower Head, Mixer, Spout (OSM-Labor Only) sets 1.00 550 550 -

- -
3.0 Dismantling & Chipping Works - -
1.00 Dismantling of Existing Main Room and T&B Floor Tiles sqm 4.07 300 1,221 -
2.00 Dismantling of Existing Wall Tiles @ T&B sqm 5.04 300 1,512 -
3.00 Dismantling of Existing Door (T&B) set/s 1.00 250 250 -
4.00 Dismantling of Existing Headboard set/s 1.00 1,000 1,000 -
5.00 Wall Mirror w/ Frame set/s 1.00 200 200 80% 160
6.00 Dismantling of Drop Ceiling set/s 1.00 1,500 1,500 -
Demolitionof wall for the new opening of new ante cabinet and relocation
7.00 set/s 1.00 1,250 1,250 100% 1,250
of SDB
8.00 Dismantling of Existing Door ( Main Room) set/s 1.00 1,100 1,100 -
9.00 Dismantling of Existing Dresser Mirror w/ Frame set/s 1.00 200 200 -
10.00 Dismantling of Baseboard lm 2.00 150 300 100% 300
11.00 Dismantling of Existing Accent Wall at Dinette set/s 1.00 200 200 -
8.00 Dismantling of ACU Molding set/s 1.00 150 150 100% 150
9.00 Dismantling of Grab Bar set/s 1.00 150 150 100% 150
-
7 Regency 2 Room # 703 - Grey 1 102,085 8.047834077 2.414350223 30,625.49 27% 29,355
1.0 Main Room -
Ceiling Finishes -
1.0 9mm thk gypsum board on metal frame due to dismantling of dropped sqm 5.76 750 4,320 60% 2,592
ceiling Lamp in Black (dresser - 1 pc) - 7W LED Light (daylight)
2.0 Pendant set/s 2.00 260 520 -
3.0 LED Striplight (4.8W - Red) with power supply lm 3.00 550 1,650 -
4.0 Cove Light lm 4.00 900 3,600 20% 720
- -
Wall Finishes - -

Surface Preparation for Leatherette, Wall Mirror, dresser mirror and


1.0 sqm 3.17 550 1,744 30% 523
headboard

6mm thk Reflected copper free clear/silver mirror glass with 1/4" thk
2.0 sqm 1.62 500 810 50% 405
plywood backing with 10mm groove

6mm thk Reflected copper free dark grey mirror glass with 1/4" thk
3.0 sqm 1.18 500 590 50% 295
plywood backing and 10 mm groove 10mm Groove

4.0 2 3/4" thk foam with leatherette with 3/4" thk plywood backing sqm 0.85 650 553 30% 166

5.0 Headboard Wall accent on 1/2 thk plywood on paint finish sqm 7.00 1,200 8,400 50% 4,200

6.0 Reading Light pcs 3.00 120 360 -


7.0 Wall Mirror Paint set/s 1.00 2,500 2,500 80% 2,000
- -
Door and Jambs - -
PVC Door White w/ louver incl accessories, incl. 304 Hinges and S/S
1.0 set/s 1.00 350 350 30% 105
screws (Upson)
Federal Moulded Doors HDF (40mm x 800mm x 2100mm) -Pateco
2.0 set/s 1.00 350 350 20% 70
Brand
- -
Door Hardwares - -
1.0 Replacement of S.S Screw of Butterfly hinges set/s 3.00 150 450 -
- -
Wood Mouldings & Sash Works - -
1.0 Baseboards using 3/4 thk ficem board lm 16.22 750 12,165 30% 3,650
2.0 White PVC Cornice at T&B lm 6.72 150 1,008 -
4.0 ACU Moulding set/s 1.00 700 700 20% 140
- -
Floor Finishes - -
1.0 Floor Tiles 600x600mm, homogeneous tiles, arkitek white V6500 sqm 4.96 270 1,339 40% 536
2.0 Floor Tiles 600x600mm, arkitek white CL03 sqm 2.77 270 748 40% 299
3.0 Regrouting of Main Floor Tiles) 13.32 150 1,998 -
- -
Painting Works - -
1.00 Doors and Jambs - Spray finished (lacquer type) set/s 1.00 1,100 1,100 40% 440
2.00 Ceilings (main) sqm 16.12 280 4,514 30% 1,354

3.00 Baseboard (painted on boysen - 0169 fossil tan gloss automotive finish) lm 16.22 180 2,920 20% 584

5.00 Cornice at T&B lm 6.72 180 1,210 -

Wall painting (Non-Accent and Accent Walls) including surface


6.0 sqm 37.22 220 8,188 50% 4,094
preparation
ACU Moulding (painted on boysen - 0169 fossil tan gloss automotive
8.0 set/s 1.00 350 350 70
finish) 20%
- -
Amenities - -
1.0 Refurbishing & Repainting of Bedbox (incldg addtl framing - used existing set/s 2.00 2,500 5,000 30% 1,500
2.0 Repaint of Dresser Mirror Frame set/s 1.00 1,500 1,500 -
3.0 Refurbishing & Repainting of Dresser Table Replacement of Laminate & Edging set/s 1.00 2,000 2,000 20% 400
4.0 Closet Cabinet with Laminated Door with side ledge & shoe rack & Luggage set/s 1.00 2,400 2,400 30% 720
5.0 Repainting and refurbishing including replacement of laminates and edging set/s 3.00 2,500 7,500 -
7.0 Refurbishing and Repainting of Dinette Table set/s 1.00 1,800 1,800 20% 360
- -
2.0 T&B - -
1.0 Ceiling Repainting @ T&B sqm 2.77 220 609 -
2.0 Regrouting Main Wall Tiles sqm 9.98 150 1,497 -
3.0 Accent Wall Tiles MP6351 sqm 4.68 250 1,170 -

Waterproofing works,elastomeric (2 coats primer & 4 coats rubberize


4.0 sqm 4.11 750 3,084 -
membrane with sealer (3 years warranty) - campbridge manufacturer

soap niche 1000 mm x 300 mm x 3" depth in 600 mm x 600 mm matt


5.0 set/s 1.00 250 250 -
ceramic tile mp6351

6.0 Replacement of Shower Head, Mixer, Spout (OSM-Labor Only) sets 1.00 550 550 -

7.0 Replacement of Floor Drain(OSM-Labor Only) sets 1.00 150 150 -


- -
3.0 Dismantling & Chipping Works - -
1.00 Dismantling of Existing Main Room and T&B Floor Tiles sqm 7.73 300 2,319 -
2.00 Dismantling of Existing Wall Tiles @ T&B sqm 4.68 350 1,638 -
3.00 Dismantling of Existing Door (T&B) set/s 1.00 250 250 -
4.00 Dismantling of Existing Headboard set/s 1.00 1,000 1,000 -
6.00 Dismantling of Drop Ceiling set/s 1.00 1,500 1,500 -
7.00 Dismantling of Cabinet set/s 1.00 1,250 1,250 100% 1,250
8.00 Dismantling of Existing Door ( Main Room) set/s 1.00 1,100 1,100 -
9.00 Dismantling of Baseboard lm 16.22 150 2,433 100% 2,433
10.00 Dismantling of Existing Accent Wall at Dinette set/s 1.00 200 200 -
8.00 Dismantling of ACU Molding set/s 1.00 150 150 100% 150
9.00 Dismantling of Grab Bar set/s 1.00 150 150 100% 150
10.00 Dismantling of Floor drain set/s 1.00 150 150 100% 150
-
Design B - WTA Design 7 500,504 116,126
Premium Room 1 70,893 16,356
8 Premium Room # 614 1 70,893 5.588800994 1.676640298 21,267.80 24% 16,356
1.0 Main Room -
Ceiling Finishes -
1.0 9mm thk gypsum board on metal frame due to dismantling of dropped sqm 2.88 750 2,160 60% 1,296
2.0 ceilingdia. Pinlights - 7w warmwhite with clear glass diffuser
10cm set/s 1.00 260 260 -
3.0 Cove Light lm 5.58 900 5,022 20% 1,004
-
Wall Finishes - -
Surface Preparation for Leatherette, Wall Mirror, dresser mirror and
1.0 sqm 8.32 550 4,576 30% 1,373
headboard
6mm thk Reflected mirror with 50mm frame painted in automotive paint
2.0 sqm 1.00 550 550 60% 330
finish-Wall Mirror
3.0 Side Table in Accent on Laminate Finish with 20mm frame with backlit sqm 4.08 1,250 5,100 -
4.0 Wall on Wallpaper sqm 1.64 550 902 -
5.0 2 3/4" thk foam with leatherette with 3/4" thk plywood backing sqm 3.63 650 2,360 30% 708
- -
Door and Jambs - -
PVC Door White w/ louver incl accessories, incl. 304 Hinges and S/S
1.0 set/s 1.00 350 350 30% 105
screws (Upson)
- -
Door Hardwares - -
1.0 Replacement of S.S Screw of Butterfly hinges set/s 3.00 150 450 -
- -
Wood Mouldings & Sash Works - -
1.0 Baseboards using 3/4 thk ficem board lm 9.86 750 7,395 30% 2,219
2.0 White PVC Cornice at T&B lm 5.48 150 822 -
4.0 ACU Moulding set/s 1.00 700 700 20% 140
- -
Floor Finishes - -
1.0 Floor Tiles 200x1200mm, Candlewood Blanco-Non Porous 201201J sqm 4.86 270 1,312 70% 919
2.0 Regrouting of Floor Tiles @ T&B sqm 1.71 150 257 -
- -
Painting Works - -
1.00 Doors and Jambs - Spray finished (lacquer type) set/s 1.00 1,100 1,100 40% 440
2.00 Ceilings (main) sqm 7.66 220 1,685 30% 506
Baseboard (painted on boysen 0314 trade secret) gloss automotive
3.00 lm 9.86 180 1,775 20% 355
finish
5.00 Cornice at T&B lm 5.48 180 986 -
Wall painting (Non-Accent and Accent Walls) including surface
6.0 sqm 20.51 220 4,513 50% 2,257
preparation
7.0 Cornice sqm 9.86 180 1,775 -
ACU Moulding (painted on boysen - 0169 fossil tan gloss automotive
8.0 set/s 1.00 350 350 20% 70
finish)
- -
Amenities - -
1.0 Refurbishing & Repainting of Bedbox (incldg addtl framing - used existing set/s 1.00 2,500 2,500 30% 750
2.0 Refurbishing & Repainting of Dresser Table Replacement of Laminate & Edging set/s 1.00 2,500 2,500 20% 500
800mm x 1000mm x 6mm Reflected mirror with 50mm frame painted in
3.0 set/s 1.00 2,000 2,000 -
automotive finish- Vanity Mirror
4.0 Repainting and refurbishing including replacement of laminates and edging set/s 1.00 1,800 1,800 -
- -
2.0 T&B - -
1.0 Ceiling Repainting @ T&B sqm 1.71 220 376 -
2.0 Regrouting of Main Wall Tiles sqm 8.44 50 422 -
3.0 200mm x 300mm Accent Wall Tiles ORANI sqm 3.24 280 907 100% 907
400mm x 800mm x 6mm Reflected Mirror with 2" frosted glass both
4.0 set/s 1.00 280 280 -
sides (OSM-Labor Only)
soap niche 500 mm x 200mm x 3" depth in 200 mm x 300 mm wall tile
5.0 set/s 1.00 250 250 -
(orani)
6.0 Replacement of Water closet incl. Accessories (OSM-Labor Only) set/s 1.00 550 550 -
7.0 Replacement of Lavatory incl Accessories (OSM-Labor Only) set/s 1.00 550 550 -
8.0 6mm thk Mirror @ T & B (OSM-Labor Only) sets 1.00 182 182 -
9.0 Lavatory Faucet (OSM-Labor Only) sets 1.00 500 500 -
10.0 Replacement of Shower Head, Mixer, Spout (OSM-Labor Only) sets 1.00 550 550 -
12.0 Replacement of Floor Drain(OSM-Labor Only) sets 1.00 150 150 -
13.0 Ceiling Exhaust (OSM-labor Only) pc/s 1.00 250 250 -
- -
3.0 Dismantling & Chipping Works - -
1.00 Dismantling of Existing Main Room Floor Tiles sqm 4.86 300 1,458 -
2.00 Dismantling of Existing Wall Tiles @ T&B sqm 11.68 350 4,089 -
3.00 Dismantling of Existing Dresser Mirror w/ Frame set/s 1.00 200 200 -
4.00 Dismantling of Existing Headboard set/s 1.00 1,000 1,000 -
5.00 Dismantling of Drop Ceiling sqm 1.00 1,500 1,500 -
6.00 Dismantling of Existing Door ( Main Room) set/s 1.00 1,100 1,100 -
7.00 Dismantling of Existing Door (T&B) set/s 1.00 350 350 -
8.00 Dismantling of Baseboard lm 9.86 150 1,479 100% 1,479
8.00 Dismantling of ACU Molding set/s 1.00 150 150 100% 150
9.00 Dismantling of Grab Bar set/s 1.00 150 150 100% 150
10.00 Dismantling of Watercloset set/s 1.00 550 550 100% 550
11.00 Dismantling of Lavatory set/s 1.00 550 550 -
12.00 Dismantling of Floor drain set/s 1.00 150 150 100% 150
-
Deluxe Room 4 287,199 63,107
9 Deluxe Room # 611 1 64,092 5.0526401 1.51579203 19,227.48 21% 13,374
1.0 Main Room -
Ceiling Finishes -
1.0 9mm thk gypsum board on metal frame due to dismantling of dropped sqm 2.88 750 2,160 60% 1,296
2.0 ceiling
10cm dia Pinlights - 7W Warmwhite with Clear Glass Diffuser set/s 1.00 260 260 -
- -
Wall Finishes - -
Surface Preparation for Leatherette, Wall Mirror, Side Table Accent and
1.0 sqm 7.95 550 4,373 30% 1,312
Wallpaper
6mm thk Reflected mirror with 1/4 thk plywood with 50mm frame painted
2.0 set/s 1.28 550 704 50% 352
in automotive paint finish-Wall Mirror

3.0 LED Striplight (4.8w, 9v- red) with power supply lm 4.80 550 2,640 -

4.0 LED Striplight (4.8w, 9v- red) with power supply lm 4.80 50 240 -

5.0 2 3/4" thk foam with leatherette with 3/4" thk plywood backing sqm 2.32 650 1,508 30% 452

Side table accent on laminated finish (merino laminate novara teak


6.0 sqm 2.40 2,400 5,760 -
10953 chalky) with 20mm frame
- -
Door and Jambs - -
PVC Door White w/ louver incl accessories, incl. 304 Hinges and S/S
1.0 set/s 1.00 350 350 30% 105
screws (Upson)
- -
Door Hardwares - -
1.0 Replacement of S.S Screw of Butterfly hinges set/s 3.00 150 450 -
- -
Wood Mouldings & Sash Works - -
1.0 White PVC Cornice at T&B lm 6.00 170 1,020 -
4.0 ACU Moulding set/s 1.00 700 700 20% 140
- -
Floor Finishes - -
1.0 Regrouting of Main Floor Tiles sqm 9.26 150 1,389 -
2.0 Regrouting of Floor Tiles @ T&B sqm 2.24 50 112 -
3.0 Replacement of Existing Floor Tiles sqm 2.88 270 778 -
- -
Painting Works - -

1.00 Doors and Jambs - Spray finished (lacquer type) set/s 2.00 1,100 2,200 40% 880

2.00 Ceilings (main) sqm 12.06 280 3,377 30% 1,013

Baseboard (painted on boysen 0314 trade secret) gloss automotive


3.00 lm 16.00 180 2,880 20% 576
finish

5.00 Cornice at T&B lm 6.00 180 1,080 -

Wall painting (Non-Accent and Accent Walls) including surface


6.0 sqm 31.89 220 7,016 50% 3,508
preparation
ACU Moulding (painted on boysen - 0169 fossil tan gloss automotive
8.0 set/s 1.00 350 350 70
finish) 20%
- -
Amenities - -
1.0 Refurbishing & Repainting of Bedbox (incldg addtl framing - used existing set/s 1.00 2,500 2,500 30% 750
2.0 Refurbishing & Repainting of Dresser Table Replacement of Laminate & Edging set/s 1.00 2,500 2,500 20% 500
800mm x 1000mm x 6mm Reflected mirror with 50mm frame painted in
3.0 set/s 1.00 1,800 1,800 -
automotive finish- Vanity Mirror
Closet Cabinet with Laminated Door with side ledge & shoe rack & Luggage
4.0 set/s 1.00 2,400 2,400 30% 720
Rack in duco paint.
Repainting and refurbishing including replacement of laminates and edging
5.0 set/s 2.00 1,800 3,600 -
aluminum of side table
- -
2.0 T&B - -
1.0 Ceiling Repainting @ T&B sqm 2.24 220 493 -
2.0 Regrouting of Main Wall Tiles sqm 8.25 150 1,238 -
3.0 Accent Wall Tiles S268D sqm 4.68 270 1,264 -
4.0 Replacement of Lavatory incl Accessories (OSM-Labor Only) set/s 1.00 550 550 -
5.0 Lavatory Faucet (OSM-Labor Only) sets 1.00 550 550 -
6.0 Replacement of Shower Head, Mixer, Spout (OSM-Labor Only) sets 1.00 550 550 -
7.0 Replacement of Floor Drain(OSM-Labor Only) sets 1.00 150 150 -
- -
3.0 Dismantling & Chipping Works - -
1.00 Dismantling of Existing Main Room Floor Tiles sqm 2.88 300 864 -
2.00 Dismantling of Existing Wall Tiles @ T&B sqm 4.68 350 1,638 -
3.00 Dismantling of Existing Door (T&B) set/s 1.00 250 250 -
4.00 Dismantling of Existing Dresser Mirror w/ Frame set/s 1.00 200 200 -
5.00 Dismantling of Existing Headboard set/s 1.00 1,000 1,000 -
6.00 Dismantling of Drop Ceiling sqm 1.00 1,500 1,500 -
Demolitionof wall for the new opening of new ante cabinet and relocation
7.00 set/s 1.00 1,250 1,250 100% 1,250
of SDB
8.00 Dismantling of ACU Molding set/s 1.00 150 150 100% 150
9.00 Dismantling of Grab Bar set/s 1.00 150 150 100% 150
11.00 Dismantling of Floor drain set/s 1.00 150 150 100% 150
-
10 Deluxe Room # 617 1 86,055 6.784111173 2.035233352 25,816.48 29% 22,438
1.0 Main Room -
Ceiling Finishes -
9mm thk gypsum board on metal frame due to dismantling of dropped
1.0 sqm 2.88 750 2,160 60% 1,296
ceiling

2.0 10cm dia Pinlights - 7W Warmwhite with Clear Glass Diffuser set/s 1.00 260 260 -

- -
Wall Finishes - -
Surface Preparation for Leatherette, Wall Mirror, Side Table Accent and
1.0 sqm 7.95 550 4,373 30% 1,312
Wallpaper

6mm thk Reflected mirror with 1/4 thk plywood with 50mm frame painted
2.0 set/s 1.28 500 640 50% 320
in automotive paint finish-Wall Mirror

3.0 LED Striplight (4.8w, 9v- red) with power supply lm 4.80 550 2,640 -

4.0 LED Striplight (4.8w, 9v- red) with power supply lm 4.80 550 2,640 -

5.0 2 3/4" thk foam with leatherette with 3/4" thk plywood backing sqm 2.32 650 1,508 30% 452

Side table accent on laminated finish (merino laminate novara teak


6.0 sqm 2.40 2,400 5,760 -
10953 chalky) with 20mm frame
- -
Door and Jambs - -

PVC Door White w/ louver incl accessories, incl. 304 Hinges and S/S
1.0 set/s 1.00 350 350 30% 105
screws (Upson)
- -
Door Hardwares - -

1.0 Replacement of S.S Screw of Butterfly hinges set/s 3.00 150 450 -

- -
Wood Mouldings & Sash Works - -
1.0 Baseboards using 3/4 thk ficem board lm 15.14 750 11,355 30% 3,407
2.0 White PVC Cornice at T&B lm 5.95 150 893 -
4.0 ACU Moulding set/s 1.00 700 700 20% 140
- -
Floor Finishes - -

1.0 Floor Tiles 200x1200mm, Candlewood Blanco-Non Porous 201201J sqm 8.56 270 2,311 70% 1,618

2.0 Floor Tiles 600x600MM, GCM 01, Non Skid Tiles (T&B) CL03 sqm 2.20 270 594 40% 238

- -
Painting Works - -
1.00 Doors and Jambs - Spray finished (lacquer type) set/s 2.00 1,100 2,200 40% 880

2.00 Ceilings (main) sqm 11.36 280 3,181 30% 954


Baseboard (painted on boysen 0314 trade secret) gloss automotive
3.00 lm 15.14 180 2,725 20% 545
finish
5.00 Cornice at T&B lm 5.95 180 1,071 -
Wall painting (Non-Accent and Accent Walls) including surface
6.0 sqm 29.83 220 6,562 50% 3,281
preparation
ACU Moulding (painted on boysen - 0169 fossil tan gloss automotive
8.0 set/s 1.00 350 350 70
finish) 20%
- -
Amenities - -

Refurbishing & Repainting of Bedbox (incldg addtl framing - used existing


1.0 set/s 1.00 2,500 2,500 30% 750
framing at the dismantle headboard)

Refurbishing & Repainting of Dresser Table Replacement of Laminate & Edging


2.0 set/s 1.00 2,500 2,500 20% 500
(aluminum)

800mm x 1000mm x 6mm Reflected mirror with 50mm frame painted in


3.0 set/s 1.00 1,800 1,800 -
automotive finish- Vanity Mirror

Closet Cabinet with Laminated Door with side ledge & shoe rack & Luggage
4.0 set/s 1.00 2,400 2,400 30% 720
Rack in duco paint.

Repainting and refurbishing including replacement of laminates and edging


5.0 set/s 2.00 1,800 3,600 -
aluminum of side table
- -
2.0 T&B - -
1.0 Ceiling Repainting @ T&B sqm 2.20 220 484 -
2.0 Regrouting of Main Wall Tiles sqm 8.13 150 1,220 -
3.0 Accent Wall Tiles S268D sqm 4.68 250 1,170 100% 1,170

400mm x 800mm x 6mm Reflected Mirror with 2" frosted glass both
4.0 set/s 1.00 280 280 -
sides (OSM-Labor Only)

Waterproofing works,elastomeric (2 coats primer & 4 coats rubberize


5.0 sqm 3.39 750 2,543 -
membrane with sealer (3 years warranty) - campbridge manufacturer

soap niche 400 mm x 200mm x 3" depth in 200 mm x 600 mm wall tile
6.0 set/s 1.00 250 250 -
(ski cb marfil)

7.0 Replacement of Water closet incl. Accessories (OSM-Labor Only) set/s 1.00 550 550 -

8.0 Replacement of Lavatory incl Accessories (OSM-Labor Only) set/s 1.00 550 550 -

9.0 Replacement of Shower Head, Mixer, Spout (OSM-Labor Only) sets 1.00 550 550 -

10.0 Replacement of Floor Drain(OSM-Labor Only) sets 1.00 150 150 -

11.0 Ceiling Exhaust (OSM-labor Only) pc/s 1.00 250 250 -


- -
3.0 Dismantling & Chipping Works - -

1.00 Dismantling of Existing Main Room and T&B Floor Tiles sqm 10.76 300 3,228 -

2.00 Dismantling of Existing Wall Tiles @ T&B sqm 4.68 350 1,638 -
3.00 Dismantling of Existing Door (T&B) set/s 1.00 250 250 -

4.00 Dismantling of Existing Dresser Mirror w/ Frame set/s 1.00 200 200 -

5.00 Dismantling of Existing Headboard set/s 1.00 1,000 1,000 -


6.00 Wall Mirror w/ Frame set/s 1.00 200 200 80% 160
7.00 Dismantling of Drop Ceiling sqm 1.00 1,500 1,500 -
Demolitionof wall for the new opening of new ante cabinet and relocation
8.00 set/s 1.00 1,250 1,250 100% 1,250
of SDB
9.00 Dismantling of Baseboard lm 15.14 150 2,271 100% 2,271
8.00 Dismantling of ACU Molding set/s 1.00 150 150 100% 150
9.00 Dismantling of Grab Bar set/s 1.00 150 150 100% 150
10.00 Dismantling of Watercloset set/s 1.00 550 550 100% 550
11.00 Dismantling of Floor drain set/s 1.00 150 150 100% 150
-
11 Deluxe Room # 618 1 64,854 5.112713695 1.533814109 19,456.09 22% 12,695
1.0 Main Room -
Ceiling Finishes -
1.0 9mm thk gypsum board on metal frame due to dismantling of dropped sqm 2.88 750 2,160 60% 1,296
ceilingdia Pinlights - 7W Warmwhite with Clear Glass Diffuser
2.0 10cm set/s 1.00 260 260 -
- -
Wall Finishes - -
Surface Preparation for Leatherette, Wall Mirror, Side Table Accent and
1.0 sqm 7.95 550 4,373 30% 1,312
Wallpaper
6mm thk Reflected mirror with 1/4 thk plywood with 50mm frame painted
2.0 set/s 1.28 500 640 50% 320
in automotive paint finish-Wall Mirror

3.0 LED Striplight (4.8w, 9v- red) with power supply lm 4.80 550 2,640 -

4.0 LED Striplight (4.8w, 9v- red) with power supply lm 4.80 550 2,640 -

5.0 2 3/4" thk foam with leatherette with 3/4" thk plywood backing sqm 2.32 650 1,508 30% 452

Side table accent on laminated finish (merino laminate novara teak


6.0 sqm 2.40 2,400 5,760 -
10953 chalky) with 20mm frame

- -

Door and Jambs - -


PVC Door White w/ louver incl accessories, incl. 304 Hinges and S/S
1.0 set/s 1.00 350 350 30% 105
screws (Upson)
- -
Door Hardwares - -
1.0 Replacement of S.S Screw of Butterfly hinges set/s 3.00 150 450 -
- -
Wood Mouldings & Sash Works - -
1.0 White PVC Cornice at T&B lm 5.95 150 893 -
4.0 ACU Moulding set/s 1.00 700 700 20% 140
- -
Floor Finishes - -
1.0 Regrouting of Main Floor Tiles sqm 8.56 150 1,284 -
2.0 Regrouting of Floor Tiles @ T&B sqm 2.20 150 330 -
3.0 Replacement of Existing Floor Tiles sqm 2.24 270 605 -
- -
Painting Works - -
1.00 Doors and Jambs - Spray finished (lacquer type) set/s 2.00 1,100 2,200 40% 880
2.00 Ceilings (main) sqm 11.36 180 2,045 30% 613
Baseboard (painted on boysen 0314 trade secret) gloss automotive
3.00 lm 15.14 180 2,725 20% 545
finish
5.00 Cornice at T&B lm 5.95 180 1,071 -
Wall painting (Non-Accent and Accent Walls) including surface
6.0 sqm 29.83 220 6,562 50% 3,281
preparation
ACU Moulding (painted on boysen - 0169 fossil tan gloss automotive
8.0 set/s 1.00 352 352 70
finish) 20%
- -
Amenities - -
Refurbishing & Repainting of Bedbox (incldg addtl framing - used existing
1.0 set/s 1.00 2,500 2,500 30% 750
framing at the dismantle headboard)

Refurbishing & Repainting of Dresser Table Replacement of Laminate & Edging


2.0 set/s 1.00 2,500 2,500 20% 500
(aluminum)

3.0 Repainting of Dresser Mirror Frame set/s 1.00 2,000 2,000 -

Closet Cabinet with Laminated Door with side ledge & shoe rack & Luggage
4.0 set/s 1.00 2,400 2,400 30% 720
Rack in duco paint.

Repainting and refurbishing including replacement of laminates and edging


5.0 set/s 2.00 1,800 3,600 -
aluminum of side table
- -
2.0 T&B - -

1.0 Ceiling Repainting @ T&B sqm 2.20 220 484 -

2.0 Regrouting of Main Wall Tiles sqm 8.13 150 1,220 -

3.0 Accent Wall Tiles S268D sqm 4.68 270 1,264 -

400mm x 800mm x 6mm Reflected Mirror with 2" frosted glass both
4.0 set/s 1.00 280 280 -
sides (OSM-Labor Only)

5.0 Lavatory Faucet (OSM-Labor Only) sets 1.00 550 550 -

6.0 Replacement of Shower Head, Mixer, Spout (OSM-Labor Only) sets 1.00 550 550 -

7.0 Replacement of Floor Drain(OSM-Labor Only) sets 1.00 150 150 -

- -
3.0 Dismantling & Chipping Works - -
1.00 Dismantling of Existing Main Room and T&B Floor Tiles sqm 2.24 300 672 -

2.00 Dismantling of Existing Wall Tiles @ T&B sqm 4.68 350 1,638 -

3.00 Dismantling of Existing Door (T&B) set/s 1.00 250 250 -


4.00 Dismantling of Existing Dresser Mirror w/ Frame set/s 1.00 200 200 -

5.00 Dismantling of Existing Lighting Fixtures set/s 4.00 200 800 -

6.00 Dismantling of Existing Headboard set/s 1.00 1,000 1,000 -

7.00 Wall Mirror w/ Frame set/s 1.00 200 200 80% 160

8.00 Dismantling of Drop Ceiling sqm 1.00 1,500 1,500 -


Demolitionof wall for the new opening of new ante cabinet and relocation
9.00 set/s 1.00 1,250 1,250 100% 1,250
of SDB
8.00 Dismantling of ACU Molding set/s 1.00 150 150 100% 150

9.00 Dismantling of Grab Bar set/s 1.00 150 150 100% 150
-
12 Deluxe Room # 620 1 72,199 5.691782723 1.707534817 21,659.69 24% 14,600
1.0 Main Room -
Ceiling Finishes -
1.0 9mm thk gypsum board on metal frame due to dismantling of dropped sqm 2.88 750 2,160 60% 1,296
ceilingdia Pinlights - 7W Warmwhite with Clear Glass Diffuser
2.0 10cm set/s 1.00 260 260 -
- -
Wall Finishes - -
Surface Preparation for Leatherette, Wall Mirror, Side Table Accent and
1.0 sqm 7.95 550 4,373 30% 1,312
Wallpaper
6mm thk Reflected mirror with 1/4 thk plywood with 50mm frame painted
2.0 set/s 1.28 500 640 50% 320
in automotive paint finish-Wall Mirror

3.0 LED Striplight (4.8w, 9v- red) with power supply lm 4.80 500 2,400 -

4.0 LED Striplight (4.8w, 9v- red) with power supply lm 4.80 500 2,400 -

5.0 2 3/4" thk foam with leatherette with 3/4" thk plywood backing sqm 2.32 650 1,508 30% 452

Side table accent on laminated finish (merino laminate novara teak


6.0 sqm 2.40 2,400 5,760 -
10953 chalky) with 20mm frame
- -
Door and Jambs - -
PVC Door White w/ louver incl accessories, incl. 304 Hinges and S/S
1.0 set/s 1.00 350 350 30% 105
screws (Upson)
Federal Moulded Doors HDF (40mm x 800mm x 2100mm) -Pateco
2.0 set/s 2.00 350 700 20% 140
Brand
- -
Door Hardwares - -
1.0 Replacement of S.S Screw of Butterfly hinges set/s 3.00 150 450 -
- -
Wood Mouldings & Sash Works - -
1.0 White PVC Cornice at T&B lm 6.17 150 926 -
4.0 ACU Moulding set/s 1.00 700 700 20% 140
- -
Floor Finishes - -

1.0 Floor Tiles 200x1200mm, Candlewood Blanco-Non Porous 201201J sqm 7.18 270 1,939 70% 1,357

2.0 Floor Tiles 600x600MM, GCM 01, Non Skid Tiles (T&B) CL03 sqm 2.18 270 589 40% 235
- -
Painting Works - -

1.00 Doors and Jambs - Spray finished (lacquer type) set/s 2.00 1,100 2,200 40% 880

2.00 Ceilings (main) sqm 10.18 280 2,850 30% 855

Baseboard (painted on boysen 0314 trade secret) gloss automotive


3.00 lm 14.91 180 2,684 20% 537
finish
5.00 Cornice at T&B lm 6.17 180 1,111 -

Wall painting (Non-Accent and Accent Walls) including surface


6.0 sqm 29.27 220 6,440 50% 3,220
preparation
ACU Moulding (painted on boysen - 0169 fossil tan gloss automotive
8.0 set/s 1.00 350 350 70
finish) 20%
- -
Amenities - -
Refurbishing & Repainting of Bedbox (incldg addtl framing - used existing
1.0 set/s 1.00 2,500 2,500 30% 750
framing at the dismantle headboard)
Refurbishing & Repainting of Dresser Table Replacement of Laminate & Edging
2.0 set/s 1.00 2,500 2,500 20% 500
(aluminum)
800mm x 1000mm x 6mm Reflected mirror with 50mm frame painted in
3.0 set/s 1.00 1,800 1,800 -
automotive finish- Vanity Mirror
Closet Cabinet with Laminated Door with side ledge & shoe rack & Luggage
4.0 set/s 1.00 2,400 2,400 30% 720
Rack in duco paint.
Repainting and refurbishing including replacement of laminates and edging
5.0 set/s 2.00 1,800 3,600 -
aluminum of side table
- -
2.0 T&B - -
1.0 Ceiling Repainting @ T&B sqm 2.18 220 480 -
2.0 Regrouting of Main Wall Tiles sqm 8.30 150 1,245 -
3.0 Accent Wall Tiles S268D sqm 4.68 250 1,170 -

Waterproofing works,elastomeric (2 coats primer & 4 coats rubberize


4.0 sqm 3.42 750 2,565 -
membrane with sealer (3 years warranty) - campbridge manufacturer
5.0 Replacement of Shower Head, Mixer, Spout (OSM-Labor Only) sets 1.00 550 550 -
6.0 Replacement of Floor Drain(OSM-Labor Only) sets 1.00 150 150 -
7.0 Ceiling Exhaust (OSM-labor Only) pc/s 1.00 250 250 -
- -
3.0 Dismantling & Chipping Works - -
1.00 Dismantling of Existing Main Room and T&B Floor Tiles sqm 9.36 300 2,808 -
2.00 Dismantling of Existing Wall Tiles @ T&B sqm 12.98 300 3,893 -
3.00 Dismantling of Existing Door (T&B) set/s 1.00 250 250 -
4.00 Dismantling of Existing Dresser Mirror w/ Frame set/s 1.00 200 200 -
5.00 Dismantling of Existing Lighting Fixtures set/s 4.00 200 800 -
6.00 Dismantling of Existing Headboard set/s 1.00 1,000 1,000 -
7.00 Wall Mirror w/ Frame set/s 1.00 200 200 80% 160
9.00 Dismantling of Drop Ceiling sqm 1.00 1,500 1,500 -
Demolitionof wall for the new opening of new ante cabinet and relocation
8.00 set/s 1.00 1,250 1,250 100% 1,250
of SDB
8.00 Dismantling of ACU Molding set/s 1.00 150 150 100% 150
9.00 Dismantling of Grab Bar set/s 1.00 150 150 100% 150
-
Executive Room 1 72,633 20,158
13 Executive Room # 622 1 72,633 5.725969377 1.717790813 21,789.79 23% 20,158
1.0 Main Room -
Ceiling Finishes -
1.0 9mm thk gypsum board on metal frame due to dismantling of dropped sqm 2.88 750 2,160 60% 1,296
2.0 ceilingdia Pinlights - 7W Warmwhite with Clear Glass Diffuser
10cm set/s 2.00 260 520 -
- -
Wall Finishes - -
Surface Preparation for Leatherette, Wall Mirror, Side Table Accent and
1.0 sqm 6.00 550 3,300 30% 990
Wallpaper
6mm thk Reflected mirror with 1/4 thk plywood with 50mm frame painted
2.0 set/s 1.00 500 500 50% 250
in automotive paint finish-Wall Mirror

3.0 2 3/4" thk foam with leatherette with 3/4" thk plywood backing sqm 1.41 650 917 30% 275

4.0 LED Striplight (12W, 9V - red) with power supply lm 4.80 550 2,640 -

5.0 LED Striplight (12W, 9V - warmwhite) with power supply lm 4.80 550 2,640 -

6.0 Wall Mirror Repaint set/s 1.00 700 700 80% 560
- -
Door and Jambs - -
PVC Door White w/ louver incl accessories, incl. 304 Hinges and S/S
1.0 set/s 1.00 350 350 30% 105
screws (Upson)
- -
Door Hardwares - -
1.0 Replacement of S.S Screw of Butterfly hinges set/s 3.00 150 450 -
- -
Wood Mouldings & Sash Works - -
1.0 White PVC Cornice at T&B lm 6.20 150 930 -
4.0 ACU Moulding set/s 1.00 700 700 20% 140
- -
Floor Finishes - -
1.0 Regrouting of Main Wall Tiles sqm 11.30 150 1,695 -
2.0 Regrouting of Floor Tiles @ T&B sqm 2.24 150 336 -
3.0 Replacement of Existing Tiles sqm 0.96 270 259 -
- -
Painting Works - -
1.00 Doors and Jambs - Spray finished (lacquer type) set/s 2.00 1,100 2,200 40% 880
2.00 Ceilings (main) sqm 14.11 280 3,951 30% 1,185
3.00 Baseboard (0314 trade secret) gloss automotive finish lm 19.76 180 3,557 20% 711
5.00 Cornice at T&B lm 6.20 180 1,116 -
Wall painting (Non-Accent and Accent Walls) including surface
6.0 sqm 40.91 220 9,001 50% 4,501
preparation
ACU Moulding (painted on boysen - 0169 fossil tan gloss automotive
8.0 set/s 1.00 350 350 70
finish) 20%
- -
Amenities - -
Refurbishing & Repainting of Bedbox (incldg addtl framing - used existing
1.0 set/s 1.00 2,500 2,500 30% 750
framing at the dismantle headboard)
Refurbishing & Repainting of Dresser Table Replacement of Laminate & Edging
2.0 set/s 1.00 2,500 2,500 20% 500
(aluminum)
800mm x 1000mm x 6mm Reflected mirror with 50mm frame painted in
3.0 set/s 1.00 1,800 1,800 -
automotive finish- Vanity Mirror
Headboard accent on Merino laminate (Montana Wallnut) with 10mm
4.0 Groove U Channel Inlay on Black Finish;Bullnose All Edge and 2 3/4" thk foam sqm 7.38 900 6,643 80% 5,315
with leatherette (Medium Beige Color), 3/4" thk Plywood Backing
Closet Cabinet with Laminated Door with side ledge & shoe rack & Luggage
5.0 set/s 1.00 2,400 2,400 30% 720
Rack in duco paint.

6.0 Refurbishing and Repainting of Dinette Table set/s 1.00 1,800 1,800 20% 360

Repainting and refurbishing including replacement of laminates and edging


7.0 set/s 2.00 1,800 3,600 -
aluminum of side table
- -
2.0 T&B - -
1.0 Ceiling Repainting @ T&B sqm 2.24 220 493 -
2.0 Regrouting of Main Wall Tiles sqm 8.73 150 1,310 -
3.0 Accent Wall Tiles EC HIDRA sqm 4.68 270 1,264 -

Waterproofing works,elastomeric (2 coats primer & 4 coats rubberize


4.0 sqm 3.48 750 2,610 -
membrane with sealer (3 years warranty) - campbridge manufacturer

soap niche 400 mm x 200mm x 3" depth in 200 mm x 600 mm wall tile
5.0 set/s 1.00 250 250 -
(linneus gl moka)
6.0 Replacement of Shower Head, Mixer, Spout (OSM-Labor Only) sets 1.00 550 550 -
7.0 Ceiling Exhaust (OSM-labor Only) pc/s 1.00 250 250 -
- -
3.0 Dismantling & Chipping Works - -
1.00 Dismantling of Existing Main Room Floor Tiles sqm 0.96 300 288 -
2.00 Dismantling of Existing Wall Tiles @ T&B sqm 4.68 300 1,404 -
3.00 Dismantling of Existing Door (T&B) set/s 1.00 250 250 -
4.00 Dismantling of Existing Accent Wall at Dinette set/s 1.00 200 200 -
5.00 Dismantling of Existing Dresser Mirror w/ Frame set/s 1.00 200 200 -
6.00 Dismantling of Existing Headboard set/s 1.00 1,000 1,000 -
7.00 Dismantling of Drop Ceiling set/s 1.00 1,500 1,500 -
Demolitionof wall for the new opening of new ante cabinet and relocation
8.00 set/s 1.00 1,250 1,250 100% 1,250
of SDB
8.00 Dismantling of ACU Molding set/s 1.00 150 150 100% 150
9.00 Dismantling of Grab Bar set/s 1.00 150 150 100% 150
-
Regency Room 1 69,779 16,505
14 Regency 1 Room # 715 1 69,779 5.501024108 1.650307232 20,933.78 21% 16,505
1.0 Main Room -
Ceiling Finishes -
1.0 9mm thk gypsum board on metal frame due to dismantling of dropped sqm 5.76 750 4,320 60% 2,592
ceiling
2.0 10cm dia Pinlights - 7W Warmwhite with Clear Glass Diffuser set/s 2.00 260 520 -
- -
Wall Finishes - -
Surface Preparation for Leatherette, Wall Mirror, Side Table Accent and
1.0 sqm 6.00 550 3,300 30% 990
Wallpaper
6mm thk Reflected mirror with 1/4 thk plywood with 50mm frame painted
2.0 set/s 1.00 500 500 50% 250
in automotive paint finish-Wall Mirror

3.0 2 3/4" thk foam with leatherette with 3/4" thk plywood backing sqm 1.41 650 917 30% 275

4.0 LED Striplight (12W, 9V - red) with power supply lm 4.80 500 2,400 -
5.0 LED Striplight (12W, 9V - warmwhite) with power supply lm 4.80 500 2,400 -
- -
Door and Jambs - -
PVC Door White w/ louver incl accessories, incl. 304 Hinges and S/S
1.0 set/s 1.00 350 350 30% 105
screws (Upson)
Federal Moulded Doors HDF (40mm x 800mm x 2100mm) -Pateco
2.0 set/s 2.00 350 700 20% 140
Brand
- -
Door Hardwares - -
1.0 Replacement of S.S Screw of Butterfly hinges set/s 3.00 150 450 -
- -
Wood Mouldings & Sash Works - -
1.0 White PVC Cornice at T&B lm 6.23 150 935 -
4.0 ACU Moulding set/s 1.00 700 700 20% 140
- -
Floor Finishes - -
1.0 Regrouting of Main Floor Tiles sqm 11.74 150 1,761 -

2.0 Floor Tiles 600x600MM, GCM 01, Non Skid Tiles (T&B) CL03 sqm 2.21 270 597 40% 239

3.0 Replacement of Existing Floor Tiles sqm 8.00 270 2,160 -


- -
Painting Works - -
1.00 Doors and Jambs - Spray finished (lacquer type) set/s 2.00 1,100 2,200 40% 880

2.00 Ceilings (main) sqm 11.74 280 3,287 30% 986

3.00 Baseboard (0314 trade secret) gloss automotive finish lm 17.87 180 3,217 20% 643

5.00 Cornice at T&B lm 6.23 180 1,121 -

Wall painting (Non-Accent and Accent Walls) including surface


6.0 sqm - 220 50% -
preparation
ACU Moulding (painted on boysen - 0169 fossil tan gloss automotive
8.0 set/s 1.00 350 350 70
finish) 20%
- -
Amenities - -

Refurbishing & Repainting of Bedbox (incldg addtl framing - used existing


1.0 set/s 1.00 2,500 2,500 30% 750
framing at the dismantle headboard)

Refurbishing & Repainting of Dresser Table Replacement of Laminate & Edging


2.0 set/s 1.00 2,500 2,500 20% 500
(aluminum)

800mm x 1000mm x 6mm Reflected mirror with 50mm frame painted in


3.0 set/s 1.00 1,800 1,800 -
automotive finish- Vanity Mirror
Headboard accent on Merino laminate (Montana Wallnut) with 10mm
4.0 Groove U Channel Inlay on Black Finish;Bullnose All Edge and 2 3/4" thk foam sqm 7.38 900 6,643 80% 5,315
with leatherette (Medium Beige Color), 3/4" thk Plywood Backing
Closet Cabinet with Laminated Door with side ledge & shoe rack & Luggage
5.0 set/s 1.00 2,400 2,400 30% 720
Rack in duco paint.

6.0 Refurbishing and Repainting of Dinette Table set/s 1.00 1,800 1,800 20% 360

Repainting and refurbishing including replacement of laminates and edging


7.0 set/s 2.00 1,800 3,600 -
aluminum of side table
- -
2.0 T&B - -

1.0 Ceiling Repainting @ T&B sqm 2.22 220 488 -

2.0 Regrouting of Main Wall Tiles sqm 14.98 150 2,247 -

3.0 Accent Wall Tiles EC HIDRA sqm 4.68 270 1,264 -

400mm x 800mm x 6mm Reflected Mirror with 2" frosted glass both
4.0 set/s 1.00 250 250 -
sides (OSM-Labor Only)
5.0 Lavatory Faucet (OSM-Labor Only) sets 1.00 550 550 -

6.0 Replacement of Shower Head, Mixer, Spout (OSM-Labor Only) sets 1.00 550 550 -

7.0 Replacement of Floor Drain(OSM-Labor Only) sets 1.00 150 150 -

8.0 pc/s 1.00 252 252 -


Ceiling Exhaust (OSM-labor Only)
- -
3.0 Dismantling & Chipping Works -
1.00 Dismantling of Existing Main Room and T&B Floor Tiles sqm 10.21 300 3,063 -
2.00 Dismantling of Existing Wall Tiles @ T&B sqm 4.68 350 1,638 -
3.00 Dismantling of Existing Door (T&B) set/s 1.00 250 250 -
4.00 Dismantling of Existing Accent Wall at Dinette set/s 1.00 250 250 -
5.00 Dismantling of Existing Dresser Mirror w/ Frame set/s 1.00 250 250 -
6.00 Dismantling of Existing Headboard set/s 1.00 1,000 1,000 -
7.00 Dismantling of Drop Ceiling set/s 1.00 1,500 1,500 -
8.00 Dismantling of Cabinet set/s 1.00 1,250 1,250 100% 1,250
9.00 Dismantling of Existing Door ( Main Room) set/s 1.00 1,100 1,100 -
8.00 Dismantling of ACU Molding set/s 1.00 150 150 100% 150
9.00 Dismantling of Grab Bar set/s 1.00 150 150 100% 150
-
C. Trade Works/Others 56,000 4.414741489 1.324422447 16,800.00 30% 10,500

1.00 Plumbing Works - Additional Piping due to Installation of Shower Mixer rms 14.00 2,500.00 35,000.00 30% 10,500

2.00 Dismantling & Tracing rms 14.00 1,500.00 21,000.00 -


-
-
Total Direct Cost 1,268,477 100 31.28 394,242.79 328,965
Prepared By:

Reginald C. Padilla
ANMAGAUX construction services
09562341719/[email protected]